Anda di halaman 1dari 4

PROJECT NAME : DCU

TEST REPORT FOR MOTOR PROTECTION RELAY DATE 30.09.15


1. Relay Details :

Make : ABB Panel tag no : PCC-1


Model : REM615 Feeder description: MOTOR PROTECTION
Sl. No : 1VYV91133735 Feeder no : 1R-D
CT Ratio : 300/1
VT Ratio : 415/110V

2. Secondary injection test: (Using Equipment Details)

Make: Kingsine Relay Test Kit.

Measurements:

Injected Measured Injected Measured


Phase
Voltage(V) voltage(KV) current(A) current(A)
RY 110.0 0.415 1.0 299.5
YB 110.0 0.415 1.0 299.7
BR 110.0 0.415 1.0 299.6

3. Non-Directional Over current & Earth Fault:


Over Current ( PHLPTOC1): Curve selection Normal Inverse
Operated Time(sec)
Set
Pickup 2*IS 5*IS
Phases current(Is) TMS
Current(A)
(A)
Nominal Actual Nominal Actual
R 1.0 1.0 1.0 10.029 10.072 4.28 4.298
Y 1.0 1.0 1.0 10.029 10.074 4.28 4.294
B 1.0 1.0 1.0 10.029 10.071 4.28 4.298

ii. Instantaneous Over Current (PHIPTOC1):


Injected
Phase Set Current (A) Set time (sec) Operating Time (Sec)
Current(A)
R 4.0 0.020 5.0 0.025
Y 4.0 0.020 5.0 0.023
B 4.0 0.020 5.0 0.023

ENGINEERS INDIA LIMITED. JACOBS. CPCL.


Signature
Name Mr.ARULKUMAR Mr.UMAMAHESHWARAN Mr.SUDHEER

Date
Tested By Witness By Witness By Witness By
PROJECT NAME : DCU
TEST REPORT FOR MOTOR PROTECTION RELAY DATE 30.09.15

iii. Earthfault (EFHPTOC1): Curve selectionNormal Inverse


Operated Time(sec)
Set
Pickup 2*IS 5*IS
Phases current(Is) TMS
Current(A)
(A)
Nominal Actual Nominal Actual

N 0.2 1 0.201 10.029 10.082 4.28 4.297

iv. Earth Fault (DEFLPDEF1):


Injected
Phases Set current(A) Set time (sec) Operated time (sec)
Current(A)
N 0.1 0.1 0.2 0.111

4. Negative Phase Sequence


(a) Negative Phase Sequence (MNSPTOC1:1)
Injected
Phase Set Current (A) Set time (sec) Operating Time (Sec)
Current(A)
R 0.2 2.0 0.6 2.019
Y 0.2 2.0 0.6 2.019
B 0.2 2.0 0.6 2.020

(b) Negative Phase Sequence (MNSPTOC2:2) curve -A


Injected
Phase Set Current (A) Set k Operating Time (Sec)
Current(A)
R 0.3 5 3.0 5.025
Y 0.3 5 3.0 5.023
B 0.3 5 3.0 5.023

5. Phase reverse (PREVPTOC1):


Injected Operating Time
Phase Set Current (A) Set time (sec)
Current(A) (Sec)
R 0.55 0
Y 0.5 0.100 0.55 120 0.118
B 0.55 240

ENGINEERS INDIA LIMITED. JACOBS. CPCL.


Signature
Name Mr.ARULKUMAR Mr.UMAMAHESHWARAN Mr.SUDHEER

Date
Tested By Witness By Witness By Witness By
PROJECT NAME : DCU
TEST REPORT FOR MOTOR PROTECTION RELAY DATE 30.09.15
6. Motor Startup supervision (STTPMSU1):
Injected
Phase Set Current (A) Set time (sec) Operating Time (Sec)
Current(A)
R
Y 2.0 5.0 2.0 5.011
B

7. Motor Load Jam (JAMPTOC1):


Injected
Phase Set Current (A) Set time (sec) Operating Time (Sec)
Current(A)
R 2.6 0
Y 2.5 2.0 2.6 240 2.011
B 2.6 120

8. Thermal Overload (MPTTR1):


Injected
Phase Set Current (A) Operating Time (Sec)
Current(A)
RYB 1.0 4.0 22.92

9. Under Voltage (PHPTUV1)


Injected
Phase Set voltage (v) Set time (sec) Operating Time (Sec)
voltage(v)
RY 77.0 2.0 76.0 2.021
YB 77.0 2.0 76.0 2.016
BR 77.0 2.0 76.0 2.022

10. Under Current (LOFLPTUC1)


Injected
Phase Set Current (A) Set time (sec) Operating Time (Sec)
Current(A)
R 0.4 0
Y <0.5 2.0 0.4 240 2.006
B 0.4 120

11. Functional checks: (Whether Operational Checks OK / Not OK / Not Available)

ENGINEERS INDIA LIMITED. JACOBS. CPCL.


Signature
Name Mr.ARULKUMAR Mr.UMAMAHESHWARAN Mr.SUDHEER

Date
Tested By Witness By Witness By Witness By
PROJECT NAME : DCU
TEST REPORT FOR MOTOR PROTECTION RELAY DATE 30.09.15

1 Correct operation of output relays OK


2 Performance test OK
3 LED checked OK

12. Remarks : Relay found healthy


.
.

ENGINEERS INDIA LIMITED. JACOBS. CPCL.


Signature
Name Mr.ARULKUMAR Mr.UMAMAHESHWARAN Mr.SUDHEER

Date
Tested By Witness By Witness By Witness By