JOINT MEASSUREMENT SHEET

MILLENNIUM ENGINEERS & CONTRACTORS PVT. LTD.,PUNE


PROJECT : OMNI ACTIVES

Bottom Trapezoidal Qty. in


Footing Footing Rectangular Top Area of Trapezoidal Rectangular
No. of Area of (M3)
Si.No. Length (L) breadth depth (h1) in footing (A2) depth (h2) in Qty. in (M3)
footings footing h2/3*(sqrt(A1A2))+
in M (B) in M (M) in M2 (M) L x B x h1
(A1) in M2 (A1+A2))

1 1 1.200 1.350 1.620 0.200 0.301 0.200 0.175 0.324


2 1 1.500 1.800 2.700 0.300 0.301 0.150 0.195 0.810
3 1 1.350 1.350 1.823 0.250 0.301 0.150 0.143 0.456

Prepared By MECPL Checked byTCG Checked By MECPL


JOINT MEASSUREMENT SHEET

MILLENNIUM ENGINEERS & CONTRACTORS PVT. LTD.,PUNE


PROJECT : OMNI ACTIVES

For footing C7 & C7/B

Footing Size = 1.830 x 1.750


Length of tie beam b/w columns = 1.830 m
Breadth = 0.380 m
Depth = 0.530 m
R.C.C Quantity for tie beam = 1.830 x 0.380 x 0.530
= 0.369 Cum
Quantity of trapezoidal portions = 2 x(1/2 x 0.685 x (0.300+0.430)) x 1.830
= 0.915 Cum
Total = 0.365 + 0.915
= 1.284 Cum
= 4 x 1.284

= 5.136 Cum (b)

GRAND TOTAL = 217.213 Cum

= 217.213 Cum

Prepared By MECPL Checked byTCG Checked By MECPL


JOINT MEASSUREMENT SHEET

MILLENNIUM ENGINEERS & CONTRACTORS PVT. LTD.,PUNE


PROJECT : OMNI ACTIVES

Prepared By MECPL Checked byTCG Checked By MECPL


MECPL, Pune
SUMMARY SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE
ITEM NO :
40 75 100 150
SI No. Description 200 (m)
(m) (m) (m) (m)

1 CP4 LVL 0.000 2.250 0.000 2.250 54.450

2 CP3 LVL 0.000 2.250 0.000 2.250 54.450

3 CP2 LVL 0.000 2.480 0.000 2.480 75.380

4 CP1 LVL 0.000 2.930 0.000 2.930 72.680

5 Pod LVL 1.400 2.880 2.230 5.100 71.080

6 CP4 LVL-F POD 0.000 0.000 0.000 0.000 1.040

7 CP3 LVL-F POD 0.000 0.000 0.000 0.000 1.010

TOTAL 1.400 12.790 2.230 15.010 330.090


BOQ QTY 0 5.000 0.000 5.000 110.000
AMENDMENT 1.400 7.790 2.230 10.010 220.090

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 4 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP4 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

50 75 100 150 200 50


(m) (m) (m) (m) (m) (m)
DRAWING REF NO: 130052-POD-111,467/P/16

1 CP47 2 0.450

CP48 1 0.450

CP49 2 0.450

CP50 2 0.450

CP51 2 0.450

CP52 2 0.450

CP53 2 0.450

CP54 2 0.450

1 0.225 0.225 0.225

CP55 2 0.450

CP56 2 0.450

CP57 2 0.450

CP58 2 0.450

1 0.225 0.225 0.225

CP59 2 0.450

CP61 2 0.450

CP62 2 0.450

CP63 2 0.450

CP64 2 0.450

CP65 2 0.450

CP67 2 0.450

CP68 2 0.450

CP69 2 0.450

CP70 1 0.450

CP71 2 0.450

1 0.225 0.225 0.225

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 5 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP4 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

