Construccin
PROYECTO
PRESUPUESTO
E. EJECUTADORA
TEM
01.00.00
01.01.00
01.02.00
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
02.06.00
02.07.00.00
02.08.00
03.00.00
03.01.00
03.02.00
03.04.00
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
04.06.00
04.07.00
yectos de Ingeniera, Arquitectura y
nstruccin
PARTIDAS
S/. 13,157.94
S/. 6,193.00
S/. 289,926.04
S/. 834.77
S/. 3,335.55
S/. 1,686.89
S/. 12,590.07
S/. 206,695.24
S/. 12,532.48
S/. 19,253.43
S/. 32,997.62
S/. 12,005.09
S/. 12.35
S/. 9,515.14
S/. 2,477.60
S/. 63,127.33
S/. 296.40
S/. 1,452.12
S/. 2,035.16
S/. 5,670.50
S/. 3,011.20
S/. 49,473.59
S/. 1,188.36
N VECES LONG ANCHO ALTURA
Z-1 2 1.7 0.9 2.05
Z-2 2 2.35 0.9 2.05
Z-3 2 0.85 1.7 2.05
Z-4 2 0.85 1.7 2.05
VIG. CIEMT 01 2 0.25 2.5 2.05
VIG. CIEMT 02 0
VIG. CIEMT 0
Z-8 0
Z-9 0
Z-10 0
DRYWALL M2
CANT. N VECES LONG H 128.3562
1 2 1.5 3.45 10.35
1 2 2.23 3.45 15.387
1 PLANTA
1 2 2.7 3.45 18.63
1 2 2 3.45 13.8
1 2 4 3.12 24.96
2 PLANTA 1 2 2.28 3.12 14.2272
1 2 2.05 3.12 12.792
1 2 2.75 3.12 17.16
VOL EXCAVACION PERFILADO AREA RELLENO
PACILA TOTAL DE VOL. PARCIAL TOTAL ALTURA
6.273 29.356 3.06 14.32 0.93
8.6715 4.23 0.93
5.9245 2.89 0.93
5.9245 2.89 0.93
2.5625 1.25 0.93
0
0
0
0
0
RELLENO CONCRETO P/ZAPATA
PARCIAL TOTAL ALTURA PARCIAL TOTAL
2.8458 13.3176 0.4 3.06 13.07
3.9339 0.4 4.23
2.6877 0.4 2.89
2.6877 0.4 2.89
1.1625 0.4