Anda di halaman 1dari 750

A- DEMOLISHER

A 001 Demolition of brick work in cement motar, bricks stacked and debris cleared away
from second floor level to roof level
PER Cu.m

L 001 Unskilled labour hour 7 0.00

ALLOW FOR SCAFFOLDING - STEEL

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A 002 Demolition of brick work in cement motar, bricks stacked and debris cleared away
from first floor level to second floor level
PER Cu.m

L 001 Unskilled labour hour 5.7 0.00

ALLOW FOR SCAFFOLDING - STEEL

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A 003 Demolition of brick work in cement motar, bricks stacked and debris cleared away
from ground floor level to first floor level
PER Cu.m

L 001 Unskilled labour hour 5 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
ay
A - DEMOLISHER

A004 Demolition of cadjan roof or wall, timber stacked and debris cleared away, for
single storey building
PER Sq.m.

L001 Unskilled labour hour 0.2 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A005 Demolition of ceiling,materials stacked and debris cleared away, for


single storey building

PER Sq.m.

L002 Unskilled labour hour 0.5 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A006 Demolition of unreiforced concrete in ground floor slab (150mm)


and debris cleared away

PER Sq.m.

L001 Unskilled labour hour 4 0.00

SUB TOTAL 0
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A007 Demolition and removing of reinforced concrete (100mm) in roof or floor slabs
and debris cleared away (first floor level) scaffolding paid seperately

PER Sq.m.

L001 Unskilled labour hour 5.6 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
A - DEMOLISHER

A008 Removal of Galvanised iron or asbestos or aluminium corrugated sheets from roofs or
wall from a single storey building and stacked. Removal of frame work paid seperately

PRE Sq.m.

L001 Unskilled labour hour 0.6 0.00

ALLOW FOR SCAFFOLDING - STEEL

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A009 Removal of corrugated Galvanised iron or asbestos or aluminium sheets from roof
or walls of two storeyed buildings and stacked. Removal of frame work paid seperately

PER Sq.m.

L001 Unskilled labour hour 0.8 0.00

ALLOW FOR SCAFFOLDING - STEE

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A010 Removal of corrugated Galvanised iron or aluminium or asbestos sheets from roof or
walls of 3 storeyed buildings. Removal of frame work paid seperately.

PER Sq.m.

L001 Unskilled labour hour 1.0 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
Basket day

Concrete Mixer hour

Lorry 3 Tonnes hour

Lorry 5 Tonnes hour

Tractor 75 Cubes hour

Vibrator hour
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

Black Smith Hour

Carpenter Hour

Glazier Hour

Mason Hour

Painter Hour

Plumber Hour

Skilled labour Hour

Skilled Labour * Day

Terrazzo Mason Hour

Tinker Hour

Unskilled Labour Hour

Unskilled Labour * Day

Sanitary labour Day


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

1/2" M/s/ rods Kg.

100mm x 100mm Aluminium grating No.


150mmx150mm Aluminium grating No.
100mm x100mm Class I timber beams(4" x 4 m

10mm chip board (8'x4') m2


10mm chip board (8'x4') * No.
1125 L, 16 BWG G.I. Tank No.
1150 X 2060 X 32MM

12mm Brass Screws Gauge 6 Nos.

12mm chip board (8'x4') m2


12mm chip board (8'x4') * No.
12mm chromium plated stop cock. No.

12mm heavy quality brass push tap No.

12mm light brass push tap No.

12mm thick class I timber planks m2

12mm x 12mm class I timber beadings m

12mm x 12mm imported class I timber fillets Lm.

12mm x 12mm local class I timber fillets m

12mm x 12mm local Class II timber fillets. L.M.

150mm x 150mm Grating Aluminium No.

16mm Brass Screws Gauge 8 Nos.

16mm x 16mm Class 1 timber m

1800 L, 16 BWG G.I. Tank No.

2" x 4" H iron Kg.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
200mm x 200mm ceramic floor tile. No.

20mm G.I. Clout nails Kg

20mm thick class A imported timber planks m2

20mm thick planks of class I local timber m2

20mm x 20mm Class 1 timber battens m

25mm brass screws - 8 Nos.

25mm thick class I imported timber planks m2

25mm thick planks of Class I local timber m2

25mm thick planks of Class II local timber m2

25mm thick Teak timber planks m2

25mm x 20mm imported timber fillets m

25mm x 25mm class I local timber fillets Lm.

25mm x 25mm Teak Timber m

28mm thick Class I timber planks. m2

28mm x 15mm Class I timber m

28mm x 28mm Class A timber. m

28mm x 28mm Class I timber m

31mm thick imported class I timber planks m2

32mm to 38mm thick (Burma Teak) imported C m

32mm x 12mm local class 1 timber fillets m

32mm x 32mm Class I timber m


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
32mm x 32mm Teak timber m

38mm x 200mm timber coping in Class 1 m3

400 gal round plastic shell Tank No.

400 L , 16 BWG G.I. Tank No.

40mm to 50mm x 12mm class I timber fillets m

40mm to 50mm x 12mm local class I timber fi m

40mm x 40mm class I timber sash bars L.M.

40mm x 40mm class II timber sash bars L.M.

50mm brass screws Gauge 8 No.

50mm iron screws Gauge 10 Nos.

50mm x 12mm Class A timber. m

50mm x 12mm Class I timber m

50mm x 12mm Class II local timber. m

50mm x 15mm Class A timber. m

50mm x 15mm Class I timber m

50mm x 25mm Class A timber m

50mm x 25mm class I local timber fillets m

50mm x 25mm class I timber m

50mm x 25mm Class II local timber. m

50mm x 25mm class II timber m

50mm x 50mm thick class 1 timber m

5mm iron nails Kg


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

600mm x 125mm glass shelf with chromium No.

Alkali resisting primer * Lit.

Aluminium paint Lit.

Aluminium Wood Primer * Lit.

Angle iron 40 x 40 x 6mm * m

Angle iron 50 x 50 x 7mm * Kg.

Anti - Corrosive Paint * Lit.

Asbestos cement riding(pair) Nos.

Asbestos plain ceiling sheet 1220 x 1220mm No.

Assistgate valve, heavy quality brass 20mm No.

Ball only (Plastic) 1" valve No.

Ball only (Plastic) 1/2" valve No.

Ball only (Plastic) 3/4" valve No.

Ball Valve, 12mm (Plastic) No.

Ball Valve, 20mm No.

Ball Valve, 25mm No.

Ball Valve, 32mm No.

Barbed wire * Kg.

Basin 360 x 560 with tap waste plug but excl No.

Bend G.I. 12mm No.

Bend G.I. 20mm No.

Bend G.I. 25mm No.

Bend G.I. 32mm No.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
Bend G.I. 38mm No.

Bend G.I. 50mm No.

Bend G.I. 63mm No.

Bend G.I. 75mm No.

Bend PVC 20mm No.

Bend PVC 25mm No.

Bend PVC 32mm No.

Bend PVC 40mm No.

Bend PVC 50mm No.

Bend PVC 63mm No.

Bend PVC 75mm No.

Bend PVC 90mm No.

Bib Cock Brass, 12mm - English No.

Bidets - White No.

Binding wire * Kg.

Bitumen * Kg.

Bitumen washers No.

Boiled Lime Kg

Bolt and nut iron 125 x 10mm No.

Bolt and nut iron 125 x 12mm No.

Bolt and nut iron 150 x 12mm No.

Bolt and nut iron 225 x 10mm Kg.

Bolt and nut iron 225 x 10mm No.

Bolt and nut iron 45 x 6mm No.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

Bolt and nut iron 63 x 10mm No.

Bolt Barrel Brass 100mm * No.

Bolt Barrel Brass 125mm * No.

Bolt Barrel Brass 150mm * No.

Bolt Barrel Brass 63mm * No.

Bolt Barrel Brass 75mm * No.

Bolt Skeleton Brass 200mm * No.

Bolt Skeleton Brass 250mm * No.

Bolt Skeleton Brass 300mm * No.

Bolt Skeleton Brass 450mm * No.

Bolt Tower iron 100mm * No.

Bolt Tower iron 125mm * No.

Bolt Tower iron 150mm * No.

Bolt Tower iron 75mm * No.

Brass door knob No.

Brick 1000nos

Cabin Hook & Eye Iron 150mm * No.

Cabin Hook & Eye Iron 200mm * No.

Cabin Hook & Eye Iron 50mm * No.

Cabin Hook & Eye Iron 75mm * No.

Cabin Hook Brass 150mm * No.

Cabin Hook Brass 200mm * No.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
Cabin Hook Brass 225mm * Nos.

Cabin Hook Brass 250mm * No.

Cabin Hook Brass 300mm * No.

Cabin Hook Brass 50mm * No.

Cabin Hook Brass 75mm * No.

Calicut pattern flat tiles No.

Calicut pattern ventilator tiles No.

Cap PVC 20mm No.

Cap PVC 25mm No.

Cap PVC 32mm No.

Cap PVC 40mm No.

Cap PVC 50mm No.

Cap PVC 63mm No.

Cap PVC 75mm No.

Casement Fastner Brass * No.

Casement Stay Brass 250mm * No.

Casement Stay Brass 300mm * No.

Cement 50kg

Cement block 100 x 200 x 400mm 1 No.

Cement block 150 x 200 x 400mm 1 No.

Cement block 200 x 200 x 400mm 1 No.

Chromium plated chain for flushing cistern No.

Cistern Bracket Pair

Cistern High level C.I. - including 1/2" dia Bal No.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

Clay m3

Close fitting asbestos ridging Pair

Closet pedestal type No.

Coal Tar Lit.

Coconut rafters m

Colour pigment for cement Kg.

Coloured cement Kg.

Conduit Pipe 18mm m

Conduit Pipe 20mm m

Conduit Pipe 25mm m

Conduit Pipe 30mm m

Conduit Pipe 40mm m

Conduit Pipe 50mm m

Connector G.I. 12mm No.

Connector G.I. 20mm No.

Connector G.I. 25mm No.

Connector G.I. 32mm No.

Connector G.I. 38mm No.

Connector G.I. 50mm No.

Connector G.I. 63mm No.

Connector G.I. 75mm No.

Corrugated asbestos sheet Sq.m.

Corrugated G.I. Sheet 24 BWG Sq.m.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
Cove moulding(63mmx40mm)imported class m

Cove moulding(63mmx40mm)local class I m

Door handle Nos.

Down pipe Clip PVC 89mm No.

Down pipe Elbow PVC 89mm No.

Down pipe joiner PVC 89mm No.

Down pipe PVC 89mm m

Down spout square PVC 114mm - Large m

Down spout square PVC 114mm - Small m

DPC Tar *
Lit.

Drainage Bend PVC 110mm 880 No.

Drainage Tee PVC 110mm 880 No.

Drainage 'Y' Junction PVC 110mm Inspection -45No.

Drive Screws and washers Nos.

Elbow G.I. 12mm No.

Elbow G.I. 20mm No.

Elbow G.I. 25mm No.

Elbow G.I. 32mm No.

Elbow G.I. 38mm No.

Elbow G.I. 50mm No.

Elbow G.I. 63mm No.

Elbow G.I. 75mm No.

Elbow PVC 20mm No.

Elbow PVC 25mm No.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

Elbow PVC 32mm No.

Elbow PVC 40mm No.

Elbow PVC 50mm No.

Elbow PVC 63mm No.

Elbow PVC 75mm No.

Elbow PVC 90mm No.

Emulsion * Lit.

Enamel * Lit.

Equal Tee PVC 20mm No.

Equal Tee PVC 25mm No.

Equal Tee PVC 32mm No.

Equal Tee PVC 40mm No.

Equal Tee PVC 50mm No.

Equal Tee PVC 63mm No.


Equal Tee PVC 75mm No.
Fanlight Catch Brass * No.

Faucet Socket PVC 110mm No.

Faucet Socket PVC 20mm No.

Faucet Socket PVC 25mm No.

Faucet Socket PVC 32mm No.

Faucet Socket PVC 40mm No.

Faucet Socket PVC 50mm No.

Faucet Socket PVC 63mm to smaller size No.

Faucet Socket PVC 75mm No.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
Faucet Socket PVC 90mm No.

Fibre glass storage tank 400 gals. No.

Fittings for Bidet - Indian No.

Fittings for Cistern No.

Floor Paint - Quick drying Lit.

Floor Paint (Epoxy) * Lit.

Flush pipe PVC (32mm) No.

G.I. 18 BWG sheets(plain) m2

G.I. 22 BWG sheets(plain) m2

G.I. 24 BWG sheets(plain) m2

G.I. Bolts and nuts No.

G.I. Hook bolts No.

G.I. Hook bolts 8mm x 115mm Nos.

G.I. Joint nut 12mm No.

G.I. Joint nut 20mm No.

G.I. Joint nut 25mm No.

G.I. Joint nut 32mm No.

G.I. Joint nut 38mm No.

G.I. Joint nut 50mm No.

G.I. Reducing socket 25mm to smaller No.

G.I. Ridging 2m x 1m - 24 B.W.G. Nos.

G.I. sheet 18 B.W.G. Sq.m.

G.I. Sheet 24 B.W.G. Sq.m.


Gate valve, heavy quality brass 12mm No.
Gate valve, heavy quality brass 20mm No.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

Gate valve, heavy quality brass 25mm No.

Gate valve, heavy quality brass 32mm No.

Gate valve, heavy quality brass 38mm No.

Glass pane clear 3mm Sq.m.

Glass pane clear 4mm Sq.m.

Glass pane Figured 3mm Sq.m.

Glass pane Figured 5mm Sq.m.

Glass Tray Holder 100 x 100mm - White Pair

Glue Kg.

Grating 100mm x 100mm Aluminium No.

Gravel m3

Gutter Bracket half round (Short Arm Alumin No.

Gutter Bracket Square PVC 114mm No.

Gutter End Cap square PVC 114mm No.

Gutter End Cap half round PVC 150mm No.

Gutter Half round PVC 150mm x 4m m

Gutter Joiner square PVC 114mm No.

Gutter Joiner half round PVC 150mm No.

Gutter square PVC 114mm m

Hasp and staple Iron 100mm * No.

Hasp and staple iron 150mm No.

Hasp and staple safety type Brass 100mm No.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
Hasp and staple safety type Brass 150mm No.

Hat Hook Brass No.

High level plastic - plastic No.

Hinge butt brass 100mm No.

Hinge Butt Brass 100mm x 63mm No.

Hinge Butt Brass 125mm x 100mm No.

Hinge Butt Brass 38mm x 25mm No.

Hinge Butt Brass 50mm x 38mm No.

Hinge Butt Brass 75mm x 38mm No.

Hinge Butt Brass 89mm x 63mm No.

Hinge Butt iron 100mmx63mm No.

Hinge Butt iron 125mmx100mm No.

Hinge Butt Iron 50mmx38mm No.

Hinge Butt iron 75mmx38mm No.

Hinge Centre Pivot Brass Set

Hinge Gravity Brass No.

Hinge Parliamentary Brass 100mm No.

Hinge Parliamentary Brass 125mm No.

Hinge Parliamentary Brass 150mm No.

Hinge Spring Double Acting Brass 100mm No.

Hinge T iron 150mm No.

Hinge T iron 200mm No.

Hinge T iron 250mm No.

Hinge T iron 300mm No.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

Holdfasts Nos.

Holdfasts - 250 x 25 x 6 Nos.

Holdfasts - 400 x 25 x 6 Nos.

Hooks 38mm G.I. Pipes No.

Hooks for 12mm G.I. Pipes No.

Hooks for 20mm G.I. Pipes No.

Hooks for 25mm G.I. Pipes No.

Hooks for 32mm G.I. Pipes No.


Hooks for 38mm G.I. Pipes No.
Imported Timber Cu.m.

Kitchen sink 600 x 375 x 175mm - White No.

Leather washer No.

Limpet washers Nos.

Lock Cupboard Four Levers Brass 63mm No.

Lock mortice single local made No.

Lock Mortice Union Double Sash No.

Lock Mortice Union Single Sash No.

Lock Rim Double Lever Brass 150mm No.

Lock Rim single Lever Brass 150mm No.

Low level cistern - white No.

Low level cistern - white - plastic No.

Low level closet unit No.

Low level commode with Trap - White No.

Lunumidella 150 x 12mm Sq.m.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
Lunumidella 150 x 20mm Sq.m.

Manhole Cover 600mm x 600mm with frame No.

Metal 20mm m3

Metal 25mm m3

Metal 40mm m3

Metal 50mm m3

Mild steel * Kg.

Mild steel flat * Kg.

Mirror Frame Oval - White (380 x 330) mm No.

Mirror Frame Square - white (320 x 280) mm No.

Mirror only, oval (380 x 330) mm No.

Mirror only, square No.

Mitre Joint half round PVC 150mm No.

Mitre Joint square PVC 114mm No.

Mould oil Lit.

Night Latch - China No.

Nipple G.I. 12mm No.

Nipple G.I. 20mm No.

Nipple G.I. 25mm No.

Nipple G.I. 32mm No.

Nipple G.I. 38mm No.

Nipple G.I. 50mm No.

Nipple G.I. 63mm No.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

Nipple G.I. 75mm No.

Oil paint (Gloss) * Lit.

Pillar Cock Chromium Plated 12mm No.

Pillar Cock Chromium plated 20mm No.

Pintels and stay hinges 50mm x 6mm x 1m Nos.

Pipe G.I. 12mm m

Pipe G.I. 20mm m

Pipe G.I. 25mm m

Pipe G.I. 32mm m

Pipe G.I. 38mm m

Pipe G.I. 50mm m

Pipe G.I. 63mm m

Pipe G.I. 75mm m

Pipe PVC 110mm type 1000 m

Pipe PVC 110mm type 400 m

Pipe PVC 110mm type 600 m

Pipe PVC 20mm type 1000 (Anton) m

Pipe PVC 25mm type 1000 m

Pipe PVC 32mm type 1000 m

Pipe PVC 32mm type 600 m

Pipe PVC 40mm type 1000 m

Pipe PVC 40mm type 600 m

Pipe PVC 50mm type 1000 m


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
Pipe PVC 50mm type 400 m

Pipe PVC 50mm type 600 m

Pipe PVC 63mm type 1000 m

Pipe PVC 63mm type 400 m

Pipe PVC 63mm type 600 m

Pipe PVC 75mm type 1000 m

Pipe PVC 75mm type 400 m

Pipe PVC 75mm type 600 m

Pipe PVC 90mm type 1000 m

Pipe PVC 90mm type 400 m

Pipe PVC 90mm type 600 m

Plaster of paris * Kg.

Plug G.I. 12mm No.

Plug G.I. 20mm No.

Plug G.I. 25mm No.

Plug G.I. 32mm No.

Plug G.I. 38mm No.

Plug G.I. 50mm No.

Plug G.I. 63mm No.

Plug G.I. 75mm No.

Plugs No.

Plugs PVC 20mm No.

Plugs PVC 25mm No.

Plugs PVC 32mm No.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

Plugs PVC 40mm No.

Plugs PVC 50mm No.

Plugs PVC 75mm No.

Plywood board, 12mm M.R. Sq.m.

Plywood board, ordinary 25mm Sq.m.

Plywood board, ordinary M.R. 1150x2060x3 No.

Plywood board, ordinary M.R. 3mm Sq.m.

Plywood board, ordinary M.R. 6mm Sq.m.

Plywood board, ordinary M.R. 9mm Sq.m.

Plywood door ordinary M.R. 838 x 2060 x 3 No.

Plywood door, ordinary B.R. 686x2060x32m No.

Plywood door, ordinary M.R. 686x2060x32m No.

Polythane Varnish * Lit.

Props (bamboo) 3 - 4 m No.

Pudlo Cement Kg.

PVC 75mm socket No.

PVC 90mm socket No.

PVC Elbow 110mm No.

PVC Elbow 75mm No.

PVC Elbow 90mm No.

Rag bolts No.

Rawl plugs. No.

Red lead Kg.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
Red Lead Paint * Lit.

Reducing Socket G.I. 20mm to smaller No.


Reducing Socket G.I. 25mm No.
Reducing Socket G.I. 32mm No.

Reducing Socket G.I. 38mm No.

Reducing Socket G.I. 50mm No.

Reducing Socket G.I. 75mm No.

Reducing Socket PVC 25mm to smaller size No.

Reducing Socket PVC 32mm to smaller size No.

Reducing Socket PVC 40mm to smaller size No.

Reducing Socket PVC 50mm to smaller size No.

Reducing Socket PVC 63mm to smaller size No.

Reducing Tee PVC 25mm to smaller size. No.

Reducing Tee PVC 32mm to smaller size. No.

Reducing Tee PVC 40mm to smaller size. No.

Reducing Tee PVC 50mm to smaller size. No.

Reducing Tee PVC 63 mm to smaller size. No.

Ridge tile calicut pattern Gr. I No.

Ring Brass 45mm to 38mm No.

Rivets (6.3mm x 10mm) No.

Robe Hook 100 x 100mm - White No.

Roofing nails Kg.

Rubber plug 25mm to 32mm No.

Rubber plug 32mm to 50mm No.

Rubble 150mm to 225mm m3


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

Running head PVC 150mm No.

Running Head Square PVC 114mm No.

Sand m3

Screws Brass 12mm x Gauge 4 Doz.

Screws Brass 12mm x Gauge 5 Doz.

Screws Brass 20mm x Gauge 6 Doz.

Screws Brass 25mm x Gauge 7 Doz.

Screws Brass 30mm x Gauge 7 Doz.

Screws Brass 40mm x Gauge 8 Nos.

Screws Brass 45mm x Gauge 9 Doz.

Screws Brass 50mm x Gauge 8 No.

Screws Brass 16mm x Gauge 7 Nos.

Screws Brass 20mm x Gauge 8 Doz.

Screws Brass 25mm x Gauge 8 Doz.

Screws Brass 30mm x Gauge 8 Doz.

Screws brass 30mm x guage 8 Doz.

Screws Brass 40mm x Gauge 8 Doz.

Screws brass 50mm x Guage 10 Nos.

Screws Iron 12mm x Gauge 6 * Doz.

Screws Iron 12mm x Gauge 8 * Doz.

Screws Iron 16mm x Gauge 6 * Doz.

Screws Iron 16mm x Gauge 8 * Doz.

Screws Iron 20mm x Gauge 6 * Doz.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
Screws Iron 25mm x Gauge 8 Doz.

Screws Iron 30mm x Gauge 8 Doz.

Screws Iron 40mm x Gauge 8 Doz.

Screws Iron 45mm x Gauge 8 Doz.

Screws Iron 50mm x Gauge 8 No.

Seat cover plastic - Indian No.

Shower Rose Copper 150mm x 12mm No.

Shower Rose PVC 150mm x 12mm No.

Slaked lime Kg.

Slaked lime Bushels

Snowcem Kg.

Soap Holder - White No.

Socket G.I. 12mm No.

Socket G.I. 20mm No.

Socket G.I. 25mm No.

Socket G.I. 32mm No.

Socket G.I. 38mm No.

Socket G.I. 50mm No.

Socket G.I. 63mm No.

Socket G.I. 75mm No.

Socket PVC 20mm No.

Socket PVC 25mm No.

Socket PVC 32mm No.

Socket PVC 40mm No.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

Socket PVC 50mm No.

Socket PVC 63mm No.

Socket PVC 75mm No.

Socket PVC 90mm No.

Solvent cement 50Grams

Spur Stones No.

Squatting Pan (M) with 'P' Trap No.

Stop cock Brass, 12mm - Italy No.

Stop cock Brass, 20mm No.

Stop cock Brass, 25mm No.

Stop cock Brass, 32mm No.

Stop cock Brass, 38mm No.

Stop cock Brass, 50mm No.

Straining bolts 16mm dia. No.

Tap for wash Basin (M) - Malasiyan No.

Tee equal PVC 75mm No.

Tee equal PVC 90mm No.

Thinner * Lit.

Tile calicut pattern Gr. I No.

Tile cement pressed 200 x 200mm No.

Tile glazed 108 x 108mm * No.

Tile half round (asbestos covering) Gr. I No.

Tile half round Gr.I No.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
Tile Terrazzo 300 x 300mm * No.

Timber beams Class I Cu.m.

Timber beams Class ii Cu.m.

Timber beams Class iii Cu.m.

Timber plank 25mm class i Sq.m.

Timber plank 25mm class ii Sq.m.

Timber plank 25mm class iii Sq.m.

Timber plank 31mm Class i Sq.m.

Timber plank 31mm Class ii Sq.m.

Timber plank 31mm Class iii Sq.m.

Timber plank 38mm class i Sq.m.

Timber plank 38mm class ii Sq.m.

Timber plank 38mm class iii Sq.m.

Timber planks 25mm class B Sqm.

Toilet Paper Holder 150 x 150 mm - White No.

Tooth Brush Holder 200 x 100mm -White No.

Tor steel * Kg.

Towel Rack Bar 750 mm No.

Towel Rack Holder 100 x 100mm - White Pair

Tower bolts, iron 250mm No.

Two way tap for wash Basin (L) - Italy No.

Urinal - White No.

Valve Socket PVC 20mm No.

Valve Socket PVC 25mm No.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

Valve Socket PVC 32mm No.

Valve Socket PVC 40mm No.

Valve Socket PVC 50mm No.

Valve Socket PVC 63mm No.

Valve socket PVC 75mm No.

Valve socket PVC 90mm No.

Wash Basin (L) Bracket Pair

Wash Basin (L) Waste No.

Wash Basin (L) with Pedestal - White No.

Wash Basin (L) without Pedestal - White No.

Wash Basin (M) Bracket Pair

Wash Basin (M) Round - White * No.

Wash Basin (M) Waste No.

Weathershield * Lit.

Weld mesh(galvanised) 50 x 50mm, Gauge 10 m2

Wire Dome, 100mm No.

Wire Dome, 50mm No.

Wire nail S.W.G. 12 to 14 * Kg.

Wire nail S.W.G. 4 to 10 * Kg.

Wire nail S.W.G. 4 to 14 * Kg.

Wire nail S.W.G. 4 to 18 * Kg.

Wire nail S.W.G. 4 to 8 * Kg.

Wood plugs. m
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.
Wood Preservative (Black / coloured) Lit.

Wood Preservative (clear) * Lit.

Yellow ochre Kg.


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

Fluorescent lamp, batten type 40W with No.


enamelled reflector(English make)

Fluorescent lamp, batten type 40W with No.


diffuser(Chinese make)

Fluorescent lamp, batten type 40W with


diffuser(English make) No.

Incandecent bulb, 25W to 100W No.

DESCRIPTION UNIT PRICE


Rs. Cts.

Incandecent bulb holder No.

Incandecent bulb shade No.

Main switch single phase 15 Amps 250v, ME No.

Main switch single 30 Amp 250v, MEM No.

Distribution Board, 4 way No.

Distribution Board, 6 way No.

Distribution Board, 10 way No.

Distribution Board, 12 way No.

Helegen lamp 1000w No.

Fluorescent bulb 20 w or 40 w No.

Starter for Fluorescent bulb No.

Choke for fluorescent bulb No.

R.C.C.B. 40Amp (Crabtree) No.

Round block(PVC) No.

Ceiling Rose (PVC) No.

Cable PVC 1mm2 m


Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

DESCRIPTION UNIT PRICE


Rs. Cts.

Earth wire PVC 2.5mm2 m

Socket outlet, surface type, 5 Amps No.


(Indian or Chinese make)

Socket outlet, surface type, 15 Amps No.


(Indian or Chinese make)

Socket outlet flush type, 5 Amps No.


(Clipsal , Tenby or Carbtree)

DESCRIPTION UNIT PRICE


Rs. Cts.

Socket outlet flush type, 15 Amps No.


(Clipsal , Tenby or Carbtree)

Ceiling Fan, sweep 1425 mm(National or KDK No.

Fluorescent lamp, batten type 40w with No.


enemelled reflector(Chinese make)
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.

Rs. Cts.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all
taxes except Goods Services Tax.

Rs. Cts.

Rs. Cts.
A - DEMOLISHER

A011 Removal of a door or a window frame including sashes (size up to 4 sq.m.)


from existing walls and stacked

PER No.

L001 Unskilled labour Hour 8.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A012 Removal of a door or a window frame including sashes (size over 4 sq.m.) from
existing wall and stacked

PER No.

L001 Unskilled labour Hour 12.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A013 Removal of door or window sash(size upto 4sq.m.)from existing wall and
stacked.
PER No.

L001 Unskilled labour Hour 0.5 0.00


L002 Skilled labour Hour 0.5 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A014 Removal of door or window sash from existing wall(over 4sq.m.)and stacked.

PER No.

L001 Unskilled labour Hour 0.75 0.00


L002 Skilled labour Hour 0.75 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
A - DEMOLISHER

A015 Removal of old or decayed, 100mm to 150mm dia. GI down pipes,


from existing buildings and stacked.

PER L.m.

L001 Unskilled labour Hour 0.30 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A016 Demolition of brick drains and clearing debries as directed. Rate included to
backfill the drain with the available earth and compacted.
PER L.m.

L001 Unskilled labour Hour 0.90 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A017 Removal of expanded metal or mesh from existing frames and stacking as
directed.

PER m2

L001 Unskilled labour Hour 1.2 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A018 Uprooting of fence post, rolling up barbed wire and stacking all material as
directed. (length of the fencing to be measured).

PER L.m.

L001 Unskilled labour Hour 1.25 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
A- DEMOLISHER

A019 Demolition of brick paved cement rendered floors and cleaning debris as directed
(75mm to 100mm thick floor)

PER M2

L001 Unskilled labour Hour 0.70 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A020 Removing and stacking of gate sash (02 Nos.) after demolishing two cement concrete
columns or removing two posts and seperating pintles.

PER No.

L001 Unskilled labour Hour 8.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A021 Removing glass panes in doors, windows and fanlights and stacking as
directed
PER M2

L002 Skilled labour Hour 2.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A022 Removing eaves gutter from roof of single storeyed buildings and stacking
as directed.

PER L.m.

L001 Unskilled labour Hour 0.20 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
A- DEMOLISHER

A023 Removing eaves gutter from roof of two storeyed buildings and stacking
as directed.

PER L.m.

L001 Unskilled labour Hour 0.30 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A024 Removing eaves gutter from roofs of 3 or more stroyed buildings and
stacking as directed.

PER L.m.

L001Unskilled labour Hour 0.35 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A025 Removing partition and stacking at site including making good to walls and floors.
Rate to include painting new plaster patches to match existing colour.
Note :- Material cost will cover from the labour cost.
PER M2

L001 Unskilled labour Hour 1.60 0.00


L002 Skilled labour Hour 1.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
A- DEMOLISHER

A026 Chipping and removing of lime plaster on Brick walls, cement concrete walls
and clearing debris as directed.
PER M2

L001 Unskilled labour Hour 0.30 0.00

ALLOW FOR TOOLS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A027 Chipping and removing of cement rendering on brick walls and floors and
clearing away debries.
PER M2

L001 Unskilled labour Hour 1.0 0.00

ALLOW FOR TOOLS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A028 Chipping and removing of cement rendering on cement concrete walls and
floors and clearing away debris

PER M2

L001 Unskilled labour Hour 1.35 0.00

ALLOW FOR TOOLS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
A- DEMOLISHER

A029 Removing roof tiles and timber and stacking serviceable material at ground and
clearing debris in single storeyed buildings.

