I am doing a foundation design for a 50' x100' pre engineered metal building and it's tricky because I am designing the
foundation before the building is designed (custom design). My question is , can anyone give me a general idea of the
maximum column spacing that would be used for a building of this size?

Thank You

Replies continue below

Self and Dual-Powered Supply for Relays and Superconductive Factory Automation for Lower
Circuit Breakers Friction and Faster Manufacturing

3D-Printed Pavilion Lays Foundation for Additive NYU Holodeck Receives National Science
Construction Foundation Funding

Most Pre-engineered steel buildings in the US use either a 20 ft. or 25 ft. bay module as this is what standard 8" Z purlins can
span for roof loads and for wall girts.

Dead loads range between 10 and 15 psf for the roof.

The difficult thing to estimate is the lateral reactions of the moment frame bents as the different sizes, tapers, and relative
rigidities vary the horizontal thrust at the columns.

With all due respect I think you're asking for trouble.

Foundations for preengineered buildings typically consist of footings, piers, and grade beams along with a slab on grade. The
footings and wall piers are cenetered under the columns, and the grade beam is set up to carry the bottom of the metal stud

1 of 4 5/4/17, 5:57 AM
Foundation design for Pre-Engineered Building - Foun... http://www.eng-tips.com/viewthread.cfm?qid=100595

wall. All of this geometry is a function of many factors that are outside your control. How wll you ever be sure that the columns
will line up with your footings. It is typically done the other way around.

That having been said, if you can preorder the building you may be able to get a preliminary, not for construction, set of plans
from the manufacturer. You would then have to write into your spec that the building would have to conform to the preliminary
layout.

I would not recommend designing the foundation without any building plans.

Yes, I realize the difficulty with this case and that it is usually done the other way around. I was asked to come forth with a
preliminary design due to the fact that the building is a custom build and will not be available in the preliminary design. I
know...I know....all the things that can be said about the way this is going but if I could just get some general knowledge on the
column spacing for this 50' x 100' building, it would help me a lot.

Thank You

In what part of the country will the building be located in?

A "typical" PRELIMINARY foundation design for a metal building in the Midwest, subject to snow loads, with a frost penitration of
about 4', that would allow a general contractor to price the foundation system, based on allowable soil bearing of 3,000 psf,
would be:

Perimeter frost wall footings: 24" wide x 10" deep


w/ 3 - #5 cont. and #5
transverse at 30"

Perimeter frost wall: 10" wide x 36" deep


w/ 2 - #5 T & B and
#5 vert. @ 4' o.c.

Spot footings - Interior: 6' x 6' x 12" thick, no pier


w/ 6 - #6 each way

- Exterior: 6' x 6' x 12" thick, w/ pier


w/ 6 - #6 each way

Column Piers: 16" x 18" x 36" deep


w/ 6 - #6 vert. and
#3 ties at 12" and
#6 hair pins 10' long each and
(4) anchor bolts at each col.

Floor slab: 6" thick with 6x6-6/6 mesh

IF the building is 50' wide clear span, then there would be no interior spot footings and bays would be at 25'.

IF the building is 100' wide, then there would be a row of spot footings and bays could still be at 25'.

The above also assumes both end walls are expandable. In either case, there would be wind columns in the end walls that
would sit on the frost wall.

REMEMBER, this would be for preliminary pricing only and the final design must be based on the loads provided by the building
manufacturer on the final, approved shop drawings.

There isn't any trouble involved with this if you follow these steps:

1. Review two or three Pre-engineered bldg company manuals to get a concept of how these buildings are laid out.

2. You can dictate on your design/bid plans what roof loads and max. dead loads your foundation is designed to carry. Many
times we estimate the dead loads a bit high to allow for variations in the actual loads.

3. Set column locations to accommodate the different companies guidelines. - but most of these are as I said, on a 20 foot to
25 foot bay. 30 foot bays are also done.

