M.V. "UNI-AGEL"
1 - 2. Shore power
Furnish electrical power A.C. 440V, 3 phase, 60Hz to main switchboard
during power shut down period while vessel in drydocking.
1
EVERGREEN LINE
1 - 5. Compressed air supply
Provide two air hose that one for E/R one for Deck for the crews general
use during repair period.
1 - 6. Garbage disposal
Provide one garbage barrel on poop deck for ship use. Also, the garbage to
be removed and disposed daily.
Note:
The quotation should include all accessory works and facilities such as
providing garbage container, mobile crane service, labors etc.
1 - 7. Crane service
Supply crane service for taking or removing vessels stores, hatch cover and
miscellaneous equipment subject to the orders of Owner Superintendent.
1 - 8. Telephone service
1) One(1) set of telephone for domestic communication is to be installed on
board during repair period, however the long distance service is available
for owner superintendent only.
2) Documented billing for long distance service will be presented to the
owner superintendent.
Notes :
Sand residual on deck, accommodation, cargo holds etc. Derived from grit
blasting jobs are to be swept and cleaned out completely after paint jobs are
finished.
B). The rusted area of flat bottom to be sand swept then touched up with
one coat of BANNOH 500N PLUM; one coat of BANNOH500R GRAY,
one coat of SEA GRANDPRIX CF-10A RED then applied one full coats of
GRANDPRIX CF-10A RED.
C). The rusted area of vertical bottom to be sand swept then touched up with
one coat of BANNOH 500N PLUM; one coat of BANNOH500R GRAY,
one coat of SEA GRANDPRIX CF-10A RED, one coat of SEA
GRANDPRIX CF-10A LIGHT RED then applied one full coats of SEA
GRANDPRIX CF-10A RED.
D). The rusted area of boot top to be sand swept then touched up with
one coat of BANNOH 500N PLUM; one coat of BANNOH500R GRAY,
one coat of SEA GRANDPRIX CF-10A LIGHT RED then applied one full
coats of SEA GRANDPRIX CF-10A RED.
E). The rusted area of topside to be sand swept then touched up with
one coat of BANNOH 500N PLUM; one coat of BANNOH500R GRAY,
then applied one full coats of UNY MARINE 2.5G 3/4 GREEN.
3
EVERGREEN LINE
F). Paint schedule :
FLAT BOTTOM (2390M2)
1.BANNOH 500N PLUM T.U. x 15 %
D.F.T.( ) 90
2.BANNOH 500R GREY T.U. x 15 %
D.F.T.( ) 85
3.SEA GRANDPRIX CF-10A RED T.U. x 15 %
D.F.T.( ) 50
4.SEA GRANDPRIX CF-10A RED A.O. x 100 % D.F.T.( )
135
VERTICAL BOTTOMS
(1875M2)
1.BANNOH 500N PLUM T.U. x 25 % D.F.T.( ) 90
2.BANNOH 500R GREY T.U. x 25 % D.F.T.( ) 85
3.SEA GRANDPRIX CF-10A RED T.U. x 25 % D.F.T.( ) 50
4.SEA GRANDPRIX CF-10A LIGHT RED A.O. x 100 % D.F.T.( ) 100
5.SEA GRANDPRIX CF-10A RED A.O. x 100 % D.F.T.( )
105
BOOT TOPS (980M2)
1.BANNOH 500N PLUM T.U. x 25 % D.F.T.( ) 90
2.BANNOH 500R GREY A.O. x 100 % D.F.T.( ) 85
3.SEA GRANDPRIX CF-10A LIGHT RED A.O. x 100 % D.F.T.( ) 95
4.SEA GRANDPRIX CF-10A RED A.O. x 100 % D.F.T. ) 95 (
TOP SIDES (2335M2)
1. BANNOH 500N PLUM T.U. x 30 % D.F.T.( ) 90
2. BANNOH 500R GREY T.U. x 30 % D.F.T.( ) 85
3.UNY MARINE 2.5G 3/4 GREEN A.O. x 100 % D.F.T.( ) 30
D). Hull mark repainting
Ships name, draft marks, port of registry and plimsoll marks etc. All of outer
shell marks to be repainted.