PER M2

L001 Unskilled labour Hour 0.90 0.00


L002 Skilled labour Hour 0.20 0.00
ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A030 Removing roof tiles and timber and stacking serviceable material and
clearing debris in 2 storeyed buildings

PER M2

L001 Unskilled labour Hour 1.30 0.00


L002 Skilled labour Hour 0.20 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A031 Removing roof tiles and timber and staking serviceable material at ground and
clearing debries in 3 storeyed buildings.

PER M2

L001Unskilled labour Hour 1.70 0.00


L002 Skilled labour Hour 0.20 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
A- DEMOLISHER

A032 Demolition of rubble masonary in cement sand motar and stacking rubble and
clearing debris as directed.

PER M3

L001 Unskilled labour Hour 9.00 0.00


ALLOW FOR SCAFFOLDING/TOOLS
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A033 Demolition of rubble masonary in lime cement sand motar stacking rubble and
clearing debris.

PER M3

L001 Unskilled labour Hour 6.00 0.00


ALLOW FOR SCAFFOLDING/TOOLS
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A034 Demolition of glazed/wall/floor tiles and clearing debris as directed


Rate to include removing cement sand bedding
PER M2

L001 Unskilled labour Hour 1.75 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A035 Removing half round tiles or calicut tiles from roof of single storeyed buildings
and stacking as directed at ground.

PER M2

L001 Unskilled labour Hour 0.40 0.00

ALLOW FOR SCAFFOLDING.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
A DEMOLISHER

A036 Removing of half round tiles or calicut tiles from roof of two storeyed buildings and
stacking as directed at ground.

PER M2

L001 Unskilled labour Hour 0.60 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A037 Removing half round tiles or calicut tiles from roof of three storeyed building and
stacking as directed at ground

PER M2

L001 Unskilled labour Hour 0.90 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A038 Removing water proof treatment of bitumen from flat roof and clearing
debris as directed

PER M2

L001 Unskilled labour Hour 1.70 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
A DEMOLISHER

A039 Removing asbestos ceiling including timber frame work, stacking serviceable materials
at ground and clearing debris as directed in single storeyed building.
PER M2

L001 Unskilled labour Hour 0.90 0.00


L002 Skilled labour Hour 0.90 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A040 Removing asbestos ceiling including timber frame work, stacking


serciceable material at ground and clearing debris as directed in two storeyed
buildings

PER M2

L001 Unskilled labour Hour 1.30 0.00


L002 Skilled labour Hour 0.90 0.00
ALLOW FOR SCAFFOLDING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A041 Removing valance barge boarding, stacking materials and clearing away
the debris in single storeyed buildings.

PER L.M.

L001 Unskilled labour Hour 0.20 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
A DEMOLISHER

A042 Removing valance barge boarding, stacking materials and clearing debris
as directed in two storeyed buildings.

PER L.M.

L001 Unskilled labour Hour 0.30 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A043 Chipping of cement lime sand plastering in soffit and cleaning debris as directed

PER m2

L001 Unskilled labour Hour 1.50 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A044 Cutting down trees girth not exceeding 600mm, grubing uprooting, logging and
stacking and fill in excavation with earth.

PER Nos.

L001 Unskilled labour Hour 16.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
A DEMOLISHER

A045 Cutting down trees, uprooting and grubbing girth exceeding 600mm but
less than 900mm excavation filled in earth logging and stacking.

PER No.

L001 Unskilled labour Hour 20.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A046 Cutting down trees, uprooting and grubbing girth exceeding 900mm but
less than 1200mm excavation filled in earth logging and stacking.

PER No.

L010 Unskilled labour day 5.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

A047 Cutting down trees, uprooting and grubbing girth exceeding 1200mm but less than
1600mm excavation filled in earth, rate to include logging and stacking

Per No.

L010 Unskilled labour day 7.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
B- EXCAVATOR

B001 Excavation of drains in any soil except rock requiring blasting as directed
by the engineer and soil deposited within site.

PER M3

L001 Unskilled labour Hour 4.5 0.00


E001 Basket day 0.2 0.00
(Cost of tool include in Basket rate)
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

B002 Excavation for foundation to a depth not exceeding 1.5 m in any material except rock
requrin blasting part return fill in and ram and surplus disposed within the site as directed.

PER M3

L001 Unskilled labour Hour 5.0 0.00


E001 Basket day 0.2 0.00
(Cost of tool include in Basket rate)
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

B003 Excavation and levelling site in any material except rock requiring
blasting surplus disposed including transport upto 0.4Km depositing and
levelling

PER M3

L001 Unskilled labour Hour 3.0 0.00


E001 Basket day 0.2 0.00
E002 Tractor 75 Cubes Hour 0.4 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
B- EXCAVATOR

B004 Filling under floors with gravel or other approved quality of filling spread,
watered and well rammed in 75mm layers (material avialable at site)

PER M3

L001 Unskilled labour Hour 5.0 0.00


E001 Basket day 0.2 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

B005 Filling under floors with gravel or other approved quality filling spread
and well rammed in75mm layers with imported earth (1.6Km transport)

PER m3

L001 Unskilled labour Hour 5.6 0.00


M001 Gravel Cu.m. 1.1 0.00
P001 Basket No. 0.1 0.00
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

B006 Filling under floors with gravel or other approved quality of filling spread
watered and rammed in 75mm layers(6Km transport).

PER M3

L001 Unskilled labour Hour 5.6 0.00


M001 Gravel Cu.m. 1.1 0.00
P001 Basket No. 0.1 0.00
ALLOW FOR EXTRA TRANSPORT

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C- CONCRETOR

C001 1:3:6 (40mm) cement concrete for volumes exceedings 3 cu.m.

PER M3

L001 Unskilled labour Hour 22.60 0.00


L002 Skilled labour Hour 2.80 0.00
M014 Cement 50 Kg. 4.70 0.00
M007 Sand Cum 0.23 0.00
M004 Metal 40mm Cu.m. 1.00 0.00
E0010 Basket day 0.30 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C002 1:3:6(40mm) cement concrete for volumes upto 3 cu.m.

PER M3

L001 Unskilled labour Hour 28.50 0.00


L002 Skilled labour Hour 3.50 0.00
M014 Cement 50 Kg. 4.70 0.00
M007 Sand Cum 0.23 0.00
M004 Metal 40mm Cu.m. 1.00 0.00
E001 Basket day 0.30 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C003 1:2 1/2:5 (25mm) cement concrete for volumes exceeding 3 cu.m.

PER M3

L001 Unskilled labour Hour 22.60 0.00


L002 Skilled labour Hour 2.80 0.00
M014 Cement 50 Kg. 5.50 0.00
M007 Sand Cum 0.23 0.00
M005 Metal 25mm Cu.m. 1.00 0.00
E001 Basket day 0.30 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C- CONCRETOR

C004 1:2 1/2:5 (25mm) cement concrete for volumes upto 3 cu.m

PER M3

L001 Unskilled labour Hour 28.25 0.00


L002 Skilled labour Hour 3.50 0.00
M014 Cement 50 Kg. 5.50 0.00
M007 Sand Cum 0.23 0.00
M005 Metal 25mm Cu.m. 1.00 0.00
E001 Basket day 0.30 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C005 1:2:4 (20mm) cement concrete for volumes exceeding 3 cu.m.

PER M3

L001 Unskilled labour Hour 22.60 0.00


L002 Skilled labour Hour 2.80 0.00
M014 Cement 50 Kg. 7.00 0.00
M007 Sand Cum 0.23 0.00
M006 Metal 20mm Cu.m. 1.00 0.00
E001 Basket day 0.30 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C006 1:2:4 (20mm) cement concrete for volumes upto 3 cu.m.

PER M3

L001 Unskilled labour Hour 28.25 0.00


L002 Skilled labour Hour 3.50 0.00
M014 Cement 50 Kg. 7.00 0.00
M007 Sand Cum 0.23 0.00
M006 Metal 20mm Cu.m. 1.00 0.00
E001 Basket day 0.30 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C- CONCRETOR

C007 Formation of 50mm semicircular channels in cement concrete floors


and 12mm thick 1:2 cement sand rendering (extra over concrete floors)

PER L.M

L001 Unskilled labour Hour 0.3 0.00


L002 Skilled labour Hour 0.7 0.00

ALLOW FOR CEMENT AND SAND

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C008 Formation of 100mm semicircular channels in cement concrete floors and


12mm thick 1:2 cement sand rendering (extra over concrete floors)

PER L.M

L001 Unskilled labour Hour 0.7 0.00


L002 Skilled labour Hour 1.3 0.00

ALLOW FOR CEMENT AND SAND

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C009 Corbel stone 150mmx225mmx375mm in cement concrete 1:2:4 (20mm)


reinforced with 4 nos. 10mm rods upto 0.3cu.m

PER No.

L001 Unskilled labour Hour 0.750 0.00


L002 Skilled labour Hour 0.750 0.00
M014 Cement 50 Kg. 0.080 0.00
M007 Sand Cum 0.008 0.00
M006 Metal 20mm Cu.m. 0.014 0.00
M031 Mild Steel * 10 mm dia Kg. 0.870 #N/A #N/A

ALLOW FOR MOULDS AND CURING

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
C- CONCRETOR

C010 225mm high 75mm thick curb in cement concrete including and 15mm
thick 1:2 cement rendering Rate to include excavation.

PER L.M.

L001 Unskilled labour Hour 2.60 0.00


L002 Skilled labour Hour 2.60 0.00
M014 Cement 50 Kg. 0.14 0.00
M007 Sand Cum 0.01 0.00
M006 Metal 20mm Cu.m. 0.02 0.00

ALLOW FOR SHUTTERING EXCAVATION CURING ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C011 Semicircular drains without ramps in cement concrete 1:3:6(25mm)


225mm wide and 225mm avarage depth, with 75mm thick sides and
base rate to include for excavation & return fill of earth.

PER L.M

L001 Unskilled labour Hour 4.00 0.00


L002 Skilled labour Hour 2.60 0.00
M014 Cement 50 Kg. 0.50 0.00
M007 Sand Cum 0.06 0.00
M005 Metal 25mm Cu.m. 0.07 0.00

ALLOW FOR SHUTTERING, BRACKETS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C CONCRETOR

C012 112mmx150mm size lintol of 1:2:4 (20mm) cement concrete including


form work.(reinforcement paid separately.)

PER L.m

L001 Unskilled labour Hour 2.00 0.00


L002 Skilled labour Hour 1.30 0.00
M014 Cement 50 Kg. 0.10 0.00
M007 Sand Cum 0.01 0.00
M006 Metal 20mm Cu.m. 0.02 0.00
M048 Timber plank 25mm Class iii Sq.m. 0.10 0.00
ALLOW FOR TIMBER PROPS AND NAILS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C013 225mmx150mm size lintol of 1:2:4(20mm) cement concrete including


form work (reinforcement paid separately)

PER L.M.

L001 Unskilled labour Hour 2.00 0.00


L002 Skilled labour Hour 1.30 0.00
M014 Cement 50 Kg. 0.20 0.00
M007 Sand Cum 0.01 0.00
M006 Metal 20mm Cu.m. 0.03 0.00
M048 Timber plank 25mm class iii Sq.m. 0.30 0.00

ALLOW FOR TIMBER PROPS AND NAILS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C CONCRETOR

C014 225mmX225mm size lintol of 1:2:4(20mm) cement concrete


including shuttering (Reinforcement paid separately)

PER L.m.

L001 Unskilled labour Hour 2.40 0.00


L002 Skilled labour Hour 1.50 0.00
M014 Cement 50 Kg. 0.30 0.00
M007 Sand Cum 0.02 0.00
M006 Metal 20mm Cu.m. 0.05 0.00
M048 Timber plank 25mm Class iii Sq.m. 0.45 0.00

ALLOW FOR NAILS AND PROPS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C015 300mm x 225mm size beam in 1:2:4 (20mm)cement concrete including


shuttering (reinforcement paid separately.)

PER L.M.

L001 Unskilled labour Hour 2.60 0.00


L002 Skilled labour Hour 1.70 0.00
M014 Cement 50 Kg. 0.40 0.00
M007 Sand Cum 0.03 0.00
M006 Metal 20mm Cu.m. 0.07 0.00
M048 Timber plank 25mm class iii Sq.m. 0.60 0.00

ALLOW FOR NAILS AND PROPS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C- CONCRETOR

C016 340mm x 150mm size beam in 1:2:4(20mm) cement concrete including


shuttering (reinforcement paid separately)

PER L.M.

L001 Unskilled labour Hour 2.60 0.00


L002 Skilled labour Hour 1.75 0.00
M014 Cement 50 Kg. 0.30 0.00
M007 Sand Cum 0.02 0.00
M006 Metal 20mm Cu.m. 0.05 0.00
M048 Timber plank 25mm Class iii Sq.m. 0.10 0.00
ALLOW FOR PROPS AND NAILS
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C017 340mm x 225mm size beam in 1:2:4(20mm) cement concrete including


shuttering (reinforcement paid for separately.)

PER L.M

L001 Unskilled labour Hour 3.10 0.00


L002 Skilled labour Hour 2.00 0.00
L003 Cement 50 Kg. 0.50 0.00
L004 Sand Cum 0.03 0.00
L005 Metal 20mm Cu.m. 0.08 0.00
L006 Timber plank 25mm Class iii Sq.m. 0.45 0.00
L007
ALLOW FOR PROPS AND NAILS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C CONCRETOR

C018 340mm x 300mm size beam in 1:2:4 (20mm) cement concrete including
shuttering (reinforcement paid for separately.)

PER L.m

L001 Unskilled labour Hour 4.00 0.00


L002 Skilled labour Hour 3.00 0.00
M014 Cement 50 Kg. 0.70 0.00
M007 Sand Cum 0.03 0.00
M006 Metal 20mm Cu.m. 0.10 0.00
M048 Timber plank 25mm class iii Sq.m. 0.60 0.00

ALLOW FOR NAILS AND PROPS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C019 450mm x 340mm x 150mm padstones in 1:2:4(20mm) cement concrete


precast or insitu

PER No.

L001 Unskilled labour Hour 1.000 0.00


L002 Skilled labour Hour 0.500 0.00
M014 Cement 50 Kg. 0.145 0.00
M007 Sand Cum 0.014 0.00
M006 Metal 20mm Cu.m. 0.025 0.00
M048 Timber plank 25mm class iii Sq.m. 0.240 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C CONCRETOR

C020 100mm thick flat roof in 1:2:4 (20mm) cement concrete and reinforced
with expanded metal, 12mm thick 1:2 cement rendering with 5% pudllo
cement and lime puttying soffit complete (reinforced paid seperately)

PER M2
L001 Unskilled labour Hour 8.75 0.00
L002 Skilled labour Hour 3.50 0.00
M014 Cement 50 Kg. 0.70 0.00
M007 Sand Cum 0.08 0.00
M006 Metal 20mm Cum 0.10 0.00
M008 Boiled lime Kg. 0.65 0.00
M012 Pudlo Cement Kg. 0.40 0.00
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C021 75mm thick slabs over drains in 1:2:4(20mm) cement concrete reinforced
12mm 1:2 cement sand rendered (reinforcement paid seperately)

PER m2

L001 Unskilled labour Hour 3.60 0.00


L002 Skilled labour Hour 2.20 0.00
L014 Cement 50 Kg. 0.60 0.00
L007 Sand Cum 0.05 0.00
L006 Metal 20mm Cu.m. 0.08 0.00
L048 Timber plank 25mm class iii Sq.m. 0.50 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C- CONCRETOR

C022 200mm x 200mm x 150mm spur stones in 1:2:4 (20mm) cement


concrete for verandah posts supplied and fixed.

PER No.

L001 Unskilled labour Hour 0.600 0.00


L002 Skilled labour Hour 0.600 0.00
M014 Cement 50 Kg. 0.040 0.00
M007 Sand Cum 0.002 0.00
M006 Metal 20mm Cu.m. 0.010 0.00

ALLOW FOR MOULDS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C- CONCRETOR

C023 100mm x75mm x 50mm spur stones in 1:2:4 (20mm) cement concrete
for door posts supplied and fixed

PER No.

L001 Unskilled labour Hour 0.2000 0.00


L002 Skilled labour Hour 0.2000 0.00
M014 Cement 50 Kg. 0.0024 0.00
M007 Sand Cum 0.0002 0.00
M006 Metal 20mm Cu.m. 0.0004 0.00

ALLOW FOR MOULDS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C024 Squatting plates for latrines in 1:2:4(20mm) cement concrete with mild steel
reinforcements 225mm centres both ways.
PER No. say - 1.25 x 1.25 x 0.10 m

L001 Unskilled labour Hour 4.000 0.00


L002 Skilled labour Hour 2.000 0.00
L003 Black smith Hour 0.500 0.00
M014 Cement 50 Kg. 0.104 0.00
M007 Sand Cum 0.004 0.00
M006 Metal 20mm Cu.m. 0.005 0.00
M031 Mild Steel * 10 mm dia Kg. 9.065 #N/A #N/A

ALLOW FOR BINDING AND MOULDS

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
C- CONCRETOR
C025 1:2:4 (20mm) cement concrete using concrete mixer and vibrator
(shuttering, reinforcement finishes paid separately)

PER m3

L001 Unskilled labour Hour 17.00 0.00


L002 Skilled labour Hour 2.80 0.00
M014 Cement 50 Kg. 6.50 0.00
M007 Sand Cum 0.21 0.00
M005 Metal 25mm Cu.m. 1.00 0.00
E001 Basket day 0.30 0.00

ALLOW FOR WATER AND CONCRETE MIXER VIBRATOR ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C026 1:2:4(20mm)cement concrete in column shafts (reinforcements shuttering


and finishes paid for separately) in ground floor using mixer and vibrator

PER m3

L001 Unskilled labour Hour 17.00 0.00


L002 Skilled labour Hour 2.80 0.00
M014 Cement 50 Kg. 6.40 0.00
M007 Sand Cum 0.21 0.00
M006 Metal 20mm Cu.m. 1.00 0.00
E001 Basket day 0.30 0.00

ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C CONCRETOR

C027 1:2:4(20mm) cement concrete in column shafts in 1st floor (reinforcement,


shuttering and finishes paid for seperately)

PER m3

L001 Unskilled labour Hour 22.60 0.00


L002 Skilled labour Hour 2.80 0.00
M014 Cement 50 Kg. 6.40 0.00
M007 Sand Cum 0.21 0.00
M006 Metal 20mm Cu.m. 1.00 0.00
E001 Basket day 0.30 0.00
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT.
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C CONCRETOR

C028 1:2:4(20mm) cement concrete in column shafts in 2nd floor (reinforcement,


shuttering and finishes paid for separately).
PER m3
L001 Unskilled labour Hour 31.10 0.00
L002 Skilled labour Hour 2.80 0.00
M014 Cement 50 Kg. 6.40 0.00
M007 Sand Cum 0.21 0.00
M006 Metal 20mm Cum 1.00 0.00
E001 Basket day 0.30 0.00
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT.
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C029 1:2:4(20mm) cement concrete in beams in ground floor (reinforcement,


shuttering and finishes paid for separately) using mixer and vibrator.

PER m3

L001 Unskilled labour Hour 22.60 0.00


L002 Skilled labour Hour 3.50 0.00
M014 Cement 50 Kg. 6.40 0.00
M007 Sand Cum 0.21 0.00
M006 Metal 20mm Cu.m. 1.00 0.00
E001 Basket day 0.24 0.00

ALLOW FOR CURING, WATER, MIXER, VIBRATOR, FUEL,


OPERATORS
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C030 1:2:4(20mm) cement concrete in beams in 1st floor (reinforcement,


shuttering and finishes paid for separately)

PER M3

L001 Unskilled labour Hour 28.20 0.00


L002 Skilled labour Hour 3.50 0.00
M014 Cement 50 Kg. 6.40 0.00
M007 Sand Cum 0.21 0.00
M006 Metal 20mm Cu.m. 1.00 0.00
E001 Basket day 0.24 0.00
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT.
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C- CONCRETOR

C031 1:2:4 (20mm) cement concrete in beams in 2nd floor (reinforcement,


shuttering and finishes paid for separately.)

PER m3

L001 Unskilled labour Hour 36.70 0.00


L002 skilled labour Hour 3.50 0.00
M014 Cement 50 Kg. 6.40 0.00
M007 Sand Cum 0.21 0.00
M006 Metal 20mm Cu.m. 1.00 0.00
E001 Basket day 0.24 0.00
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT.
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C032 Shuttering for floor slab concrete including 100mm x 50mm class ii
joints and necessary props( rate to include for removal)

PER m2

L001 Unskilled labour Hour 2.600 0.00


L002 Skilled labour Hour 0.900 0.00
M048 Timber plank 25mm class iii Sq.m. 0.110 0.00
M041 G.I. sheet 18 B.W.G. Sq.m. 0.002 0.00
M363 Props (bamboo) 3 - 4 m No. 7.500 0.00
M037 Wire nail S.W.G. 4 to 8 * Kg. 0.200 #N/A #N/A
M364 Mould oil Lit. 1.200 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
C CONCRETOR

C033 Shuttering for 225mm x 225mm column shafts including class ii timber
joists and necessary props. ( rate to include for removal).

PER m2

L001 Unskilled labour Hour 2.700 0.00


L002 Skilled labour Hour 2.700 0.00
M048 Timber plank 25mm class iii Sq.m. 0.350 0.00
M044 Timber beams Class ii Cu.m. 0.003 0.00
M065 Bolt and nut iron 225 x 10mm * No. 0.600 0.00
M363 Props (bamboo) 3 - 4 m No. 1.700 0.00

ALLOW FOR SCREWS AND NAILS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C034 Shuttering for beams sides, soffit including class ii timber joists and
necessary props (rate include for removal)

PER m2

L001 Unskilled labour Hour 1.100 0.00


L002 Skilled labour Hour 1.100 0.00
M048 Timber plank 25mm class iii Sq.m. 1.100 0.00
M041 G.I. Sheet 18 B.W.G. Sq.m. 0.005 0.00
M363 Props (bamboo) 3 - 4 m No. 0.500 0.00
M037 Wire nail S.W.G. 4 to 18 * Kg. 0.400 #N/A #N/A
M364 Mould oil Lit. 0.300 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
C CONCRETOR

C035 1:2:4 (20mm) cement concrete in lintol and beams in ground floor using
mixer and vibrator (reinforcement and shuttering paid for separately)

PER m3

L001 Unskilled labour Hour 45.20 0.00


L002 Skilled labour Hour 5.60 0.00
M014 Cement 50 Kg. 6.40 0.00
M007 Sand Cum 0.22 0.00
E001 Basket day 0.20 0.00
M006 Metal 20mm Cu.m. 1.00 0.00

ALLOW FOR WATER, CURY, MIXER, VIBRATOR, FUEL,


OPERATORS
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C036 1:2:4(20mm) cement concrete in lintol and beams as per item co35 in 1st floor

PER m3

L001 Unskilled labour Hour 50.80 0.00


L002 Skilled labour Hour 5.60 0.00
M014 Cement 50 Kg. 6.40 0.00
M007 Sand Cum 0.22 0.00
M006 Metal 20mm Cu.m. 1.00 0.00
E001 Basket day 0.20 0.00
ALLOW FOR WATER, MIXER & VIBRATOR
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C037 100mm thick 1:2:4(20mm) cement concrete in 1st floor slab using mixer
and vibrator (reinforcement and shuttering paid for separately)

PER m2

L001 Unskilled labour Hour 2.600 0.00


L002 Skilled labour Hour 0.430 0.00
M014 Cement 50 Kg. 0.650 0.00
M006 Metal 20mm Cu.m. 0.031 0.00
M007 Sand Cum 0.025 0.00

ALLOW FOR WATER ANY MIXER, OPERATOR FUEL ECT.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

C038 125mm thick 1:2:4(20mm) cement concrete in 1st floor slab


reinforcemnet and shuttering paid for separately) using mixer and vibrator.
PER m2
L001 Unskilled labour Hour 2.70 0.00
L002 Skilled labour Hour 0.43 0.00
M014 Cement 50 Kg. 0.80 0.00
M006 Metal 20mm Cu.m. 0.04 0.00
M007 Sand Cum 0.03 0.00

ALLOW FOR WATER, CURING, MIXER, VIBRATOR, FUEL,


OPERATOR ETC.
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
D- BRICKLAYER

D001 Segmental brick arch in 1:3 cement sand mortar including centering

PER m3

L001 Unskilled labour Hour 22.60 0.00


L002 Skilled labour Hour 17.00 0.00
M010 Brick 1000 Nos. 0.51 0.00
M014 Cement 50 Kg. 2.20 0.00
M007 Sand Cu.m. 0.15 0.00

ALLOW FOR WATER AND SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D002 225mm Brick work in 1:5 cement sand mortar (above 3 cu.m) upto 1st floor level

PER m3

M010 Brick 1000 Nos. 0.512 0.00


M007 Sand Cum 0.100 0.00
M014 Cement 50 kg. 1.300 0.00
L001 Unskilled labour Hour 14.100 0.00
L002 Skilled labour Hour 8.500 0.00

ALLOW FOR WATER AND SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D003 225mm brick work in 1:5 cement sand mortar upto 1st floor level (upto 3cu.m)

PER m3

L001 Unskilled labour Hour 16.200 0.00


L002 Skilled labour Hour 10.600 0.00
M010 Brick 1000 Nos. 0.512 0.00
M007 Sand Cum 0.100 0.00
M014 Cement 50 kg. 1.300 0.00

ALLOW FOR WATER AND SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
D- BRICKLAYERS

D004 225 brick work in 1:5 cement sand mortar in piers upto 1st floor level
PER m3
L001 Unskilled labour Hour 18.330 0.00
L002 Skilled labour Hour 12.730 0.00
M010 Brick 1000 Nos. 0.517 0.00
M007 Sand Cum 0.090 0.00
M014 Cement 50 kg. 1.300 0.00

ALLOW FOR WATER AND SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D005 225mm brick work in 1:5 cement sand mortar with bricks available at site
including sorting and clearing bricks

PER m3

L001 Unskilled labour Hour 17.00 0.00


L002 Skilled labour Hour 8.50 0.00
M014 Cement 50Kg. 1.30 0.00
M007 Sand Cum 0.09 0.00

ALLOW FOR WATER AND SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D006 112mm brick work in 1:5 cement sand mortar upto 1st floor level
above 10 s.q.m.)

PER m2

M010 Brick 1000 Nos. 0.060 0.00


M007 Sand Cum 0.015 0.00
M014 Cement 50 Kg. 0.140 0.00
L001 Unskilled labour Hour 1.720 0.00
L002 Skilled labour Hour 1.290 0.00

ALLOW FOR SCAFFOLDING AND WATER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
D- BRICKLAYER

D007 112mm brick work in 1:5 cement sand mortar upto 1st floor level(upto 10 sq.m.)

PER m2

M010 Brick 1000 Nos. 0.060 0.00


M007 Sand Cum 0.015 0.00
M014 Cement 50Kg. 0.140 0.00
L001 Unskilled labour Hour 2.150 0.00
L002 Skilled labour Hour 1.610 0.00

ALLOW FOR SCAFFOLDING AND WATER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D008 112mm brick work in 1:5 cement sand mortar using available bricks including
sorting and cleaning upto 1st floor level.

PER m2

M007 Sand Cum 0.015 0.00


M014 Cement 50 Kg. 0.140 0.00
L001 Unskilled labour Hour 2.250 0.00
L002 Skilled labour Hour 1.610 0.00

ALLOW FOR WATER AND SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D009 225mm brick work in 2.5 lime sand mortar upto first floor level (above 3cu.m)

PER m3

M010 Brick 1000 Nos. 0.512 0.00


M007 Sand Cum 0.100 0.00
M009 Boiled lime Kg. 66.250 0.00
L001 Unskilled labour Hour 14.100 0.00
L002 Skilled labour Hour 8.500 0.00

ALLOW FOR WATER AND SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
D- BRICKLAYER

D010 225mm brick work in 2:5 lime sand mortar upto 1st floor level (upto 3Cu.m.)

PER m3

M010 Brick 1000 Nos. 0.512 0.00


M007 Sand Cum 0.100 0.00
M009 Boiled lime Kg. 66.250 0.00
L001 Unskilled labour Hour 16.200 0.00
L002 Skilled labour Hour 10.600 0.00

ALLOW FOR WATER AND SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D011 225mm brick work in 2:5 lime sand mortar with bricks available at site,
including sorting out and cleaning bricks.

PER m3

M007 Sand Cum 0.10 0.00


M009 Boiled lime Kg. 66.25 0.00
L001 Unskilled labour Hour 19.70 0.00
L002 Skilled labour Hour 8.50 0.00

ALLOW FOR WATER AND SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D012 Extra over item D002 to D005 and D009 to D011 for brick work from
first floor level to seconed floor level

PER m3

L001 Unskilled labour Hour 4.2 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
D- BRICKLAYER

D013 Extra over item D002 to D005 and D009 to D011 for brick work above second
floor level

PER m3

L001 Unskilled labour Hour 12.7 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D014 Extra over item D006 to D008 for brick work from first floor level to
seconed floor level

PER m2

L001 Unskilled labour Hour 1.4 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D015 Extra over item D006 to D008 for brick work above 2nd floor level

PER m2

L001 Unskilled labour Hour 4.2 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
D- BRICKLAYER

D019 Weathered and throated brick coping in 1:5 cement sand mortar on 112mm thick
walls complete with 12mm thick 1:3 sand cement rendering and cement floating
coat.
PER L.m.

M010 Brick 1000 Nos. 0.013 0.00


M007 Sand Cum 0.020 0.00
M014 Cement 50 Kg. 0.330 0.00
L001 Unskilled labour Hour 1.600 0.00
L002 Skilled labour Hour 1.600 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D020 Weathered and throated brick coping in 1:5 cement sand mortar on 340mm
thick walls complete with 12mm thick 1:3 cement sand rendering and cement
floating coat.
PER L.m

M010 Brick 1000 Nos. 0.04 0.00


M007 Sand Cum 0.06 0.00
M014 Cement 50 Kg. 1.00 0.00
L001 Unskilled labour Hour 2.00 0.00
L002 Skilled labour Hour 2.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D021 Wheathered and throated brick coping in 1:5 cement sand mortar on 225mm
thick walls complete with 12mm thick 1:3 cement sand rendering and cement
floating coat.
PER L.m

M010 Brick 1000 Nos. 0.03 0.00


M007 Sand Cum 0.04 0.00
M014 Cement 50 Kg. 0.70 0.00
L001 Unskilled labour Hour 2.60 0.00
L002 Skilled labour Hour 2.60 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
D BRICKLAYER

D022 Weathered and throated brick coping in 1:5 cement sand mortar on 225mm
thick walls using available bricks complete with 12mm thick 1:3 cement sand
rendering and cement floating coat.

