Buildings
History 1988> Re-build 22m
What is the size of the whole Wyke site? - 6.7ha 16.5 acres
Area = <11,000m2
Number of classrooms? 82
Maximum number of students we can accommodate? 2000 this year

College Budget
8m 70% staffing costs

Maintenance Reactive - 380k (inc statutory requirements)


- Long Term Maintenance plan - 40k
- Capital - 150k

Running Costs Elect 120k


- Gas 19k
- Rates 54k
- Water 15k

Heating System - bore hole heat system but no solar panels or wind turbines due
to non-viable capital cost.

Waste Recycling centre located behind the sports hall


65% reduction in terms of volume - 40% weight

Equipment
The college has around 800 computers
Infrastructure servers/switches
Specialist software for Media/Film/Music/Science/Art/PE

Emergency Provision
How many practice drills are there a year? at least 2 each year
Are we inspected by the Fire Brigade? yes
Individual Escape plans for disabled students/staff/visitors

Security
CCTV -overt and covert cameras in main areas (and computer rooms)
Alarms - burglar
Security Guards nightly surveillance of the premises/on call when alarms
activated
Call out list for when an alarm is activated includes Director of Resources and
Senior Management team.

Insurance
Public Liability cost 47k
Building & Contents also purchased - has 1k excess on any claim.

Transport
5 minibuses Costs 250k/yr
16 buses routes

Catering
332k income including vending machines
7k cash surplus (2%) (catering made a loss for several years)
Technological Resources

The college has approximately 800pcs working for student and staff access but
there are approx. 20 additional computers waiting to be assigned. This is an
ongoing cost as pcs need replacing and updating. There are also laptops
available for booking from the library for use in the library.

The internet is provided through a system called JANET. This stands for Joint
Academic Network and is based at Hull Uni but provides schools and colleges
internet across the city. It costs approx. 8000 for 100 megabit speed. The
college is currently in negotiations to upgrade to 1gigabyte speed but this would
cost 11,000 per year and there would be the cost of installation too. (other
cities that dont rely on KCom would be charged about 3000 for our current
service and 8000 for the faster speed.)

MS Office and the other windows software cost the college approx. 8000 per
year (its based on staff numbers not student numbers)

The college spends approximately 8000 on other software e.g. maths and
science etc.

Adobe photoshop has 500 licences only put on 500 machines and cant be
upgraded unless the college pays more money.

Web filtering software costs 4000 and has been upgraded to Light Speed Web
Filtering Service. This software allows staff to have more influence over which
sites their students can access.

All work is backed up onto the college servers each night and a major back up is
made each Friday night.