I). Funnel, fore & radar mast to be derust and touch up with paint. Funnel
company mark to be repaint if injure by derust.
2 - 2. Rudder
A). The rested areas to be sand swept, applied two A/C paints then two
A/F paints.
B). The clearance between pintle and gudgeon bushing for rudder pintles
to be measured and recorded.
2 4. Propeller
A).The clearance between stern tube bearing and propeller shaft to be
measured and taken records.
B).The propeller blades to be polished and re-greased, root part to be dye
checked for surveyor inspection.
C).The zinc anodes in S/T after seal to be renewed with owners material.
(Estimate : B-4 x 4pcs)
2 - 5. Miscellaneous
1). All bottom plugs of ballast tank(22pcs)to be opened-up and re-plug
with cement in good order.
FPT 1 , DEEP WBT(C) 1 , NO.1 WBT(P&S) 2 ,
NO.2 F WBT (P&S) 2 , NO.2 A F.WBT (P&S) 2 ,
5
EVERGREEN LINE
NO.3 D.B. WBT(P&S) 2 , NO.3 L WBT(P&S) 2 ,
NO.3 F WBT(P&S) 2 , NO.3 AWBT(P&S) 2 ,
NO.4 F WBT(P&S) 2 , NO.4 AWBT(P&S) 2 ,
A.P.T. 1 , PIPE DUCT-------- x 1
2). The bow-thruster to be cleaned & inspected ,blade to be polished and
re-greased.
3). The zinc anodes in bow-thruster to be renewed with owner material.
(Estimate : B-8 x 11pcs)
4). ICCPS anode to be renewed with owner material. (Estimate : after P &
Sside x 1. Total : 2 pcs)
Maker: CATHELCO LTD.
5). Stool liner of hatch cover on top of hatch coaming to be renewed in bay 6
P/S, bay10 S, bay14 S, bay30 S.
6). Port side anchor chain stopper to be patch up.
7). Ships master clock in bridge to be repaired all clock not syncronized
when adjusting time.
8). Crystal light of telegraph indicator and shaft revolution indicator center
to be replaced.
9). P/S wings crystal light of propeller shaft revolution indicator, rudder
angle indicator and telegraph light indicator to be replaced.
10). P/S wings consul crystal light of telegraph dial indicator, ships speed
indicator, maneuvering lever indicator and load indicator light to be
replaced.
c. Globe valve:
7
EVERGREEN LINE
3 - 2. Propeller and propeller shaft
A). The clearance between stern tube bearing and propeller shaft to be
measured and taken records..
B).The propeller blades to be polished and re-greased.
C).The zinc anodes in S/T after seal to be renewed with owners material.
3 - 1 Miscellaneous.
A).The Following Pipe to be Renewed With Yards Material ( Ref.jis-g-
3454 (STPG-38) Quality, SCH-80 denotes Steel Tube Piping General.
Below Pipe to Galvanize .
1. Sea water pipe for M/E Jacket cooler inlet & outlet:
a.) 150A x 450mm x 120mm x 90 Elb x 1pc x 25A x 70mm x
Reducer(150 100A) x 1pc x 150AF x 2pcs x 25AF x 1pc x 100AF x
1pc.
b.) 150A x 450mm x 120mm x 90 Elb x 1pc x 150AF x 2pcs x 50A x 70mm x
Reducer(150 100A) x 1 x 50AF x 1pc x 100AF x 1pc.
2. Sea water pipe for G/E Jacket cooler inlet & outlet:
8
EVERGREEN LINE
a.) 125A x 490mm x 130mm x 230mm x 90Elb x 1pc x 125AF x 2pcs x
150AF x 1pc x 50A x 70mm x 50AF x 1pc x Reducer(150 125A) x 1pc.
b.) 125A x 490mm x 210mm x 310mm x 90 Elb x 1pc x 125AF x 2pcs x
150AF x 1pc x 25A x 50mm x Reducer(150 125A) x 1pc.
c.) 125A x 39Cm x 100mm x 90 Elb x 2pcs x 125AF x 2pcs
3. Sea water pipe for M/E L/T cooler inlet & outlet:
a.) 200A x 420mm x 100mm x 270mm x 90 Elb x 1pc x 200AF x 2pcs x 50A x
100mm x 50AF x 1pc x 25A x 80mm x 25AF x 1pc x Reducer(150 200A)
x 1pc x 150AF x 1pc.