PER L.m

M007 Sand Cum 0.04 0.00


M014 Cement 50 Kg. 0.70 0.00
L001 Unskilled labour Hour 2.60 0.00
L002 Skilled labour Hour 2.60 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D023 Brick cornices in 1:5 cement mortar complete with 12mm thick 1:3
cement rendering up to 225mm projection and 225mm depth

PER L.m

M010 Brick 1000 Nos. 0.102 0.00


M007 Sand Cum 0.020 0.00
M014 Cement 50 Kg. 0.300 0.00
L001 Unskilled labour Hour 5.200 0.00
L002 Skilled labour Hour 5.200 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D024 Inserting of door or window in existing walls including making opening


and making good to floor and wall (lintol,arch.door & window paid for
separately). up to 3m2

PER No.

L001 Unskilled labour Hour 16.00 0.00


L002 Skilled labour Hour 12.00 0.00
M010 Brick 1000 Nos. 0.10 0.00
M007 Sand Cum 0.03 0.00
M014 Cement 50 Kg. 0.52 0.00
M009 Boiled lime Kg. 8.70 0.00
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
D- BRICKLAYER

D025 300mm wide 225mm to 300mm deep, brick drains in with 112mm thick side walls
in 1:5 cement motar complete with 12mm thick 1:2 cement sand rendering with
smooth finish and necessary expansion joints(rate to included for excavation)
& backfilling.
PER L.m

L001 Unskilled labour Hour 4.000 0.00


L002 Skilled labour Hour 3.280 0.00
M010 Brick 1000 Nos. 0.065 0.00
M014 Cement 50 Kg. 0.160 0.00
M007 Sand Cum 0.020 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D026 225mm wide 150mm to 225mm deep brick drains in 1:5 cement sand mortar
complete with 12mm thick 1:2 cement sand rendering with smooth finish and
necessary expansion joints (rate to included for necessary excavation and
backfilling) side walls should be 112mm thick.
PER L.m

L001 Unskilled labour Hour 3.050 0.00


L002 Skilled labour Hour 2.440 0.00
M010 Brick 1000 Nos. 0.055 0.00
M014 Cement 50 Kg. 0.100 0.00
M007 Sand Cum 0.010 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D027 Scott's pattern drains including apron of overall width 750mm brick
masonary in 1:5 cement mortar and 12mm thick 1:2 cement sand rendering
and necessary expansion joints ( rate to include necessary excavation)

PER L.m

M010 Brick 1000 Nos. 0.05 0.00


M014 Cement 50 Kg. 0.36 0.00
M007 Sand Cum 0.02 0.00
L001 Unskilled labour Hour 3.66 0.00
L002 Skilled labour Hour 3.66 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
D- BRICKLALYER

D028 300mm wide and 150mm to 225 high brick work in 1:5 cement sand motar
steps complete with 12mm thick 1:3 cement sand rendering with smooth
finish with 300mm deep foundation. Rate to include excavation.

PER L.m

M010 Brick 1000 Nos. 0.060 0.00


M014 Cement 50 Kg. 0.250 0.00
M007 Sand Cum 0.010 0.00
L001 Unskilled labour Hour 1.220 0.00
L002 Skilled labour Hour 1.220 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

D029 Formation of vent openings upto 300mm height and 150mm width on
existing walls and making good to walls. Rate to include painting to match
the existing colours.
PER No.

M009 Boiled lime Kg. 3.140 0.00


M007 Sand Cum 0.005 0.00
L001 Unskilled labour Hour 1.000 0.00
L002 Skilled labour Hour 1.000 0.00
ALLOW FOR PAINTS ETC.
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
E- MASON

E001 Random rubble masonry in 1:5 cement sand mortar (above 3 cu.m.)

PER m3

M002 Rubble 150mm to 225mm Cu.m. 1.00 0.00


M007 Sand Cum 0.16 0.00
M014 Cement 50 Kg. 2.56 0.00
L001 Unskilled labour Hour 16.94 0.00
L002 Skilled labour Hour 8.46 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

E002 Random rubble masonry in 1:5 cement sand mortar (upto 3cu.m)

PER m3

M002 Rubble 150mm to 225mm Cu.m. 1.00 0.00


M007 Sand Cum 0.16 0.00
M014 Cement 50 Kg. 2.56 0.00
L001 Unskilled labour Hour 16.63 0.00
L002 Skilled labour Hour 9.31 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

E003 Random rubble masonary in 1:5 cement sand mortar using rubble available at
site including sorting out and cleaning rubble

PER m3

M007 Sand Cum 0.16 0.00


M014 Cement 50 Kg. 2.56 0.00
L001 Unskilled labour Hour 22.60 0.00
L002 Skilled labour Hour 8.50 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
F- PAVIOR

F001 Expansion joints in brick floors filled with bitumen and sand

PER L.m

L001 Unskilled labour Hour 0.08 0.00


L002 Skilled labour Hour 0.08 0.00

ALLOW FOR SAND AND BITUMEN

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

F002 Expansion joints in concrete floors filled with bitumen and sand (to
full depth of concrete and rendering)

PER L.m

L001 Unskilled labour Hour 0.170 0.00


L002 Skilled labour Hour 0.170 0.00
M007 Sand Cum 0.001 0.00
M018 Bitumen * Kg. 0.125 #N/A #N/A

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

F003 75mm thick brick paved floor set in 1:5 cement sand mortar and including
12mm thick 1:3 cement rendering with smooth finish.

PER m2

M010 Brick 1000 Nos. 0.034 0.00


M007 Sand Cum 0.030 0.00
M014 Cement 50 Kg. 0.490 0.00
L001 Unskilled labour Hour 2.970 0.00
L002 Skilled labour Hour 1.490 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
F- PAVIOR

F004 75mm thick brick paved floors set in 1:5 cement motar and 12mm thick
1:3 cement rendering with smooth finish with available brick including sorting out
and cleaning bricks.

PER m2

M007 Sand Cum 0.03 0.00


M014 Cement 50 Kg. 0.49 0.00
L001 Unskilled labour Hour 2.97 0.00
L002 Skilled labour Hour 1.49 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

F005 75mm thick 1:2 1/2:5 (25mm) cement concrete floors including 12mm
thick 1:2 cement rendered with smooth finish with expansion joints filled with cement
and sand
PER m2

M005 Metal 25mm Cu.m. 0.03 0.00


M007 Sand Cum 0.02 0.00
M014 Cement 50 Kg. 0.46 0.00
L001 Unskilled labour Hour 1.00 0.00
L002 Skilled labour Hour 2.60 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
F PAVIOR

F006 100mm thick, 1:2:4 (20mm) cement concrete in upper floors including form
work, with 12mm thick 1:3 cement sand rendering with smooth finish and lime
putty rendering to soffit and expansion joints filled with cement and sand
(reinforcement paid for separately).

PER m2

M007 Sand Cum 0.030 0.00


M006 Metal 20mm Cu.m. 0.033 0.00
M014 Cement 50 Kg. 0.650 0.00
M009 Boiled lime Kg. 1.750 0.00
M048 Timber plank 25mm class iii Sq.m. 0.110 0.00
M045 Timber beams Class ii Cu.m. 0.013 0.00
M363 Props (bamboo) 3 - 4 m No. 1.000 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.910 #N/A #N/A
M364 Mould oil Lit. 0.330 0.00
L001 Unskilled labour Hour 7.430 0.00

L002 Skilled labour Hour 2.600 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

F007 Spreading watering & ramming gravel in floors for 100mm thickness

PER m2

M001 Gravel Cu.m. 0.30 0.00


L001 Unskilled labour Hour 0.43 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
F008 Terrazzo tile flooring supplied and laid.rate to include for 12mm thick
1:3 cement motar levelling screed etc.

PER m2

M020 Tile Terrazzo 300 x 300mm * No. 12.00 #N/A #N/A


M014 Cement 50 Kg. 0.13 0.00
M007 Sand Cum 0.01 0.00
M001 Unskilled labour Hour 2.25 0.00
M002 Skilled labour Hour 1.50 0.00
M004 Terrazzo Mason Hour 0.75 0.00

ALLOW FOR STEEL PIN COLOURED CEMENT AND POLISHING

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

F011 Supplying and fixing ceramic floor tiles to floors including 20mm
thick 1:3 cement sand bedding.

PER m2

M380 200mm x 200mm ceramic floor tile. No. 25.00 0.00


M014 Cement 50 Kg. 0.27 0.00
M007 Sand Cum 0.02 0.00
M010 Unskilled labour Hour 4.00 0.00
L020 Skilled labour Hour 5.60 0.00
ALLOW FOR WASTAGE
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

F012 Supplying and fixing of glazed tiles with all specials to walls including raking
plaster and bedding in 12mm thick 1:3 cement motar joints shall be filled with
tile grout.
PER m2
M021 Tile glazed 108 x 108mm * No. 86.000 #N/A #N/A
M014 Cement 50 Kg. 0.270 0.00
M007 Sand Cum 0.021 0.00
L010 Unskilled labour Hour 4.000 0.00
L020 Skilled labour Hour 8.000 0.00
ADD 10% SPECIALS AND WASTAGES ETC.
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
F PAVIOR

F013 Supplying and fixing of glazed tiles to walls including raking plaster
and bedding in 12mm thick 1:2 cement motar (Tiles supplied by the
client

PER m2

M014 Cement 50 Kg. 0.270 0.00


M007 Sand Cum 0.021 0.00
L010 Unskilled labour Hour 4.000 0.00
L020 Skilled labour Hour 8.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

F014 Supplying and fixing of pressed cement tiles of approved pattern and
colour to floors including 20mm thick 1:3 cement sand bedding

PER m2

M022 Tile cement pressed 200 x 200mm * No. 25.000 #N/A #N/A
M014 Cement 50 Kg. 0.270 0.00
M007 Sand Cum 0.021 0.00
L010 Unskilled labour Hour 4.000 0.00
L020 Skilled labour Hour 5.600 0.00
ALLOW FOR WASTAGE
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
G- ROOFER

G001 Fixing of corrugated asbestos or GI (24 BWG) sheets with hooks


bolts and nuts to roofing or walling(sheets available at site)

PER m2

L001 Unskilled labour Hour 0.38 0.00


L003 Black smith Hour 0.30 0.00
M367 G.I. Hook bolts 8mm x 115mm Nos. 4.00 0.00
M368 Limpet washers Nos. 4.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G002 Supplying and fixing of corrugated GI (24 BWG) sheets roofing on class I timber
purlins complete including treating timber with wood preservatives
ridging measured seperately)

PER m2

M040 G.I. Sheet 24 B.W.G. Sq.m. 1.20 0.00


M043 Timber beams Class I Cu.m. 0.01 0.00
M369 Drive screws and washers Nos. 3.00 0.00
L001 Unskilled labour Hour 1.72 0.00
L002 Skilled labour Hour 0.65 0.00
M141 Wood Preservative (Black/ Coloured) * Lit. 0.05 54.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G003 Supplying and fixing of corrugated GI (24 BWG) sheet on 100mm x 50mm
class I timber frame work for cladding

PER m2

M043 Timber beams Class I Cu.m. 0.01 0.00


M026 Corrugated G.I. Sheet 24 BWG * Sq.m. 1.20 #N/A #N/A
M369 Drive screws and washers Nos. 3.00 0.00
L001 Unskilled labour Hour 1.10 0.00
L002 Skilled labour Hour 1.72 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
G- ROOFER

G004 Supplying and fixing of corrugated GI (24 BWG) sheets on existing roof frame
or wall.

PER m2

M026 Corrugated G.I. Sheet 24 BWG * Sq.m. 1.20 #N/A #N/A


M369 Drive screws and washers Nos. 3.00 0.00
L001 Unskilled labour Hour 0.43 0.00
L002 Skilled labour Hour 0.43 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

G005 Supplying and fixing of corrgated asbestos sheet roofing on class I timber
purlins complete including treating timber with wood preservative

PER m2

M023 Corrugated asbestos sheet Sq.m. 1.167 0.00


M043 Timber beams Class I Cu.m 0.010 0.00
M369 Drive Screws and washers Nos. 3.000 0.00
L001 Unskilled labour Hour 1.140 0.00
L002 Skilled labour Hour 1.720 0.00
M141 Wood Preservative (Black / coloured) * Lit. 0.050 54.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G006 Supplying and fixing of corrugated asbestos sheet cladding on class I


timber frame work complete.

PER m2

M043 Timber beams Class I Cu.m. 0.011 0.00


M023 Corrugated asbestos sheet Sq.m. 1.167 0.00
M369 Drive Screws and washers Nos. 4.000 0.00
L001 Unskilled labour Hour 1.100 0.00
L002 Skilled labour Hour 1.720 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
G- ROOFER

G007 Supplying and fixing of corrugated asbestos sheets to roof or wall on


existing frame work with necessary coach screws and linpet washers or
hook bolts

PER m2

M023 Corrugated asbestos sheet Sq.m. 1.2 0.00


M369 Drive screws and washers Nos. 2.0 0.00
L001 Unskilled labour Hour 0.7 0.00
L002 Skilled labour Hour 0.5 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G008 Supplying and fixing of 24 BWG corrugated GI roofing on class I timber


purlins complete with GI ridging washers hook bolts or clips including
treating timber with wood preservative.

PER m2

M369 Drive screws and washers Nos. 3.000 0.00


M141 Wood preservative (black / coloured)* Lit 0.050 0.00
M043 Timber beams Class I Cu.m. 0.019 0.00
M040 G.I. Sheet 24 B.W.G. Sq.m. 1.200 0.00
L001 Unskilled labour Hour 1.110 0.00
L002 Skilled labour Hour 1.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G009 supplying and fixing corrugated GI cladding on class I timber frame work
fixed complete.

PER m2

M043 Timber beams Class I Cu.m. 0.01 0.00


M040 G.I. Sheet 24 B.W.G. Sq.m. 1.20 0.00
M370 Drive screws and washers Nos. 3.00 0.00
L001 Unskilled labour Hour 1.10 0.00
L002 Skilled labour Hour 1.72 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
G- ROOFER

G010 24BWG Corrugated GI sheets fixid to roof wall or fence with necessary
cup washers hool bolts or screws (timber framing paid for seperately)

PER m2

M040 G.I. Sheet 24 B.W.G. Sq.m. 1.2 0.00


M369 Drive Screws and washers Nos. 3.0 0.00
L001 Unskilled labour Hour 0.43 0.00
L002 Skilled labour Hour 0.43 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G011 Rectification of leaks (upto 5 in number) in roofs of single storeyed


building

PER No.

L001 Unskilled labour Hour 1.3 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G012 Rectification of leaks (above 5 in number) in roofs of single storeyed


building

PER No.

L001 Unskilled labour Hour 0.5 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G013 Rectification of leaks (upto 5 in number) of roof of buildings above one


storeyed building

PER No.

L001 Unskilled labour Hour 1.7 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
G- ROOFER

G014 Rectification of leaks (above 5 in number) in roofs of building above one


storeyed

PER No.

L001 Unskilled labour Hour 0.67 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G015 Rectification of leaks in corrugated sheet roofs with bitumen washers


and G.I. Bolts and nuts.

PER No.

M371 Bitumen washers Nos. 1.0 0.00


M372 G.I. Bolts and nuts Nos. 1.0 0.00
L001 Unskilled labour Hour 1.2 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G016 Rectification of leaks in corrugated sheet roof patched with jute hesseian
dipped in asphalt and laid over with a cement and sand layer.

PER No.

L001 Unskilled labour Hour 1.2 0.00

ALLOW FOR JUTE HESSIAN, BITUMEN AND CEMENT

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
G- ROOFER

G017 Fixing of asbestos cement, Aluminium alloy or G.I. Ridging available at


site with hook bolts or screws.

PER L.M.

M369 Drive Screws and washers Nos 7.0 0.00


L001 Unskilled labour Hour 0.5 0.00
L003 Black smith Hour 0.5 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G018 Calicut pattern ridging bedded in cement sand and lime mortar 1:1:4 coloured
to match tiles

PER L.m.

M028 Ridge tile calicut pattern Gr. I Nos. 3.000 0.00


M007 Sand Cum 0.010 0.00
M008 Slaked lime Kg. 2.280 0.00
M0143 Cement 50 Kg. 0.050 0.00
L001 Unskilled labour Hour 0.550 0.00
L002 Skilled labour Hour 0.550 0.00

ALLOW FOR COLOURING POWDER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G019 Calicut pattern ridging bedded in cement sand and lime mortar 1:1:4 coloured
to match tiles (Tiles available at site).

PER m

M007 Sand Cum 0.01 0.00


M008 Slaked lime Kg. 2.28 0.00
M014 Cement 50 Kg. 0.05 0.00
L001 Unskilled labour Hour 0.55 0.00
L002 Skilled labour Hour 0.55 0.00

ALLOW FOR COLOURING POWDER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
G- ROOFER

G020 24 BWG GI ridging 450mm wide overall fixed complete

PER L.M.

M373 G.I. Ridging 2m x 1m - 24 B.W.G. Nos. 0.6 0.00


M369 Drive Screws and washers Nos. 7.0 0.00
L001 Unskilled labour Hour 0.6 0.00
L003 Black smith Hour 0.6 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G021 Asbestos ridging complete with roofing screws or hooks.

PER L.M

M025 Close fitting asbestos ridging Pair 1.0 0.00


M369 Drive Screws and washers Nos. 4.0 0.00
L001 Unskilled labour Hour 0.5 0.00
L002 Skilled labour Hour 0.5 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G022 Half round tile ridging bedded in lime cement mortar 1:1:4 and coloured to
match tiles.

PER L.M

M029 Tile half round Gr.I Nos. 4.00 0.00


M007 Sand Cum 0.01 0.00
M008 Slaked lime Kg. 2.73 0.00
L001 Unskilled labour Hour 0.70 0.00
L002 Skilled labour Hour 0.70 0.00
M014 Cement 50 Kg. 0.06 0.00

ALLOW FOR COLOURING POWDER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
G- ROOFER

G023 Ridging with half round bedded in lime cement mortar 1:1:4 coloured to
match tiles. Tiles available at site

PER L.M

M007 Sand Cum 0.01 0.00


M008 Slaked lime Kg. 2.73 0.00
L001 Unskilled labour Hour 0.70 0.00
L002 skilled labour Hour 0.70 0.00
M014 Cement 50 Kg. 0.06 0.00

ALLOW FOR COLOURING POWDER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G024 Ridging with half round or calicut pattern tiles removed and relaid in lime
mortar 1:1:4 and coloured to match the tile

PER L.M

M007 Sand Cum 0.01 0.00


M008 Slaked lime Kg. 2.73 0.00
M014 Cement 50 Kg. 0.06 0.00
L001 Unskilled labour Hour 0.90 0.00
L002 Skilled labour Hour 0.90 0.00

ALLOW FOR COLOURING POWDER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G025 0.6m X 0.6m x 5mm thick ribbed skylight glass supplied and fixed to
roof including necessary lime cement filleting

PER No.

M200 Glass pane figured 5mm Sq.m. 0.36 0.00


L001 Unskilled labour Hour 2.00 0.00
L002 Skilled labour Hour 2.00 0.00

ALLOW FOR LIME SAND ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
G- ROOFER

G026 Supplying and laying calicut pattern flat tiles (up to 5 tiles) in single
storeyed building on existing frame.

PER per tile

M375 Calicut pattern flat tiles No. 1.00 0.00


L001 Unskilled labour Hour 0.17 0.00
ALLOW FOR SCAFFOLDING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G027 Supplying and laying calicut pattern flat tiles(above 5 tiles) in single
storeyed building

PER Per tile

M375 Calicut pattern flat tiles No. 1.00 0.00


L001 Unskilled labour Hour 0.07 0.00
ALLOW FOR SCAFOLDING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G028 Supplying and laying calicut pattern flat tiles (upto 5 tiles) in buildings of
more than one storey

PER Per tile

M375 Calicut pattern flat tiles No. 1.00 0.00


L001 Unskilled labour Hour 0.33 0.00
ALOW FOR SCAFFOLDING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
G- ROOFER

G029 Supplying and laying calicut pattern flat tiles (above 5 upto 25 tiles)
in building of more than one storey

PER per tile

M375 Calicut pattern flat tiles No. 1.00 0.00


L001 Unskilled labour Hour 0.13 0.00
ALLOW FOR SCAFFOLDING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G030 Supplying and laying of calicut pattern tiles in any buildings

PER m2

M027 Tile calicut pattern Gr. I No. 14.00 0.00


L001 Unskilled labour Hour 0.43 0.00
ALLOW FOR SCAFFOLDING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G031 Laying calicut pattern tiles in any building (Tiles available at site)

PER m2

L001 Unskilled labour Hour 0.43 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G034 Glass tiles laid in small quantities including fixing with G.I. Wire where
necessary (tiles supplied by the client)

PER No.

L001 Unskilled labour Hour 0.5 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
G- ROOFER

G036 Supplying and laying half round tiles upto 50 Nos. in single storeyed building

PER per tile

M029 Tile half round Gr.I No. 1.00 0.00


L001 Unskilled labour Hour 0.03 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G037 Supplying and laying half round tiles above 50 and upto 100 in single
storeyed buildings.

PER Per tile

M029 Tile half round Gr.I No. 1.00 0.00


L001 Unskilled labour Hour 0.02 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G038 Supplying and laying half round tiles upto 50 on buildings of more than
one storeyed

PER per tile

M029 Tile half round Gr.I No. 1.00 0.00


L001 Unskilled labour Hour 0.07 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G039 Supplying and laying half round tiles above 50 and upto 100 in number
on roof of buildings of more than one storeyed

PER per tile

M029 Tile half round Gr.I No. 1.00 0.00


L001 Unskilled labour Hour 0.05 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
G- ROOFER

G040 Supplying and alying half round tiles in any building

PER m2

M029 Tile half round Gr.I No. 56.00 0.00


L001 Unskilled labour Hour 0.86 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G041 Half round tiles laid in any building (Tiles available at site)

PER m2

L001 Unskilled labour Hour 0.86 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G042 Shifting and relaying half round tiles

PER m2

L001 Unskilled labour Hour 0.65 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G043 Shifting and relaying calicut pattern tiles

PER m2

L001 Unskilled labour Hour 0.29 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
G- ROOFER

G044 Supplying and laying one layer half round tiles over the existing asbestos roof

PER m2

M030 Tile half round (asbestos covering) Gr. I No. 38.00 0.00
L001 Unskilled labour Hour 0.08 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

G045 Supply and fixing of calicut pattern tiled roof on class I sawn timber frame work
including ridges, hips etc.
PER M2

M043 Timber beams class I Cum 0.02 0.00


M055 50mm x 25mm timber class I m 3.61 0.00
M029 Tile calicut pattern Gr. I No 13.00 0.00
M030 Ridge tile calicut pattern Gr. I No 1.33 0.00
M037 Binding wire * Kg 0.07 #N/A #N/A
M041 Wire nail S.W.G. 12 to 14 * Kg 0.07 #N/A #N/A
M076 Wood preservative (Black / coloured)* Lit 0.18 0.00
M010 Cement Kg 0.03 0.00
M084 Slaked Lime Kg 0.03 0.00
M007 Sand Cum 0.00 0.00
L002 Skilled labour Hour 2.96 0.00
L001 Unskilled Labour Hour 1.86 0.00

Allow for colouring powder

SUB TOTAL #N/A


OVER HEADS & PROFITS 22.00% #N/A
TOTAL #N/A
I CARPENTER & JOINER

I001 40mm to 50mm x 12mm plain chamfered class I timber beading fixed
complete with brass screw.

PER L.m.

M381 40mm to 50mm x 12mm local class I timber f m 1.05 0.00


M382 Screws Brass 40mm x Gauge 8 Nos. 1.57 0.00
L001 Unskilled labour Hour 0.13 0.00
L002 Skilled labour Hour 0.13 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I002 25mm x20mm plain chamfered Imported timber beadings fixed complete
with brass screws

PER L.m

M383 25mm x 20mm Imported timber fillets m 1.05 0.00


M382 Screws Brass 40mm x Gauge 8 Nos. 1.57 0.00
L001 Unskilled labour Hour 0.13 0.00
L002 Skilled labour Hour 0.13 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I003 Beading or filleting in Class I timber for glass panes fixed complete
with brass springs of brass panel pins.

PER L.m

M384 12mm x 12mm local class I timber fillets m 1.100 0.00


L002 Skilled labour Hour 0.200 0.00

ALLOW FOR PANEL PIN AND PUTTY

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I004 Beading or filleting on under side of ceiling removed and re fixed with
brass screws complete.
PER L.m
M382 Screws Brass 40mm x Gauge 8 Nos. 2.0 0.00
L001 Unskilled labour Hour 0.2 0.00
L002 Skilled labour Hour 0.2 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 0.00
TOTAL 0.00
I005 Beading filleting in class I local timber for glass panes fixed complete
with brass springs or brass panel pins

PER L.m

M386 12mm x12mm local class I timber fillets Lm. 1.1 0.00
L002 Skilled labour Hour 0.2 0.00

ALLOW FOR BRASS PANEL PINS AND PUTTY

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I004 Beading or filleting on under side of ceiling removed and re fixed with
brass screws complete.

PER L.m

M382 Screws Brass 40mm x Gauge 8 Nos. 2.0 0.00


L001 Unskilled labour Hour 0.2 0.00
L002 Skilled labour Hour 0.2 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I CARPENTER & JOINER

I005 Barge valance facia boards 20mm thick in class I timber fixed complete
with necessary iron screws (above 0.03 m3)

PER m2

M046 Timber plank 25mm class I Sq.m. 0.97 0.00


M387 50mm iron screws Gauge 10 Nos. 8.21 0.00
L001 Unskilled labour Hour 0.69 0.00
L002 Skilled labour Hour 2.74 0.00
ALLOW FOR MACHINE PLANING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I006 Barge valance facia boards 20mm thick in class I local timber fixed
complete with necessary iron screws (upto 0.03 m3)

M046 Timber plank 25mm class I Sq.m. 0.97 0.00


M387 50mm iron screws Gauge 10 Nos. 8.21 0.00
L001 Unskilled labour Hour 0.86 0.00
L002 Skilled labour Hour 3.43 0.00
ALLOW FOR MACHINE PLANING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I007 Barge valance facia boards 20mm thick in class II timber fixed complete
with necessary iron screws (above 0.03 m3)

PER m2

M047 Timber plank 25mm class II Sq.m. 0.97 0.00


M387 50mm iron screws Gauge 10 Nos. 8.21 0.00
L001 Unskilled labour Hour 0.69 0.00
L002 Skilled labour Hour 2.74 0.00
ALLOW FOR MACHINE PLANING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I CARPENTER & JOINER

I008 Barge valance facia boards 20mm thick in class II local timber fixed
complete with necessary screws (upto 0.03 m3)

PER m2

M047 Timber plank 25mm class ii Sq.m. 0.97 0.00


M387 50mm iron screws Gauge 10 Nos. 8.21 0.00
L001 Unskilled labour Hour 0.86 0.00
L002 Skilled labour Hour 3.43 0.00
ALLOW FOR MACHINE PLANING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I009 Barge valance facia boards available fixed including cutting and minor
repairs

PER m2

L001 Unskilled labour Hour 0.43 0.00


L002 Skilled labour Hour 0.86 0.00
M387 50mm iron screws Gauge 10 Nos. 5.17 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I010 Flat asbestos ceiling fixed to 100mm x 50mm joists and 50x50mm bearers
of class I timber including 40mm x 12mm cover fillets and 40 x 40mm coves
of class I timber. 2coats of alkali resisting primer and 2 coats of emulision paint.
PER m2
L001 Unskilled labour Hour 3.313 0.00
L002 Skilled labour Hour 1.767 0.00
L005 Painter Hour 1.767 0.00
M043 Timber Beams Class I Cu.m. 0.013 0.00
M037 Wire nail S.W.G. 12 to 14 * Hour 1.767 #N/A #N/A
M141 Wood preservative (black / coloured) * Hour 1.767 0.00
M024 Asbestos plain ceiling sheet 1220 x 1220m No. 0.75 0.00
M391 20mm G.I. Clout nails Kg. 0.025 0.00
M384 40mm to 50mm x 12mm local class I timber f m 0.084 0.00
M382 Screws Brass 40mm x Gauge 8 No. 1.078 0.00
M469 Cove moulding(63mmx40mm)local class I m 1.00 0.00
M084 Alkali resisting primer * Lit. 0.020 #N/A #N/A
M073 Emulsion * Lit. 0.040 #N/A #N/A

ALLOW FOR CEMENT SAND SCAFFOLDING AND BRUSHES


SUB TOTAL #N/A
OVER HEAD & PROFITS 22 % #N/A
TOTAL #N/A
I CARPENTER & JOINER

I011 Asbestos, plywood, cainte or colotex ceiling supplied by client cut


and fixed on existing bearers rafter or frames (Beading or cover fillets
paid separately).

PER m2

M391 20mm G.I. Clout nails Kg. 0.006 0.00


L001 Unskilled labour Hour 0.650 0.00
L002 Skilled labour Hour 0.430 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I012 Asbestos ceiling or partition fixed with clout heading nails to existing
bearers or frames (beadings or cover fillets paid seperately)

PER m2

M024 Asbestos plain ceiling sheet 1220 x 1220 No. 0.75 0.00
L001 Unskilled labour Hour 0.65 0.00
L002 Skilled labour Hour 0.43 0.00
M391 20mm G.I. clout nails Kg. 0.006 0.00
ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I CARPERNTER & JOINER

I013 Canito treotex or colotex ceiling or partition fixed to exixting bearers,


rafters or frames (beadings or cover fillets paid for separately)

PER m2

M024 Asbestos plain ceiling sheet 1220 x 1220 No. 0.75 0.00
L001 Unskilled labour Hour 0.650 0.00
L002 Skilled labour Hour 0.430 0.00
M391 20mm G.I. clout nails Kg. 0.006 0.00
ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I CARPENTER & JOINER

I013 Lunumidella ceiling boards of 150mm x 20mm renewed in small


quantites.

PER L.m

M054 Lunumidella 150 x 20mm Sq.m. 0.18 0.00


L001 Unskilled labour Hour 0.22 0.00
L002 Skilled labour Hour 0.22 0.00

ALLOW FOR NAILS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I014 Lunumidella ceiling fixed with wire nails (boards available at site)

PER m2

M037 Wire nail S.W.G. 4 to 14 * Kg. 0.04 #N/A #N/A


L001 Unskilled labour Hour 0.90 0.00
L002 Skilled labour Hour 0.90 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I CARPENTER & JOINER

I015 20mm Lunumidella ceiling or partition beaded and rebated nailed to


under side of existing joists rafters or frames above 10m2 (fillets or
beading paid for separately).

PER m2

M054 Lunumidella 150 x 20mm Sq.m. 1.100 0.00


M037 Wire nail S.W.G. 4 to 14 * Kg. 0.040 #N/A #N/A
L001 Unskilled labour Hour 1.000 0.00
L002 Skilled labour Hour 1.000 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I016 20mm Lunumidella ceiling or partition beaded and rebated nailed to


nder side of existing joists, rafters or frames upto 10m2 (fillets and
beading paid for separately.)