CP72 2 0.450

CP73 2 0.450

CP74 2 0.450

CP75 2 0.450

CP76 2 0.450

1 0.225 0.225 0.225

CP77 1 0.450

CP78 1 0.450

CP79 2 0.450

CP80 2 0.450

CP81 1 0.450

CP82 1 0.450

CP83 2 0.450

CP85 2 0.450

CP86 2 0.450

CP87 2 0.450

CP88 2 0.450

CP89 2 0.450

CP90 2 0.450

CP91 2 0.450

CP92 2 0.450

CP93 2 0.450

CP94 2 0.450

CP95 2 0.450

1 0.225 0.225 0.225

CP96 2 0.450

CP97 2 0.450

CP98 2 0.450

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 6 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP4 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

CP99 2 0.450

CP100 2 0.450

1 0.225 0.225 0.225

CP101 2 0.450

CP102 2 0.450

CP103 2 0.450

CP104 2 0.450

CP105 2 0.450

CP106 2 0.450

CP107 2 0.450

CP108 1 0.450

1 0.450 0.450 0.450

CP109 1 0.450

CP110 1 0.450

1 0.450 0.450 0.450

CP111 1 0.450

CP112 2 0.450

0.00

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 2.250 Rmt

Previous Quantity if any = 0.00 Rmt

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 7 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP4 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

This bill Qty = 2.250 Rmt

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 2.250 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 2.250 Rmt

Item No:

Total Quantity = 54.450 Nos

Previous Quantity if any = 0.00 Nos

This bill Qty = 54.450 Nos

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 8 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 01

Total QTY (RMT)

75 100 150 200


(m) (m) (m) (m)

0.900

0.450

0.900

0.900

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.450

0.900

0.225 0.225 0.225

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 9 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 01

Total QTY (RMT)

0.900

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.450

0.450

0.900

0.900

0.450

0.450

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 10 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 01

Total QTY (RMT)

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.450

0.450 0.450 0.450

0.450

0.450

0.450 0.450 0.450

0.450

0.900

2.25 0.00 2.25 54

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 11 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 01

Total QTY (RMT)

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 12 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP3 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

50 75 100 150 200 50


(m) (m) (m) (m) (m) (m)
DRAWING REF NO: 130052-POD-111,467/P/05C

CP47 2 0.450

CP48 1 0.450

CP49 2 0.450

CP50 2 0.450

CP51 2 0.450

CP52 2 0.450

CP53 2 0.450

CP54 2 0.450

1 0.225 0.225 0.225

CP55 2 0.450

CP56 2 0.450

CP57 2 0.450

CP58 2 0.450

1 0.225 0.225 0.225

CP59 2 0.450

CP61 2 0.450

CP62 2 0.450

CP63 2 0.450

CP64 2 0.450

CP65 2 0.450

CP67 2 0.450

CP68 2 0.450

CP69 2 0.450

CP70 1 0.450

CP71 2 0.450

1 0.225 0.225 0.225

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 13 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP3 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

CP72 2 0.450

CP73 2 0.450

CP74 2 0.450

CP75 2 0.450

CP76 2 0.450

1 0.225 0.225 0.225

CP77 1 0.450

CP78 1 0.450

CP79 2 0.450

CP80 2 0.450

CP81 1 0.450

CP82 1 0.450

CP83 2 0.450

CP85 2 0.450

CP86 2 0.450

CP87 2 0.450

CP88 2 0.450

CP89 2 0.450

CP90 2 0.450

CP91 2 0.450

CP92 2 0.450

CP93 2 0.450

CP94 2 0.450

CP95 2 0.450

1 0.225 0.225 0.225

CP96 2 0.450

CP97 2 0.450

CP98 2 0.450

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 14 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP3 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

CP99 2 0.450

CP100 2 0.450

1 0.225 0.225 0.225

CP101 2 0.450

CP102 2 0.450

CP103 2 0.450

CP104 2 0.450

CP105 2 0.450

CP106 2 0.450

CP107 2 0.450

CP108 1 0.450

1 0.450 0.450 0.450

CP109 1 0.450

CP110 1 0.450

1 0.450 0.450 0.450

CP111 1 0.450

CP112 2 0.450

0.00

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 2.250 Rmt

Previous Quantity if any = 0.00 Rmt

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 15 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP3 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

