Assistant Engineer, Geotechnical

Hamza Nadeem is an Assistant Engineer specializing in Geotechnical


Engineering. He graduated from the University of Hong Kong in 2013
with a Bachelors Degree in Civil Engineering. His educational
background includes multi-disciplinary topics with a focus on
geotechnical engineering, project management and sustainability. The
projects undertaken include large scale infrastructure developments in
Hong Kong and Macau.

Hamza has received numerous awards for academic excellence


throughout his academic career from various national and international
organizations.

His core skills lie in the analysis and design of geotechnical elements,
construction supervision and contract administration with a focus on
reclamation works, ground improvement and remediation works and
temporary works.

Professional History

Benaim an AECOM Company, HK


2016 to date
Assistant Engineer, Geotechnical

AECOM, HK
2015 2016
Assistant Resident Engineer

Benaim, HK
2013-2015
Graduate Engineer

Academic Training
Qualifications
B.Sc.(Eng), University of Hong Kong, 2013 (Recipient of the HKU Foundation Scholarship and the HKU
International Students Scholarship)

M.Sc.(Eng), University of Hong Kong, 2014-Present, majoring in Geotechnical Engineering (Recipient of the AGS
Geotechnical Scholarship)
Affiliations
Member
Graduate Member, Institution of Civil Engineers, 2013

Key Experience

Page 1 of 2
CV JAN17
Curriculum Vitae
Hamza Nadeem
Assistant Engineer, Geotechnical

Deep Cement Mixing Works


Non-Dredged Reclamation Works
Temporary Excavations
Problematic Soils
Ground Improvement
Stone Columns
Prefabricated Vertical Drains
Jack Box Tunnelling
Deep Excavations
Ground Investigation & Soil Testing
Foundation Engineering
Numerical Modelling
Construction Management
Design Coordination
Contract Administration
Site Supervision

Detailed Experience

Hong Kong International Airport, Hong Kong Airport Authority Three Runway System Project
Main Reclamation Works Contract 3206

Hong Kong International Airport, Hong Kong Airport Authority Three Runway System Project
Deep Cement Mixing Works for Contract 3201

Hong Kong International Airport, Hong Kong Airport Authority Three Runway System Project
Deep Cement Mixing Works for Contract 3201,2,3,4 and Optional Works (Tender Stage)

Tender Design for KVMRT Line 2

Hong Kong-Zhuhai-Macao Bridge Link Project, Hong Kong Boundary Crossing Facilities Contract
HY/2013/01
Assistant Resident Engineer responsible for contract administration and construction supervision for the
construction of the foundation works for the Passenger Clearance Building (PCB) associated with the Hong Kong
Border Crossing facilities. Key issues included less than anticipated improvements in the soft soils and
implementation of the observational method for the PCB basement excavation requiring close coordination with the
contractor to ensure that the temporary works do not have any adverse effects on the as-built bored piles.

Hong Kong-Zhuhai-Macao Bridge Link Project, Hong Kong Boundary Crossing Facilities
Engineer for detailed design to construction of the Reclamation Works, Seawall and Remedial Works at Portions A,
B, and C2a. Worked in close collaboration with the Main Contractor to solve complex technical problems.
Key issues included assessment of ground conditions and ground properties, review of field performance following
construction, back analysis and prescription of remedial measures.

Wynn Resorts Cotai Ground Investigation & Enabling Works Design Services, Macau
Engineering Designer for the design of foundations, basement and associated excavation & lateral support of a
proposed prestigious international 5-star fully integrated hotel resort and casino.
Key issues included the design of temporary works in soft ground conditions.

Page 2 of 2
CV JAN17
Curriculum Vitae
Hamza Nadeem
Assistant Engineer, Geotechnical

MTR XRL C823B Shek Kong Stabling Sidings and Emergency Rescue Sidings
Prescription of alternate design and construction sequence for D-wall panels located in the immediate vicinity
below a 1400mm diameter water main that traverses the cut and cover tunnel. Alternative solutions included
preloading temporary struts and the provision of additional mass concrete infill (MCI) during the backfilling process.
Key issues included reducing any on-going ground settlement behind the D-wall that would consequently affect the
1400mm dia. water main and review evaluation of the structural integrity of the pipeline.

Scenic Hill Jacked Box Tunnel


Responsible for assessment of the geological and geotechnical conditions of the project area and detailed design
of the temporary works to facilitate the box jacking works under the operational Airport Express Line Railway. Key
issues included the stability of the temporary works in the presence of soft soil deposits.

Macau LRT Phase I Redesign of Stations 9,11,12 Viaduct & Tunnels (C230R)
Provided geotechnical support to carry out review of geotechnical desk studies and local geotechnical information
to determine the geological and geotechnical conditions and their impact on the ELS design. Carried out detailed
design of diaphragm walls and lateral support system at Portion Stations 9, 11 and 12 based on envisaged
construction sequence, ground conditions, site geometry, and the permanent works geometry.

Hong Kong Jockey Club Conghua Training Centre, Guangzhou


Carried out a detailed engineering check for the surface drainage design (U-Channels and Step Channels) for
slope features at the Hong Kong Jockey Club Training Centre and ascertain the provided channel size, gradient
and number of required channels.

MTR Contract 810B Express Rail Link West Kowloon Terminus (South)
Engineer for and design of rock stabilization works for the exposed rock face during excavation in the south east
corner of the site based on kinematic analysis using Televiewer data and rock face mapping and prescription of
pattern bolting requirements based on potential kinematic failures and pull out tests to ascertain the performance of
additional support.