PER m2

M054 Lunumidella 150 x 20mm Sq.m. 1.100 0.00


M037 Wire nail S.W.G. 4 to 18 * Kg. 0.040 #N/A #N/A
L001 Unskilled labour Hour 1.100 0.00
L002 Skilled labour Hour 1.100 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I017 Ceiling openings 600mm x 450mm approx formed complete with


50mm x 50mm bearers (glass tiles or sheets paid for seperately)

PER No.

M053 Lunumidella 150 x 12mm Sq.m. 0.330 0.00


M043 Timber beams Class I Kg. 0.003 0.00
L001 Unskilled labour Hour 4.000 0.00
L002 Skilled labour Hour 4.000 0.00

ALLOW FOR NAILS


SUB TOTAL 0.00
OVER HEADS & PROFITS 22 % 0.00
TOTAL 0.00
I CARPENTER & JOINER
I018 Cleaning of ceiling upper side and clearing away the debris

PER m2

L001 Unskilled labour Hour 0.22 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I019 Cove moulding with 63mm x 40mm imported class I timber fixed with
brass screws and plugs new or renewed

PER L.m

M392 Cove moulding(63mm x 40mm)imported cla m 1.100 0.00


M393 Wood plugs. m 1.312 0.00
M389 Screws Brass 50mm x Gauge 8 No. 1.180 0.00
L001 Unskilled labour Hour 0.394 0.00
L002 skilled labour Hour 0.919 0.00

ALLOW FOR CEMENT AND SAND

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I CARPENTER & JOINER

I020 Supplying and fixing of Doors and Windows ledged, braced and battened with
grooved and tongued joints 100mm x 75mm frames and 20mm thick sashes in
class I local timber complete with brass furniture with local mortice lock for doors
heavy gauge stays fastners and barrel bolts for windows.

PER m2

M043 Timber beams Class I Cu.m. 0.03 0.00


M046 Timber plank 25mm class I Sq.m. 1.30 0.00
M382 Brass screws (40mm) Guage 8 Nos. 40.00 0.00
M389 Screws brass 50mm x Gauge 8 No. 4.00 0.00
M117 Hinge Butt Brass 100mm x 63mm * No. 1.00 #N/A #N/A
M127 Lock mortice single local made No. 0.70 0.00
L001 Unskilled labour Hour 6.60 0.00
L002 Skilled labour Hour 16.00 0.00

ALLOW FOR SPUR STONES ROWL PLUGS, DOWELS,


SAND PAPER ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I021 Supplying and fixing of 20mm thick ledged, braced and battened sashes and
100mm x75mm frames in class II timber for doors and windows with local
mortice lock for doors or heavy gauge casement stays, fastners and barrael
bolts for windows.
PER m2
M044 Timber beams Class ii Cu.m. 0.03 0.00
M047 Timber plank 25mm class II Sq.m 1.30 0.00
M382 Brass screws (40mm) Guage 8 Nos. 40.00 0.00
M389 Screws Brass 50mm x Guage 10 Nos. 4.00 0.00
M117 Hinge Butt Brass 100mm x 63mm * Nos. 1.00 #N/A #N/A
M127 Lock mortice single local made Nos. 0.70 0.00
L001 Unskilled Labour Hour 6.00 0.00
L002 Skilled Labour Hour 16.00 0.00
ALLOW FOR SPUR STONES RAWL, DOWELS SAND PAPER ETC.
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I CARPENTER & JOINER

I022 Supplying and fixing of 20mm thick ledged, braced and battened sash
only for doors and windows in class I timber fixed with available furniture

PER m2

M046 Timber plank 25mm class I Sq.m 1.500 0.00


M135 Screws Brass 40mm x Gauge 8 Doz. 3.740 0.00
M133 Screws Brass 25mm x Gauge 7 Doz. 0.374 0.00
L001 Unskilled labour Hour 6.000 0.00
L002 Skilled labour Hour 13.500 0.00

ALLOW FOR SAND PAPER ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I 023 Supplying and fixing of 20mm thick ledged, braced and battened sash
for door and windows in class II timber fixed with available furniture.

PER m2

M047 Timber plank 25mm class ii Sq.m. 1.5 0.00


M382 Screws Brass 40mm x Gauge 8 Nos. 45.0 0.00
M389 Screws Brass 50mm x Gauge 10 No. 5.0 0.00
L001 Unskilled labour Hour 6.0 0.00
L002 Skilled labour Hour 13.5 0.00

ALLOW FOR SAND PAPER ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I CARPENTER & JOINER

I024 Supplying and fixing of 25mm thick framed and 15mm thick battened sashes
and 100mm x 75mm frame class I local timber complete with brass
furniture, for doors and windows (locks paid seperately)

PER m2

M043 Timber beams Class I Cu.m. 0.032 0.00


M049 Timber plank 31mm class I Sq.m. 0.500 0.00
M425 25mm thick planks of class I local timber m2 0.816 0.00
M117 Hinge Butt Brass 100mm x 63mm * No. 2.000 #N/A #N/A
M135 Screws Brass 40mm x Gauge 8 Doz. 1.330 0.00
M133 Screws Brass 25mm x Gauge 7 Doz. 0.330 0.00
L001 Unskilled labour Hour 10.600 0.00
L002 Skilled labour Hour 22.500 0.00
ALLOW FOR BARREL BOLTS ETC.
ALLOW FOR SPUR STONES DOWELS,RAWL PLUGS AND
SCREWS SAND PAPER ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I025 Supplying and fixing of 25mm thick framed and 15mm thick battened sashes
with 100mm x 75mm frames in class II local timber complete with brass
furniture for doors and windows (locks paid seperately)

PER m2

M044 Timber beams Class ii Cu.m. 0.032 0.00


M050 Timber plank 31mm Class ii Sq.m. 0.500 0.00
M426 25mm thick planks of class II local timber m2 0.816 0.00
M117 Hinge Butt Brass 100mm x 63mm * No. 2.000 #N/A #N/A
M135 Screws Brass 40mm x Gauge 8 Doz. 1.330 0.00
M133 Screws Brass 25mm x Gauge 7 Doz. 0.330 0.00
L001 Unskilled labour Hour 10.600 0.00
L002 Skilled labour Hour 22.500 0.00
ALLOW FOR BARREL BOLTS ETC
ALLOW FOR SUPER STONES DOWLS, RAWLS PLUGS,
SCREWS AND SAND PAPER ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I CARPENTER & JOINER

I026 Supplying and fixing of 32mm thick framed and 15mm thick battened sashes
with 100mm x 75mm frames in class I local timber complete with brass
furniture for doors and windows (locks paid seperately)

PER m2

M043 Timber beams Class I Cu.m. 0.032 0.00


M051 Timber plank 38mm class I Sq.m. 0.500 0.00
M425 25mm thick planks of class I local timber m2 0.816 0.00
M117 Hinge Butt Brass 100mm x 63mm * No. 2.000 #N/A #N/A
M135 Screws Brass 40mm x Gauge 8 Doz. 1.330 0.00
M133 Screws Brass 25mm x Gauge 7 Doz. 0.330 0.00
L001 Unskilled labour Hour 10.600 0.00
L002 Skilled labour Hour 22.500 0.00
ALLOW FOR BARREL BOLTS, SKELTON BOLTS
ALLOW FOR SPURSTONES, DOWELS,RAWL PLUGS SAND
PAPER AND SCREWS ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I027 Supplying and fixing of 32mm thick framed and 15mm thick battened sashes
with 100mm x 75mm frames in class II local timber complete with brass
furniture for doors and windows (locks opaid seperately)

PER m2

M044 Timber beams Class II Cu.m. 0.032 0.00


M052 Timber plank 38mm class II Sq.m. 0.500 0.00
M426 25mm thick planks of class II local timber m2 0.816 0.00
M117 Hinge Butt Brass 100mm x 63mm * No. 2.000 #N/A #N/A
M135 Screws Brass 40mm x Gauge 8 Doz. 1.330 0.00
M133 Screws Brass 25mm x Gauge 7 Doz. 0.330 0.00
L001 Unskilled labour Hour 10.600 0.00
L002 Skilled labour Hour 22.500 0.00
ALLOW FOR BARREL BOLTS, SKELTON BOLTS
ALLOW FOR SPURSTONES, DOWELS, SANDPAPER RAWL
PLUGS AND SCREWS

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I CARPENTER & JOINER

I028 Supplying and fixing of 25mm thick, ledged, braced and battened sash in class I
timber for doors and windows (Barrel Bolts, Skeleton Bolts paid seperately)

PER m2

M049 Timber plank 31mm class I Sq.m. 1.500 0.00


M134 Screws brass 30mm x Guage 8 Doz. 3.740 0.00
M133 Screws brass 25mm x Guage 7 Doz. 0.374 0.00
L002 Unskilled labour Hour 6.000 0.00
L001 Skilled labour Hour 14.000 0.00

ALLOW FOR SAND PAPER ETC

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I029 Supplying and fixing of 25mm thick, ledged , braced and battened sash in class II
local timber for doors and windows( Barrel Bolts & Skeleton Bolts paid seperately)

PER m2

M050 Timber plank 31mm class II Sq.m. 1.500 0.00


M134 Screws brass 30mm x Guage 8 Doz. 3.740 0.00
M133 Screws brass 25mm x Guage 7 Doz. 0.374 0.00
L001 Skilled labour Hour 14.000 0.00
L002 Unskilled labour Hour 6.000 0.00

ALLOW FOR SAND PAPER ETC


SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I030 Supplying and fixing of 32mm thick, ledged, braced and battened sash in class I
timber for doors and windows. (Barrel Bolts & Skeleton Bolts paid seperately)

PER m2

M051 Timber plank 38mm class I Sq.m. 1.500 0.00


M134 Screws brass 30mm x Guage 8 Doz. 3.740 0.00
M133 Screws brass 25mm x Guage 7 Doz. 0.374 0.00
L002 Skilled labour Hour 15.000 0.00
L001 Unskilled labour Hour 6.000 0.00

ALLOW FOR SAND PAPER ETC

SUB TOTAL 0.00


OVER HEAD & PROFITS 0.00
TOTAL 0.00
king serviceable materials
d within the site as directed.
joints filled with cement
I CARPENTER & JOINER

I031 Supplying and fixing of 32 thick, ledged, braced and battened sash in class II local
timber for doors and windows (Barrel Bolts & Slkeleton Bolts paid seperately)

PER m2

M052 Timber plank 38mm class II sq.m 1.500 0.00


M134 Screws brass 30mm x Guage 8 Doz 3.740 0.00
M133 Screws brass 25mm x Guage 8 Doz 0.374 0.00
L002 Skilled labour hour 15.000 0.00
L001 Unskilled labour hour 6.000 0.00

ALLOW FOR SCREWS AND SAND PAPER


SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I032 Supplying and fixing of 25mm thick sash in imported timber for doors and
windows (Iron Mongery glazing paid seperately)

PER m2

M427 32mm thick imported timber planks m2 1.400 0.00


L002 Skilled labour hour 15.000 0.00
L001 Unskilled labour hour 6.000 0.00

ALLOW FOR SCREWS AND SAND PAPER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I033 Supplying and fixing of battened, door for gurge 32mm framed 15mm thick battened with
125mm x 100mm frames in class I timber with iron pintels and strap hinges Iron tower bolts for doors
for Hasp & Staple.
PER m2
M381 Hasp and staple Iron 100mm * No. 0.200 #N/A #N/A
M382 Screws Brass 40mm x Gauge 8 Nos. 3.400 0.00
M043 Timber beams class I Cu.m 0.02 0.00
M051 Timber plank 38mm class I sq.m 0.60 0.00
M425 25mm thick planks of class I local timber M2 0.64 0.00
M429 Holdfasts - 250 x 25 x 6 Nos. 1.00 0.00
M430 Pintels and stay hinges 50mm x 6mm x 1m Nos. 1.00 0.00
M062 Bolt & nut iron 45 x 6mm Nos. 5.00 0.00
M068 Bolt Tower iron 75mm * Nos. 0.20 #N/A #N/A
L001 Unskilled labour Hour 4.000 0.00
L002 Skilled labour Hour 6.000 0.00
ALLOW FOR SPUR STONES SAND PAPER DOWELS
ALLOW FOR MACHINE PLANING
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I034 Supplying and fixing of glazed and panelled, 32mm thick sash and with 100mm x 75mm frames
in class I local timber for doors and windows including all Brass furniture. (Door lock paid
seperately)
PER m2

M043 Timber beams class I Cu.m 0.02 0.00


M049 Timber plank 38mm class I sq.m 0.64 0.00
M425 25mm thick planks of class I local timber M2 0.25 0.00
M432 40mm x 40mm class I timber sash bars L.m 1.64 0.00
M386 12mm x 12mm local class I timber fillets L.m 5.30 0.00
M197 Glass Pane clear 3mm sq.m 0.36 0.00
M122 Hinge butt brass 125mm x 100mm * No. 1.50 #N/A #N/A
M099 Bolt skeleton brass 300mm * No. 0.40 #N/A #N/A
M096 Bolt barrel brass 150mm * Nos. 0.80 #N/A #N/A
M398 25mm brass screws - 8 Nos. 12.00 0.00
L001 Unskilled labour hour 6.00 0.00
L002 Skilled labour hour 12.00 0.00

ALLOW FOR SPUR STONES, RAWL PLUGS, SCREWS, DOWELS,


SAND PAPER ETC.
ALLOW FOR MACHINE PLANING & JOINT
SUB TOTAL #N/A
OVER HEAD & PROFITS 22 % #N/A
TOTAL #N/A
I035 Supplying and fixing of glazed or pannelled 32mm thick sashes with
100mm x 75mm frames in class II local timber complete with brass
furniture for doors and windows. ( door lock paid seperately)

PER m2

M044 Timber beams class II Cum 0.02 0.00


M050 Timber plank 38mm class II m2 0.64 0.00
M426 25mm thick planks of class II local timber m2 0.25 0.00
M433 40mm x 40mm Class II timber sash bars L.m 1.64 0.00
M434 12mm x 12mm local class II timber fillets. L.m 5.30 0.00
M197 Glass pane clear 3mm sqm 0.36 0.00
M122 Hinge Butt Brass 125mm x 100mm * No. 2.00 #N/A #N/A
M099 Bolt Skeleton Brass 300mm * No. 0.40 #N/A #N/A
M096 Bolt Barrel Brass 150mm * No. 0.33 #N/A #N/A
M398 Screws brass 25mm x Gauge 8 No. 9.00 0.00
L001 Unskilled labour hour 6.00 0.00
L002 Skilled labour hour 12.00 0.00

ALLOW FOR MACHINE PLANING

ALLOW FOR SPUR STONES RAWL PLUGS, SCREWS, DOWELS,


SAND PAPER ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I CARPENTER & JOINER
I036 Supplying and fixing of doors or windows glazed and or panelled sashes
32mm thick in class I timber with brass furniture.

PER m2

M049 Timber plank 31mm class I sq.m 0.72 0.00


M425 25mm thick planks of class I local timber m2 0.28 0.00
M432 40mm x 40mm class I timber sash bars L.m 1.86 0.00
M386 12mm x 12mm local class I timber fillets L.m 6.00 0.00
M197 Glass Pane clear 3mm sq.m 0.41 0.00
M122 Hinge Parliamentary Brass 125mm No. 1.00 0.00
M099 Bolt Skeleton Brass 300mm * No. 0.50 #N/A #N/A
M096 Bolt barrel Brass 150mm * No. 0.90 #N/A #N/A
M398 25mm brass screws - 8 No. 10.00 0.00
L002 Skilled labour hour 12.00 0.00
L001 Unskilled labour hour 6.00 0.00

ALLOW FOR SAND PAPER AND SCREWS

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I037 Supplying and fixing of glazed or panelled, 32mm thick sashes in class
II timber with brass furniture for doors and windows.

PER m2

M050 Timber plank 31mm class II sq.m 0.73 0.00


M426 25mm thick planks of class II local timber m2 0.28 0.00
M433 40mm x 40mm class II timber sash bars L.m 1.86 0.00
M434 12mm x 12mm local class II timber fillets. L.m 6.00 0.00
M197 Glass pane clear 3mm sq.m 0.40 0.00
M122 Hinge parliamentary Brass 125mm No. 1.00 0.00
M099 Bolt Barrel Brass 150mm * No. 0.50 #N/A #N/A
M096 Bolt Skeleton Brass 300mm * No. 0.90 #N/A #N/A
M398 25mm brass screws - 8 No. 10.00 0.00
L001 Unskilled labour Hour 6.00 0.00
L002 Skilled labour Hour 12.00 0.00

ALLOW FOR SAND PAPER AND SCREWS

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I038 Supplying and fixingbof panelled 31mm thick sash and 100mm x 75mm
frames in class I timber and trelised with weld mesh no.32 and complete
with brass furniture

PER m2

M043 Timber beams class I Cu.m 0.03 0.00


M049 Timber plank 31mm class I sq.m 0.52 0.00
M425 25mm thick planks of class I local timber m2 0.29 0.00
M035 Weld mesh(galvanised) 50 x 50mm, Gauge 10 m2 0.36 0.00
M386 12mm x12mm local class I timber fillets Lm 1.87 0.00
M117 Hinge butt brass 100mm No. 1.00 0.00
M127 Lock mortice single local made No. 0.70 0.00
M382 Screws Brass 40mm x Gauge 8 No. 16.00 0.00
M389 Screws Brass 50mm x Gauge 8 No. 4.00 0.00
L001 Unskilled labour hour 10.60 0.00
L002 Skilled labour hour 22.50 0.00

ALLOW FOR SPUR STONE DOWELS, RAWL PLUGS AND SCREWS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I039 Supplying and fixing of 31mm door sash panelled and terllis with Gal
weld mesh with 31 class I timber and available furniture.

PER m2

M049 Timber plank 31mm class I sq.m 0.62 0.00


M425 25mm thick planks of class I local timber m2 0.34 0.00
M035 Weld mesh(galvanised) 50 x 50mm, Gauge 10 m2 0.42 0.00
M386 12mm x 12mm local class I timber fillets Lm 2.22 0.00
L002 Skilled labour hour 17.00 0.00
L001 Unskilled labour hour 6.06 0.00
M384 40mm to 50mm x 12mm local class I timber filet m 15.00 0.00
M398 25mm brass screws - 8 Nos. 4.00 0.00

ALLOW FOR SAND PAPER ETC.

SUB TOTAL 0.00


OVER HEADS & PROFITS 22 % 0.00
TOTAL 0.00
I040 Supplying and fixing of 32mm panneled doors sash and with BRC No. 32
weld mesh in class I timber with available furniture.

PER m2

M435 28mm thick class I timber planks. m2 0.62 0.00


M425 25mm thick planks of class I local timber m2 0.34 0.00
M035 Weld mesh (galvanised) 50x50mm, gauge 10 m2 0.42 0.00
M386 12mm x12mm local class I timber fillets Lm 2.22 0.00
L002 Skilled labour hour 17.00 0.00
L001 Unskilled labour hour 6.06 0.00
M384 40mm to 50mm x 12mm local class I timber fillet m 15.00 0.00
M398 25mm brass screws - 8 Nos. 4.00 0.00

ALLOW FOR SAND PAPER ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I041 Supplying and fixing of 32mm panelled door sashes and 100mm x 75mm
frames in class I timber fixed complete with brass furniture. (door lock paid seperately)

PER m2

M043 Timber beams class I Cu.m 0.03 0.00


M049 Timber plank 38mm class I sq.m 0.67 0.00
M425 25mm thick planks of class I local timber m2 0.52 0.00
L002 Skilled labour hour 10.00 0.00
L001 Unskilled labour hour 6.00 0.00
M117 Hinge Butt Brass 125mm x 100mm * No. 1.50 #N/A #N/A
M382 Screws Brass 40mm x Gauge 8 No. 12.30 0.00
M389 Screws Brass 50mm x Gauge 8 No. 3.00 0.00

ALLOW FOR MACHINE PLANING AND JOINTS


ALLOW FOR SPUR STONES RAWL PLUGS AND SCREWS
SUB TOTAL #N/A
OVER HEAD & PROFITS 22% #N/A
TOTAL #N/A
I CARPENTER & JOINER

I042 Removing , easing and refixing of doors or windows.

PER No

L001 Unskilled labour Hour 1.50 0.00


L002 Skilled labour Hour 1.50 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I043 Easing of doors and windows

PER No

L002 Skilled labour Hour 1.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I044 Renewing in short lenghs with Class I timber in Doors and Windows frames.

PER L.m.

M043 Timber beams class I Cu.m. 0.013 0.00


L002 Skilled labour Hour 4.400 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I CARPENTER & JOINER
I045 Altering door or window frame by filleting existing rebate using Class I
timber and rehanging screws and sashes on opposite side.

PER No.

M517 32mm x 12mm local class 1 timber fillets m2 6.41 0.00


M134 Screws Brass 30mm x Gauge 8 Doz. 1.50 0.00
M133 Screws Brass 25mm x Gauge 8 Doz. 1.00 0.00
L002 Skilled labour Hour 12.00 0.00
L001 Unskilled labour Hour 4.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I046 Renewing of glazing bars in door or windows in Class I timber, (per 2.0m,
32mm x 32mm)

PER m

M432 40mm x 40mm class I timber sash bars L.m. 1.17 0.00
L002 Skilled labour Hour 2.80 0.00
L001 Unskilled labour Hour 0.94 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I047 Fixing of louvered Door or Window sash 25mm to 32mm in Imported Timber with
available furniture.

PER m2

M427 31mm to 38mm thick (Burma Teak) imported Lm 0.720 0.00


Class Timber planks
M518 12mm thick class I timber planks m2 1.330 0.00
M133 Screws brass 25mm x Gauge 8 Doz. 3.074 0.00
L002 Skilled labour Hour 33.000 0.00
L001 Unskilled labour Hour 9.000 0.00
ALLOW FOR SAND PAPER
SUB TOTAL 0.00
OVER HEAD & PROFITS 22% 0.00
TOTAL 0.00
I CARPENTER & JOINER

I048 Supplying and fixing 38mm x 38mm x 125mm tapered doors tops in Class I
timber

PER Nos.

M520 50mm x 50mm thick class 1 timber Lm 0.150 0.00


L002 Skilled labour Hour 1.000 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR CEMENT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I049 Fixing of door or window sashes to position (sash and fittings supplied by client)

PER NO.

L002 Skilled labour Hour 3.00 0.00


L001 Unskilled labour Hour 3.00 0.00

ALLOW FOR TOOLS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I CARPENTER & JOINER

I050 Removing and refixing of door sashes in new position

PER NO.

L002 Skilled labour Hour 2.00 0.00


L001 Unskilled labour Hour 2.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I051 Supplying and fixing of 25mm thick swing doors (900mm x 450mm each) with
12mm panel or glazed and panelled in Class I timber including brass gravity hinges.

PER PAIR

M435 28mm thick Class I timber planks. m2 0.51 0.00


M518 12mm thick class I timber planks m2 0.79 0.00
M120 Hinge Gravity Brass No. 4.00 0.00
M135 Screws Brass 40mm x Gauge 8 Doz. 1.00 0.00
L002 Skilled labour Hour 20.00 0.00
L001 Unskilled labour Hour 6.00 0.00
M133 Screws Brass 25mm x Gauge 8 Doz. 3.00 0.00

ALLOW FOR SAND PAPER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I CARPENTER & JOINER

I052 Supplying and fixing 25mm thick swing doors (900mm x 450mm each) panels in
Class I timber complete with gravity hinges.

PER pair

M435 28mm thick Class I timber planks. m2 0.51 0.00


M120 Hinge Gravity Brass No. 4.00 0.00
M135 Screws brass 40mm x Gauge 8 Doz. 1.00 0.00
M061 Plywood board, 12mm M.R. Sq.m. 0.56 0.00
L002 Skilled labour Hour 20.00 0.00
L001 Unskilled labour Hour 6.00 0.00

ALLOW FOR SAND PAPER ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I053 Supplying and fixing quadrant fillets 20mm x 20mm with spring or nails
in Class I timber.

PER m

M388 25mm x 25mm class I local timber fillets Lm. 1.10 0.00
L002 Skilled labour Hour 0.33 0.00

ALLOW FOR NAILS OR SPRINGS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I054 Supplying and fixing quadrant fillets 25mm x 25mm with springs or nails in Class I
timber.

PER m

M524 32mm x 32mm Class I timber Lm 1.10 0.00


L002 Skilled labour Hour 0.33 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00 % 0.00
TOTAL 0.00
I CARPENTER & JOINER

I055 Supplying and fixing of gate sash with available posts at site including fixing post
(Gate and posts supplied by Client)

PER sash

L001 Unskilled labour Hour 8.00 0.00


L002 Skilled labour Hour 2.00 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I056 Supplying and fixing of louver blades with 10mm minimum thickness in
Class I timber up to 100mm width.

PER m

M518 12mm thick class i timber planks m2 0.120 0.00


L002 Skilled labour Hour 1.312 0.00

ALLOW FOR NAILS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I057 Supplying and fixing of louvers blades with 10mm minimum thickness and
100mm to 150mm wide in class I timber.

PER m

M518 12mm thick class i timber planks m2 0.160 0.00


L002 Skilled labour Hour 1.400 0.00

ALLOW FOR NAILS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00 % 0.00
TOTAL 0.00
I CARPENTER & JOINER

I058 Supplying and fixing of louver blades with a 10mm minimum thickness and
150mm to 225mm wide in Class I timber.

PER m

M518 12mm thick class i timber planks m2 0.230 0.00


L002 Skilled labour Hour 1.640 0.00

ALLOW FOR NAILS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I059 Fixing of available partitions including making good to walls and floors.

PER m2

L002 Skilled labour Hour 0.92 0.00


L001 Unskilled labour Hour 2.46 0.00

ALLOW FOR PLUGS, SCREWS, CEMENT & PAINT

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I CARPENTER & JOINER

I060 Fixing of full panelled or panelled and glazed 38mm thick partitions with
100mm x 50mm frames and 25mm x 25mm quadrant fillets, complete with
brass screws in Class I local timber.

PER m2

M041Timber beams Class I Cu.m 0.02 0.00


M046 Timber plank 25mm class I Sq.m. 0.36 0.00
M425 32mm thick planks of Class I local timber m2 0.36 0.00
M524 32mm x 32mm Class I timber m 7.52 0.00
M526 20mm x 20mm Class 1 timber battens m 3.38 0.00
L002 Skilled labour Hour 26.73 0.00
L001 Unskilled labour Hour 9.83 0.00
M197 Glass Pane clear 3mm Sq.m. 0.43 0.00
M137 Screws Brass 50mm x Gauge 8 Doz. 0.93 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.04 #N/A #N/A

ALLOW FOR SAND PAPER ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I061 Fixing of glazed and plywood panelled partitions in Class I timber with
100mm x 100mm x 300mm intermediate posts 100mm x 50mm x 2150mm and
40mm x 200mm capping complete.

PER m2

M043 Timber beams Class I Cu.m. 0.003 0.00


M046 Timber plank 25mm class I Sq.m. 0.360 0.00
M061 Plywood board, 12mm M.R. Sq.m. 0.360 0.00
M524 32mm x 32mm Class I timber m 7.520 0.00
M526 20mm x 20mm Class 1 timber battens m 3.380 0.00
L002 Skilled labour Hour 26.730 0.00
L001 Unskilled labour Hour 9.830 0.00
M197 Glass Pane clear 3mm Sq.m. 0.430 0.00
M137 Screws Brass 50mm x Gauge 8 Doz. 0.930 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.040 #N/A #N/A

ALLOW FOR SAND PAPER ETC.


SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I CARPENTER & JOINER

I062 Supplying and fixing 100mm long tapered 75mm x 50mm plugs in Class I
timber on walls with 1:3 cement mortar finish neately.

PER No.

M043 Timber beams Class I Cu.m. 0.001 0.00


L002 Skilled labour Hour 0.400 0.00
L001 Unskilled labour Hour 0.200 0.00

ALLOW FOR CEMENT & PAINT

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I063 Supplying of 3 ply plywood panels 6mm thick and fixing to existing frames (beading paid for
separately).

PER m2

M059 Plywood board, ordinary M.R. 6mm Sq.m. 1.005 0.00


L002 Skilled labour Hour 1.802 0.00

ALLOW FOR NAILS SCREWS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I064 Fixing of 2135mm long, 125mm x 125mm verandah post tapering to 100mm x 100mm
on spur stone in Class I timber(Spur stone paid for separately).

PER No.

M043 Timber beams Class I Cu.m. 0.037 0.00


L002 Skilled labour Hour 5.000 0.00
L001 Unskilled labour Hour 1.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00 % 0.00
TOTAL 0.00
I CARPENTER & JOINER

I065 Fixing of 2135mm long, 150mm x 150mm verandah post tapering to 125mm x 125mm
on spur stone in Class I local timber(Spur stone paid for separately).

PER No.

M043 Timber beams Class I Cu.m. 0.053 0.00


L002 Skilled labour Hour 6.000 0.00
L001 Unskilled labour Hour 1.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I066 Fixing of round jungle timber available wooden posts 150m to 200mm(posts
supplied by Client).

PER m

L001 Unskilled labour Hour 1.300 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I067 Supplying and fixing of coconut rafters

PER m

M529 Coconut rafters m 1.100 0.00


L002 Skilled labour Hour 0.153 0.00
L001 Unskilled labour Hour 0.077 0.00

ALLOW FOR NAILS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00 % 0.00
TOTAL 0.00
I CARPENTER & JOINER

I068 Supplying and fixing of 50mm x 25mm reepers in Class I timber new or renewed with Iron
nails up to 30m (Shifting of tiles paid for separately) Rate include applying wood preservative.

PER m

M530 50mm x 25mm Class I timber m 1.100 0.00


L002 Skilled labour Hour 0.066 0.00
L001 Unskilled labour Hour 0.066 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.004 #N/A #N/A
ALLOW FOR WOOD PRESERVATIVE
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I069 Supplying and fixing of 50mm x 25mm reepers in Class I timber new or renewed with Iron
nails over 30m (Shifting of tiles paid for separately) Rate include applying wood preservative.

PER m

M530 50mm x 25mm Class I timber m 1.100 0.00


L002 Skilled labour Hour 0.044 0.00
L001 Unskilled labour Hour 0.044 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.004 #N/A #N/A
ALLOW FOR WOOD PRESERVATIVE
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I070 Supplying and fixing of 50mmx25mm reepers in ClassII local timber new or renewed with Iron
nails up to 30m (Shifting of tiles paid for separately) Rate include applying wood preservative.