This bill Qty = 2.250 Rmt

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 2.250 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 2.250 Rmt

Item No:

Total Quantity = 54.450 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 54.450 Rmt

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 16 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 02

Total QTY (RMT)

75 100 150 200


(m) (m) (m) (m)

0.900

0.450

0.900

0.900

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.450

0.900

0.225 0.225 0.225

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 17 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 02

Total QTY (RMT)

0.900

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.450

0.450

0.900

0.900

0.450

0.450

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 18 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 02

Total QTY (RMT)

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.450

0.450 0.450 0.450

0.450

0.450

0.450 0.450 0.450

0.450

0.900

2.25 0.00 2.25 54.45

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 19 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 02

Total QTY (RMT)

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 20 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP2 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

50 75 100 150 200 50


(m) (m) (m) (m) (m) (m)
DRAWING REF NO: 130052-POD-111,467/P/04C

CP2 1 0.450

CP3 1 0.450

1 0.450 0.450 0.450

CP4 1 0.450

CP5 1 0.450

CP6 1 0.450

1 0.450 0.450 0.450

CP7 1 0.450

CP8 1 0.450

CP8A 1 0.450

CP10 2 0.450

CP11 2 0.450

CP12 2 0.450

CP13 2 0.450

CP14 2 0.450

CP15 2 0.450

CP16 2 0.450

CP17 2 0.450

CP20 2 0.450

CP21 2 0.450

CP22 2 0.450

CP24A 2 0.450

1 0.225 0.225 0.225

CP24 2 0.450

CP25 2 0.450

CP26 2 0.450

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 21 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP2 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

CP27 2 0.450

1 0.225 0.225 0.225

CP28 2 0.450

CP29 2 0.450

CP30 2 0.450

CP31 2 0.450

CP32 2 0.450

CP33 2 0.450

1 0.225 0.225 0.225

CP34 2 0.450

CP35 2 0.450

CP36 2 0.450

CP37 2 0.450

CP38 2 0.450

CP39 2 0.450

CP40 2 0.450

CP41 2 0.450

CP42 1 0.450

CP43 2 0.450

CP44 2 0.450

CP45 2 0.450

CP46 2 0.450

CP47 2 0.450

CP48 1 0.450

CP49 2 0.450

CP50 2 0.450

CP51 2 0.450

CP52 2 0.450

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 22 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP2 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

CP53 2 0.450

CP54 2 0.450

1 0.225 0.225 0.225

CP55 2 0.450

CP56 2 0.450

CP57 2 0.450

CP58 2 0.450

1 0.225 0.225 0.225

CP59 2 0.450

CP61 2 0.450

CP62 2 0.450

CP63 2 0.450

CP64 2 0.450

CP65 2 0.450

CP67 2 0.450

CP68 2 0.450

CP69 2 0.450

CP70 1 0.450

CP71 2 0.450

1 0.225 0.225 0.225

CP72 2 0.450

CP73 2 0.450

CP74 2 0.450

CP75 2 0.450

CP76 2 0.450

1 0.225 0.225 0.225

CP77 1 0.450

CP78 1 0.450

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 23 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP2 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

CP79 2 0.450

CP80 2 0.450

CP81 1 0.450

CP82 1 0.450

CP83 2 0.450

CP85 2 0.450

CP86 2 0.450

CP87 2 0.450

CP88 2 0.450

CP89 2 0.450

CP90 1 0.450

CP91 1 0.450

CP92 1 0.450

CP93 1 0.450

CP94 2 0.450

Near CP94 2 0.225

In front of G BLDG 4 0.225

In front of B BLDG 4 0.225

0.00

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 2.480 Rmt

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 24 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP2 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

Previous Quantity if any = 0.00 Rmt

This bill Qty = 2.480 Rmt

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 2.480 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 2.480 Rmt

Item No:

Total Quantity = 75.380 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 75.380 Rmt

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 25 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 03

Total QTY (RMT)

75 100 150 200


(m) (m) (m) (m)

0.450

0.450

0.450 0.450 0.450

0.450

0.450

0.450

0.450 0.450 0.450

0.450

0.450

0.450

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 26 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 03

