Anda di halaman 1dari 3

Fern Cecile Van Milligan

Louisville, CO 80027
720-708-5515-landline
720-341-0984 - cell
Professional Experience:
Senior Technical Project Manager:
CenturyLink: Program/Project/Application PM including the Application PM level and at the PM level for 12
years.
My Responsibilities:

Responsible for software project management in IT in various roles from Application Project Manager,
Senior Technical Project Manager and on occasion, Program Manager in Telecommunications.
Use SDLC (Waterfall) or Scrum/Agile and Extreme Programming Methodologies.
Understand the technical scope of work, design packages to grasp the architecture, topology, and
technology involved in the project.
Understand and identify up front, with the aid of the project team, dependencies and interactions that
must be managed for successful on-time completion.
Work with project teams to develop alternative solutions when necessary, identify early on when
expedited activity is required and drive true escalations to keep projects on plan.
Responsible for Financial Analysis. Responsible for managing as well as tracking budgets down to the
individual and hour as necessary per application to make sure costs are reported correctly for each
application.
Responsible for delivering projects on time and within budget and with quality.
Host global team meetings with software development managers, developers, testers, software
architects, and system engineers at least weekly to manage risks, gather status, drive coding, testing, and
defect fixes to meet deadlines.
Responsible for individual applications as well as integration of those applications code and testing.
Meetings: Program Managers weekly, meet with my supervisor bi-weekly.
Budget report done weekly or bi-weekly, depending on the project.
Maintain q-share sites where data about the project can be viewed 24 X7.
Responsible for verifying and correcting information in SAP at the Project Manager level.
Very active with Change Control Management as driving the changes and defects being worked.
Negotiation of Project with third party vendors is done through our Contracts office and they supplied
the experts who helped walk us through the process. Making sure that both the third-party contractor
and our company were clear with each other on the technical aspects of the software code to be
delivered.
Keep Microsoft Project up to date regarding the schedule, percent of each task completed, created risks
and assigned them to the appropriate personnel with deadlines and continually managed and reported
upwards on those risks.
Participate in deployments, host bridges for the applications or the project and report status upwards.
Participate in the post deployment checkout where the Business gives its approval or made specific
requests.
Serve as Team Leader for my applications.
Create and maintain technical documentation such as Project Plans, Defect Lists, and Lessons Learned.
Take responsibility to make project teams successful and accountable.
Build relationships to foster team success.
1
Openly recognize team members for their contributions to go above and beyond to meet difficult
objectives. Strong oral and written communication skills.
Major CenturyLink Projects deployed for various applications:

CR4184 IPV6 Infrastructure Upgrade-Feb 2015


CR4184 IPV6 Infrastructure Upgrade-May 2015
CR5534 Adtran 4.5 Broadcom based DSLAM-Aug
CR4184 IPV6 Infrastructure Upgrade-November
2015
CR5534 Adtran 4.5 Broadcom based DSLAM-Aug
CR5534 Adtran 4.5 Broadcom based DSLAM-Nov
PG1-CR5971 ROM - Initiation
PG1-CR6011 - ROM Initiation
Adtran TASK EoCu with Repeaters for Metro
Ethernet
CR3453 AIN CVAS Upgrade
CR3522 CVOIP over IMS Ph2-LQ
CR3510 Digital Dialog Release 3.5
CR4591 Integrate Autopayroll W/IEXR4
CR3510 Digital Dialog Rel 3.5
CR4599-Ethernet over DSL
App Con into SWOES Retire OPUSCONS1-2
CR3308 Phase 4-Migrate ROMS to DOCS
CR3510 Digital Dialog Rel 4
CR3522 Consumer VOIP over IMS Ph3
CR4049 SSP-R20 May 2014
CR4114, Phase 2
PG1-CR4665-CALIX E3 12 Combo&E7-2 VDSL2-
48 Combo Operation
IE9-BCP-AUGUST-2014
CR3313 - FTTN for Core Connect - Aug 2014
CR4066 2014 Contract charges for Union Labor
Agreement
CR4184 IPV6 Infrastructure Upgrade-Aug-2014
CR4318-IVR Migration - Phase 3-May
CR5534 Adtran 4.5 Gen Broadcom based DSLAM-
Aug
Supplying ROM for PG1-CR5534 Adtran 4.5 Gen
Broadcom based DSLAM 2014
Retire Magic MBQCC
CR3522 Consumer VOIP over IMS Ph1 CRIS
CR3308 Phase 4 - Migrate ROMS to DOCS
CR4184 IPv6 Infrastructure Upgrade-Feb 2014
CR3522 Consumer VOIP over IMS Ph2
CR3313 - FTTN for Core Connect - May 2014
CR4817 Sales Order Valuation May 2014

2
CR3372 - POS Customer Information
CR4037 Shared Access via DSL, Metro Ethernet
CR2968-IMA 34-CMP Enhancements-LQ
CR2969-IMA 34-UR30230-LSOG-Multiple Form
Ph 2
CR3086 - MTG - April 2013
CR3086-MTG Patch Feb 2013
CR3510 Digital Dialog Rel 1
CR3532 Prism Over GPON Rel 2
LNP-DW EOSL project PDR 10337
LOSDB Rehost Project
RX Database EOSL project (DEV06124176, PDR
10503)
WINDOWS 7 - BILLING - APRIL 2013
251 CMP IMA 27.0 (Mandate)
Bordertown BTN & Billing Record Distribution (Mandate) , Border Town Main Release
CPE Systems, R1.5, CPE SC, CPE Systems Consolidation
GSA Networx MTB Q1, Q4, GSA Networx R9, R10
Networx R3.5, R4, R5, R5.5
SDP, SDP Platform Enhancements, Q1 SDP Platform Enhancements Q4
SDP Wholesale Direct Ordering
Simple Port Interval Reduction Phase 1, Phase 2
VOIP
Project Management Tools: ALM, Borland Caliber 11.3, Clarity, Microsoft Office Communicator 2007 R2,
Internet Office Explorer, Microsoft Office Excel, Microsoft Office Live Meeting, Microsoft Office Project,
Microsoft Office Power Point, Microsoft Office Word, SAP, CA Technologies, Rally, Clarity. Remedy,
Dimensions.
Training:
Completed 4 day Project Management Professional (PMP) Boot Camp on 12/30/2016. Currently studying for
PMP exam.
Certified Scrum Master Scrum Alliance
Education:
M.S. Telecommunications, University of Colorado, 1997
Thesis: Wireless 911: is Bundling of Services the Answer? This was one of the first theses in the world on the
subject as Wireless 911 was being researched in Boulder, CO.
Recipient of Study Abroad Scholarship for 1 Year as an exchange student at the University of Uppsala,
Uppsala, Sweden majoring in studying computer science and communications in 1994-1995.
Nominee: Fulbright Scholarship.
B.S. Social Work, the University of Iowa.
Foreign Language: Studied French 6 years.
Member:
Project Management Institute
P.E.O Sorority A womens philanthropic and educational organization.
3

Anda mungkin juga menyukai