2 of 4 5/4/17, 5:57 AM
Foundation design for Pre-Engineered Building - Foun... http://www.eng-tips.com/viewthread.cfm?qid=100595

4. Indicate on your plans what column loads you are basing your design on and indicate that if the actual column loads that
result from the actual building are higher, then the contractor/building manufacturer must notify you to adjust the foundation
design (your design loads getting exceeded is rare).

5. Require an engineer's seal on the building design.

I've designed quite a few of these foundations. Here are a few important concrete details that I have often seen over looked on
Pre-Fab building plans:

1. Overall slab dimensions will typically be larger than 50'x100'. Typical slabs will be 50'-3" x 100'- 3" because of a 1 1/2" sheet
ledge permiter around the entire foundation. The sheet ledge may vary depending on building mfgr. Most are 1-1/2".
2. Sheeting ledge should be stopped at all walk in doors.
3. If overhead roll up doors are used a detail should be shown to slope concrete away from the door. Otherwise water can
accumulate around roll up doors.
4. Plan for concrete to be pumped.
5. If you know who the building mfgr. is I suggest contacting them.

Do you know the parameters for the pre-engineered building? Low eave height, roof slope, spans, column spacings, minimum
clearance below steel, etc. I have designed many foundations for pre-engineered buildings before the building was
designed. And I have approached the problems in different ways: 1) I do the analysis myself, 2) I review loads/reactions from
standard manufacturers published literature (Butler being one that comes to mind) and 3) I call a rep. for the pre-engineered
building under consideration and they usually generate the loads based on the criteria that I give them for the geographic area
that the building is to be built. They all have computer software that quickly generates the reactions, the base plate dimensions
and number of anchor bolts and their spacings in a matter of minutes. They fax me the answers which can often be as many as
twenty sheets for each and all of the load conditions; then I do the combinations to meet the local code, (if their software did
not do it).

As the foundation designer I eventually see the final loads/reactions and can make modifications as required. However, if you
have not done many of these you should notify your client in advance that your design is preliminary and is to be only used for
developing budgetary costs, as the design may change if they the owner does not commit to the building parameters up front.

My question would be'What's so special about this bldg?' If there is a special use, it may add to the foundation. also believe and
follow advice listed above.

pmkPE,
I don't know in what circumstances you can get the info from a manufacturer of pre-engineered building if it is not a vendor (or
not yet). You can get that for free?

J1D,

I often times, on behalf of the owner, will select a building manufacturer (depending on what I have liked about their
construction or where the job is located in the past). Then I contact their represenative and get them in touch with the owner
so that they have a good feeling about getting the assignment. Often times they know that they are to get the work (I do a lot
of industrial jobs where our clients are not locked in to picking the lowest price, but can pick a prime contractor based on
performance (what a novel idea)).

Other times I run out the calculations by hand and can readily size up the worse case loadings; I will then do the foundation
design and then after the job is awarded I have the building manufacturer send me their loadings. I review against my original
design loads - I can not think of a time where there was any major changes other than revising bolt sizing and/or spacing to
match their preferred orientations.

Achwlidog,
The preceding messages gave pretty good ideas of the procedure. We designed a lot of pre-engineered building foundations as
well before the buildings were designed. We typically issued the architecture dwgs with design live loads to the bldg
manufacturer, to whom contract was awarded, and reviewed their design dwgs later. Before this time, the fdn was designed. In
this case, we designed the anchor bolts and asked the bldg designer to check.

If you are working on behalf of the owner or the bldg manufacturer is your subcontractor, you can get more help from them as
described by pmkPE. But in any case, you need to have the design experience of this type of building.

3 of 4 5/4/17, 5:57 AM
Foundation design for Pre-Engineered Building - Foun... http://www.eng-tips.com/viewthread.cfm?qid=100595

No Collateral & Hassle Free. Online


Business Loans
Application. Apply Now! for SMEs

Join | Advertise

Copyright 1998-2017 ENGINEERING.com, Inc. All rights reserved.


Unauthorized reproduction or linking forbidden without expressed written permission. Registration on or use of this site constitutes acceptance of our Privacy Policy.

4 of 4 5/4/17, 5:57 AM

Anda mungkin juga menyukai