Total QTY (RMT)

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.450

0.900

0.900

0.900

0.900

0.900

0.450

0.900

0.900

0.900

0.900

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 27 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 03

Total QTY (RMT)

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.450

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.450

0.450

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 28 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 03

Total QTY (RMT)

0.900

0.900

0.450

0.450

0.900

0.900

0.900

0.900

0.900

0.900

0.450

0.450

0.450

0.450

0.900

0.450

0.900

0.900

2.48 0.00 2.48 75.38

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 29 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 03

Total QTY (RMT)

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 30 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP1 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

50 75 100 150 200 50


(m) (m) (m) (m) (m) (m)
DRAWING REF NO: 130052-POD-111,467/P/03C

CP2 1 0.450

CP3 1 0.450

1 0.450 0.450 0.450

CP4 1 0.450

CP5 1 0.450

CP6 1 0.450

1 0.450 0.450 0.450

CP7 1 0.450

CP8 1 0.450

CP8A 1 0.450

CP10 2 0.450

CP11 2 0.450

CP12 2 0.450

CP13 2 0.450

CP14 2 0.450

CP15 2 0.450

CP16 2 0.450

CP17 2 0.450

CP20 2 0.450

CP21 2 0.450

CP22 2 0.450

CP24A 2 0.450

1 0.225 0.225 0.225

CP24 2 0.450

CP25 2 0.450

CP26 2 0.450

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 31 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP1 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

CP27 2 0.450

1 0.225 0.225 0.225

CP28 2 0.450

CP29 2 0.450

CP30 2 0.450

CP31 2 0.450

CP32 2 0.450

CP33 2 0.450

1 0.225 0.225 0.225

CP34 2 0.450

CP35 2 0.450

CP36 2 0.450

CP37 2 0.450

CP38 2 0.450

CP39 2 0.450

CP40 2 0.450

CP41 2 0.450

CP42 1 0.450

CP43 2 0.450

CP44 2 0.450

CP45 2 0.450

CP46 2 0.450

CP47 2 0.450

CP48 1 0.450

CP49 2 0.450

CP50 2 0.450

CP51 2 0.450

CP52 2 0.450

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 32 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP1 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

CP53 2 0.450

CP54 2 0.450

1 0.225 0.225 0.225

CP55 2 0.450

CP56 2 0.450

CP57 2 0.450

CP58 2 0.450

1 0.225 0.225 0.225

CP59 2 0.450

CP61 2 0.450

CP62 2 0.450

CP63 2 0.450

CP64 2 0.450

CP65 2 0.450

CP67 2 0.450

CP68 2 0.450

CP69 2 0.450

CP70 1 0.450

CP71 2 0.450

1 0.225 0.225 0.225

CP72 2 0.450

CP73 2 0.450

CP74 2 0.450

CP75 2 0.450

CP76 2 0.450

1 0.225 0.225 0.225

CP77 1 0.450

CP78 1 0.450

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 33 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP1 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

CP79 2 0.450

CP80 2 0.450

CP81 1 0.450

CP82 1 0.450

CP83 2 0.450

CP85 2 0.450

CP86 2 0.450

CP87 2 0.450

CP88 2 0.450

CP89 1 0.450

1 0.225 0.225 0.225

CP90 1 0.450

CP91 1 0.450

CP92 1 0.450

CP93 1 0.450

CP94 1 0.450

1 0.225 0.225 0.225

0.00

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 2.930 Rmt

Previous Quantity if any = 0.00 Rmt

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 34 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ CP1 LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

This bill Qty = 2.930 Rmt

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 2.930 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 2.930 Rmt

Item No:

Total Quantity = 72.680 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 72.680 Rmt

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 35 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 04

Total QTY (RMT)

75 100 150 200


(m) (m) (m) (m)

0.450

0.450

0.450 0.450 0.450

0.450

0.450

0.450

0.450 0.450 0.450

0.450

0.450

0.450

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 36 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 04

Total QTY (RMT)

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.450

0.900

0.900

0.900

0.900

0.900

0.450

0.900

0.900

0.900

0.900

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 37 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 04

