Anda di halaman 1dari 1

Shanghai Triumph Energy Conservation Engineering Co., Ltd.

Transmittal
Project Name:PAKCEM 12MW WHR PROJECT Contract NoSTEC-BCL-2015-EP-001

Ref No.:WHR-T-STEC-PAK-0007 Pages: 1 Date: DEC 5, 2015

To:(addressee) PAKCEM From: (sender) STEC

Copies to: Object:


1 We are forwarding you the following documents:
DRAWING NO. REV STAT. TITLE
SP BOILER
E1509-712B-052-01 0 01 PLAN OF SP BOILER FOUNDATION

GENERAL DESCRIPTION OF
STRUCTURAL DESIGN
E1509-991-052-01 0 01 GENERAL DESCRIPTION OF STRUCTURAL DESIGN (I)
E1509-991-052-02 0 01 GENERAL DESCRIPTION OF STRUCTURAL DESIGN (II)
E1509-991-052-03 0 01 GENERAL DESCRIPTION OF STRUCTURAL DESIGN (III)
E1509-991-052-04 0 01 GENERAL DESCRIPTION OF STRUCTURAL DESIGN (IV)
E1509-991-052-05 0 01 GENERAL DESCRIPTION OF STRUCTURAL DESIGN (V)

STAT. COPY:
01 FOR COMMENTS OR REVIEW C COPY
02 FOR APPROVAL D DISK
PLEASE ACKNOWLEDGE RECEIPT BY 03 FOR FABRICATION M MYLAR
SIGNING AND RETURNING ONE COPY. 04 RELEASED FOR BID P PRINT
05 FOR CONSTRUCTION R REPRODUCIBLE
06 FOR REFERENCE S SEPIA
07 CERTIFIED DRAWING T TRANSMITTAL
08 FOR INTERFACE
SIGNED: DATE:
INFORMATION
09 REVISED ASEXCHANGE
BUILT

1/1

Anda mungkin juga menyukai