wide, span 16m Very large column free areas Narrows Bridge, Perth Long central span of 97.5m (320ft) Deck designed as double cantilevers with suspended beams Continuous under live loads Anchored on north abutment and all expansion provided at south abutment Sg. Perak Bridge -Teluk Intan Main span 160m, side spans 95m Balanced cantilever Continuity at mid- span In-situ concrete with travelling formwork Second Severn Crossing Approach viaduct consist of precast twin box externally prestressed sections.
Each viaduct spanning
from Avon (English) and Ghent (Welsh) sides 2km and total of 25 span i.e. 80m in length. Gladesville Bridge, Sydney Deck comprised of eight precast prestressed beams spanning 30.4m Continuous over 19 spans Supported on precast prestressed columns Precast RC box- section ribbed arch, 304m span RIP Bridge, New South Wales Prestressed concrete cantilever bridge over RIP (Rapid Tidal Current) Central span 180m Supported on precast prestressed columns Precast PSC arch ribs, deck beams, verticals and diagonals