Bill of Quantities
Rate (NRs.)
S. N. Description of work Unit Quantity Amount( NRs.)
In figure In words
A General item
Insurance for the loss of damage to works, plant,
1 material, equipment property and personnel injury or Ls 1.00
death and third party as per contract data.
B Roadway Excavation
Earth work excavation for road works in all types of
1 soil/rock including disposal etc. all complete as per m3 2250.00
specification.(905)*
C Quantity of 60 cm diameter Humepipe Culvert
Earth work excavation for drain and trenches
1 including shoring,struting,bracing,sheeting, disposal m3 33.42
and all complete as per specification.
BoQ Page 1 of 3
Bill of Quantities
BoQ Page 2 of 3
Bill of Quantities
TOTAL
VAT (13%)
GRAND TOTAL
Notes :
1 All the works as listed above shall be completed complying the Specification, Name of the Bidder's Firm:
the Special Provision and other Contract Documents. The numbers enclosed
in the bracket in the particulars represent DOR Standard Specifications
Section Number.
2 The cost of laboratory tests as stipulated in the Standard Specification and Signature of the Authorised Person:
QAP shall be borne by the Contractor and such cost is deemed to be included
in the relevant BOQ items.
Name of the Authorised Person:
3 The payment against Provisional Sum item is based on the net cost as
supported by original invoices plus 10% of the total amount to cover all costs
of handling, transportation, storage, ancilliary works, overhead and profit. Seal of the Firm:
BoQ Page 3 of 3