Total QTY (RMT)

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.900

0.450

0.900

0.225 0.225 0.225

0.900

0.900

0.900

0.900

0.900

0.225 0.225 0.225

0.450

0.450

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 38 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 04

Total QTY (RMT)

0.900

0.900

0.450

0.450

0.900

0.900

0.900

0.900

0.900

0.450

0.225 0.225 0.225

0.450

0.450

0.450

0.450

0.450

0.225 0.225 0.225

2.93 0.00 2.93 72.68

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 39 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 04

Total QTY (RMT)

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 40 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ POD LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

50 75 100 150 200 50


(m) (m) (m) (m) (m) (m)
DRAWING REF NO: 130052-POD-111,467/P/03C

CP3 1 0.200 0.200 0.200

Near CP6 1 0.200 0.200 0.200

CP10 1 0.200

1 0.500

CP11 1 0.200

1 0.500

CP12 1 0.200

1 0.500

CP13 1 0.200

1 0.500

CP14 1 0.200

1 0.500

CP15 1 0.200

1 0.500

CP16 1 0.200

1 0.500

CP17 1 0.200

1 0.500

Sloping Slab_Conv. 7 0.200 0.200 0.200 1.400

Near CP13 3 0.275

1 0.275

Near CP13 2 0.275

CP20 2 0.500

CP21 2 0.500

CP22 2 0.500

CP24A 2 0.500

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 41 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ POD LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

CP24 2 0.500

CP25 2 0.500

CP26 2 0.500

Near CP27 1 0.275 0.275 0.275

Near CP24A 1 0.275 0.275 0.275

Near CP33 1 0.275 0.275 0.275

CP27 2 0.500

CP28 2 0.500

CP29 2 0.500

CP30 2 0.500

CP31 2 0.500

CP32 2 0.500

CP33 2 0.500

CP34 2 0.500

CP35 2 0.500

CP36 2 0.500

CP37 2 0.500

CP38 2 0.500

CP39 2 0.500

CP40 2 0.500

CP41 2 0.500

CP42 2 0.500

CP43 2 0.500

CP44 2 0.500

CP45 2 0.500

CP46 2 0.500

CP47 1 0.500

CP48 2 0.500

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 42 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ POD LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

CP49 2 0.500

CP50 2 0.500

CP51 2 0.500

CP52 2 0.500

CP53 2 0.500

CP54 2 0.500

CP55 2 0.500

CP56 2 0.500

CP57 2 0.500

CP58 2 0.500

Near CP54 1 0.275 0.275 0.275

Near CP58 1 0.275 0.275 0.275

CP59 2 0.600

CP61 2 0.600

CP62 2 0.500

CP63 2 0.500

CP64 2 0.500

CP65 2 0.600

CP67 2 0.600

CP68 2 0.500

CP69 2 0.500

CP70 2 0.500

CP71 2 0.500

CP72 2 0.500

CP73 2 0.500

CP74 2 0.500

CP75 2 0.500

CP76 2 0.500

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 43 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ POD LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

Near CP72 1 0.275 0.275 0.275

Near CP76 1 0.275 0.275 0.275

CP77 1 0.500

CP78 1 0.500

CP79 2 0.500

CP80 2 0.500

CP81 1 0.500

CP82 1 0.500

CP83 2 0.500

CP85 2 0.500

Near CP85 & 86 2 0.500

CP86 2 0.500

CP87 2 0.500

CP88 2 0.500

CP89 1 0.500

CP90 1 0.500

CP91 1 0.500

CP92 1 0.500

CP93 1 0.500

CP94 1 0.500

Near CP95 1 0.275 0.275 0.275

Near CP100 1 0.275 0.275 0.275

1.40

Item No:

Total Quantity = 1.400 Rmt

Previous Quantity if any = 0.00 Rmt

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 44 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -CENTRAL PODIUM
PARTICULARS : SLEEVE @ POD LVL
ITEM NO : 1 (1102927),2 (1103053),3 (1403255),4 (1101791)

SI No. Description No Length (m)

