Anda di halaman 1dari 8

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

NON-DESTRUCTIVE TESTING (NDT) REQUEST FORM SATR-NDE-2011 30-Apr-13


PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION

ANDR-0618 TO ANDR-525 PROJECT 10-01032-5534 ABIS ABIS FABRICATION SHOP,ABUHADRYAH

SAUDI ARAMCO USE ONLY

SATIP NUMBER SATIP ACTIVITY NUMBER CONTRACTOR INSP LEVEL SUBCONTRACTOR INSP LEVEL ARAMCO INSP LEVEL QTY INSP MH's SPENT

SATIP-W-011-01 3.12 W/RH W/R

NON-DESTRUCTIVE TESTING (NDT) REQUESTED


RT UT MPI LPI HARDNESS X PMI

DRAWING LINE SKETCH SHT REV SPOOL WELD WELDER WELDING


ITEM DIA Thk REMARKS
NUMBER NUMBER NUMBER NO. NO. NUMBER ID ID PROCESS

BLOWDOWN TO
1 BB-737276 8"-BD-0113-90SD0P BURNPIT
001 0 23 SW-21 W-4748 GTAW + SMAW 8" 0.5"

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Remarks
Reasons for Re-shoots or Re-weld

NDT Request flow


CONSTRUCTION REPRESENTATIVE Name Sign Date

QC INSPECTOR or SUPERVISOR ASHOK KUMAR

PRIME CONTRACTOR NDT COORDINATOR MICHAEL JUDE

NDT TECHNICIAN
SAUDI ARAMCO PROJECT MANAGEMENT
PID REPRESENTATIVE
MD.TAUSIF AHMAD
31-Mar-13
REPORT DATE

11-Feb-17
OCATION
ABIS FABRICATION SHOP,ABUHADRYAH

DI ARAMCO USE ONLY

TRAVEL TIME

REMARKS
Date
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

NON-DESTRUCTIVE TESTING (NDT) REQUEST FORM SATR-NDE-2011 30-Apr-13


PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION

UTMN-1966 TO SDGM R/H-E 10-01032-5515 ABIS ABIS FABRICATION SHOP,ABUHADRYAH

SAUDI ARAMCO USE ONLY

SATIP NUMBER SATIP ACTIVITY NUMBER CONTRACTOR INSP LEVEL SUBCONTRACTOR INSP LEVEL ARAMCO INSP LEVEL QTY INSP MH's SPENT

SATIP-W-011-01 3.12 W/RH W/R

NON-DESTRUCTIVE TESTING (NDT) REQUESTED


RT UT MPI LPI HARDNESS X PMI

DRAWING LINE SKETCH SHT REV SPOOL WELD WELDER WELDING


ITEM DIA Thk REMARKS
NUMBER NUMBER NUMBER NO. NO. NUMBER ID ID PROCESS

1 BB-067456 2"-BD-0130-15SD0P OPTF AREA 002 0 23 SW-87 W-7603 GTAW 2" 0.218"

2 BB-067456 2"-BD-0130-15SD0P OPTF AREA 002 0 23 SW-88 W-7603 GTAW 2" 0.218"

3 BB-067456 2"-BD-0130-15SD0P OPTF AREA 002 0 24 SW-89 W-7603 GTAW 2" 0.218"

4 BB-067456 2"-BD-0130-15SD0P OPTF AREA 002 0 24 SW-90 W-7603 GTAW 2" 0.218"

5 BB-067456 2"-BD-0130-15SD0P OPTF AREA 002 25 SW-91 W-7603 GTAW 2" 0.218"

6 BB-067456 2"-BD-0130-15SD0P OPTF AREA 002 25 SW-92 W-7603 GTAW 2" 0.218"

7 BB-067456 2"-BD-0130-15SD0P OPTF AREA 002 25 SW-93 W-7603 GTAW 2" 0.218"

8 BB-067456 2"-BD-0130-15SD0P OPTF AREA 002 25 SW-94 W-7749 GTAW 2" 0.218"

9 BB-067456 2"-BD-0130-15SD0P OPTF AREA 002 25 SW-95 W-7603 GTAW 2" 0.218"

10 BB-067456 2"-BD-0130-15SD0P OPTF AREA 002 25 SW-96 W-7603 GTAW 2" 0.218"

11 BB-067456 2"-BD-0130-15SD0P OPTF AREA 002 25 SW-97 W-7749 GTAW 2" 0.218"

12 BB-067456 2"-BD-0130-15SD0P OPTF AREA 002 25 SW-98 W-7749 GTAW 2" 0.218"

13 BB-067456 2"-BD-0137-15SD0P OPTF AREA 002 26 SW-101 W-7749 GTAW 2" 0.218"

14 BB-067456 2"-BD-0137-15SD0P OPTF AREA 002 26 SW-102 W-7749 GTAW 2" 0.218"

15 BB-067456 2"-BD-0137-15SD0P OPTF AREA 002 27 SW-99 W-7749 GTAW 2" 0.218"

16 BB-067456 2"-BD-0137-15SD0P OPTF AREA 002 27 SW-100 W-7749 GTAW 2" 0.218"

Remarks
Reasons for Re-shoots or Re-weld

NDT Request flow


CONSTRUCTION REPRESENTATIVE Name Sign Date

QC INSPECTOR or SUPERVISOR ASHOK KUMAR

PRIME CONTRACTOR NDT COORDINATOR MICHAEL JUDE

NDT TECHNICIAN
SAUDI ARAMCO PROJECT MANAGEMENT
PID REPRESENTATIVE
MD.TAUSIF AHMAD
31-Mar-13
REPORT DATE

11-Feb-17
OCATION
ABIS FABRICATION SHOP,ABUHADRYAH

DI ARAMCO USE ONLY

TRAVEL TIME

REMARKS
Date