PER m

M530 50mm x 25mm Class II timber m 1.100 0.00


L002 Skilled labour Hour 0.066 0.00
L001 Unskilled labour Hour 0.066 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.004 #N/A #N/A
ALLOW FOR WOOD PRESERVATIVE
SUB TOTAL #N/A
OVER HEAD & PROFITS 22% #N/A
TOTAL #N/A
I071 Supplying and fixing of 50mmx25mm reepers in ClassII local timber new or renewed with Iron
nails over 30m (Shifting of tiles paid for separately) Rate include for apply wood preservative.

PER m

M530 50mm x 25mm Class II timber m 1.100 0.00


L002 Skilled labour Hour 0.044 0.00
L001 Unskilled labour Hour 0.044 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.004 #N/A #N/A
ALLOW FOR WOOD PRESERVATIVE
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I072 Supplying and fixing of 50mm x 12mm reepers in Class I local timber new or renewed
with Iron nails up to 30m.

PER m

M485 50mm x 12mm Class I timber m 1.100 0.00


L002 Skilled labour Hour 0.066 0.00
L001 Unskilled labour Hour 0.066 0.00

ALLOW FOR NAILS WOOD PRESERVATIVE

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I CARPENTER & JOINER

I073 Supplying and fixing of 50mm x 12mm reepers in Class I local timber new or renewed
with Iron nails over 30m and apply wood preservative.

PER m

M485 50mm x 12mm Class I timber m 1.100 0.00


L002 Skilled labour Hour 0.044 0.00
L001 Unskilled labour Hour 0.044 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.003 #N/A #N/A
ALLOW FOR WOOD PRESERVATIVE
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I074 Fixing of available reepers with wir nails and apply wood preservative.

PER m

L002 Skilled labour Hour 0.066 0.00


L001 Unskilled labour Hour 0.066 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.004 #N/A #N/A
ALLOW FOR WOOD PRESERVATIVE
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I075 Supplying and fixing calicut pattern tiles roof on Class I sawn timber frame work
including ridges, hips etc.

PER m2

M043 Timber beams Class I Cu.m. 0.018 0.00


M530 50mm x 25mm class I timber m 3.609 0.00
M027 Tile calicut pattern Gr. I No. 12.550 0.00
M028 Ridge tile calicut pattern Gr. I No. 0.810 0.00
M037 Wire nail S.W.G. 4 to 10 * Kg. 0.065 #N/A #N/A
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.016 #N/A #N/A
M141 Wood Preservative (black / coloured) * Lit. 0.204 0.00
M014 Cement 50 Kg. 0.027 0.00
M416 Slaked lime 25Kg. 0.675 0.00
M007 Sand Cum 0.004 0.00
L002 Skilled labour Hour 1.650 0.00
L001 Unskilled labour Hour 1.650 0.00

ALLOW FOR COLOURING POWDER ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS #N/A
TOTAL #N/A

I076 Supplying and fixing calicut pattern tiled roof on Class II sawn timber frame work
including ridges, hips etc.

PER m2

M044 Timber beams class II Cu.m. 0.018 0.00


M484 50mm x 25mm Class II timber m 3.609 0.00
M027 Tile calicut pattern Gr. I No. 12.550 0.00
M028 Ridge tile calicut pattern Gr. I No. 0.810 0.00
M037 Wire nail S.W.G. 4 to 10 * Kg. 0.065 #N/A #N/A
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.016 #N/A #N/A
M141 Wood Preservative (black / coloured) * Lit. 0.204 0.00
M416 Slaked lime 25Kg. 0.675 0.00
M007 Sand Cum 0.004 0.00
M014 Cement 50 Kg. 0.027 0.00
L002 Skilled labour Hour 1.650 0.00
L001 Unskilled labour Hour 1.650 0.00
ALLOW FOR COLOURING POWDER ETC.
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I077 Supplying material and fixing half round tiled roof on Class I sawn timber
frame work including fidges, hips etc.
PER m2
M043 Timber beams class I Cu.m. 0.017 0.00
M485 50mm x 25mm Class I timber m 7.218 0.00
M028 Ridge tile calicut patten Gr. I No. 0.810 0.00
M029 Tile half round Gr.I No. 61.340 0.00
M037 Wire nail S.W.G. 4 to 10 * Kg. 0.065 #N/A #N/A
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.016 #N/A #N/A
M141 Wood Preservative (black / coloured) * Lit. 0.245 0.00
M014 Cement 50 Kg. 0.027 0.00
M416 Slaked lime Bushels 0.027 0.00
M007 Sand Cum 0.004 0.00
L002 Skilled labour Hour 1.794 0.00
L001 Unskilled labour Hour 1.794 0.00
ALLOW FOR COLOURING POWDER ETC.
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I078 Supplying material and fixing half round tiles roof on Class II sawn timber
frame work including fidges, hips etc.

PER m2
M044 Timber beams class II Cu.m. 0.017 0.00
M485 50mm x 25mm Class II timber m 7.218 0.00
M028 Ridge tile calicut pattern Gr. I m 0.810 0.00
M029 Tile half round Gr. I No. 61.340 0.00
M037 Wire nail S.W.G. 4 to 10 * Kg. 0.065 #N/A #N/A
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.016 #N/A #N/A
M141 Wood Preservative (black / coloured) * Lit. 0.245 0.00
M014 Cement 50 Kg. 0.027 0.00
M416 Slaked lime Bushels 0.027 0.00
M007 Sand Cum 0.004 0.00
L002 Skilled labour Hour 1.794 0.00
L001 Unskilled labour Hour 1.794 0.00
ALLOW FOR COLOURING POWDER ETC.
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I079 Sorting out of available timber cut to required sizes and fixed in partitions and frames.

PER m3

L002 Skilled labour Hour 12.80 0.00


L001 Unskilled labour Hour 4.30 0.00

ALLOW FOR SCREWS , SAND PAPER ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I080 Sorting out of available timber cut to required sizes and fixed in roof and other
carpentry work.

PER m3

L002 Skilled labour Hour 21.300 0.00


L001 Unskilled labour Hour 4.300 0.00

ALLOW FOR NAILS, SPIKES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I081 Fixing or renewing partitions and frames with Class I timber (excluding Milla)
including panels and boards.

PER m3

M043 Timber beams class I Cu.m. 1.00 0.00


L002 Skilled labour Hour 25.60 0.00
L001 Unskilled labour Hour 12.80 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I082 Fixing or renewing partitions and frames with Class II timber
including panels and boards
PER M3

M044 Timber beams class II Cu.m. 1.00 0.00


L002 Skilled labour Hour 256.00 0.00
L001 Unskilled labour Hour 128.00 0.00
ALLOW FOR TOOLS ETC.
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I083 Fixing or renewing Class I timber in roof and other carpentry work.

PER m3

M043 Timber beams class I Cu.m. 1.00 0.00


L002 Skilled labour Hour 256.00 0.00
L001 Unskilled labour Hour 128.00 0.00
ALLOW FOR TOOLS ETC.
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

I084 Fixing or renewing Class II timber in roof and other carpentry work.

PER m3

M044 Timber beams class II Cu.m. 1.00 0.00


L002 Skilled labour Hour 256.00 0.00
L001 Unskilled labour Hour 128.00 0.00
ALLOW FOR TOOLS ETC.
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I085 Renewing of trellis laths 16mm x 16mm in Class I local timber in quantities over 30m.

PERm

M511 16mm x 16mm Class 1 timber m 1.100 0.00


M038 Wire nail S.W.G. 12 to 14 * Kg. 0.004 #N/A #N/A
L002 Skilled labour Hour 0.140 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I086 Renewing of trellis laths 16mm x 16mm in Class I local timber in quantities
up to 30m.
PERm

M511 16mm x 16mm Class 1 timber m 1.100 0.00


M038 Wire nail S.W.G. 12 to 14 * Kg. 0.004 #N/A #N/A
L002 Skilled labour Hour 0.175 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I087 Renewing of trellis laths 25mm x 12mm in Class I local timber in quantities over 30m.

PERm

M527 28mm x 15mm Class I timber m 1.100 0.00


L002 Skilled labour Hour 0.170 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.004 #N/A #N/A

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I088 Renewing of trellis laths 25mm x 12mm in Class I local timber in small
quantities upto 30m.

PER m

M527 28mm x 15mm Class I timber m 1.100 0.00


L002 Skilled labour Hour 0.220 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.004 #N/A #N/A

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00 % #N/A
TOTAL #N/A

I089 Supplying and fixing of trellis laths 25mm x 25mm in Class I local timber.

PER m

M483 28mm x 28mm Class I timber m 1.100 0.00


L002 Skilled labour Hour 0.170 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.008 #N/A #N/A

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I090 Renewing of trellis laths 50mm x 12mm in Class I timber.

PER m

M486 50mm x 15mm Class I timber m 1.100 0.00


L002 Skilled labour Hour 0.170 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.008 #N/A #N/A

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I091 Supplying and fixing in position 100mm x 75mm door frame in Class I
timber

PER m2

M043 Timber beams class I Cu.m. 0.020 0.00


L002 Skilled labour Hour 5.960 0.00
L001 Unskilled labour Hour 5.960 0.00
M533 Spur stones No. 1.325 0.00
M488 Holdfasts - 400 x 25 x 6 No. 2.650 0.00

ALLOW FOR CEMENT, SAND, DOVEL PINS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 0.00
TOTAL 0.00

I092 Supplying and fixing in position of 100mm x 50mm Class I timber door frames.

PER m2

M043 Timber beams class I Cu.m. 0.014 0.00


L002 Skilled labour Hour 5.960 0.00
L001 Unskilled labour Hour 5.960 0.00
M512 Spur Stones No. 1.325 0.00
M429 Holdfasts - 400 x 25 x 6 Nos. 2.650 0.00

ALLOW FOR CEMENT , SAND & DOUBLE PINS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I093 Supplying and fixing of 32mm thick ordinary sash single (ordinary finish)
plywood door hung on 100mm x 75mm frame in Class I timber complete
with brass furniture(lock paid for separately).

PER m2

M043 Timber beams class I Cu.m. 0.022 0.00


M512 Spur Stones No. 0.950 0.00
M429 Holdfasts - 400 x 25 x 6 Nos. 2.830 0.00
L002 Skilled labour Hour 4.000 0.00
L001 Unskilled labour Hour 2.000 0.00
M056 Plywood door ordinary M.R. 838 x 2060 x 32mm No. 0.472 0.00
M117 Hinge Butt Brass 100mm x 63mm * No. 1.416 #N/A #N/A
M099 Bolt Skeleton Brass 300mm * No. 0.472 #N/A #N/A
M096 Bolt Barrel Brass 150mm * No. 0.472 #N/A #N/A
M135 Screws brass 40mm x Gauge 8 Doz. 0.480 0.00
M133 Screws brass 25mm x Gauge 8 Doz. 0.943 0.00
M132 Screws brass 20mm x Gauge 8 Doz. 0.480 0.00
ALLOW FOR MACHINE PLANING
ALLOW FOR DOWELS, CEMENT ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00 % #N/A
TOTAL #N/A

I094 Supplying and fixing of 32mm thick ordinary sash single (ordinary finish)
plywood door hung on 100mm x 50mm frame in Class I timber complete
with brass furniture(lock paid for separately).

M043 Timber beams class I Cu.m. 0.014 0.00


M512 Spur Stones No. 0.943 0.00
M429 Holdfasts - 250 x 25 x 6 Nos. 2.830 0.00
L002 Skilled labour Hour 4.000 0.00
L001 Unskilled labour Hour 2.000 0.00
M056 Plywood door ordinary M.R. 838 x 2060 x 32mm No. 0.472 0.00
M117 Hinge Butt Brass 100mm x 63mm * No. 1.416 #N/A #N/A
M099 Bolt Skeleton Brass 300mm * No. 0.472 #N/A #N/A
M096 Bolt Barrel Brass 150mm * No. 0.472 #N/A #N/A
M135 Screws brass 40mm x Gauge 8 Doz. 0.480 0.00
M133 Screws brass 25mm x Gauge 8 Doz. 0.943 0.00
M132 Screws brass 20mm x Gauge 8 Doz. 0.480 0.00
ALLOW FOR MACHINE PLANING
ALLOW FOR DOWELS, CEMENT ETC.
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I095 Supplying and fixing of 32mm thick ordinary sash single (ordinary finish)
plywood door on existing frame(lock paid for separately).

PER m2

L002 Skilled labour Hour 2.320 0.00


L001 Unskilled labour Hour 2.320 0.00
M056 Plywood door ordinary M.R. 838 x 2060 x 32mm No. 0.472 0.00
M117 Hinge Butt Brass 100mm x 63mm * No. 1.416 #N/A #N/A
M099 Bolt Skeleton Brass 300mm * No. 0.472 #N/A #N/A
M096 Bolt Barrel Brass 150mm * No. 0.472 #N/A #N/A
M135 Screws brass 20mm x Gauge 8 Doz. 0.480 0.00
M133 Screws brass 25mm x Gauge 8 Doz. 0.943 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I096 Supplying and fixing of 32mm thick marine type plywood door (ordinary water
proof) on existing frame.(lock paid for separately).

PER m2

M056 Plywood door ordinary M.R. 636x2060x32mm No. 0.710 0.00


L002 Skilled labour Hour 2.837 0.00
L001 Unskilled labour Hour 2.837 0.00
M096 Bolt Barrel Brass 150mm * No. 1.420 #N/A #N/A
M135 Screws brass 20mm x Gauge 8 Doz. 0.710 0.00
M125 Ring Brass 45mm to 38mm No. 0.710 0.00
M133 Screws brass 25mm x Gauge 8 No. 0.750 0.00
M117 Hinge butt brass 100mm x 63mm * No. 1.416 #N/A #N/A
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I097 Supplying & fixing 2100 to 3000mm high, 4mm thick glazed partition with
12mm thick chipboard panels on 100 x 75 and 100 x 100mm uprights
at 900mm intervals & 100 x 50mm as horizontal members in CI I timber
with 50 x 12mm timber beadings around glasspane.

PER m2

M514 12mm chip board (8'x4') * No. 0.400 0.00


M043 Timber beams class I Cu.m. 0.017 0.00
M198 Glass pane Clear 4mm Sq.m. 0.544 0.00
M384 40mm to 50mm x 12mm local class I timber fillet m 2.220 0.00
ets.
L002 Skilled labour Hour 8.833 0.00
L001 Unskilled labour Hour 1.890 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.144 #N/A #N/A
M133 Screws brass 25mm x Gauge 8 Doz. 0.473 0.00

ALLOW FOR CEMENT, SAND ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00 % #N/A
TOTAL #N/A

I098 Supplying & fixing 2100 to 3000mm high, 4mm thick glazed partition with
10mm thick chipboad panels on 100 x 75mm & 100x100mm uprights at 900mm intervals
& horizontal members in Cl I timber and 50 x 12mm timber beading around glass pane.
PER m2
M515 10mm chip board (8'x4') * No. 0.400 0.00
M043 Timber beams class I Cu.m. 0.017 0.00
M198 Glass pane Clear 4mm Sq.m. 0.544 0.00
M384 40mm to 50mm x 12mm local class I timber fillet m 2.220 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.144 #N/A #N/A
M133 Screws Brass 25mm x Gauge 8 Doz 0.473 0.00
L002 Skilled labour Hour 8.833 0.00
L001 Unskilled labour Hour 1.890 0.00
ALLOW FOR CEMENT, SANS ETC.
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I099 Supplying & fixing 2100 to 3000mm high panelled partition with 12mm thick
chipboard on both sides with 100 x 50mm & 100 x 100mm upright fixed at
900mm intervals & 100 x 50mm as horizontal members in Cl I timber.

PER m2

M043 Timber beams class I Cu.m. 0.016 0.00


M514 12mm chip board (8'x4') m2 2.200 0.00
M516 50mm x 25mm Class I local timber fillets m2 2.885 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.215 #N/A #N/A
L002 Skilled labour Hour 6.310 0.00
L001 Unskilled labour Hour 6.940 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I100 Supplying & fixing 2100 to 3000mm high panelled partition with 10mm thick
chipboard on both sides with 100 x 50mm & 100 x 100mm upright fixed at
900mm intervals & 100 x 50mm as horizontal members in Class I timber.

PER m2

M515 10mm chip board (8'x4') m2 2.200 0.00


M043 Timber beams class I Cu.m. 0.016 0.00
L002 Skilled labour Hour 6.310 0.00
L001 Unskilled labour Hour 6.940 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.215 #N/A #N/A
M516 50mm x 25mm Class I local timber fillets m2 2.885 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
I101 Supplying & fixing 12mm thick lunumidella planks inceiling to frame work
consisting of 100 x 50mm joists and 50 x50mm bearers in Class I timber.
Rate to include for 2 coats of tarnap to joists and bearers.

PER m2

M043 Timber beams class I Cu.m. 0.012 0.00


M038 Wire nail S.W.G. 12 to 14 * Kg. 0.074 #N/A #N/A
L002 Skilled labour Hour 1.830 0.00
L001 Unskilled labour Hour 2.260 0.00
M141 Wood Preservative (black / coloured) * Lit. 0.163 0.00
M053 Lunumidella 150 x 12mm Sq.m. 1.300 0.00

ALLOW FOR CEMENT AND SAND

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

I102 Supplying & fixing 20mm thick lunumidella planks in ceiling to frame work
consisting of 100 x 50mm joists and 50 x50mm bearers in Class I timber.
Rate to include for 2 coats of tarnap to joists and bearers.

PER m2

M043 Timber beams class I Cu.m. 0.012 0.00


M038 Wire nail S.W.G. 12 to 14 * Kg. 0.074 #N/A #N/A
L002 Skilled labour Hour 1.830 0.00
L001 Unskilled labour Hour 2.260 0.00
M141 Wood Preservative (black / coloured) * Lit. 0.163 0.00
M053 Lunumidella 150 x 20mm Sq.m. 1.300 0.00

ALLOW FOR CEMENT AND SAND

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J IRON MONGER

J001 Supplying and fixing of 45mm x 6mm bolts and nuts with washers.

PER No.

M062 Bolt and nut iron 45 x 6mm * No. 1.000 #N/A #N/A
L002 Skilled labour Hour 0.500 0.00

ALLOW FOR WASHERS ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J002 Supplying and fixing of 65mm x 10mm bolts and nuts with washers.

PER No.

M063 Bolt and nut iron 63 x 10mm * No. 1.000 #N/A #N/A
L002 Skilled labour Hour 0.500 0.00

ALLOW FOR WASHERS ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J003 Supplying and fixing of 125mm x 10mm bolts and nuts with washers.

PER No.

M064 Bolt and nut iron 125 x 10mm * No. 1.000 #N/A #N/A
L002 Skilled labour Hour 0.500 0.00

ALLOW FOR WASHERS ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J IRON MONGER

J004 Supplying and fixing of 225mm x 10mm iron bolts and nuts washers.

PER No.

M065 Bolt and nut iron 225 x 10mm * No. 1.000 0.00
L002 Skilled labour Hour 0.500 0.00

ALLOW FOR WASHERS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

J005 Supplying and fixing 125mm x 12mm iron bolts and nuts with washers.

PER No.

M066 Bolt and nut iron 125 x 12mm * No. 1.000 #N/A #N/A
L002 Skilled labour Hour 0.500 0.00

ALLOW FOR WASHERS ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J006 Suupplying and fixing of 150mm x 12mm iron bolts and nuts with washers.

PER No.

M067 Bolt and nut iron 150 x 12mm * No. 1.000 #N/A #N/A
L002 Skilled labour Hour 0.500 0.00

ALLOW FOR WASHERS ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J IRON MONGER

J007 Supplying of 75mm iron heavy quality tower bolts and fixing with iron screws.

PER No.

M068 Bolt Tower iron 75mm * No. 1.000 #N/A #N/A


M085 Screws Iron 16mm x Gauge 8 * Doz. 0.500 #N/A #N/A
L002 Skilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J008 Supplying of 100mm iron heavy quality tower bolts and fixing iron screws.

PER No.

M069 Bolt Tower iron 100mm * No. 1.000 #N/A #N/A


M085 Screws Iron 16mm x Gauge 8 * Doz. 0.500 #N/A #N/A
L002 Skilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J009 Supplying of 125mm iron heavy quality tower bolts and fixing iron screws.

PER No.

M070 Bolt Tower iron 125mm * No. 1.000 #N/A #N/A


M085 Screws Iron 16mm x Gauge 8 * Doz. 0.750 #N/A #N/A
L002 Skilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J IRON MONGER

J010 Supplying of 150mm iron heavy quality tower bolts and fixing them with
iron screws.

PER No.

M071 Bolt Tower iron 150mm * No. 1.000 #N/A #N/A


M085 Screws Iron 16mm x Gauge 8 * Doz. 0.750 #N/A #N/A
L002 Skilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J011 Making 1000mm (approx) iron brackets out of 40mm x 6mm flat iron with fish
tail at end and fixing to walls and making good to walls.

PER No.

M033 Mild steel flat * Kg. 2.000 #N/A #N/A


L020 Skilled labour (Carpenter & Mason) day 0.400 0.00

ALLOW FOR CEMENT SAND ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J012 Supplying 50mm x 50mm G.I. Weldmesh (gauge 10) and fixing to existing frame
with staples (Fillets and beading paid separately).

PER m2

M035 Weld mesh(galvanised) 50 x 50mm, Gauge 10 * m2 1.170 #N/A #N/A


L002 Skilled labour Hour 2.500 0.00
L001 Unskilled labour Hour 2.000 0.00
ALLOW FOR STAPLES ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J IRON MONGER

J013 Supplying 50mm x 50mm G.I. Weldmesh (gauge 10) and fixing to window frame
with 50 x 12mm Class II timber beading including painting mesh with red lead and
2 coats of enamel paint, beading with primer and 2 coats of enamel.

PER m2

M035 Weld mesh(galvanised) 50 x 50mm, Gauge 10 * m2 1.150 #N/A #N/A


M484 50mm x 12mm Class II local timber. m 4.100 0.00
L002 Skilled labour Hour 2.000 0.00
L001 Unskilled labour Hour 2.000 0.00
M048 Timber plank 25mm Class III Sq.m. 1.500 0.00
L005 Painter Hour 3.000 0.00

ALLOW FOR PAINT ETC. & SCREWS

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J014 Supplying and fixing of 50mm iron cabin hooks and eyes.

PER No.

M072 Cabin Hook & Eye Iron 50mm * No. 1.000 #N/A #N/A
L002 Skilled labour Hour 0.330 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J015 Supplying and fixing of 75mm iron cabin hooks and eyes.

PER No.

M072 Cabin Hook & Eye Iron 75mm * No. 1.100 #N/A #N/A
L002 Skilled labour Hour 0.330 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J IRON MONGER

J016 Supplying and fixing of 150mm iron cabin hooks and eyes.

PER No.

M073 Cabin Hook & Eye Iron 150mm * No. 1.000 #N/A #N/A
L002 Skilled labour Hour 0.330 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J017 Supplying and fixing of 200mm iron cabin hooks and eyes.

PER No.

M074 Cabin Hook & Eye Iron 200mm * No. 1.000 #N/A #N/A
L002 Skilled labour Hour 0.330 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J018 Making iron gate with 40 x 40 x 6mm angle iron frame work including bracing and
horizontal centre member with 16mm M.S. bar at 150mm centres and fixing in
position.

PER m2

M039 Angle iron 40 x 40 x 6mm * m 4.000 #N/A #N/A


M031 Mild steel * M/ton 0.012 0.00
M033 Mild steel flat * M/ton 0.005 0.00
L070 Black smith day 1.000 0.00
L010 Unskilled labour day 1.000 0.00

ALLOW FOR COAL ETC.


ALLOW FOR WELDING
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J IRON MONGER

J019 Supplying of 20mm x 3mm gutter hook brackets and fixing in position with iron screws.

PER No.

M531 Mild steel Flat * Kg. 0.228 #N/A #N/A


M087 Screws iron 25mm x Gauge 8 * Doz. 0.170 #N/A #N/A
L002 Skilled labour Hour 0.750 0.00
L001 Unskilled labour Hour 0.750 0.00

ALLOW FOR COAL ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J020 Supplying of approved heavy quality safety type 100mm iron hasp and staples
and fixing in position with iron screws.

PER No.

M075 Hasp and staple Iron 100mm * No. 1.000 #N/A #N/A
M087 Screws iron 25mm x Gauge 8 * Doz. 0.250 #N/A #N/A
L002 Skilled labour Hour 0.600 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J021 Supplying of approved heavy quality safety type 150mm iron hasp and staples
and fixing in position with iron screws.

PER No.

M076 Hasp and staple Iron 150mm * No. 1.000 #N/A #N/A
M087 Screws iron 25mm x Gauge 8 * Doz. 0.250 #N/A #N/A
L002 Skilled labour Hour 0.600 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J IRON MONGER

J022 Making 300 x 50mm hasp and staple out of 6mm iron plate and fixing in position
with 6 x 50mm bolts and nuts.

PER No.

M531 Mild steel (Flat) Kg. 1.150 0.00


M062 Bolt and nut iron 45 x 6mm * No. 8.000 #N/A #N/A
L020 Skilled labour (Carpenter & Mason) day 1.000 0.00
L010 Unskilled labour * day 1.000 #N/A #N/A

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J023 Supplying and fixing of approved heavy quality 50mmx38mm iron butt hinges.

PER No.

M077 Hinge Butt Iron 50mmx38mm No. 1.000 0.00


M087 Screws iron 25mm x Gauge 8 * Doz. 0.500 #N/A #N/A
L002 Skilled labour Hour 0.400 0.00
L001 Unskilled labour Hour 0.400 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J024 Supplying and fixing of approved heavy quality 75mmx38mm iron butt hinges.

PER No.

M078 Hinge Butt Iron 75mmx38mm No. 1.000 0.00


M087 Screws iron 25mm x Gauge 8 * Doz. 0.500 #N/A #N/A
L002 Skilled labour Hour 0.400 0.00
L001 Unskilled labour Hour 0.400 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J IRON MONGER

J025 Supplying and fixing of approved heavy quality 100mmx63mm iron butt hinges.

PER No.

M079 Hinge Butt Iron 100mmx63mm No. 1.000 0.00


M087 Screws iron 25mm x Gauge 8 * Doz. 0.500 #N/A #N/A
L002 Skilled labour Hour 0.400 0.00
L001 Unskilled labour Hour 0.400 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J026 Supplying and fixing of approved heavy quality 125mmx100mm iron butt hinges.

PER No.

M080 Hinge Butt Iron 125mmx100mm No. 1.000 0.00


M087 Screws iron 25mm x Gauge 8 * Doz. 0.500 #N/A #N/A
L002 Skilled labour Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J027 Fixing hinges supplied by Client with iron screws.

PER No.

M087 Screws iron 25mm x Gauge 8 * Doz. 0.500 #N/A #N/A


L002 Skilled labour Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J IRON MONGER

J028 Supplying and fixing of 40 x 6mm, 300mm long iron strap hinge with necessary
bolts and nuts excluding pintle.

PER No.

M531 Mild steel Flat * Kg. 0.800 #N/A #N/A


M067 Bolt and nut iron 150 x 12mm * No. 4.000 #N/A #N/A
L002 Skilled labour Hour 3.000 0.00
L001 Unskilled labour Hour 2.000 0.00
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J029 Supplying and fixing of 50 x 6mm , 900mm long iron strap hinges with necessary
bolts and nuts including pintles.

PER No.

M531 Mild steel Flat * Kg. 2.500 #N/A #N/A


M067 Bolt and nut iron 150 x 12mm * No. 6.000 #N/A #N/A
L002 Skilled labour Hour 5.000 0.00
L001 Unskilled labour Hour 3.000 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J030 Supplying of 60 x 10 x 1050mm iron double strap hinges, flat iron bend to shape
and fixing with bolts and nuts.

PER No.

M531 Mild steel Flat * Kg. 2.200 #N/A #N/A


M067 Bolt and nut iron 150 x 12mm * No. 6.000 #N/A #N/A
L020 Skilled labour (Carpenter & Mason) day 0.750 0.00
L001 Unskilled labour * day 0.500 #N/A #N/A

ALLOW FOR COAL ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J031 Supplying of 65 x 10 x 1650mm iron double strap hinges, flat iron bend to shape
and fixing with bolts and nuts.

PER No.

M531 Mild steel Flat * Kg. 17.270 #N/A #N/A


M067 Bolt and nut iron 150 x 12mm * No. 8.000 #N/A #N/A
L020 Skilled labour (Carpenter & Mason) day 1.000 0.00
L001 Unskilled labour * day 0.630 #N/A #N/A

ALLOW FOR COAL ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J032 Supplying and fixing of heavy quality 150mm iron T hinges with iron screws.

PER No.

M081 Hinge T iron 150mm No. 1.000 0.00


M084 Screws Iron 12mm x Gauge 8 * Doz. 1.500 #N/A #N/A
L001 Unskilled labour Hour 1.000 0.00
L002 Skilled labour Hour 1.000 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J033 Supplying and fixing of heavy quality, 200mm iron T hinges with screws.

PER N0.

M081 Hinge T iron 200mm No. 1.000 0.00


M084 Screws Iron 12mm x Gauge 8 * Doz. 1.500 #N/A #N/A
L001 Unskilled labour Hour 1.000 0.00

L002 Skilled labour Hour 1.000 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J034 Supplying and fixing of heavy quality 250mm iron T hinges with iron screws.

PER No.

M082 Hinge T iron 250mm No. 1.150 0.00


M084 Screws Iron 12mm x Gauge 8 * Doz. 1.500 #N/A #N/A
L001 Unskilled labour Hour 1.500 0.00
L002 Skilled labour Hour 1.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J035 Supplying and fixing of heavy quality 300mm iron T hinges with iron screws.

PER No.

M083 Hinge T iron 300mm No. 1.000 0.00


M084 Screws Iron 12mm x Gauge 8 * Doz. 1.500 #N/A #N/A
L001 Unskilled labour Hour 1.500 0.00
L002 Skilled labour Hour 1.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J036 Supplying and fixing of 3mm x 50mm x 225mm iron hold fasts.

PER No.

M531 Mild steel Flat * Kg. 0.410 #N/A #N/A


M089 Screws Iron 40mm x Gauge 8 * Doz. 0.200 #N/A #N/A
L002 Skilled labour Hour 1.000 0.00
L001 Unskilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J037 Cutting iron rods supplied by Client to correct length inserting in window frames
including painting with red lead and 2 coats of anti - corrosive paint.

PER No.

L002 Skilled labour Hour 0.250 0.00


L001 Unskilled labour Hour 0.250 0.00
L008 Plumber Hour 0.250 0.00

ALLOW FOR PAINT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

J038 Supplying mild steel rods in reinforcing lintols, beams, columns and laid in position with
binding wire.

PER Kg.

M031 Mild Steel * M/ton 0.001 0.00


M034 Binding wire * Kg. 0.010 #N/A #N/A
L002 Skilled labour Hour 0.150 0.00
L001 Unskilled labour Hour 0.150 0.00

ALLOW FOR WASTAGE

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J IRON MONGER

J039 Supplying mild steel rods in reinforcing foundation and laid in position with
G.I. binding wire.

PER Kg.

