Anda di halaman 1dari 2

EXECUTIVE SUMMARY

Introduction

Hindustan Petroleum Corporation Limited (HPCL) operates a 243 Km long 18 dia. Cross
country multi-product pipeline from Guru Gobind Singh Refinery (GGSR) Dispatch terminal
(Ramanmandi) in Bhatinda (Punjab) to product receiving facilities at Bahadurgarh (Haryana) for
transporting POL products such as Motor Spirit (EURO-III, EURO-IV), HSD (EUROIII, EURO-
IV), two grades of Superior Kerosene Oil (SKO), Aviation turbine fuel (ATF) and Naptha. The
current capacity of the pipeline is 4.71 MMTPA. The pipeline capacity is planned to be enhanced
up to 7.11 MMTPA.

It is intended to transport LPG through the RamanmandiBahadurgarh multi product Pipeline to


cater the LPG demand at the Bahadurgarh and its adjoining areas. The study to consider batching
of LPG with HSD and ) MS and include facilities required for HSDLPG & MSLPG interface
separation at Bahadurgarh receiving terminal to meet product quality specifications. The
RamanmandiBahadurgarh cross country Pipeline (RBPL) was commissioned during November
2012 for the evacuation of POL products i.e., MS, HSD, SKO, ATF etc. from HMEL Refinery to
Bahadurgarh terminal. The pipeline passes through 8 districts and 85 villages of Punjab and
Haryana states.

Presently, LPG is being transported from HMEL refinery to Bahadurgarh and other LPG plants
in North India by LPG Tank Trucks and rail wagons. The utilization of RBPL for transporting
LPG along with POL products in RBPL will bring down the dependency of transporting LPG
through road trucks and rail wagons and will be environment friendly and economic.

Project Facilities & system configuration:

The proposed project facilities are as follows:


1. New Pumping station at Ramanmandi suitable for handling POL and LPG products both. No
extra land acquisition is required for pumping station.

2. 1 no. of Intermediate Pumping Station at SV-4 (Near Barwala) with 2 +1 (Working+ Standby)
mainline pumps along with associated facilities.

3. 8 nos. of Sectionalization Valve (SV) stations along with associated facilities. No. of SV
stations are tentative and may reduce based on detailed engineering studies.

4. Augmentation of receipt facilities at Bahadurgarh for LPG receipt and installation of


Interface batch separation facilities for LPG-MS and LPG-HSD along with associated facilities
at Bahadurgarh and pipeline jobs for compliance of relevant OISD codes/ standards.

Nature of the Project

The proposed project envisages transportation of LPG along with MS, HSD, SKO, ATF etc.
from Ramanmandi station to Bahadurgarh terminal. The transportation of LPG will be done in
already exists pipeline with 243 km long having 18" dia pipeline. The pipeline is already laid and
there are no rehabilitation and resettlement (R&R) issues.

Land form, Land Use and Land Ownership

The land use at station/terminal is flat and land use of pipeline is varying from flat terrain and
there are some undulations. The pipeline crosses river and number of canals/nallas, agricultural
land etc. The agricultural land is already restored to original and return back to farmer for
agricultural purpose. No additional land will be required for laying of pipeline.

Mainline Route

The pipeline originates at Ramanmandi station and utilizes existing Ramanmandi-Bahadurgarh


pipeline and same transferred up to Bahadurgarh terminal.

There are no national parks/sanctuaries/coral reefs/ecologically sensitive areas fall within 10 km


radius of the Ramanmandi-Bahadurgarh Pipeline.

Project Schedule & Cost Estimates

Total cost of the project is estimated as Rs. 400 Crores (approx.)


Project schedule is 24 months after statutory clearance.