This bill Qty = 1.400 Rmt

Item No:

Total Quantity = 2.880 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 2.880 Rmt

Item No:

Total Quantity = 2.230 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 2.230 Rmt

Item No:

Total Quantity = 5.100 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 5.100 Rmt

Item No:

Total Quantity = 71.080 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 71.080 Rmt

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 45 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 04

Total QTY (RMT)

75 100 150 200


(m) (m) (m) (m)

0.200 0.200 0.200

0.200 0.200 0.200

0.200

0.200

0.200

0.200

0.200

0.200

0.200

0.200

1.400 1.400

0.825

0.275

0.550

1.000

1.000

1.000

1.000

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 46 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 04

Total QTY (RMT)

1.000

1.000

1.000

0.275 0.275 0.275

0.275 0.275 0.275

0.275 0.275 0.275

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 47 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 04

Total QTY (RMT)

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

0.275 0.275 0.275

0.275 0.275 0.275

1.200

1.000

1.000

1.000

1.200

1.200

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

1.000

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 48 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 04

Total QTY (RMT)

0.275 0.275 0.275

0.275 0.275 0.275

0.500

0.500

1.000

1.000

0.500

0.500

1.000

1.000

1.000

1.000

1.000

1.000

0.500

0.500

0.500

0.500

0.500

0.500

0.275 0.275 0.275

0.275 0.275 0.275

2.88 2.23 5.10 71.08

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 49 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / C.POD /VO-03/ 01/ 04

Total QTY (RMT)

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 50 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -F
PARTICULARS : SLEEVE @ CP4 LVL
ITEM NO :

SI No. Description No Length (m)

50 75 100 150 200 50


(m) (m) (m) (m) (m) (m)
DRAWING REF NO: 130052-BLDG-F-261,467/P/19

1 Near FC13 1 0.140

2 Near FC40 1 0.130

3 Near FC42 1 0.130

4 Near FC21 1 0.130

5 Near FC6 1 0.115

6 Near FC8 1 0.150

7 Near FC10 1 0.130

8 Near FC18 1 0.115

0.00

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 51 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -F
PARTICULARS : SLEEVE @ CP4 LVL
ITEM NO :

SI No. Description No Length (m)

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 1.040 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 1.040 Rmt

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 52 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / F /VO-03/ 01/ 01

Total QTY (RMT)

75 100 150 200


(m) (m) (m) (No)

0.140

0.130

0.130

0.130

0.115

0.150

0.130

0.115

0.00 0.00 0.00 1.04

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 53 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / F /VO-03/ 01/ 01

Total QTY (RMT)

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 54 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -F
PARTICULARS : SLEEVE @ CP3 LVL
ITEM NO :

SI No. Description No Length (m)

50 75 100 150 200 50


(m) (m) (m) (m) (m) (m)
DRAWING REF NO: 130052-BLDG-F-271,273,467/P/20

1 Near FC13 1 0.140

2 Near FC21 1 0.130

3 Near FC42 1 0.115

4 Near FC40 1 0.115

5 Near FC6 1 0.115

6 Near FC8 1 0.150

7 Near FC10 1 0.130

8 Near FC18 1 0.115

0.00

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 55 of 62


MECPL, Pune
MEASUREMENT SHEET

PROJECT : KALPATARU,BANER
STRUCTURE : BUILDING -F
PARTICULARS : SLEEVE @ CP3 LVL
ITEM NO :

SI No. Description No Length (m)

Item No:

Total Quantity = 0.000 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 0.000 Rmt

Item No:

Total Quantity = 1.010 Rmt

Previous Quantity if any = 0.00 Rmt

This bill Qty = 1.010 Rmt

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 56 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / F /VO-03/ 01/ 02

Total QTY (RMT)

75 100 150 200


(m) (m) (m) (No)

0.140

0.130

0.115

0.115

0.115

0.150

0.130

0.115

0.00 0.00 0.00 1.01

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 57 of 62


ASUREMENT SHEET

Date: 31.08.16

JMS No: N-KPT / F /VO-03/ 01/ 02

Total QTY (RMT)