M031 Mild Steel * M/ton 0.001 0.00


M034 Binding wire * Kg. 0.010 #N/A #N/A
L002 Skilled labour Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR WASTAGE

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J040 Bending and tying reinforcement and laid in position in beams lintols, floors, etc.
with G.I. Wire, Steel rod supplied by Client, (mild steel or tor steel)

PER Kg.

M034 Binding wire * Kg. 0.010 #N/A #N/A


L002 Skilled labour Hour 0.150 0.00
L001 Unskilled labour Hour 0.150 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J041 Bending and tying reinforcement and laid in position in foundation with
G.I. Binding wire, (mild steel or tor steel supplied by Client, )

PER Kg.

M034 Binding wire * Kg. 0.010 #N/A #N/A


L002 Skilled labour Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J IRON MONGER

J042 Supplying 16mm dia. Mild steel bars and fixing in window frames at 100mm
centres including painting with red lead and 2 coats anti - corrosive paint.

PER m

M031 Mild steel * Kg 1.579 0.00


L002 Skilled labour Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00
ALLOW FOR PAINTING ETC.
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

J043 Supplying 20mm dia. Mild steel bars and fixing in window frames at 100mm
centres including painting with red lead and 2 coats anti - corrosive paint.

PER m

M031 Mild steel * Kg. 2.466 0.00


L002 Skilled labour Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00
ALLOW FOR PAINTING ETC.
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

J044 Supplying pintels for gates and garage doors and fixing in position in cement
concrete (Concrete paid separately.)

PER No.

M531 Mild steel Flat * Kg. 2.280 #N/A #N/A


L002 Skilled labour Hour 3.250 0.00
L001 Unskilled labour Hour 3.250 0.00

ALLOW FOR COAL ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
J IRON MONGER

J045 Supplying and fixing 100mm x 16mm rag bolts with nuts, washers.

PER No.

M531 Mild steel Flat * Kg. 0.682 #N/A #N/A


L002 Skilled labour Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00
ALLOW FOR WASHERS & WASTE
SUB TOTAL #N/A
OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

J046 Supplying and fixing of 24 B.W.G. plain G.I. Sheets to existing frame with wire
nails.
PER m2

M040 G.I. Sheet 24 B.W.G. Sq.m. 1.000 0.00


L002 Skilled labour Hour 1.435 0.00
L001 Unskilled labour Hour 1.435 0.00

ALLOW FOR NAILS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

J047 Supplying and BS 4449 high Yeild steel bars and laid in positing as reinforcement
in beams, columns, slabs etc. with binding wire.

PER Kg.

M032 Tor steel * M/ton 0.001 0.00


M034 Binding wire * Kg. 0.010 #N/A #N/A
L002 Skilled labour Hour 0.150 0.00
L001 Unskilled labour Hour 0.150 0.00

ALLOW FOR WASTAGE

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00 % #N/A
TOTAL #N/A
J048 Supplying and BS 4449 high Yeild steel bars and laid in positing as reinforcement
in foundation with binding wire.

PER Kg.

M032 Tor steel * M/ton 0.001 0.00


M034 Binding wire * Kg. 0.010 #N/A #N/A
L002 Skilled labour Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR WASTAGE

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
K BRASS FOUNDER

K001 Removing and refixing of Bolts, casement fastners or stays, including making good
to holes in frames and sashes.

PER No.

L002 Skilled labour Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K002 Supplying fixing and polishing of 63mm heavy quality brass barrel bolts with
brass screws.

PER No.

M092 Bolt Barrel Brass 63mm * No. 1.000 #N/A #N/A


M389 Screws Brass 20mm x Gauge 8 No. 6.000 0.00
L002 Skilled labour Hour 0.330 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K003 Supplying fixing and polishing of 75mm heavy quality brass barrel bolts with
brass screws.

PER No.

M093 Bolt Barrel Brass 75mm * No. 1.000 #N/A #N/A


M389 Screws brass 20mm x gauge 8 No. 6.000 0.00
L002 Skilled labour Hour 0.330 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
K BRASS FOUNDER

K004 Supplying fixing and polishing of 100mm heavy quality brass barrel bolts with
brass screws.

PER No.

M094 Bolt Barrel Brass 100mm * No. 1.000 #N/A #N/A


M389 Screws Brass 20mm x Gauge 8 No. 6.000 0.00
L002 Skilled labour Hour 0.330 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K005 Supplying fixing and polishing of 125mm heavy quality brass barrel bolts with
brass screws.

PER No.

M094 Bolt Barrel Brass 125mm * No. 1.000 #N/A #N/A


M389 Screws brass 20mm x Gauge 8 No. 6.000 0.00
L002 Skilled labour Hour 0.330 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K006 Supplying fixing and polishing of 150mm heavy quality brass barrel bolts with
brass screws.

PER No.

M094 Bolt Barrel Brass 150mm * No. 1.000 #N/A #N/A


M389 Screws Brass 20mm x Gauge 8 No. 6.000 0.00
L002 Skilled labour Hour 0.330 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
K BRASS FOUNDER

K007 Supplying and fixing of 200mm brass skeleten bolts with brass screws.

PER No.

M097 Bolt Skeleton Brass 200mm * No. 1.000 #N/A #N/A


L002 Skilled labour Hour 0.500 0.00
M394 Screws Brass 20mm x Gauge 8 No. 9.000 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K008 Supplying and fixing of 250mm brass skeleten bolts with brass screws.

PER No.

M098 Bolt Skeleton Brass 250mm * No. 1.000 #N/A #N/A


L002 Skilled labour Hour 0.500 0.00
M394 Screws Brass 20mm x Gauge 8 No. 9.000 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K009 Supplying and fixing of 300mm brass skeleten bolts with brass screws.

PER No.

M099 Bolt Skeleton Brass 300mm * No. 1.000 #N/A #N/A


M394 Screws Brass 20mm x Gauge 8 No. 9.000 0.00
L002 Skilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
K BRASS FOUNDER

K010 Supplying and fixing of 450mm brass skeleten bolts with brass screws.

PER No.

M100 Bolt Skeleton Brass 450mm * No. 1.000 #N/A #N/A


M394 Screws Brass 20mm x Gauge 8 No. 12.000 0.00
L002 Skilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K011 Supplying , fixing and polishing of 50mm heavy quality brass cabin hooks
with brass screws.

PER No.

M101 Cabin Hook Brass 50mm * No. 1.000 #N/A #N/A


L002 Skilled labour Hour 0.500 0.00
M395 Screws Brass 16mm x Gauge 7 No. 9.000 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K012 Supplying , fixing and polishing of 75mm heavy quality brass cabin hooks
with brass screws.

PER No.

M102 Cabin Hook Brass 75mm * No. 1.000 #N/A #N/A


L002 Skilled labour Hour 0.500 0.00
M395 Screws Brass 16mm x Gauge 7 No. 9.000 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
K BRASS FOUNDER

K013 Supplying , fixing and polishing of 150mm heavy quality brass cabin hooks
with brass screws.

PER No.

M103 Cabin Hook Brass 150mm * No. 1.000 #N/A #N/A


L002 Skilled labour Hour 0.500 0.00
M395 Screws Brass 16mm x Gauge 7 No. 9.000 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K014 Supplying , fixing and polishing of 200mm heavy quality brass cabin hooks
with brass screws.

PER No.

M104 Cabin Hook Brass 200mm * No. 1.000 #N/A #N/A


L002 Skilled labour Hour 0.500 0.00
M395 Screws Brass 16mm x Gauge 7 No. 9.000 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
K BRASS FOUNDER

K015 Supplying , fixing and polishing of 225mm heavy quality brass cabin hooks
with brass screws.

PER No.

M396 Cabin Hook Brass 225mm * No. 1.000 #N/A #N/A


L002 Skilled labour Hour 0.500 0.00
M395 Screws Brass 16mm x Gauge 7 No. 9.000 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K016 Supplying , fixing and polishing of 250mm heavy quality brass cabin hooks
with brass screws.

PER No.

M105 Cabin Hook Brass 250mm * No. 1.000 #N/A #N/A


L002 Skilled labour Hour 0.500 0.00
M395 Screws Brass 16mm x Gauge 7 No. 9.000 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K017 Supplying , fixing and polishing of 300mm heavy quality brass cabin hooks
with brass screws.

PER No.

M106 Cabin Hook Brass 300mm * No. 1.000 #N/A #N/A


L002 Skilled labour Hour 0.500 0.00
M395 Screws Brass 16mm x Gauge 7 No. 9.000 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
K BRASS FOUNDER

K018 Supplying and fixing of Brass heavy quality casement fastners with mortice plate
polished, with brass screws.

PER No.

M107 Casement Fastner Brass * No. 1.000 #N/A #N/A


M394 Screws Brass 16mm x gauge 7 No. 4.000 0.00
L002 Skilled labour Hour 0.750 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K019 Supplying , fixing and polishing of 250mm heavy quality casement stays.

PER No.

M108 Casement Stay Brass 250mm * No. 1.000 #N/A #N/A


M394 Screws Brass 16mm x Gauge 7 No. 4.000 0.00
L002 Skilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K020 Supplying , fixing and polishing of 300mm heavy quality casement stays.

PER No.

M109 Casement Stay Brass 300mm * No. 1.000 #N/A #N/A


M394 Screws Brass 16mm x Gauge 7 No. 4.000 0.00
L002 Skilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
K BRASS FOUNDER

K021 Supplying and fixing of Heavy quality brass fanlight catches complete with brass
screws.

PER No.

M110 Fanlight Catch Brass * No. 1.000 #N/A #N/A


M394 Screws Brass 16mm x Gauge 7 No. 4.000 0.00
L002 Skilled labour Hour 0.750 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K022 Supplying, fixing and polishing of Heavy quality brass door handles with
brass screws.

PER No.

M397 Door handle No. 1.000 0.00


M389 Screws Brass 20mm x gauge 8 No. 4.000 0.00
L002 Skilled labour Hour 0.250 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K023 Supplying, fixing and polishing of 150mm brass safety type heavy quality
hasp and staple with brass screws complete.

PER No.

M112 Hasp and staple safety type Brass 150mm * No. 1.000 #N/A #N/A
M394 Screws Brass 20mm x gauge 8 No. 7.000 0.00
L002 Skilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
K BRASS FOUNDER

K024 Supplying, fixing and polishing of 100mm brass safety type heavy quality
hasp and staple with brass screws complete.

PER No.

M111 Hasp and staple safety type Brass 100mm * No. 1.000 #N/A #N/A
M394 Screws brass 20mm x Gauge 8 No. 7.000 0.00
L002 Skilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
K025 Supplying and fixing of brass hat hooks with brass screws

K025 Hat Hook Brass * No. 1.000 #N/A #N/A


M389 Screws Brass 25mm x Gauge 8 No. 4.000 0.00
L002 Skilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K026 Supplying, fixing and polishing of 50mmx 38mm heavy quality brass butt hinges with
brass screws.

PER No.

M114 Hinge Butt Brass 50mm x 38mm * No. 1.000 0.00


M382 Screws Brass 20mm x Gauge 8 No. 6.000 0.00
L002 Skilled labour Hour 0.250 0.00
L001 Unskilled labour Hour 0.350 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
K BRASS FOUNDER

K027 Supplying, fixing and polishing of 75mmx38mm heavy quality brass butt hinges with
brass screws.

PER No.

M115 Hinge Butt Brass 75mm x 38mm * No. 1.000 #N/A #N/A
M382 Screws Brass 40mm x Gauge 8 No. 6.000 0.00
L002 Skilled labour Hour 0.380 0.00
L001 Unskilled labour Hour 0.330 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K028 Supplying, fixing and polishing of 89mm x63mm heavy quality brass butt hinges with
brass screws.

PER No.

M116 Hinge Butt Brass 89mm x 63mm No. 1.000 0.00


M382 Screws Brass 40mm x Gauge 8 No. 8.000 0.00
L002 Skilled labour Hour 0.380 0.00
L001 Unskilled labour Hour 0.380 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K029 Supplying, fixing and polishing of 100mm x 63mm heavy quality brass butt hinges with brass screws.

PER No.

M117 Hinge Butt Brass 100mm x 63mm * No. 1.000 #N/A #N/A
M382 Screws Brass 40mm x Gauge 8 No. 8.000 0.00
L002 Skilled labour Hour 0.380 0.00
L001 Unskilled labour Hour 0.380 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
K BRASS FOUNDER

K030 Supplying, fixing and polishing of 125mm x 100mm heavy quality brass butt hinges with brass screws.

PER No.

M118 Hinge Butt Brass 125mm x 100mm * No. 1.000 #N/A #N/A
M382 Screws Brass 40mm x Gauge 8 No. 8.000 0.00
L002 Skilled labour Hour 0.380 0.00
L001 Unskilled labour Hour 0.380 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K031 Supplying, fixing and polishing of Brass center pivot hinges(Consisting of 2 pieces)
heavy quality with brass screws..

PER No.

M119 Hinge Centre Pivot Brass * Set 1.000 #N/A #N/A


M133 Screws brass 20mm x Gauge 8 Doz. 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00
L002 Skilled labour Hour 0.500 0.00

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

K032 Supplying and fixing of Brass gravity hinges with brass screws complete.

PER No.

M120 Hinge Gravity Brass No. 1.000 0.00


M382 Screws Brass 20mm x Gauge 8 No 8.000 0.00
L002 Skilled labour Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
K BRASS FOUNDER

K033 Supplying, fixing and polishing of 100mm x 90mm brass parliamentary heavy quality
hinges with brass screws complete.

PER No.

M121 Hinge Parliamentary Brass 100mm No. 1.000 0.00


M387 Screws Brass 25mm x Gauge 8 No. 8.000 0.00
L001 Unskilled labour Hour 0.380 0.00
L002 Skilled labour Hour 0.380 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K034 Supplying, fixing and polishing of 125mm x 150mm brass parliamentary heavy quality
hinges with brass screws complete.

PER No.

M122 Hinge Parliamentary Brass 125mm No. 1.000 0.00


M382 Screws Brass 25mm x gauge 8 No. 8.000 0.00
L001 Unskilled labour Hour 0.380 0.00
L002 Skilled labour Hour 0.380 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K035 Supplying, fixing and polishing of 150mm x 180mm brass parliamentary heavy quality
hinges with brass screws.

PER No.

M122 Hinge Parliamentary Brass 150mm No. 1.000 0.00


M382 Screws Brass 25mm x Gauge 8 No. 10.000 0.00
L001 Unskilled labour Hour 0.380 0.00
L002 Skilled labour Hour 0.380 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
K BRASS FOUNDER

K036 Repairing and re - fixing available spring hinges.

PER No.

L002 Skilled labour Hour 1.000 0.00


L003 Black smith Hour 2.000 0.00

ALLOW FOR SCREWS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K037 Supplying and fixing 100mm brass, double acting springs hinges.

PER No.

M532 Hinge Spring Double Acting Brass 100mm No. 1.000 0.00
M135 Screws brass 30mm x Gauge 8 No. 8.000 0.00
L002 Skilled labour Hour 2.000 0.00
L001 Unskilled labour Hour 2.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K038 Fixing of hinges in position with brass screws, the hinges supplied by Client.

PER No.

M135 Screws brass 30mm x Gauge 8 Nos. 8.000 0.00


L002 Skilled labour Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
K BRASS FOUNDER

K039 Making and supplying brass keys for door locks.

PER No.

L003 Black smith Hour 2.500 0.00

ALLOW FOR BLANK KEY

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K040 Supplying, fixing and polishing good quality brass door knobs.

PER No.

M533 Brass door knob No. 1.000 0.00


L002 Skilled labour Hour 0.250 0.00

ALLOW FOR SCREWS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K041 Fixing available door locks.

PER No.

M133 Screws brass 25mm x Gauge 8 Doz. 0.500 0.00


L002 Skilled labour Hour 1.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
K BRASS FOUNDER

K042 Repairing and re - fixing door locks.

PER No.

L003 Black smith Hour 2.000 0.00


M133 Screws brass 25mm x Gauge 8 Doz. 0.500 0.00
L002 Skilled labour Hour 1.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K043 Supplying 65mm brass, 4 lever approved quality locks for cupboards and fiixing
in position with brass screws.

PER No.

M124 Lock Cupboard Four Levers Brass 63mm No. 1.000 0.00
M132 Screws brass 20mm x Gauge 8 Doz. 0.333 0.00
L002 Skilled labour Hour 1.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K044 Repairing and refixing cupboard locks.

PER No.

L002 Skilled labour Hour 0.150 0.00


L003 Black smith Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
K BRASS FOUNDER

K045 Supplying, fixing and polishing 150mm brass, 2 lever , approved qualiry rim
lock.

PER No.

M126 Lock Rim Double lever Brass 150mm No. 1.000 0.00
M133 Screws brass 25mm x Gauge 8 Doz. 0.500 0.00
L002 Skilled labour Hour 1.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
K046 Supplying, fixing and polishing 150mm brass, single lever , approved qualiry rim
lock.

PER No.

M127 Lock Rim single lever Brass 150mm No. 1.000 0.00
M133 Screws brass 25mm x Gauge 8 Doz. 0.500 0.00
L002 Skilled labour Hour 1.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K047 Supplying, fixing and polishing 150mm brass, double lever , approved qualiry rim
lock.

PER No.

M126 Lock Rim Double lever Brass 150mm No. 1.000 0.00
M133 Screws brass 25mm x Gauge 8 Doz. 0.500 0.00
L002 Skilled labour Hour 1.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
K BRASS FOUNDER

K048 Supplying and fixing of 125mm good quality single lever rim lock.

PER No.

M127 Lock Rim single lever Brass 150mm No. 1.000 0.00
M133 Screws brass 25mm x Gauge 8 Doz. 0.500 0.00
L002 Skilled labour Hour 1.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K047 Supplying and fixing of night latch Yale or Union lock with duplicate keys.

PER No.

M128 Night Latch - China No. 1.000 0.00


M133 Screws brass 25mm x Gauge 8 Doz. 0.500 0.00
L002 Skilled labour Hour 2.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K048 Supplying and fixing of 32mm to 40mm brass rings to doors and windows with
brass screws.

PER No.

M125 Ring Brass 45mm to 38mm No. 1.000 0.00


M132 Screws brass 20mm x Gauge 8 Doz. 0.250 0.00
L002 Skilled labour Hour 0.250 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
K BRASS FOUNDER

K049 Supplying and fixing of Union mortice lock (imported) for single sash.

PER No.

M128 Lock Mortice Union single Sash No. 1.000 0.00


L002 Skilled labour Hour 4.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

K050 Supplying and fixing of Union Mortice (Imported) lock for double sash.

PER No.

M129 Lock Mortice Union Double Sash No. 1.000 0.00


L002 Skilled labour Hour 6.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
L PLASTERER

L001 15mm thick , 1:1:5 cement lime plastering.

PER m2

M010 cement 50Kg. 0.086 0.00


M550 Boiled lime Kg. 2.400 0.00
M007 sand Cu.m. 0.021 0.00
L004 Mason Hour 0.646 0.00
L001 Unskilled labour Hour 1.292 0.00
SCAFFOLDING 3 %
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L002 Clay plastering and lime puttying smooth

PER m2

M550 Boiled lime Kg. 1.200 0.00


L004 Mason Hour 0.646 0.00
L001 Unskilled labour Hour 0.215 0.00
ALLOW FOR SCAFFOLDING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L003 65mm x 65mm Cove moulding build in existing walls in 1:2 cement mortar.

PER m

M010 cement 50Kg. 0.036 0.00


M007 sand Cu.m. 0.003 0.00
L004 Mason Hour 0.656 0.00
L001 Unskilled labour Hour 0.656 0.00
ALLOW SCAFFOLDING, WATER & LIME
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
L PLASTERER

L004 Plastering of 50mm to 100mm wide cracks in wall with 1:3 cement plaster after
chipping.

PER m

M010 cement 50Kg. 0.013 0.00


L004 Mason Hour 0.164 0.00
L001 Unskilled labour Hour 0.328 0.00
M007 sand Cu.m. 0.002 0.00
ALLOW SCAFFOLDIN, WATER & LIME PUTTY
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L005 Cresting with broken glass in 1:4 cement mortar on coping of boundary wall.

PER m

M010 cement 50Kg. 0.082 0.00


M007 sand Cu.m. 0.009 0.00
L004 Mason Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR GLASS BOTTLING, SCAFFOLDING & WATER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L006 75mm x 12mm Ddo moulding in walls in 1:1:4 lime and cement mortar for
replacement to match existing, or to be extra over rate for plastering.

PER m

M010 cement 50Kg. 0.008 0.00


M007 sand Cu.m. 0.002 0.00
L004 Mason Hour 0.800 0.00
L001 Unskilled labour Hour 0.800 0.00
M550 Boiled lime Kg. 0.230 0.00
ALLOW FOR SCAFFOLDING & WATER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
L PLASTERER
L007 150mm x 25mm Dado moulding in walls in 1:1:4 lime and cement mortar only for
replacement to match existing or to be extra over rate for plastering.

PER m

M010 cement 50Kg. 0.033 0.00


M007 sand Cu.m. 0.008 0.00
L004 Mason Hour 1.000 0.00
L001 Unskilled labour Hour 1.000 0.00
M550 Boiled lime Kg. 0.900 0.00
ALLOW FOR SCAFFOLDING & WATER
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L008 100mm x 50mm Dado moulding in cement and sand 1:2 built in existing wall or to be extra
over rate for plstering
PER m

M010 cement 50Kg. 0.082 0.00


M007 sand Cu.m. 0.006 0.00
L004 Mason Hour 1.200 0.00
L001 Unskilled labour Hour 1.200 0.00
ALLOW FOR SCAFFOLDING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L009 Laying of Flashing or plaster bands over tiles 100mm to 150mm wide on roof
in 1:1:4 cement and lime mortar rate including scaffolding and colour figment to match
tile colour
PER m

M010 cement 50Kg. 0.026 0.00


M007 sand Cu.m. 0.005 0.00
L004 Mason Hour 0.250 0.00
L001 Unskilled labour Hour 0.500 0.00
M550 Boiled lime Kg. 0.720 0.00

ALLOW FOR SCAFFOLDING & COLOUR FIGMENTS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
L PLASTERER

L010 Letters embosed in plaster 20mm thick 150mm high in cement and sand
1:2 cement floated and painted.

PER No.

L004 Mason Hour 0.500 0.00


L001 Unskilled labour Hour 0.250 0.00
L015 Painter Hour 0.125 0.00

ALLOW FOR CEMENT, PAINT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L011 15mm thick 1:1:5 Lime plastering and finished smooth with lime putty.

PER m2

M007 sand Cu.m. 0.021 0.00


M550 Boiled lime Kg. 3.000 0.00
L004 Mason Hour 1.300 0.00
L001 Unskilled labour Hour 1.300 0.00
M010 cement 50Kg. 0.086 0.00
ALLOW FOR SCAFFOLDING & WATER
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L012 1:2 cement plastering flush in surface cracks including raking out joints and lime putty
floating and painting to matchthe existing surface

PER m

L004 Mason Hour 0.164 0.00


L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR CEMENT, SAND & LIME PUTTY

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
L PLASTERER

L013 15mm 1:3 cement sand plastering in brick masonary etc. including cement floating

PER m2

M010 cement 50Kg. 0.108 0.00


M007 sand Cu.m. 0.009 0.00
L004 Mason Hour 2.500 0.00
L001 Unskilled labour Hour 2.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L014 12mm thick 1:2 cement rendering , above 10m2

PER m2

M010 cement 50Kg. 0.161 0.00


M007 sand Cu.m. 0.015 0.00
L004 Mason Hour 0.650 0.00
L001 Unskilled labour Hour 1.300 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L015 12mm thick 1:2 cement rendering upto 10m2.

PER m2

M010 cement 50Kg. 0.161 0.00


M007 sand Cu.m. 0.015 0.00
L004 Mason Hour 0.800 0.00
L001 Unskilled labour Hour 1.600 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
L PLASTERER

L016 12mm thick 1:3 cement rendering , above 10m2.

PER m2

M010 cement 50Kg. 0.115 0.00


M007 sand Cu.m. 0.015 0.00
L004 Mason Hour 0.650 0.00
L001 Unskilled labour Hour 1.300 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L017 12mm thick 1:3 cement rendering , upto 10m2.

PER m2

M010 cement 50Kg. 0.115 0.00


M007 sand Cu.m. 0.015 0.00
L004 Mason Hour 0.800 0.00
L001 Unskilled labour Hour 1.600 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L018 20mm thick 1:2 cement rendering , above 10m2.

PER m2

M010 cement 50Kg. 0.242 0.00


M007 sand Cu.m. 0.022 0.00
L004 Mason Hour 0.865 0.00
L001 Unskilled labour Hour 1.730 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
L PLASTERER

L019 20mm thick 1:2 cement rendering , upto10m2.

PER m2

M010 cement 50Kg. 0.242 0.00


M007 sand Cu.m. 0.022 0.00
L004 Mason Hour 1.000 0.00
L001 Unskilled labour Hour 2.160 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L020 20mm thick 1:3 cement rendering , above 10m2.

PER m2

M010 cement 50Kg. 0.188 0.00


M007 sand Cu.m. 0.022 0.00
L004 Mason Hour 0.865 0.00
L001 Unskilled labour Hour 1.730 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L021 20mm thick 1:3 cement rendering , up to 10m2.

PER m2

M010 cement 50Kg. 0.188 0.00


M007 sand Cu.m. 0.022 0.00
L004 Mason Hour 1.000 0.00
L001 Unskilled labour Hour 2.160 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
L PLASTERER

L022 Normal cement floating coat in rendering , using normal cement


and finish smooth.

PER m2

M010 cement 50Kg. 0.029 0.00


L004 Mason Hour 0.100 0.00
L001 Unskilled labour Hour 0.050 0.00

ALLOW FOR CURING


SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L023 Brown or Green cement floating in rendering with black cement and finish
smooth.

PER m2

M010 cement 50Kg. 0.029 0.00


M011 Colour pigment for cement Kg. 0.004 0.00
L004 Mason Hour 0.100 0.00
L001 Unskilled labour Hour 0.050 0.00
ALLOW FOR CURING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L024 Black cement floating in rendering with black cement and finish smooth.

PER m2

M010 cement 50Kg. 0.029 0.00


M011 Colour pigment for cement Kg. 0.004 0.00
L004 Mason Hour 0.100 0.00
L001 Unskilled labour Hour 0.050 0.00
ALLOW FOR CURING
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
L PLASTERER

L025 20mm thick , 1:2 cement rendering with 5% pudlo cement.

PER m2

M010 cement 50Kg. 0.242 0.00


M007 sand Cu.m. 0.022 0.00
M012 Pudlo cement Kg. 0.549 0.00
L004 Mason Hour 0.865 0.00
L001 Unskilled labour Hour 1.730 0.00
ALLOW FOR CURING & FLOATING CEMENT
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L026 12mm x 150mm Skirting in 1:3, projected on flush with wall and including
forming groove with smooth finish

PER m

M010 cement 50Kg. 0.033 0.00


M007 sand Cu.m. 0.003 0.00
L004 Mason Hour 0.800 0.00
L001 Unskilled labour Hour 0.800 0.00
ALLOW FOR WATER
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L027 12mm x 150mm Skirting in 1:3 cement mortar projected in flush with wall
and finished with red cement floating including forming groove.

PER m

M010 cement 50Kg. 0.032 0.00


M007 sand Cu.m. 0.003 0.00
M011 Colour pigment for cement Kg. 0.001 0.00
L004 Mason Hour 1.000 0.00
L001 Unskilled labour Hour 0.800 0.00
ALLOW FOR WATER
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
L PLASTERER

L028 15mm thick plastering , 1:1:3 cement lime and sand to R.C. beams and slab
sooffit including floating with lime putty.

PER m2

M010 cement 50Kg. 0.086 0.00


M007 sand Cu.m. 0.015 0.00
M550 Boiled lime Kg. 2.400 0.00
L004 Mason Hour 1.750 0.00
L001 Unskilled labour Hour 1.750 0.00

ALLOW FOR SCAFFOLDING WATER ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L029 20mm thick, 1:2 cement sand D.P.C. and finished smooth with 2 coats of hot
tar blinded with coarse sand.

PER m2

M010 cement 50Kg. 0.242 0.00


M007 sand Cu.m. 0.003 0.00
M013 DPC Tar * Lit. 0.500 #N/A #N/A
L004 Mason Hour 1.000 0.00
L001 Unskilled labour Hour 2.000 0.00

ALLOW FOR FIRE WOOD AND WATER ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
L PLASTERER

L030 12mm x 100mm skirting in 1:3 cement sand mortar in flush with wall and finished with
smooth cement floating. Rate include for forming groove.
PER m2
M010 cement 50Kg. 0.022 0.00
M007 Sand Cu.m. 0.002 0.00
L004 Mason Hour 0.700 0.00
L001 Unskilled labour Hour 0.700 0.00
ALLOW FOR WATER
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

L031 12mm x 100mm skirting in 1:3 cement sand mortar projected in flush with wall and
finished with colour cement floating. Rate include for forming groove.

PER m
M010 Cement 50Kg. 0.021 0.00
M007 Sand Cu. m. 0.002 0.00
M011 Colour pigment for cement Kg. 0.001 0.00
L004 Mason Hour 0.900 0.00
L001 Unskilled labour Hour 0.700 0.00
ALLOW FOR WATER
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
M TINKER
M001 Supplying and fixing of 100mm dia. G.I. 24 BWG down pipes fixed to walls
with holdfast or plugs in 1:3 cement.

PER m

M022 G.I. 24 BWG sheets(Plain) m2 0.400 0.00


L004 Mason Hour 0.250 0.00
L007 Tinker Hour 2.250 0.00
L001 Unskilled labour Hour 1.000 0.00

ALLOW FOR PLUGS, BRACKETS, IRON SCREWS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M002 Supplying and fixing of 150mm dia. G.I. 24 BWG down pipes fixed to walls
with holdfast or plugs in 1:3 cement.

PER m

M022 G.I. Sheet 24 B.W.G. m2 0.600 0.00


L004 Mason Hour 0.250 0.00
L007 Tinker Hour 3.000 0.00
L001 Unskilled labour Hour 1.000 0.00

ALLOW FOR PLUGS, BRACKETS, SCREWS , SOLDER AND CEMENT

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
M TINKER

M003 Supplying and fixing of 100 x 75mm rectangular G.I. 24 BWG down pipes
fixed with holdfast or plugs in 1:3 cement.

PER m

M022 G.I. 24 BWG sheets(Plain) m2 0.450 0.00


L004 Mason Hour 0.250 0.00
L007 Tinker Hour 2.750 0.00
L001 Unskilled labour Hour 1.000 0.00

ALLOW FOR PLUGS, BRACKETS, IRON SCREWS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M004 Fixing of 100 to 150mm circular or rectangular down pipes fixed with holdfast
or plugs in 1:3 cement mortar (G.I. Sheets supplied by Client.)

PER m

L004 Mason Hour 0.029 0.00


L007 Tinker Hour 0.293 0.00
L001 Unskilled labour Hour 0.234 0.00

ALLOW FOR PLUGS, IRON SCREWS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M005 Extra over item M001 to M004 in two storeyed buildings.