9
EVERGREEN LINE
b.) 200A x 430mm 100mm x 270mm x 90 Elb x 1pc x 200AF x 2pcs x 50A x
100mm x 100mm x 50AF x 2pcs x Reducer(150 200A) x 1pc x 150AF x
1pc.
c.) 200A x 420mm x 110mm x280mm x 90 Elb x 1pc x 200AF x 2AF x 2pcs x
50A x 100mm x 50AF x 1pc x Reducer(150 200A) x 1pc x 150AF x 1pc.
d.) 200A x 430mm x 100mm x 270mm x 90 Elb x 1pc x 200AF x 2AF x 2pcs
x 25A x 100mm x Reducer(150 200A) x 1pc x 150AF x 1pc.
10
EVERGREEN LINE
e.) 250A x 900mm x 250AF x 2pcs.
4. Fresh water pipe for M/E L/T cooler inlet & outlet:
a.) 250A x 2200mm x 250AF x 1pc.
c.) 50A x 100mm x 1750mm x 45 Elb x 2pc x 50AF x 5pcs..
11
EVERGREEN LINE
d.) 125A x 200mm x 170mm x 90Elb x 1pc x 125AF x 2pcs.
e.) 250A x 1080mm x 330mm x 90 Elb x 1pc x 250AF x 2pcs.
5. Fresh water pipe for Air compressor cooling system inlet & outlet:
a.) 40A x 120mm x 270mm x 40AF x 4pcs x 15A x 70mm x 15AF x 1pc.
b.) 40A x 1220mm x 270mm x 40AF x 4pcs x 15A x 70mm x 15AF x 1pc.
12
EVERGREEN LINE
c.) 50A x 2820mm x 50mm x 90 Elb x 1pc x 50AF x 2pcs x 40A x 80mm x
100mm x 40AF x 2pcs.
13
EVERGREEN LINE
9. Sea water pipe for GS pump inlet:
a.) 150A x 660mm x 150mm x 120mm x 40mm x 90 Elb x 1pc x 150AF x 4pcs
x 100A x 110mm x 100AF x 1pc.
14
EVERGREEN LINE
15
EVERGREEN LINE
12. Hot water pipe(Copper):
a.) 45mm x 1500mm x Socket x 1pc.
b.) 25mm x 300mm x Socket x 1pc.
Adjust or repair.
12. All F.O. tanks gauge in port offer computer to be check
13. Expansion joints between M/E exhaust manifold to T/C to be renewed with
ships spare.
14. Lathe in Eng work shop cant make Meter thread to be check & repair.
15. Hydraulically valve 4set ( FPT, #3FWB-S, BW-1, BW-2) of Ballast water
system leakage oil to be check & repair.
17. M/E air cooler element to be drawn out & cleaned with chemical & water
pressure test, then renewed the packing & o-ring with owners material.
18. Aux. boiler safety valves: 2 sets. to be opened up, ground and executed
popping test, and surveyed by NK surveyor, then repacked in good
order.(type-1627).
19. Economizer safety valve: 1 set. to be opened up, ground and executed
popping test and surveyed by NK surveyor, then repacked in good order.
(type-1627)
16
EVERGREEN LINE
SECTION 4. SURVEY ITEMS
Class NK
1. Boiler survey.
2. CMS survey:
a.) M/E No.7 Crankpin & Bearing
b.) M/E No.4Crankjournal & Bearing
c.) T/C of M/E
d.) Intermediate survey
e.) Docking survey
INCHARGE(engine dept)
INCHARGE(deck dept)
CHANG JI-GUANG CHANG YI-PING
TEL NO. +886-03-3123724
TEL NO. +886-03-3123727
FAX NO. 03-3227729
FAX NO. 03-3227729
Mobilphone 0933931471
Mobilphone 0937392080