SITEPROGRESSREPORTNO.106
WEEK 180
WEEK180
10th APRIL2017
1.0EXECUTIVESUMMARYREPORT.
1.1ProgressSummary(BasedonRDWPRev.9)
1.3ProgressSummary
1.1ProgressSummary(BasedonRDWPRev.9) OriginalContract
Note:
BasedonRevisedDetailedWorkProgrammeRev.9approved on4February2017
EOTNo. 3havebeenissuedforbalancetunnelloop(Section8)on27December2016
ACONEX:WCTTRXLETTER000731
1.1ProgressSummary(BasedonRDWPRev.8C) AdditionalContract
SCURVEOFACTUALVSPLAN
0.60% 101.00%
0.50% 100.00%
0.40% 99.00%
0.30% 98.00%
0.20% 97.00%
0.10% 96.00%
0.00% 95.00%
16Jan17 23Jan17 30Jan17 6Feb17 13Feb17 20Feb17 27Feb17 6Mar17 13Mar17 20Mar17 27Mar17 3Apr17 10Apr17
Week WK173 WK174 WK175 WK176 WK177 WK178 WK179 WK180 WK181 WK182 WK183 WK184 WK185
Date 16Jan17 23Jan17 30Jan17 6Feb17 13Feb17 20Feb17 27Feb17 6Mar17 13Mar17 20Mar17 27Mar17 3Apr17 10Apr17
Plan 0.50% 0.50% 0.49% 0.50% 0.50% 0.27% 0.19% 0.11% 0.09% 0.08% 0.09% 0.08% 0.03%
Cumm.Schedule 97.07% 97.57% 98.06% 98.56% 99.06% 99.33% 99.52% 99.63% 99.72% 99.80% 99.89% 99.97% 100.00%
Actual 0.50% 0.50% 0.49% 0.50% 0.19% 0.14% 0.02% 0.02% 0.03% 0.00% 0.04% 0.00% 0.00%
Cumm.Actual 97.07% 97.57% 98.06% 98.56% 98.75% 98.89% 98.91% 98.93% 98.96% 98.96% 99.00% 99.00% 99.00%
Variance 0.00% 0.00% 0.00% 0.00% 0.31% 0.44% 0.61% 0.70% 0.76% 0.84% 0.89% 0.97% 1.00%
Note:
BasedonRevisedDetailedWorkProgrammeRev.9
1.3ProgressSummary
2.0HEALTH,SAFETY,SECURITY&ENVIRONMENT(HSSE)ANDQA/QC
SUMMARY REPORT
SUMMARYREPORT.
2.2WithoutLostTimeIncidentSummaryReport
2.4NotificationonDailyWalkabout
2.5StatusofRequestForInformation(RFI)
2.1Accident,DangerousOccurrence,OccupationalDiseaseandOccupational
1 Fatality 0
2 Major 1 DistressingtendonforGroundAnchoratJalan Utara
3 Minor 0
4 FirstAid 6 Minor cutonfinger(24/12/2013).
Minor cutonfinger(02/08/2014).
Minor cutonfinger(14/08/2014).
Minor cutonfinger(09/09/2014).
cut on finger (09/09/2014)
Minor cutonfinger(30/03/2015).
Minorinjuryonshin(29/04/2015)
5 Others 1 ( )
Vandalism(cutoncanvas).
6 Property 4 HoardingatGate1 HitbyMRTtrailer.
Damage CanvasTornatGate1 HitbyMRTconcretemixer.
Hoarding atGate1 HitbyMRTconcreteLorry
H di t G t 1 HitByMRTLorry
HoardingatGate1 Hit B MRT L
N
No. It
Items FFromStartofProject
St t f P j t
ToReportDate
1 CumulativeNumbersofEmployee 170,350
2 Numbersofmanhours 1,703,500
2.3NonConformanceRecord(NCR)SummaryReport
NCRStatus
C S
Issue Closed Remaining Remarks
QA/QC 88 83 5
SafetyViolation 11 11 0
Environmental 1 1 0
2.3NonConformanceRecord(NCR)SummaryReport
TRXNewProjectSite
78 13Nov15 FloortilesCrackatpantry,staircase&infrontofmeeting. 31Mar17 Pending
Office 1stFlooroffice
Office 1st Floor office
TRXNewProjectSite
82 25Nov15 1stFloor Floortilescrackinbetweenplywoodjoint 31Mar17 Pending
Office 1stFlooroffice
1st Floor.FloortilesrepairingworkdoneonSaturday27August.NCRobserved
TRXNewProjectSite asfollows.
f ll A)Theresinstillwetafterinstallationover24hours.B)Theresinis
) h ll f ll h ) h Pending
85 29Aug16 31Mar17
Office 1stFlooroffice seepingthroughthejoinsC)Tilesareformdifferentcolour andsizefrom
existing.D)Tileslaidwithmanysmallpiecesjointtogether.
