Reduction Roadmap
=
The Six Sigma
Methodology
What causes the Noise & the Variation in the Noise Level ????
Opportunity
Identification
Define
Measure Continuously
Process repeat and
Characterization improve!
Analyze No complacency
with success!
Improve
Process
A IC
Optimization
D M
Control
Tools:
DOE, Factorial
Designs
These tools are utilized to characterize the process, that is, to understand
the behavior of process outputs (Y) given specific values of inputs (X).
This type of study investigates the process in its natural operating state
(no artificially induced variation, such as with Design of Experiments).
Scatterplot of Ice Cream Sales vs Weekly Temperature Scatterplot of Ice Cream Sales vs Weekly Rainfall
16000 16000
14000 14000
12000 12000
10000 10000
8000 8000
6000 6000
4000 4000
2000 2000
0 0
30 40 50 60 70 80 90 100 0.0035 0.0040 0.0045 0.0050 0.0055 0.0060 0.0065
Weekly Temperature Weekly Rainfall
Multivariate Analysis
Taking the total process variation apart into its components is essential to
understanding and prioritizing the elimination of significant sources and
controlling those that remain.
Machine A Machine B
11.4329 8.1385 N Mean St. Dev.
12.4480 10.0835 Machine A 20 11.888 0.307
11.8542 16.3094 Machine B 20 10.32 3.53
11.4890 7.7275
12.5328 7.1933
11.7902 12.3426 Difference = (Machine A) - (Machine B)
11.8711 12.2819 95% CI for difference: (-0.09756, 3.22369)
11.7120 16.4145 T-Test of difference = 0 (vs. 0): T-Value = 1.97 P-Value = 0.064 DF = 19
11.7132 9.2918
11.6420 7.4546
11.9299 16.0162
12.0497 9.7891
11.7749 10.1473
11.9015 14.2649
12.1880 6.7127
12.1130 12.5284 Would you invest Money in changing from
12.0407 3.5586 Machine A to Machine B ?
12.0431 10.6715
11.9194 8.4894
11.3139 7.0822
One Output, Cycle Time Two-way ANOVA: Cycle Time versus Process, Machine Operator
Two Factors, Process and Operator
Source DF SS MS F P
Process 2 211.985 105.993 9.20 0.015
Is there a difference in Processes? Machine Op 1 2.430 2.430 0.21 0.662
Is there a difference in Operators? Interaction 2 62.565 31.282 2.71 0.145
Error 6 69.160 11.527
Is there a significant Interaction? Total 11 346.140
DOE allows for more information to be gained from less trial runs
than traditional one factor at a time experimentation methods.
Define A Identify Project KPOVs & KPIVs Project KPOVs & KPIVs
B Develop Team Charter Approved Charter
C Define Process Map Process Mapping High Level Process Map
Measure 1 Select KPOV Characteristics Y Customer, QFD, FMEA, Process Mapping, Cause Project Y
& Effect Diagram, Discrete vs. Continuous Data
2 Define Performance Standards Y Customer, Blueprints Performance Standard for
Project Y
3 Measurement System Analysis Y Continuous Gage R&R, Test/Retest, Attribute R&R Data Collection Plan & MSE,
Data for Project Y
Analyze 4 Establish Process Capability Y Basic statistics, Graphical Analysis, Sampling, Process Capability for Project Y
Continuous Zst / Zlt, Normality, Discrete Zst / Zlt
5 Define Performance Objectives Y Team, Benchmarking Improvement Goal for Project Y
6 Identify Variation Sources X Process Analysis, Graphical Analysis, Hypothesis Prioritized List of all Xs
Tests, Regression Analysis, ANOVA
Control 10 Define & Validate Measurement Y, X Continuous Gage R&R, Test/Retest, Attribute R&R MSE
System on Xs in Actual Application
11 Determine Process Capability Y, X Basic statistics, Graphical Analysis, Sampling, Process Capability Y, X
Continuous Zst / Zlt, Normality, Discrete Zst / Zlt
12 Implement Process Control X FMEA, Poka-Yoke, 5-S,Training / Certification, Sustained Solution,
Stat. Process Control, Std. Work Processes Documentation