PER m

L004 Mason Hour 0.125 0.00


L001 Unskilled labour Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
M TINKER

M006 Extra over item M001 to M004 in buildings of three or more storeyed.

PER m

L004 Mason Hour 0.250 0.00


L001 Unskilled labour Hour 1.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M007 Fixing of down pipes loose or new fixed with holdfast or plugs including making
good to walls (down pipes supplied by Client, plugs or holdfast paid for separately).

PER m

L007 Tinker Hour 0.350 0.00


L001 Unskilled labour Hour 0.350 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M008 450mm wide G.I. Flashing (G.I. 24 BWG) fixed with 150mm turned up along
and top edge tucked well into wall in cement lime mortar including removal of
old flashing.

PER m

M022 G.I. 24 BWG sheets(Plain) m2 0.600 0.00


L007 Tinker Hour 1.000 0.00
L004 Mason Hour 0.250 0.00
L001 Unskilled labour Hour 1.250 0.00

ALLOW FOR CEMENT, SAND

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
M TINKER

M009 Refixing of G.I. Flashing including making good to walls in cement and lime
mortar.

PER m

L007 Tinker Hour 0.750 0.00


L004 Mason Hour 0.250 0.00
L001 Unskilled labour Hour 1.000 0.00

ALLOW FOR CEMENT, SAND, LIME ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M010 150mm G.I. Gutters eaves semi circular made with G.I. 24 B.W.G. and fixed with
hooks or brackets and bolts and joints soldered complete.

PER m

M022 G.I. 24 BWG sheets(Plain) m2 0.350 0.00


L007 Tinker Hour 2.500 0.00
L001 Unskilled labour Hour 1.500 0.00
M546 Mild steel Flat * Kg. 0.228 #N/A #N/A
M124 Bolt and nut iron 63 x 10mm * No. 2.500 0.00
M123 Bolt and nut iron 45 x 6mm * No. 1.667 0.00

ALLOW FOR MAKING BRACKETS, ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
M TINKER

M011 150mm G.I. Gutters eaves semi circular made with G.I. 24 B.W.G. and fixed with
hooks or brackets and screws and joints soldered complete (G.I. Sheets supplied
by Client.)

PER m

L007 Tinker day 0.285 0.00


L001 Unskilled labour day 0.178 0.00

ALLOW FOR GUTTERS HOOKS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M012 150mm Gutters, eaves moulded in G.I. 24 BWG and fixed complete including
brackets.

PER m

M022 G.I. 24 BWG sheets(Plain) m2 0.400 0.00


L007 Tinker Hour 4.000 0.00
L001 Unskilled labour Hour 2.000 0.00

ALLOW FOR GUTTERS HOOKS ETC. AS IN ITEM NO M010

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M013 Extra over items M010 to M012 and M026 in two storeyed Buildings.

PER m

L007 Tinker Hour 1.000 0.00


L001 Unskilled labour Hour 1.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
M TINKER

M014 Extra over items M010 to M012 and M026 in three storeyed Buildings.

PER m

M445 Props (bamboo) 3 - 4 m No. 0.950 0.00


L001 Unskilled labour Hour 1.750 0.00
L007 Tinker Hour 1.500 0.00

ALLOW FOR COIR, STRING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M015 Cleaning of Gutters, eaves and down pipes in single storeyed buildings.

PER m

L001 Unskilled labour Hour 0.150 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M016 Cleaning of Gutters, eaves and down pipes in two storeyed buildings.

PER m

L001 Unskilled labour Hour 0.200 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
M TINKER

M017 Re - grading Gutters eaves , in single storeyed Buildings.

PER m

L007 Tinker day 0.064 0.00


L001 Unskilled labour Hour 0.064 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M018 Re - grading Gutters eaves , in two storeyed Buildings.

PER m

L007 Tinker Hour 0.100 0.00


L001 Unskilled labour Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M019 Making openings to existing gutters to receive 100mm to 150mm down pipe
attaching spigot piece joints soldered including making good.

PER No.

M022 G.I. 24 BWG sheets(Plain) m2 0.100 0.00


L007 Tinker Hour 2.000 0.00
L001 Unskilled labour Hour 2.000 0.00

ALLOW FOR PLUGS, BRACKETS IRON SCREWS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
M TINKER

M020 Making of 250 x 300 x 500mm deep gutter head with G.I. Sheets 24 B.W.G. down
pipe and fixed complete.

PER No.

M022 G.I. 24 BWG sheets(Plain) m2 0.900 0.00


L007 Tinker Hour 7.000 0.00
L001 Unskilled labour Hour 2.000 0.00

ALLOW FOR PLUGS, SCREWS FOR SOLDER AND CEMENT

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M021 Making of 250 x 300 x 500mm deep gutter head with G.I. Sheets 24 B.W.G. down
pipe and fixed complete.(Sheets supplied by Client).

PER No.

L007 Tinker Hour 7.000 0.00


L001 Unskilled labour Hour 2.000 0.00

ALLOW FOR LEAD, SOLDERING, FLUID ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
M TINKER

M022 Making of 250 x 300 x 300mm deep gutter head with G.I. Sheets 24 B.W.G. down
pipe and fixed complete.

PER No.

M022 G.I. 24 BWG sheets(Plain) m2 0.500 0.00


L007 Tinker Hour 5.000 0.00

ALLOW FOR LEADS, ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M023 Making of 250 x 300 x 300mm deep gutter head with G.I. Sheets 22 B.W.G. down
pipe and fixed complete.(Sheets supplied by Client).

PER No.

L007 Tinker Hour 5.000 0.00


L001 Unskilled labour Hour 2.000 0.00

ALLOW FOR LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M024 Supplying of 20mm x 3mm Gutter hooks or brackets and fixing with
iron screws.

PER No.

M546 Mild steel Flat * Kg. 0.227 #N/A #N/A


M147 Screws Iron 16mm x Guage 6 Doz. 0.167 0.00
L005 Black Smith Hour 0.042 0.00
L011 Unskilled labour day 0.073 0.00
L012 Skilled labour day 0.032 0.00

ALLOW FOR COAL ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
M025 Gutters, leaks, replaced or joints soldered.

PER No.

L007 Tinker Hour 0.500 0.00


L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M026 G.I. 900mm wide overall, 22 B.W.G. Parapet gutters renewed on existing boards joints
soldered and laid complete.

PER m

M023 G.I. 22 BWG sheets(Plain) m2 0.920 0.00


L007 Tinker Hour 1.250 0.00
L002 Skilled labour Hour 0.250 0.00
L001 Unskilled labour Hour 1.250 0.00

ALLOW FOR LEAD, SOLERING, FLUID CEMENT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M027 18 BWG 900mm wide valley gutters renewed on existing boards, sheets tarred,
joints soldered and cement lime filletting complete.

PER m

M024 G.I. 18 BWG sheets(Plain) m2 0.998 0.00


M476 Coal Tar Lit. 0.224 0.00
M010 Cement 50 Kg. 0.027 0.00
M481 Slaked lime Kg. 0.800 0.00
M007 Sand Cu.m. 0.004 0.00
L001 Unskilled labour Hour 1.500 0.00
L002 Skilled labour Hour 0.300 0.00
L007 Tinker Hour 0.600 0.00

ALLOW FOR NAILS, SOLDERING, MATERIALS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
M TINKER

M032 18 BWG 900mm wide valley gutters renewed including timber 25mm thick
boarding sheet tarred joints soldered and cement lime filleting complete.

PER m

M024 G.I. 18 BWG sheets(Plain) m2 0.998 0.00


M047 Timber planks 25mm class B Sq.m. 1.000 0.00
M476 Coal Tar Lit. 0.224 0.00
M010 Cement 50 Kg. 0.027 0.00
M550 Boiled lime Kg. 0.800 0.00
M007 Sand Cu.m. 0.004 0.00
M041 Wire nail S.W.G. 12 to 14 * Kg. 0.067 #N/A #N/A
M076 Wood Preservative (black / coloured) * Lit. 0.335 0.00
L001 Unskilled labour Hour 3.500 0.00
L002 Skilled labour Hour 2.000 0.00

ALLOW FOR NAILS, SLODERING MATERIAL ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

M033 Fixing of Half round, 150mm pvc Eaves gutters with aluminium brackets and brass screws
at 450mm intervals including necessary moulded fittings.

PER m

M478 Gutter half round PVC 150mm x 4m No. 0.273 0.00


M401 Gutter end cap half round PVC 150mm No. 0.137 0.00
M400 Mitre Joint half round PVC 150mm No. 0.068 0.00
M404 Gutter Bracket half round (Short Arm Aluminium No. 3.100 0.00
M402 Gutter Joiner half round PVC 150mm No. 0.205 0.00
M405 Running head PVC 150mm No. 0.137 0.00
M406 Solvent cement 50 Grams 0.137 0.00
M197 Screws Brass 20mm x Gauge 6 Doz. 0.580 0.00
L008 Plumber Hour 0.273 0.00
L001 Unskilled labour Hour 0.273 0.00

ALLOW FOR LADDER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
M034 Fixing of 114mm PVC square Eave gutters with P.V.C. brackets and brass screws
at 450mm intervals including all necessary moulded fittings.

PER m

M388 Gutter Square PVC 114mm m 1.000 0.00


M390 Gutter End Cap Square PVC 114mm No. 0.137 0.00
M3989 Mitre Joint Square PVC 114mm No. 0.068 0.00
M391 Gutter Joiner Square PVC 114mm No. 0.205 0.00
M393 Gutter Bracket Square PVC 114mm No. 3.100 0.00
M392 Running Head Square PVC 114mm No. 0.137 0.00
M406 Solvent cement 50 Grams 0.137 0.00
M197 Screws brass 20mm x Gauge 6 Doz. 0.580 0.00
L008 Plumber Hour 0.273 0.00
L001 Unskilled labour Hour 0.273 0.00

ALLOW FOR LADDER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

M035 Fixing of 87mm dia. PVC Down pipes with wooden plug including all necessary
moulded fittings.

PER m

M395 Down pipe PVC 89mm m 1.093 0.00


M398 Down pipe Elbow PVC 89mm No. 0.547 0.00
M396 Down pipe joiner PVC 89mm No. 0.137 0.00
M470 Wood plugs. m 0.547 0.00
M397 Down pipe Clip PVC 89mm No. 0.547 0.00
M197 Screws Brass 20mm x Guage 6 Doz. 0.091 0.00
M406 Solvent cement 50 Grams 0.205 0.00
L008 Plumber Hour 0.273 0.00
L002 Skilled labour Hour 0.273 0.00
L001 Unskilled labour Hour 0.546 0.00

ALLOW FOR LADDER & RAWL PLUG

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
N GLAZIER

N001 Fixing of Glass panes with class I timber boarding (Glass Supplied by Client)

PER m2

M479 12mm x 12mm Class I timber beadings m 19.650 0.00


L009 Glazier Hour 5.000 0.00

ALLOW FOR PUTTY, NAILS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

N002 Supplying of 3mm thick clear Glass panes and fixing with class I timber
beading.

PER m2

M228 Glass Pane clear 3mm Sq.m. 1.100 0.00


M479 12mm x 12mm Class I timber beadings m 15.000 0.00
L009 Glazier Hour 5.000 0.00

ALLOW FOR NAILS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

N003 Supplying of 4mm clear Glass panes and fixing with class I timber beading.

PER m2

M229 Glass Pane clear 4mm Sq.m. 1.100 0.00


M479 12mm x 12mm Class I timber beadings m 8.000 0.00
L009 Glazier Hour 4.000 0.00

ALLOW FOR NAILS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
N GLAZIER

N004 Supplying of 3mm figured Glass panes and fixing with Class I timber beading.

PER m2

M230 Glass pane Figured 3mm Sq.m. 1.10 0.00


M479 12mm x 12mm Class I timber beadings m 15.00 0.00
L009 Glazier Hour 5.00 0.00

ALLOW FOR NAILS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

N005 Supplying of 5mm figured Glass panes and fixing with Class I timber beading.

PER m2

M231 Glass pane Figured 5mm Sq.m. 1.10 0.00


M479 12mm x 12mm Class I timber beadings m 8.00 0.00
L009 Glazier Hour 4.00 0.00

ALLOW FOR NAILS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
P PAINTER & DECORATOR

P001 One coat of cement washing to walls of single storeyed buildings, patching
and preparing surface.

PER m2

M010 Cement 50 Kg. 0.004 0.00


L006 Painter Hour 0.088 0.00
L001 Unskilled labour Hour 0.088 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P002 Two coat of cement washing to walls of single storeyed buildings, patching
and preparing surface.

PER m2

M010 Cement 50 Kg. 0.007 0.00


L006 Painter Hour 0.150 0.00
L001 Unskilled labour Hour 0.150 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
P PAINTER & DECORATOR

P003 One coat of cement washing externally to walls of buildings upper floor

PER m2

M010 Cement 50 Kg. 0.004 0.00


L006 Painter Hour 0.104 0.00
L001 Unskilled labour Hour 0.104 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P004 Flags average size 1800mm x 900mm hung upon buildings as directed and removed
when required (Flags supplied by Client. Any poles used are to be paid separately).

PER No.

L001 Unskilled labour Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P005 Flags small (burges) up to 100 hungs upon buildings as directed and removed when
required (Flags supplied by Client. Any poles used are to be paid separately).

PER No.

L001 Unskilled labour day 0.007 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
P PAINTER & DECORATOR

P006 Flags small (burges) up to 100 hungs upon buildings as directed and removed when
required (Flags supplied by Client. Any poles used are to be paid separately).

PER No.

L001 Unskilled labour day 0.006 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P007 Flag poles (Supplied by Client) planted as directed removed when required
and ground made good.

PER post

L001 Unskilled labour day 0.150 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P008 Lettering 25mm to 50mm painted in Sinhala, English or Tamil including painting
ground.

PER p/letter

L006 Painter Hour 0.184 0.00

ALLOW FOR BRUSHERS PAINT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
P PAINTER & DECORATOR

P009 Lettering 50mm to 75mm painted in Sinhala, English or Tamil including painting
ground.

PER p/letter

L006 Painter Hour 0.200 0.00

ALLOW FOR BRUSHERS PAINT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P010 Lettering 100mm to 125mm painted in Sinhala, English or Tamil including painting
ground.

PER p/letter

L006 Painter Hour 0.250 0.00

ALLOW FOR BRUSHERS PAINT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P011 Painting the metal surface with one coat of aluminium paint.

PER m2

M480 Aluminium paint Lit. 0.070 0.00


L015 Painter day 0.054 0.00

ALLOW FOR BRUSHERS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
P PAINTER & DECORATOR

P012 Painting one coat of enamel paint including washing (using washing soda) , cleaning and
smoothing down with sand paper.

PER m2

M075 Enamel * Lit. 0.081 #N/A #N/A


L006 Painter Hour 0.430 0.00

ALLOW FOR BRUSHES , SAND PAPER, WASHING SODA ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

P013 Painting two coats of enamel paint including washing( using washing soda) cleaning and smoothing
down with sand paper.

PER m2

M075 Enamel * Lit. 0.161 #N/A #N/A


L006 Painter Hour 1.000 0.00

ALLOW FOR BRUSHES , SAND PAPER WASHING SODA ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

P014 Painting new wood work with primer and 2 coats of oil paint.

PER m2

M077 Aluminium wood primer * Lit. 0.081 #N/A #N/A


M083 Oil paint (Gloss) * Lit. 0.161 #N/A #N/A
L006 Painter Hour 1.300 0.00

ALLOW FOR BRUSHES , SAND PAPER ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
P PAINTER & DECORATOR

P015 Painting new wood work with one coat of approved wood primer

PER m2

M077 Aluminium wood primer * Lit. 0.081 #N/A #N/A


L006 Painter Hour 0.500 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

P016 Painting steel work, with 1 coat of red lead including removing scale and wire brushing.

PER m2

M082 Red Lead Paint * Lit. 0.081 #N/A #N/A


L006 Painter Hour 0.500 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

P017 Painting steel work, with 2 coat of red lead including removing scale and wire brushing.

PER m2

M082 Red Lead Paint * Lit. 0.162 #N/A #N/A


L006 Painter Hour 1.000 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
P PAINTER & DECORATOR

P018 Painting walls with Alkali resisting primer where necessary.

PER m2

M084 Alkali resisting primer * Lit. 0.097 #N/A #N/A


L006 Painter Hour 0.300 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

P019 Painting walls with one coat of emulsion paint including preparing surface
of new work.

PER m2

M073 Emulsion * Lit. 0.081 #N/A #N/A


L006 Painter Hour 0.300 0.00

ALLOW FOR BRUSHES PLASTER OF PARIS & WITING ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

P020 Painting walls with two coats of emulsion paint including preparing surface
of new work.

PER m2

M073 Emulsion * Lit. 0.150 #N/A #N/A


L006 Painter Hour 0.600 0.00

ALLOW FOR BRUSHES PLASTER OF PARIS & WITING ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
P PAINTER & DECORATOR

P021 Painting walls with one coat of emulsion paint including preparing surface
of old work.

PER m2

M073 Emulsion * Lit. 0.081 #N/A #N/A


L006 Painter Hour 0.376 0.00

ALLOW FOR BRUSHES & WITING ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

P022 Painting walls with two coats of emulsion paint including preparing surface of old work.

PER m2

M073 Emulsion * Lit. 0.150 #N/A #N/A


L006 Painter Hour 0.650 0.00

ALLOW FOR BRUSHES & WITING ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

P023 Painting walls with two coats of snowcem or equivalent cemet paint to new work.

PER m2

M080 Snowcem Kg. 0.345 0.00


L006 Painter Hour 0.700 0.00
L001 Unskilled labour Hour 0.400 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
P PAINTER & DECORATOR

P024 Painting old walls with two coats of snowcem or equivalent cement paint after scraping
existing colourwash, sand papering and wiping down.

PER m2

M080 Snowcem Kg. 0.345 0.00


L006 Painter Hour 0.700 0.00
L001 Unskilled labour Hour 0.700 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P025 Painting old walls with one coat of snowcem or equivalent cement paint after scraping
existing colour wash, sand papering and wiping

PER m2

M080 Snowcem Kg. 0.197 0.00


L006 Painter Hour 0.400 0.00
L001 Unskilled labour Hour 0.600 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
P PAINTER & DECORATOR

P026 Removing paint entirely with blow lamp to bare timber.

PER m2

L001 Unskilled labour Hour 1.300 0.00

ALLOW FOR BLOW LAMP OIL ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P027 Removing paint on panelled and moulded surfaces.

PER m2

L001 Unskilled labour Hour 2.000 0.00

ALLOW FOR BLOW LAMP OIL SAND PAPER ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P028 Painting G.I. Pipes 20mm to 40mm diameter with 2 coats of enamel paint.

PER m

M075 Enamel * Lit. 0.022 #N/A #N/A


L006 Painter Hour 0.200 0.00

ALLOW FOR BRUSHES

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
P PAINTER & DECORATOR

P029 Applying of 1 coat Tarnap or other wood preservative to old wood work.

PER m2

M076 Wood Preservative (black / coloured) * Lit. 0.122 0.00


L006 Painter Hour 0.200 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P030 Applying of 2 coats Tarnap or other wood preservative to new wood work.

PER m2

M076 Wood Preservative (Black / Coloured) * Lit. 0.218 0.00


L006 Painter Hour 0.400 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P031 Varnishing with 1 coat of polyurethene best Copal varnish after washing down and sand papering.

PER m2

M079 Polythane Varnish * Lit. 0.097 #N/A #N/A


L001 Unskilled labour Hour 0.300 0.00
L006 Painter Hour 0.400 0.00

ALLOW FOR SAND PAPER BRUSHES ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
P PAINTER & DECORATOR

P032 Varnishing with 2 coats of Polyurathene varnish after washing down and sand papering.

PER m2

M079 Polythane Varnish * Lit. 0.178 #N/A #N/A


L001 Unskilled labour Hour 0.300 0.00
L006 Painter Hour 0.800 0.00

ALLOW FOR SAND PAPER , BRUSHES ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

P033 Removing existing varnishing to bare timber and preparing surface.

PER m2

L001 Unskilled labour Hour 1.750 0.00

ALLOW FOR SAND PAPER ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P034 Scraping and removing soot on walls and levelling internally(extra over colour
washing).

PER m2

L001 Unskilled labour Hour 0.200 0.00

ALLOW FOR TOOLS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
P PAINTER & DECORATOR

P035 Scraping of walls to original plaster, sand papering and lime putting cracks and
defects, preparing surface for new application of distermper, snowcem paint or similar
application.

PER m2

L001 Unskilled labour Hour 0.200 0.00


L004 Mason Hour 0.050 0.00

ALLOW FOR SAND PAPER LIME PUTTY & SCAFFOLDING ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P036 White washing or colour washing wall with 1 coat in single storeyed building
including patching and preparing surface.

PER m2

M550 Boiled Lime Kg. 0.182 0.00


M482 Glue Kg. 0.001 0.00
M483 Yellow ochre Kg. 0.001 0.00
L006 Painter Hour 0.088 0.00
L001 Unskilled labour Hour 0.088 0.00

ALLOW FOR SCAFFOLDING, BRUSHES CEMENT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
P PAINTER & DECORATOR

P039 White washing or colour washing external walls with one coat in buildings of more
than two storeys.

PER m2

M484 Slaked lime Bushels 0.182 0.00


M482 Glue Kg. 0.001 0.00
M483 Yellow ochre Kg. 0.001 0.00
L006 Painter Hour 0.088 0.00
L001 Unskilled labour Hour 0.144 0.00

ALLOW FOR CEMENT SAND AND SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P040 White washing or colour washing external walls with two coats in 2 storeyed buildings.

PER m2

M484 Slaked lime Bushels 0.296 0.00


M482 Glue Kg. 0.002 0.00
M483 Yellow ochre Kg. 0.002 0.00
L006 Painter Hour 0.150 0.00
L001 Unskilled labour Hour 0.184 0.00

ALLOW FOR CEMENT SAND BRUSHES SCAFFOLDING ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
P PAINTER & DECORATOR

P041 White washing or colour washing external walls with 2coat in buildings with more
than two storeys.

PER m2

M484 Slaked lime Bushels 0.296 0.00


M482 Glue Kg. 0.002 0.00
M483 Yellow ochre Kg. 0.002 0.00
L006 Painter Hour 0.150 0.00
L001 Unskilled labour Hour 0.208 0.00

ALLOW FOR CEMENT SAND SCAFFOLDING BRUSHES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P042 Walls internal faces scraped to original plaster patching up cracks and defects
lime putty sand papering applying plaster of paris and preparing surfaces for
application of emulsion paint or enamel paint.

PER m2

L001 Unskilled labour Hour 1.000 0.00


L004 Mason Hour 0.200 0.00
L006 Painter Hour 0.100 0.00

ALLOW FOR SAND PAPER , CEMENT SAND PLASTER OF PARIS AND


SCAFFOLDING ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
P PAINTER & DECORATOR

P043 Walls external faces scraped to original plaster patching up cracks and defects and
preparing surface including sand papering for application of snowcem / white washing
in single storeyed buildings.

PER m2

L001 Unskilled labour Hour 1.000 0.00


L004 Mason Hour 0.200 0.00

ALLOW FOR CEMENT SAND LIME PUTTY AND SCAFFOLDING ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P044 Walls external faces scraped to original plaster patching up cracks and defects and
preparing surface including sand papering for application of snowcem or white washing
in two storeyed buildings.

PER m2

L001 Unskilled labour Hour 1.300 0.00


L004 Mason Hour 0.200 0.00

ALLOW FOR CEMENT SAND AND SCAFFOLDING ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
P PAINTER & DECORATOR

P045 Walls external faces scraped to original plaster patching up cracks and defects and
preparing surface including sand papering for application of snowcem or white washing
in more than two storeyed buildings.

PER m2

L001 Unskilled labour Hour 1.700 0.00


L004 Mason Hour 0.200 0.00

ALLOW FOR CEMENT SAND AND LIME PUTTY.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

P046 Painting walls with 1 coat weathershield paint including preparing surface of new work.

PER m2

M074 Weathershield * Lit. 0.117 #N/A #N/A


L006 Painter Hour 0.320 0.00

ALLOW FOR SCAFFOLDING, BRUSHES SAND PAPER ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

P047 Painting walls with 2 coats weathershield paint including preparing surface of new work.

PER m2

M074 Weathershield * Lit. 0.223 #N/A #N/A


L006 Painter Hour 0.600 0.00

ALLOW FOR SCAFFOLDING, BRUSHES SAND PAPER ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
P PAINTER & DECORATOR

P048 Painting walls with 1 coat weathershield paint including preparing surface of old work.

PER m2

M074 Weathershield * Lit. 0.117 #N/A #N/A


L006 Painter Hour 0.376 0.00

ALLOW FOR SCAFFOLDING, BRUSHES SAND PAPER ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

P049 Painting walls with 2 coats weathershield paint including preparing surface of old work.

PER m2

M074 Weathershield * Lit. 0.223 #N/A #N/A


L006 Painter Hour 0.700 0.00

ALLOW FOR SCAFFOLDING, BRUSHES SAND PAPER ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

P050 Painting floors with 1 coat floor paint including preparing surface.

PER m2

M081 Floor Paint - Quick drying Lit. 0.082 0.00


M085 Thinner * Lit. 0.008 #N/A #N/A
L006 Painter Hour 0.250 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
P PAINTER & DECORATOR

P051 Painting floors with 2 coats floor paint including preparing surface.

PER m2

M081 Floor Paint - Quick drying Lit. 0.164 0.00


M085 Thinner * Lit. 0.016 #N/A #N/A
L006 Painter Hour 0.400 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
Q PLUMBER

Q001 Supplying and fixing of 12mm Ball float valve.

PER No.

M216 Ball Valve, 12mm (plastic) No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q002 Supplying and fixing of 20mm Ball valve.

PER No.

M217 Ball Valve, 20mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q003 Supplying and fixing of 25mm Ball valve.

PER No.

M218 Ball Valve, 25mm No. 1.000 0.00


L008 Plumber Hour 0.750 0.00
L001 Unskilled labour Hour 0.750 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q004 Supplying and fixing of 32mm Ball valve.

PER No.

M219 Ball Valve, 32mm No. 1.000 0.00


L008 Plumber Hour 1.000 0.00
L001 Unskilled labour Hour 1.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q005 Fixing of 12mm to 25mm Ball valve (Valve supplied by Client.)

PER No.

L008 Plumber Hour 0.500 0.00


L001 Unskilled labour Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q006 Removing , repairing , testing and fixing of Ball valve.

PER No.

L008 Plumber Hour 0.500 0.00


L001 Unskilled labour Hour 0.500 0.00
L007 Tinker Hour 1.000 0.00

ALLOW FOR LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q007 Supplying and fixing of Ball only plastic, for 12mm valve.

PER No.

M220 Ball only (plastic) 1/2" valve No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00
L007 Tinker Hour 0.250 0.00

ALLOW FOR LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q008 Supplying and fixing of Ball only plastic, for 20mm valve.

PER No.

M221 Ball only (plastic) 3/4" valve No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00
L007 Tinker Hour 0.250 0.00

ALLOW FOR LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q009 Supplying and fixing of Ball only plastic, for 25mm valve.

PER No.

M222 Ball only (Plastic) 1" valve No. 1.000 0.00


L008 Plumber Hour 0.750 0.00
L001 Unskilled labour Hour 0.750 0.00
L007 Tinker Hour 0.250 0.00

ALLOW FOR LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q010 Ball soldered and fixed to lever operating valve.

PER No.

L008 Plumber Hour 0.500 0.00


L001 Unskilled labour Hour 0.500 0.00
L007 Tinker Hour 0.250 0.00

ALLOW FOR LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q011 Fixing of lavatory Basin to wall and connected to existing water service and making
good (Basin brackets and fittings supplied by Client).

PER No.

M485 Plugs No. 4.000 0.00

L001 Unskilled labour Hour 8.000 0.00


L008 Plumber Hour 6.000 0.00

ALLOW FOR SCREWS , CEMENT , RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q012 Fixing of lavatory Basin on existing brackets(Tap , waste trap and basin supplied
by Client.).

PER No.

L008 Plumber Hour 4.000 0.00


L001 Unskilled labour Hour 4.000 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q013 Supplying and fixing of lavatory Basin 560mm x 360mm with one taps, waste
plug, with new brackets (additional tap , trap and outlet pipe paid separately).

PER No.

M122 Basin 360 x 560 with tap waste plug but No. 1.000 0.00
excluding bracket.
M485 Plugs No. 4.000 0.00

L001 Unskilled labour Hour 8.000 0.00


L008 Plumber Hour 6.000 0.00
M113 Wash Basin (L) Bracket Pair 1.000 0.00

ALLOW FOR SCREWS, CEMENT RED LEAD

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q014 Supplying and fixing of lavatory Basin 560mm x 360mm with one tap on existing
brackets complete (additional tap, trap and outlet pipe paid separately).

PER No.

M122 Basin 360 x 560 with tap waste plug but No. 1.000 0.00
excluding bracket.
M485 Plugs No. 4.000 0.00

L001 Unskilled labour Hour 8.000 0.00


L008 Plumber Hour 6.000 0.00

ALLOW FOR SCREWS, CEMENT RED LEAD

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q015 Removing Basin, Urinal or sink including all fittings and walls made good.

PER No.

L008 Plumber Hour 3.000 0.00


L001 Unskilled labour Hour 4.000 0.00
L002 Skilled labour Hour 1.000 0.00

ALLOW FOR CEMENT , LIME ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q016 C.I. Enamelled baths removing and re - fixing in new position and making good to
walls and floors (extra pipes required paid separately).

PER N0.

L008 Plumber Hour 10.000 0.00


L001 Unskilled labour Hour 14.000 0.00
L002 Skilled labour Hour 4.000 0.00

ALLOW FOR CEMENT , RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q017 C.I. Enamelled baths any size including trap, tap, outlet pipes etc. fixed complete
(Bath and fittings supplied by Client).

PER N0.

L008 Plumber Hour 8.000 0.00


L001 Unskilled labour Hour 10.000 0.00
L002 Skilled labour Hour 2.000 0.00

ALLOW FOR CEMENT , RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q018 Fixing of C.I. Bends,elbows, tees, cresses any size upto 50mm(fittings supplied by Client).

PER N0.

L008 Plumber Hour 0.250 0.00


L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR RED LEAD HEMP ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q019 Supplying and fixing of 12mm G.I. Bends.

PER N0.

M240 Bend G.I. 12mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q020 Supplying and fixing of 20mm G.I. Bends.

PER N0.

M241 Bend G.I. 20mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q021 Supplying and fixing of 25mm G.I. Bends.

PER N0.

M242 Bend G.I. 25mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q022 Supplying and fixing of 32mm G.I. Bends.

PER N0.

M243 Bend G.I. 32mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q023 Supplying and fixing of 38mm G.I. Bends.

PER N0.

M244 Bend G.I. 38mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q024 Supplying and fixing of 50mm G.I. Bends.