Request forInformation(RFI)
Issue Closed Remaining Remark
143 143 0
3.0TIMEANDCOSTNOTIFICATION
3 1 Notification Summary
3.1NotificationSummary
3.1NotificationSummary
Item Description Notification LetterRef Date EDPsResponse Date Remarks
Submission Response
SECTION1toSECTION4
1. VentilationShaftSection1 1st Notification WCTW381TRXB15 18Aug15 (404) in16 20Aug15
QSGEN125 1116/L15
2nd Notification
N tifi ti WCTW381 TRXB 15
WCTW381TRXB15 21 J l 15
21Jul15 (369) in16
i 16 23 J l 15
23Jul15
QSGEN115 1116/L15 EOTNo.1
Submitted
2. WallOpeningofSection3 1st Notification WCTW381TRXB15 28Aug15 (426) in16 04Sep15 on29th
and Section 4
andSection4. G CORR EDP 560
GCORREDP560 1116/L 15
1116/L15 January
January
2016
2nd Notification WCTW381TRXB15 20Oct15 (477) in16 21Oct15
QSGEN143 1116/L15
3. Newrequirementofblasting 1st Notification WCTW381TRXB15 02Sep15 (421) in16 04Sep15
priortocastingbasement
b QSGEN133 1116/L15
slab
SECTION5 (B10.17CT)
1. AdditionalTestPileatSection 1st Notification WCTW381TRXB15 31Jul15 EDPGCOR 14Jul15
5(PlotB10.17CT)
5 (Pl t B10 17 CT) QSGEN119 001370
2. LateConfirmationofSoldier 1st Notification WCTW381TRXB15 27Aug15 (425) in16 04Sep15
PileWall atPlotB10.17 QSGEN129 1116/L15
EOTNo.2
Submitted
2nd Notification WCTW381TRXB15 20Oct15 (478) in16 21Oct15 on15th
QSGEN144 1116/L15 march2016
3. ElectricalCableatPlot 1st Notification WCTW381TRXB15 27Aug15 (440) in16 18Sep15
B10 17 CT
B10.17 G CORR EDP 588
GCORREDP588 1116/L 15
1116/L15
2nd Notification WCTW381TRXB15 20Oct15 (479) in16 21Oct15
QSGEN145 1116/L15
3.1NotificationSummary
Item Description Notification LetterRef Date EDPsResponse Date Remarks
Submission Response
p
SECTION5 (B10.17CT)
4. Instruction ofCAINo.31 (442) in16 22Sep15
WCTW381TRXB15
(RoadDiversion&Backfilling) 1st Notification 17Sep15 1116/L15
GCORREDP138
Plot B10.17CT
PlotB10.17 CT
5. WaterSeepageatB10.17 CT 1st Notification WCTW381TRXB15 24Nov15 (569) in16 26Nov15
QSGEN151 1116/L15
2nd Notification WCTW381TRXB15 31Dec15 (634) in16 6Jan16
QSGEN160
QS GEN 160 1116/L16
1116/L 16
EOTNo.2
6. SmallBlasting WCTW381TRXB15 (573) in16 27Nov15 Submittedon
1st Notification 25Nov15
GQS153 1116/L15 15th March
2016
WCTW381TRXB15 (633) in16 6Jan16
2nd Notification
GQS159 31Dec15 1116/ 16
1116/L16
SECTION 6(PLOTC7.7CT)
1. OnHoldInstructionSection6 1st Notification WCTW381TRXB15 28Jul15 (377) in16 30Jul15
(PlotC7.7CT) GQS117 1116/L15
Notimeclaim
(work
2nd Notification WCTW381 TRXB 15
WCTW381TRXB15 08Sep15
08 Sep 15 (438) in16
in 16 10Sep15
10 Sep 15 completed
QSGEN127 1116/L15 ahead
2. ChangeofLevelandAreaof Schedule)
1st Notification WCTW381TRXB15 25Aug15 (408) in16 04Sep15
PlotC7.7CT QSGEN128 1116/L15
3.1NotificationSummary
Item Description Notification LetterRef Date EDPsResponse Date Remarks
Submission Response
SECTION 7(PLOTC7.8CT)
1. ScopeofWorksatSection7 1st Notification WCTW381TRXB15 21Jul15 (455) in16 22Jul15
(PlotC7.8CT) GCORREDP507 1116/L15
Scopeof
2nd Notification WCTW381TRXB15 01Sep15 (422) in16 04Sep15 works
QSGEN131 1116/L15 omitted
3rd Notification WCTW381TRXB15 07Oct15 (461) in16 08Oct15
QS GEN 139
QSGEN139 1116/L 15
1116/L15
4th Notification WCTW381TRXB15 07Nov15 EDPLETTER 21Jan16 OmittedviaCAI
No.46on13th
QSGEN149 000333 January2016.
SECTION 8(BALANCENORTHERNTUNNELLOOP)
8 (BALANCE NORTHERN TUNNEL LOOP)
1. SecantPilesatSection8 1st Notification WCTW381TRXB15 21Jul15 EDPGCOR 10Jul15
(Jalan Utara) GCORREDP508 001828
2nd Notification
N tifi ti WCTW381TRXB15
WCTW381 TRXB 15 01 S 15
01Sep15 (423) in16
i 16 04 S 15
04Sep15
QSGEN132 1116/L15
3rd Notification WCTW381TRXB15 06Oct15 (460) in16 08Oct15
QSGEN140 1116/L15
4th Notification WCTW381TRXB15 03Dec15 (596) in16 15Dec15
QSGEN156 1116/L15
3.1NotificationSummary
Item Description Notification LetterRef Date EDPsResponse DateResponse Remarks
Submission
SECTION 8(BALANCENORTHERNTUNNELLOOP)
2. SecantPilesatSection8 4th Notification WCTW381TRXB15 03Dec15 (596) in16 15Dec15
(Jalan Utara) QSGEN156 1116/L15
3. EncumbranceofSection8 1st Notification WCTW381TRXB15 07Dec15 (424) in16 04Sep15
(Jalan Utara) QSEDP572 1116/L15
2nd Notification WCTW381TRXB15 20Oct15 (481) in16 21Oct15
QSGEN147 1116/L15
3rd Notification WCTW381TRXB15 03Nov15 (597) in16 15Dec15
QSGEN157 1116/L15