Anda di halaman 1dari 4
242016 Completions Module Questions - CM6 - Completion Equipment and Components Questions ‘Wiki Home « © Recent Changes CM6 - Completion Equipment and Components : hee ies Questions (/CM6+- ‘Search +Completion+Equipment+and+Components+ Questions) 2 Edi ~All Pages ‘@ 0 (]CM6+-+Completion+Equipment+and+Components+ Questions#discussion) Completions Module Question Papers Rev 1 @ 2 (/page/history/CM6~-+Completion+Equipment+and~Components+Questions) CCM - Introduction to Well Engineering Questions (M2 - HSE Questions. CM - Rig Selection Questions (/page/menu/CM6+-+Completion+Equipment+and+Components+Questions) M6 - Completion Equipment and Components CM4 «Logistics Questions | Rev 4.4 assctatetractatetartesbcig MBE RUD ns eandcean at tA0T2Oeb abst tetas ology Completions Engineers Questions (CMB - Completion Equipment and Components Questions ‘A completion engineer should be familar with the range of completion ‘equipment available forthe variety of completions which could be installed ‘The engineer should be able to specify the equipment to ensure it is suitable for the proposed duty for the life of the completion taking into account well Conditions (pressures, flow rates, temperatures) and produced / injected fluids. This section addresses these issues, M7 - Welheads and Trees Questions ous - Hydraulics Reference Material: Questions CM - Procurement and Bellarby, J, Well Completion design, section 6, (Developments in Inspection Questions Petroleum Science, Vol 56), Elsevier (CMO - Tubing Size Bellarby, J., Well Completion design, section 10, (Developments in Questions Petroleum Science, Vol 56), Elsevier M11 - Pore Pressure and cote Poesne Clegg, J-D., 2007, Petroleum Engineering Handbook, Volume IV: production Operations Engineering, Section 2, SPE, ISBN: 978-1- hitpleomplevorsmodulequestions well wikispaces neCM5+-+Completion*Equpment ands Components +Questions 1 242016 Questions (M2 - Cost Estimating and AFE Questions CMI - Fishing and Miting Questions (CM4 - Toraue and Drag Questions (CMS - Dil Sting Design Questions M16 - Wel Integrity Questions M17 - Tubing Stress Analysis Questions (CM18 - MCF Well Control Questions M9 - Detailed Completion Design Questions Completions Module Questions - CM5 - Completion Equipment and Components Questions 55563-118-5 ‘Questions 1. Describe the principal basic function of each of the following types of completion equipment a PBR », Packer «. Safety Valve 4. Nipples Tubing Hanger £. Flow Coupling 9. Gas Lit Mandret Fh. Chemical Injection Mantel |. Downhole Gauge |. Water Injection Valve i. Flud Loss Control Vawwe |. Control Lines m. Pup Joints 2. For each of the following pieces of equipment, give thee entical properties unique to that type of equipment which may cause the too to fall to deliver ther required duty if specified incorectly ‘8. Completion Packer ». Downhole Safety Valve © PRR 4, Fluid Loss Control Valve 3, Outline the purpose of nipple profiles installed inthe following locations within a werbore 2. In the Tubing Hanger », Above the DHSV ©. Below the Production Packer 4. Give four reasons for instaling permanent downhole pressure gauges within completion. 5, Explain the basic differences between a hydrostatic set packer and a hydraulic Set packer? Why might one be selected over the other? hitpleomplevorsmodulequestions well wikispaces neCMS+-+Completion+Equpmertand+ Components Questions 242016 Completions Module Questions - CM6 - Completion Equipment and Components Questions 6, Explain the basic differences between a permanent packer and 8 rettievable packer? Why might one be selected aver the other? 7. Whal checks are needed to ensure compatiblity between through tubing tooling and completion equipment? What checks can be made prior to well ‘completion and during completion instalation? 8. A tubing seal assembly isto be run in a well. What design checks are required to confirm the seal assembly specification prior to procurement? In what way should the completion programme address the correct installation of this equipment? 9, A sand control completion isto be installed in @ deep water gas reservoir \where reservoir pressure is expected to deplete from 15kps to 3kpsi over field life, The design engineer has designed the well with a 3m telescoping joint set stroked fully open betwven the packer and the sereens. Explain the purpose of this joint and wary the engineer may choose to install the too. 10, Explain the purpose of the folowing functional and technical specifications for equipment. Why would you include this detal as part of your specification of equipment for a well competion? ‘4 Equipment functionality »b. Service ie. ©. Conditions equipment willbe exposed to, 4. Fluids to be encountered le of wel «2, Setting method if applicable {Qualification standard requires 11. ISO 14310 & API Spec 11D are standards used in the selection, ‘manufacture, design and laboratory testing of packers. Which special design- validation grade within these standards calls fo testing to include a gas test axial load test, temperature cycling and bubble tight gas testing? How does. this differ from the design validation grade V1? 12. A packer has pre-set while running n hole. The completion has to be cut ‘and pulled and the packer milled to allow continued completion operations \What investigative steps are needed to understand why the packer pre-set? \What design & operational changes might you consider to reduce the chance ‘of a repeat once the completion is re-tun? 18, A 4.5" tubing hanger is to be run in a subsea well whichis to be ‘completed with 5.5° tubing and completion equipment. What installation, ‘operation and workover problems could occur due to this configuration? hitpleomplevorsmodulequestions well wikispaces neCMS+-+Completion+Equpmertand+ Components Questions a4 242016 Completions Module Questions - CM6 - Completion Equipment and Components Questions 2, Installation issues ». Operational issues «©, Workover issues 14, A safety valve is to be run in @ well where the contol fluid is 0.95.9, and the packer fluid has a 1.1 s.g. The valve has a closure pressure of 1250psia Calculate the failsafe setting depth, assuming a safety margin of 200psi 15, In which ways do the well conditions within @ HPHT well push the envelope on the specification and design of completion equipment? 16.You have chosen a brand new piece of equipment that has never been run anywhere else in the oilfield, It is essential for your well to be successful but You wish to conduct teste to ensure itis fit for purpose. What design and installation reviews should you consider prior to ordering the equipment and (on delivery of the frst component ex manufacturers works? 17. A Tubing retrievable safety valve has failed to test during completion running. It did not hold pressure during an inflow test on the flapper and the control ine pressure was seen to leak during pressure testing, indicating ‘multiple points of failure. The tubing has been recovered and a back-up valve run in its place. This has also failed in a similar manner and the well has been suspended to allow a fallure investigation. What modes of failure do you need ta consider and how would you approach this during equipment strip down? ® Add Discussion hitpleomplevorsmodulequestions well wikispaces neCMS+-+Compleion+Equpmertand+ Components +Questions

Anda mungkin juga menyukai