Prepared By MECPLF-QSS / 06 / R0 Checked byPMC Verified By CLIENTPage 58 of 62


Omni Levels
No Points IS Ori.Ex.GL GL . Trimurti Finished top
1 X0 - Y3 - 619.560 619.560 620.85
2 X0 - Y4 - 619.250 619.250 620.67
3 X0 - Y5 - 619.145 619.145
4 X0 - Y6 - 619.150 619.150
5 X0 - Y7 - 619.035 619.035
6 X0 - Y8 - 618.875 618.875
7 X0 - Y9 - 618.930 618.930
8 X0 - Y10 - 618.715 618.715
9 X0 - Y11 - 618.605 618.605
10 X0 - Y12 - 618.265 618.265
11 X0 - Y13 - 618.005 618.485
12 X0 - Y14 - 617.880 618.615
13 X0 - Y15 - 617.740 618.210
14 X0 - Y16 - 617.600 617.950
15 X1 - Y3 0.61 619.710 620.020
16 X1 - Y4 1.345 619.105 619.285
17 X1 - Y5 1.58 619.020 619.050
18 X1 - Y6 1.62 618.985 619.010
19 X1 - Y7 1.565 618.930 619.065
20 X1 - Y8 1.61 618.900 619.020
21 X1 - Y9 1.7 618.960 618.930
22 X1 - Y10 1.625 618.760 619.005
23 X1 - Y11 1.83 618.570 618.800
24 X1 - Y12 2.175 618.175 618.455
25 X1 - Y13 - 617.900 618.220
26 X1 - Y14 - 618.530
27 X1 - Y16 - 618.090
28 X2 - Y3 0.77 619.695 619.860
29 X2 - Y4 1.4 619.200 619.230
30 X2 - Y5 1.59 619.035 619.040
31 X2 - Y6 1.715 618.905 618.915
32 X2 - Y7 1.77 618.880 618.860
33 X2 - Y8 1.77 618.885 618.860
34 X2 - Y9 1.745 618.875 618.885
35 X2 - Y10 1.83 618.660 618.800
36 X2 - Y11 1.7 618.625 618.930
37 X2 - Y12 1.78 618.210 618.850
38 X2 - Y13 2.24 617.960 618.390
39 X2 - Y14 1.95 617.850 618.680
40 X2 - Y15 - 617.765 618.375
41 X2 - Y16 - 617.680 618.125
42 X3 - Y3 0.92 619.790 619.710
43 X3 - Y4 1.365 619.260 619.265
Omni Levels
No Points IS Ori.Ex.GL GL . Trimurti Finished top
44 X3 - Y5 1.485 619.180 619.145
45 X3 - Y6 1.64 618.910 618.990
46 X3 - Y7 1.735 618.835 618.895
47 X3 - Y8 1.83 618.735 618.800
48 X3 - Y9 1.89 618.785 618.740
49 X3 - Y10 1.915 618.680 618.715
50 X3 - Y11 1.92 618.665 618.710
51 X3 - Y12 1.665 618.410 618.965
52 X4 - Y3 0.725 619.775 619.905
53 X4 - Y4 0.915 619.485 619.715
54 X4 - Y5 1.41 619.155 619.220
55 X4 - Y6 1.67 618.980 618.960
56 X4 - Y7 1.675 618.845 618.955
57 X4 - Y8 1.785 618.740 618.845
58 X4 - Y9 1.82 618.800 618.810
59 X4 - Y10 1.85 618.700 618.780
60 X4 - Y11 1.85 618.710 618.780
61 X4 - Y12 1.665 618.450 618.965
62 X5 - Y5 1.155 619.125 619.475
63 X5 - Y6 1.395 618.940 619.235
64 X5 - Y7 1.53 618.550 619.100
65 X5 - Y8 1.685 618.650 618.945
66 X5 - Y9 1.52 618.815 619.110
67 X5 - Y10 1.765 618.690 618.865
68 X5 - Y11 1.69 618.640 618.940
69 X5 - Y12 1.625 618.650 619.005
Remarks
Remarks