Submitted to
Humayun Shuja
Submitted by
Introductory page
Executive Summary
Industry Analysis
Macro environments
Specific industry environment & competitor analysis
Market Segmentation Basis and Identification of Target Market
Description of Venture
Production Plan
Operation Plan
2
Marketing Plan
Product
Pricing
Distribution
Promotion
Controls
Organizational Plan
Form of ownership
Identification of partners or principal shareholders and their
respective Authorities
Middle Level Management team
Formal design of organization
Assessment of Risk
S.W.O.T Analysis
Contingency plans
Financial Plan
Appendix
Letters
Market research data
Leases or Contract
Price lists from suppliers
3
A Words of Gratitude
We would like to thank our professor Mr. Humayun Shuja for giving
us the opportunity to carry out this knowledge-full activity.
Special thanks to our parents and peers who pray for our success. Our
special thanks to the group members who have whole heartily worked for the
completion of this project. All of us have had a valuable and worthy
experience during the project.
4
Introductory page
Name and address of business:
Production plant:
Site Office:
1. Mehreen Najib
Director Finance
House # 55, Street # 25,
I-10/2, Islamabad
mehreen_najib@Punjab cement.pk
2. Gulshan Batool
Director Marketing & HR
House # 1420, Street # 71,
G-10/4, Islamabad
gulshan_batool@Punjab cement.pk
3. Masooma Akhtar
Director Production
House # 59, St # 41,
G-5, Islamabad
masooma_akhtar@Punjab cement.pk
5
Nature of business:
Our Mission:
Our Vision:
Our Slogan:
The total fund is required to installed the cement plant are Rs. 65
millions. Rs. 45 millions is our personal equity and remaining Rs. 20 millions
are borrowed from the Bank. Rs. 50 millions is required for machinery and
installation, Rs. 10 millions for quality assurance equipment, office
equipment and for marketing purposes and remaining Rs. 5 millions used for
working capital to grow our business.
6
Industry Analysis
The company has achieved its premier position by virtue of its solid
focus on management, technology, production and marketing leadership.
We are in the business of providing quality shelter, cement and related
construction materials, and related services at competitive prices, in a way
that promotes sustainable development.
Economy:
The economic value of the total worth of the country with the global
perspective rates rising, so we use the imported as well as local raw material
from the supplies. Therefore we control the customers at reasonable prices.
Cultural:
Technology:
Legal Concerns:
7
Competitor Analysis:
Fecto Cement
Fauji Cement
Star Cement
Master Cement
Global Cement
Decent Cement
Mughal Cement
Islamabad/Rawalpindi
Lahore
Multan
Faisalabad
Gujranwala
Taxila/Fateh Jhang/Wah Cantt
Target market:
The target market is not an easy task for an entrepreneur. So thats why
we are targeting the main sectors which help us to start new business.
Punjab cement can be improved their standards as per customer
8
requirements and satisfactions. Each segment has sufficient potential sizes
and having a wide range of hardness as per requirement of customers. There
are few sectors a listed below:
Construction Companies
Wholesalers
Government
Industrialist
Multinational Companies
Contractors
Description of Venture
9
We strictly comply with our quality policy and each employee works
under the slogan Better Shelter for a Better Life.
Product/Services details:
PCC is designed for general use of constructions, such as houses, high rise
buildings, bridges, concrete road, pre-cast and pre-stressed concrete.
OWC is a special type of cement used for oil and natural gas drilling, either
onshore or offshore. OWC is mixed into slurry and is then injected between
the drilling pipe and the oil well casing where it is able to set and harden thus
bonding the pipe to the casing.
White Cement:
White cement is used for exterior and interior building decorations. Punjab
cement which is the only white cement producer in Pakistan, has sufficient
production capacity to satisfy total domestic white cement demand.
10
Office Equipment:
Personnel:
11
Background of Entrepreneurs:
Mehreen Najib
MBA & MS (Finance)
Gulshan Batool
MBA & M.Phill (HR & Marketing)
Masooma Akhtar
MBA & MS (HRM and Procurement Specialist)
12
Production Plan
Complete Manufacturing process:
Production Process:
13
Quarrying:
The main raw materials used in cement production are limestone, silica
sand, clay, iron sand and gypsum. Limestone, clay and silica sand are
quarried by drilling and blasting and then brought to the crushing plants
located adjacent to the quarries. Crushed limestone, clay and silica sand are
then delivered by means of conveyor belt system or by truck.
In wet-process system, raw materials are ground wet and fed to the
kiln in slurry form, which results in relatively high rates of heat consumption.
In dry-process system, raw materials are ground dry and fed to the kiln in
powder form. Given this advantage, dry-process kilns have been used by
modern cement producers. Punjab cement uses the dry-process kilns, which
consume less heat and are more efficient than wet-process kilns.
Raw materials are dried in rotary dryers using waste heat from the kiln.
The moisture content is greatly reduced to improve quality control and
handling. The dried materials are mixed and fed to raw grinding mills to
produce "raw meal". During the process of grinding, samples are tested half-
hourly through X-ray analyzers to ensure consistent raw meal quality. The
blended raw meal is delivered into storage silos.
14
Hot clinker from the rotary kiln is discharged onto coolers where it is
quenched and cooled by fresh air from high capacity fans. The air that
passes through the clinker layer is thereby heated and is subsequently used
as combustion air in the kiln. Cooled clinker is delivered to clinker silos.
Finish Grinding:
From clinker silos, the cooled clinker is mixed with gypsum and fed into
the grinding mill to produce cement. The finished cement is then pumped
into cement silos.
Packing:
Cement is transferred from the storage silos to the packing plant for
bag and bulk loading. Bagging is done by high speed in line and rotary
packing machines. Filled bags are automatically weighed, sealed and loaded
onto trucks by conveyor belt. The total combined rated capacity of all Punjab
cement's packing machines is 5,000 tons per hour. Bulk cement is loaded
into special tank trucks for delivery to customers' portable silos at
construction sites or is trucked to Punjab cement's port facilities.
15
Making Bags for Cement Mining Machinery
16
Ahmed Tariq & Co. Trading
M.R. 6/4, Noor Mansion, Virjee Street,
Jodia Bazar, Karachi
Phone: 021-2442732
Fax: 021-2474927
Email: atvohra@yahoo.com
17
P.O.Box: 1120, Karachi.
Phone: 021-5611020/5611019/5611841/5611842
Fax: 021-5610820
Email: attock@digicom.net.pk
18