1) Hadi Hammam
Stage Date Crew Note
1 03/26/2017 -1 Supervisor Day Only
04/06/2017 -4 pipe fitter
3 -2 Supervisors. Day
-25 pipe Fitters.
-1 Forklift Operator.
04/10/2017
05/08/2017 - 2 Supervisors. Night
- 20 Pipe fitter.
- 1 Fork lift operator.
Other Contractors:
2) Insulation (BinZagr)
Mobilization date (Mar.26.2017)
E-305:
1st Removal (Apr.17.2017)
2nd Installion (Apr.29.2017)
3rd Removal (Mar.02.2017)
4th installion (Mar.04.2017)
Others:
Removal:
E-302 (Apr.17.2017)
Installion:
E-302 (Apr.17.2017)