PER N0.

M245 Bend G.I. 50mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q025 Supplying and fixing of 75mm G.I. Bends.

PER N0.

M247 Bend G.I. 75mm No. 1.000 0.00


L008 Plumber Hour 0.333 0.00
L001 Unskilled labour Hour 0.333 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q026 Supplying and fixing of chain, chromium plated for flushing cistern.
PER No.

M121 Chromium plated chain for flushing cistern No. 1.000 0.00
L008 Plumber Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q027 Supplying and fixing of PVC reducing Sockets from 20mm to smaller sizes.

PER No.

L008 Plumber Hour 0.100 0.00


L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q028 Supplying and fixing of PVC reducing Sockets from 25mm to smaller sizes.

PER No.

M356 Reducing Socket PVC 25mm to smaller size. No. 1.000 0.00
L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q029 Supplying and fixing of PVC reducing Sockets from 32mm to smaller sizes.

PER No.
M357 Reducing Socket PVC 32mm to smaller size. No. 1.000 0.00
L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q030 Supplying and fixing of PVC reducing Sockets from 38mm to smaller sizes.

PER No.

M358 Reducing Socket PVC 40mm to smaller size. No. 1.000 0.00
L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q031 Supplying and fixing of PVC reducing Sockets from 50mm to smaller sizes.

PER No.

M359 Reducing Socket PVC 50mm to smaller size. No. 1.000 0.00
L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q032 Supplying and fixing of PVC reducing Tees from 20mm to smaller sizes.

PER No.

M361 Reducing Socket PVC 20mm to smaller size. No. 1.000 0.00
L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00
ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q033 Supplying and fixing of PVC reducing Tees from 25mm to smaller sizes.

PER No.

M361 Reducing Socket PVC 20mm to smaller size. No. 1.000 0.00
L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q034 Supplying and fixing of PVC reducing Tees from 32mm to smaller sizes.

PER No.

M362 Reducing Socket PVC 32mm to smaller size. No. 1.000 0.00
L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q035 Supplying and fixing of PVC reducing Tees from 40mm to smaller sizes.

PER No.

M363 Reducing Socket PVC 40mm to smaller size. No. 1.000 0.00
L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q036 Supplying and fixing of PVC reducing Tees from 50mm to smaller sizes.

PER No.

M364 Reducing Socket PVC 50mm to smaller size. No. 1.000 0.00
L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q037 Supplying and fixing of 560mm x 510mm pedestal type wash basin(L)
with two way tapand waste plug.

PER No.

M088 Wash Basin(L) with pedestal - white No. 1.000 0.00


L002 Skilled labour Hour 2.000 0.00
L001 Unskilled labour Hour 8.000 0.00
L008 Plumber Hour 8.000 0.00

ALLOW FOR CEMENT ETC.

Q PLUMBER

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q038 Supplying and fixing of 20mm p.v.c. Valve socket.

PER No.

M378 Valve Socket PVC 20mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q039 Supplying and fixing of 25mm p.v.c. Valve socket.

PER No.

M379 Valve Socket PVC 25mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q040 Supplying and fixing of 32mm PVC Valve socket.

PER No.

M379 Valve Socket PVC 25mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q041 Supplying and fixing of 40mm PVC Valve socket.


PER No.

M381 Valve Socket PVC 40mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q042 Supplying and fixing of 50mm PVC Valve socket.

PER No.

M382 Valve Socket PVC 50mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q043 Supplying and fixing of 75mm PVC Valve socket.

PER No.

M346 Valve Socket PVC 75mm No. 1.000 0.00


L008 Plumber Hour 0.150 0.00
L001 Unskilled labour Hour 0.150 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q044 Supplying and fixing of 90mm PVC Valve socket.

PER No.
M347 Valve Socket PVC 75mm No. 1.000 0.00
L008 Plumber Hour 0.200 0.00
L001 Unskilled labour Hour 0.200 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q045 Supplying and fixing of 20mm p.v.c. Faucet socket.

PER No.

M336 Faucet Socket PVC 20mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q046 Supplying and fixing of 25mm p.v.c. Faucet socket.

PER No.

M337 Faucet Socket PVC 25mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00
ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q047 Supplying and fixing of 32mm p.v.c. Faucet socket.

PER No.

M338 Faucet Socket PVC 32mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q048 Supplying and fixing of 40mm p.v.c. Faucet socket.

PER No.

M339 Faucet Socket PVC 40mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q049 Supplying and fixing of 50mm p.v.c. Faucet socket.

PER No.

M340 Faucet Socket PVC 50mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q050 Supplying and fixing of 75mm p.v.c. Faucet socket.

PER No.

M342 Faucet Socket PVC 75mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q051 Supplying and fixing of 90mm p.v.c. Faucet socket.

PER No.

M343 Faucet Socket PVC 90mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q052 Supplying and fixing of 20mm p.v.c. equal Tee.

PER No.

M372 Faucet Socket PVC 20mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q053 Supplying and fixing of 25mm p.v.c. Equal Tee.

PER No.

M373 Equal Tee PVC 25mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q054 Supplying and fixing of 32mm p.v.c. Equal Tee.

PER No.

M374 Equal Tee PVC 25mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q055 Supplying and fixing of 40mm p.v.c. Equal Tee.


PER No.

M375 Equal Tee PVC 40mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q056 Supplying and fixing of 50mm p.v.c. Equal Tee.

PER No.

M376 Equal Tee PVC 50mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q057 Supplying and fixing of 75mm p.v.c. Equal Tee.

PER No.

M348 Equal Tee PVC 75mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q058 Supplying and fixing of 40mm p.v.c. Equal Tee.

PER No.

M349 Equal Tee PVC 40mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q059 Supplying and fixing of 20mm p.v.c. Plugs.

PER No.

M495 Plugs PVC 20mm(see M350) No. 1.000 0.00


L008 Plumber Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q060 Supplying and fixing of 20mm p.v.c. Plugs.

PER No.

M496 Plugs PVC 25mm (see M351) No. 1.000 0.00


L008 Plumber Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q061 Supplying and fixing of 32mm p.v.c. Plugs.

PER No.

M497 Plugs PVC 32mm (see M352) No. 1.000 0.00


L008 Plumber Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES


SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q062 Supplying and fixing of 40mm p.v.c. Plugs.

PER No.

M498 Plugs PVC 40mm (see M353) No. 1.000 0.00


L008 Plumber Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q063 Supplying and fixing of 50mm p.v.c. Plugs.

PER No.

M499 Plugs PVC 50mm (see M354) No. 1.000 0.00


L008 Plumber Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q064 Supplying and fixing of 75mm p.v.c. Plugs.

PER No.

M500 Plugs PVC 75mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q065 Supplying and fixing of 20mm P.V.C. Sockets plain.

PER No.

M320 Socket PVC 20mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q066 Supplying and fixing of 25mm P.V.C. Sockets plain.

PER No.

M321 Socket PVC 25mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q067 Supplying and fixing of 32mm P.V.C. Sockets plain.

PER No.

M322 Socket PVC 32mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER
Q068 Supplying and fixing of 40mm P.V.C. Sockets plain.

PER No.

M323 Socket PVC 40mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q069 Supplying and fixing of 50mm P.V.C. Sockets plain.

PER No.

M324 Socket PVC 50mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q070 Supplying and fixing of 75mm P.V.C. Sockets plain.

PER No.

M326 Socket PVC 75mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q071 Supplying and fixing of 90mm P.V.C. Sockets plain.


PER No.

M327 Socket PVC 75mm No. 1.000 0.00


L008 Plumber Hour 0.200 0.00
L001 Unskilled labour Hour 0.200 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q072 Supplying and fixing of 20mm p.v.c. pipes.(fittings paid separately.)

PER m

M293 Pipe PVC 20mm type 1000 m 1.000 0.00


L008 Plumber Hour 0.050 0.00
L001 Unskilled labour Hour 0.050 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q073 Supplying and fixing of 25mm (type 1000) p.v.c. pipes.(Fittings paid separately.)

PER m

M293 Pipe PVC 20mm type 1000 m 1.000 0.00


L008 Plumber Hour 0.067 0.00
L001 Unskilled labour Hour 0.067 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q074 Supplying and fixing of 32mm (type 1000) p.v.c. pipes.(Fittings paid separately.)

PER m

M293 Pipe PVC 32mm type 1000 m 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q075 Supplying and fixing of 40mm (type 1000) p.v.c. pipes.(Fittings paid separately.)

PER m

M296 Pipe PVC 32mm type 1000 m 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q076 Supplying and fixing of 50mm (type 1000) p.v.c. pipes.(Fittings paid separately.)

PER m

M297 Pipe PVC 50mm type 1000 m 1.000 0.00


L008 Plumber Hour 0.333 0.00
L001 Unskilled labour Hour 0.333 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q077 Supplying and fixing of 63mm (type 1000) p.v.c. pipes.(Fittings paid separately.)

PER m

M298 Pipe PVC 63mm type 1000 m 1.000 0.00


L008 Plumber Hour 0.333 0.00
L001 Unskilled labour Hour 0.333 0.00
ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q078 Supplying and fixing of 75mm (type 1000) p.v.c. pipes.(Fittings paid separately.)

PER m

M299 Pipe PVC 75mm type 1000 m 1.000 0.00


L008 Plumber Hour 0.333 0.00
L001 Unskilled labour Hour 0.333 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q079 Fixing of Closet pedestal type available at site with cement concrete after
breaking concrete floor and making good and making connections to soil and
flush pipe.

PER No.

M010 Cement 50 Kg. 0.250 0.00


L008 Plumber Hour 6.000 0.00
L001 Unskilled labour Hour 6.000 0.00

ALLOW FOR METAL , SAND RED LEAD, HEMP ETC.


SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q080 Fixing of 20mm to 50mm p.v.c. Pipes with specials (pipes and specials supplied
by Client.)

PER m

L008 Plumber Hour 0.100 0.00


L001 Unskilled labour Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q081 Supplying and fixing of 20mm (type 1000) p.v.c. Pipes including specials and
fittings.

PER m

M293 Pipe PVC 20mm type 1000 m 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q082 Supplying and fixing of 25mm (type 1000) p.v.c. Pipes including specials and
fittings.

PER m

M294 Pipe PVC 25mm type 1000 m 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q083 Supplying and fixing of 32mm (type 1000) p.v.c. Pipes including specials and
fittings.

PER m

M295 Pipe PVC 25mm type 1000 m 1.100 0.00


L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q084 Supplying and fixing of 40mm (type 1000) p.v.c. Pipes including specials and
fittings.

PER m

M296 Pipe PVC 40mm type 1000 m 1.100 0.00


L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q085 Supplying and fixing of 50mm (type 1000) p.v.c. Pipes including specials and
fittings.

PER m

M297 Pipe PVC 50mm type 1000 m 1.100 0.00


L008 Plumber Hour 0.200 0.00
L001 Unskilled labour Hour 0.200 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q086 Supplying and fixing of 63mm (type 1000) p.v.c. Pipes including specials and
fittings.

PER m
M298 Pipe PVC 63mm type 1000 m 1.100 0.00
L008 Plumber Hour 0.200 0.00
L001 Unskilled labour Hour 0.200 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q087 Supplying and fixing of 150mm x 12mm p.v.c. shower rose with specials.

PER No.

M117 Shower Rose PVC 150mm x 12mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q088 Supplying and fixing of plastic seat cover.

PER No.

M116 Seat cover plastic No. 1.000 0.00


L008 Plumber Hour 1.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q089 Supplying and fixing of 12mm brass Gate valve.

PER No.

M501 Gate valve, brass 12mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q090 Supplying and fixing of 20mm brass Gate valve.

PER No.

M502 Gate valve, brass 20mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q091 Supplying and fixing of 25mm brass Gate valve.

PER No.

M503 Gate valve, brass 25mm No. 1.000 0.00


L008 Plumber Hour 0.750 0.00
L001 Unskilled labour Hour 0.750 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q092 Supplying and fixing of 32mm brass Gate valve.

PER No.

M504 Gate valve, brass 32mm No. 1.000 0.00


L008 Plumber Hour 1.000 0.00
L001 Unskilled labour Hour 1.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q093 Supplying and fixing of 38mm brass Gate valve.

PER No.

M505 Gate valve, brass 38mm No. 1.000 0.00


L008 Plumber Hour 1.000 0.00
L001 Unskilled labour Hour 1.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q094 Supplying and installing of 400 gal capacity round plastic shell tank(with 2 Nos.
of 01 oz.mat.) including scaffolding & transport.

PER P/tank

M547 400 gal round plastic shell Tank No. 1.000 0.00
L011 Unskilled labour day 4.000 0.00
L018 Plumber day 1.000 0.00

ALLOW FOR SCAFFOLDING

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q095 Disconneting pedestal type closet and plugging sewer connction and making good
to all affected walls and floors.

PER No.

M010 Cement 50 Kg. 0.167 0.00


L008 Plumber Hour 4.000 0.00
L001 Unskilled labour Hour 4.000 0.00

ALLOW FOR SAND METAL ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q096 Supplying and fixing pedestal type Closet (seat and cover available).

PER No.

M102 Closet pedestal type No. 1.000 0.00


M010 Cement 50 Kg. 0.250 0.00
L008 Plumber Hour 6.000 0.00
L001 Unskilled labour Hour 6.000 0.00

ALLOW FOR SAND ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q097 Supplying and fixing of Closet pedestal type with low level glazed earthenware
flushing cistern, flush pipe, double plastic seat cover 12mm stop cock trap etc.

PER No.

M506 Low level closet unit No. 1.000 0.00


M204 Stop Cock Brass, 12mm No. 1.000 0.00
L008 Plumber Hour 8.000 0.00
L001 Unskilled labour Hour 8.000 0.00
M109 Fittings for Cistern No. 1.000 0.00
M110 Cistern Bracket Pair 1.000 0.00
M094 Low level cistern - white No. 1.000 0.00

ALLOW FOR METAL SAND ETC.


ALLOW FOR TRANSPORT
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q098 Supplying and fixing of Closet squatting type with trap excluding cistern.

PER No.

M091 Squatting Pan (M) with 'P' Trap No. 1.000 0.00
M010 Cement 50 Kg. 0.333 0.00
L018 Plumber day 1.000 0.00
L011 Unskilled labour day 1.000 0.00

ALLOW FOR METAL ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q099 Supplying and fixing of Closet, squatting type with trap with cistern flush
pipe including 12mm stop cock and specials.

PER No.

M091 Squatting Pan (M) with 'P' Trap No. 1.000 0.00
M010 Cement 50 Kg. 0.333 0.00
L018 Plumber day 1.000 0.00
L011 Unskilled labour day 1.000 0.00
M204 Stop Cock Brass, 12mm No. 1.000 0.00
M109 Fittings for Cistern No. 1.000 0.00
M110 Cistern Bracket Pair 1.000 0.00
M094 Low level cistern - White No. 1.000 0.00

ALLOW FOR METAL ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q100 Removing Closet , squatting type and plugging sewer connections and making
good to floors.

PER No.

M010 Cement 50 Kg. 0.500 0.00


L018 Plumber hour 6.000 0.00
L011 Unskilled labour hour 6.000 0.00

ALLOW FOR METAL SAND ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q101 Installing Closet, squatting type including breaking floor and fixed in cement
concrete (Closet supplied by Client.)

PER No.

M010 Cement 50 Kg. 0.340 0.00


L018 Plumber hour 6.000 0.00
L011 Unskilled labour hour 6.000 0.00

ALLOW FOR METAL SAND ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q102 Installing Closet, squatting type including trap, breaking floor and fixed in cement
concrete (Closet and trap supplied by Client.)

PER No.

M010 Cement 50 Kg. 0.333 0.00


L018 Plumber hour 8.000 0.00
L011 Unskilled labour hour 8.000 0.00

ALLOW FOR METAL ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q103 Installing Closet, squatting type including flushing cistern and pipes complete
(Closet and all fittings supplied .)

PER No.

M485 Plugs No. 6.000 0.00


L002 Skilled labour Hour 1.000 0.00
L001 Unskilled labour Hour 13.000 0.00
L008 Plumber Hour 12.000 0.00
M010 Cement 50 Kg. 0.333 0.00

ALLOW FOR METAL ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q104 Supplying and fixing of 12mm brass bib cocks of approved quality.

PER No.

M204 Stop Cock Brass, 12mm No. 1.000 0.00


L008 Plumber Hour 0.334 0.00
L001 Unskilled labour Hour 0.334 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q105 Supplying and fixing of 12mm chromium plated bib cocks of approved quality.

PER No.

M211 Pillar Cock chromium plated 12mm No. 1.000 0.00


L008 Plumber Hour 0.334 0.00
L001 Unskilled labour Hour 0.334 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q106 Fixing of Cocks, brass any size or push (cock supplied by Client.)

PER No.

L008 Plumber Hour 0.334 0.00


L001 Unskilled labour Hour 0.334 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q107 Removing of Cocks, brass bib push or stop cock of size 12mm to 40mm.

PER No.

L008 Plumber Hour 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q108 Repairing of Cocks bib or stop by fixing leather washers.

PER No.

M507 Leather washer No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q109 Repairing of Cocks self closing by fixing leather washer.

PER No.

M507 Leather washer No. 1.000 0.00


L008 Plumber Hour 1.000 0.00
L001 Unskilled labour Hour 1.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER
Q110 Supplying and fixing of 12mm G.I. Connector.

PER No.

M272 Connector G.I. 12mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q111 Supplying and fixing of 20mm G.I. Connector.

PER No.

M273 Connector G.I. 20mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q112 Supplying and fixing of 25mm G.I. Connector.

PER No.

M274 Connector G.I. 25mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q113 Supplying and fixing of 32mm G.I. Connector.

PER No.
M275 Connector G.I. 32mm No. 1.000 0.00
L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q114 Supplying and fixing of 38mm G.I. Connector.

PER No.

M276 Connector G.I. 38mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q115 Supplying and fixing of 50mm G.I. Connector.

PER No.

M277 Connector G.I. 50mm No. 1.000 0.00


L008 Plumber Hour 0.667 0.00
L001 Unskilled labour Hour 0.667 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q116 Supplying and fixing of 75mm G.I. Connector.

PER No.

M278 Connector G.I. 75mm No. 1.000 0.00


L008 Plumber Hour 0.667 0.00
L001 Unskilled labour Hour 0.667 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q117 Fixing of connector any size upto 38mm (connector supplied by Client.)

PER No.

L008 Plumber Hour 0.500 0.00


L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q118 Fixing of connector above 38mm and upto 75mm (connector supplied by Client.)

PER No.

L008 Plumber Hour 0.667 0.00


L001 Unskilled labour Hour 0.667 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q119 Supplying and fixing of Plastic cover for commode.

PER No.

M116 Seat cover plastic No. 1.000 0.00


L008 Plumber Hour 2.000 0.00
L001 Unskilled labour Hour 2.000 0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q120 Supplying and fixing of 12mm G.I. Elbows.

PER No.

M248 Elbow G.I. 12mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q121 Supplying and fixing of 20mm G.I. Elbows.

PER No.

M249 Elbow G.I. 20mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q122 Supplying and fixing of 25mm G.I. Elbows.

PER No.

M250 Elbow G.I. 25mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q123 Supplying and fixing of 32mm G.I. Elbows.

PER No.

M251 Elbow G.I. 32mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q124 Supplying and fixing of 38mm G.I. Elbows.

PER No.

M252 Elbow G.I. 38mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q125 Supplying and fixing of 50mm G.I. Elbows.

PER No.

M253 Elbow G.I. 50mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q126 Cleaning of cost iron Flushing cistern and painting with one coat Anti - corrosive
paint internally.

PER No.

L008 Plumber Hour 2.500 0.00

ALLOW FOR PAINT AND BRUSHES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q127 Supplying and fixing of Flushing cistern, cistern, C.I. 9 litres, excluding flush pipe
and brackets but including ball valve.

PER No.

M119 Cistern High level C.I. No. 1.000 0.00


L008 Plumber Hour 4.000 0.00
L001 Unskilled labour Hour 4.000 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q128 Supplying and fixing of Flushing cistern, cistern, C.I. 9 litres, excluding flush pipe
and brackets but ball valve.
PER No.

M120 Cistern High level C.I. No. 1.000 0.00


L008 Plumber Hour 4.000 0.00
L001 Unskilled labour Hour 4.000 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q128 Supplying and fixing of Flushing cistern plastic 9 litres excluding flush pipe and
brackets but ball valve.

PER No.

M120 Cistern high level plastic No. 1.000 0.00


L008 Plumber Hour 4.000 0.00
L001 Unskilled labour Hour 4.000 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q129 Fixing of Flushing cistern (cistern brackets supplied).

PER No.

M485 Plugs No. 4.000 0.00


L002 Skilled labour Hour 1.000 0.00
L001 Unskilled labour Hour 4.000 0.00
L008 Plumber Hour 4.000 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q130 Supplying and fixing of low level porcelain Flushing cistern.

PER No.

M094 Low level cistern - White No. 1.100 0.00


L008 Plumber Hour 4.000 0.00
L001 Unskilled labour Hour 4.000 0.00
M110 Cistern Brackets Hour 1.000 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q131 Fixing of Flushing cistern lever forged out of wrought iron 25mm x 5m, bent to shape

PER No.

L005 Black Smith Hour 4.000 0.00


L001 Unskilled labour Hour 5.000 0.00
L008 Plumber Hour 1.000 0.00
ALLOW FOR STEEL ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q132 Disconnecting C.I. Flushing cistern and plugging water connection including making
good to all damage walls, floors etc.

PER No.

M256 Plug G.I. 12mm No. 1.000 0.00


L008 Plumber Hour 4.000 0.00
L001 Unskilled labour Hour 4.000 0.00

ALLOW FOR RED LEAD CEMENT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q133 Removing of Flushing cistern and re- fixing in new position including necessary
plugs, and making good to walls.

PER No.

M485 Plugs No. 4.000 0.00


L002 Skilled labour Hour 1.000 0.00
L001 Unskilled labour Hour 8.000 0.00
L008 Plumber Hour 8.000 0.00
M256 Plug G.I. 12mm No. 1.000 0.00
ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q134 Refixing of Flush pipe of pedestal closets after removing old putty etc.

PER No.

L008 Plumber Hour 1.000 0.00


L001 Unskilled labour Hour 1.000 0.00

ALLOW FOR PUTTY ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q135 Fixing G.I. Flush pipe including solders, joints (Flush pipe supplied by Client).

PER No.

L008 Plumber Hour 2.000 0.00


L001 Unskilled labour Hour 2.000 0.00

ALLOW FOR RED LEAD, CEMENT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q136 Supplying and fixing 32mm p.v.c. flush pipe p.v.c.


PER No.

M295 Pipe PVC 32mm type 1000 m 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q137 Supplying and fixing of Hooks for G.I. 12mm pipes.

PER No.

M509 Hooks for 12mm G.I. Pipes No. 1.000 0.00


L008 Plumber Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q138 Supplying and fixing of Hooks for G.I. 20mm pipes.

PER No.

M510 Hooks for 20mm G.I. Pipes No. 1.000 0.00


L008 Plumber Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q139 Supplying and fixing of Hooks for G.I. 25mm pipes.

PER No.

M511 Hooks for 25mm G.I. Pipes No. 1.000 0.00


L008 Plumber Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q140 Supplying and fixing of Hooks for G.I. 32mm pipes.

PER No.

M512 Hooks for 32mm G.I. Pipes No. 1.000 0.00


L008 Plumber Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q141 Supplying and fixing of Hooks for G.I. 38mm pipes.

PER No.

M513 Hooks for 38mm G.I. Pipes No. 1.000 0.00


L008 Plumber Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q142 Fixing of Hooks for G.I. Pipes,(Hooks available).

PER No.

L008 Plumber Hour 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q143 Supplying and fixing of 12mm G.I. Jam nuts.

PER No.

M514 G.I. Joint nut 12mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q144 Supplying and fixing of 20mm G.I. Jam nuts.

PER No.

M515 G.I. Joint nut 20mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q145 Supplying and fixing of 25mm G.I. Jam nuts.

PER No.

M516 G.I. Joint nut 25mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q146 Supplying and fixing of 32mm G.I. Jam nuts.

PER No.

M517 G.I. Joint nut 32mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q147 Supplying and fixing of 38mm G.I. Jam nuts.

PER No.

M518 G.I. Joint nut 38mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q148 Supplying and fixing of 50mm G.I. Jam nuts.

PER No.

M519 G.I. Joint nut 50mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q149 Fixing of Jam nuts any size upto 50mm (Jam nuts supplied by Client).

PER No.

L008 Plumber Hour 0.100 0.00


L001 Unskilled labour Hour 0.100 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q150 Supplying and fixing of Bath room type oval shape bevelled mirror, 380mm x 330mm
with rawl plugs and chromium plated fittings.

PER No.

M104 Mirror Frame Oval - White No. 1.000 0.00


L008 Plumber Hour 2.000 0.00
M103 Mirror only, oval No. 1.000 0.00

ALLOW FOR PLUGS SCREWS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q151 Supplying and fixing 320mm x 280mm Rectangular bevelled mirror to wall with rawl
plugs and chromium plated fittings.

PER No.

M105 Mirror Frame Square - White No. 1.000 0.00


L008 Plumber Hour 2.000 0.00
M101 Mirror only, square No. 1.000 0.00

ALLOW FOR PLUGS SCREWS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q152 Supplying and fixing of 12mm G.I. Pipe. Rate to include trenching backfilling and
making good to wall (fittings and pipe hooks paid separately).

PER m

M232 Pipe G.I. 12mm m 1.000 0.00


M520 Red lead Kg. 0.333 0.00
L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q153 Supplying and fixing of 20mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).

PER m

M233 Pipe G.I. 20mm m 1.000 0.00


M520 Red lead Kg. 0.038 0.00
L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q154 Supplying and fixing of 25mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).

PER m
M234 Pipe G.I. 25mm m 1.000 0.00
M520 Red lead Kg. 0.042 0.00
L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 1.000 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q155 Supplying and fixing of 32mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).

PER m

M235 Pipe G.I. 32mm m 1.000 0.00


M520 Red lead Kg. 0.033 0.00
L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 1.000 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q156 Supplying and fixing of 38mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).

PER m

M236 Pipe G.I. 38mm m 1.000 0.00


M520 Red lead Kg. 0.033 0.00
L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 1.000 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q157 Supplying and fixing of 50mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).

PER m

M237 Pipe G.I. 50mm m 1.000 0.00


M520 Red lead Kg. 0.033 0.00
L008 Plumber Hour 0.600 0.00
L001 Unskilled labour Hour 1.200 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q158 Supplying and fixing of 75mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).

PER m

M239 Pipe G.I. 75mm m 1.000 0.00


M520 Red lead Kg. 0.033 0.00
L008 Plumber Hour 0.600 0.00
L001 Unskilled labour Hour 1.200 0.00
ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q159 Fixing of 12mm to 50mm G.I. Pipes with specials bends, elbows etc.(Pipes and
specials supplied by Client). Rate to include trenching and making good to walls.

PER m

M520 Red lead Kg. 0.033 0.00


L001 Unskilled labour Hour 1.200 0.00
L008 Plumber Hour 0.600 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q160 Fixing of 63mm to 75mm G.I. Pipes Rate to include trenching and making good to walls.
(Fittings and pipe hooks paid separately,)

PER m

M520 Red lead Kg. 0.030 0.00


L001 Unskilled labour Hour 1.200 0.00
L008 Plumber Hour 0.600 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q161 Removing of G.I. Pipes any size upto 50mm and trench filled in.

PER m

L001 Unskilled labour Hour 1.000 0.00


L008 Plumber Hour 0.132 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q162 Removing of G.I. Pipes 50mm to 100mm and making good to walls and floors.

PER m

L001 Unskilled labour Hour 0.550 0.00


L008 Plumber Hour 0.850 0.00
M010 Cement 50 Kg. 0.035 0.00

ALLOW FOR BRICKS SAND ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q163 Existing G.I. Pipes upto 50mm takeout cleaned and relaid. Rate to include backfilling.

PER m

L001 Unskilled labour Hour 0.500 0.00


L008 Plumber Hour 0.270 0.00
M520 Red lead Kg. 0.019 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q164 Existing G.I. Pipes 63mm to 75mm takeout cleaned and relaid. Rate to include backfilling.

PER m

L001 Unskilled labour Hour 1.000 0.00


L008 Plumber Hour 0.400 0.00
M520 Red lead Kg. 0.030 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q165 Existing G.I. Pipes upto 50mm takeout cleaned and relaid in new position.
Rate to include backfilling.

PER m

L001 Unskilled labour Hour 1.200 0.00


L008 Plumber Hour 0.300 0.00
Red lead Kg. 0.019 0.00
ALLOW FOR EXPENSES
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q166 Cleaning of pipe outlets, upto 2400mm length, (Excluding removing and
replacing.

PER m

L001 Unskilled labour Hour 1.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q167 G.I. Plugs of any size fixed in position (plugs supplied by Client).

PER No.

L008 Plumber Hour 0.083 0.00


L001 Unskilled labour Hour 0.083 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q168 Supplying and fixing of 12mm G.I. Plugs.

PER No.

M256 Plug G.I. 12mm No. 1.000 0.00


L008 Plumber Hour 0.083 0.00
L001 Unskilled labour Hour 0.083 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q169 Supplying and fixing of 20mm G.I. Plugs.


PER No.

M257 Plug G.I. 20mm No. 1.000 0.00


L008 Plumber Hour 0.083 0.00
L001 Unskilled labour Hour 0.083 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q170 Supplying and fixing of 25mm G.I. Plugs.

PER No.

M258 Plug G.I. 25mm No. 1.000 0.00


L008 Plumber Hour 0.083 0.00
L001 Unskilled labour Hour 0.083 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q171 Supplying and fixing of 32mm G.I. Plugs.

PER No.

M259 Plug G.I. 32mm No. 1.000 0.00


L008 Plumber Hour 0.083 0.00
L001 Unskilled labour Hour 0.083 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q172 Supplying and fixing of 38mm G.I. Plugs.

PER No.
M260 Plug G.I. 38mm No. 1.000 0.00
L008 Plumber Hour 0.083 0.00
L001 Unskilled labour Hour 0.083 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q173 Supplying and fixing of 50mm G.I. Plugs.

PER No.

M261 Plug G.I. 50mm No. 1.000 0.00


L008 Plumber Hour 0.083 0.00
L001 Unskilled labour Hour 0.083 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q174 Supplying and fixing of 25mm to 32mm rubber plugs for wash basins and sinks.

PER No.

M521 Rubber plug 25mm to 32mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q175 Supplying and fixing of 38mm to 50mm rubber plugs for wash basins and sinks

PER No.

M522 Rubber plug 32mm to 50mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q176 Supplying and fixing of Wooden plugs in Class I timber , 100mm long, tapered 75mm
to 50mm square section bedded in 1:2 cement mortar.

PER No.

M523 100mm x 100mm Class I timber beams(4" x 4")


L002 Skilled labour
L001 Unskilled labour

ALLOW FOR CEMENT ETC.

SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL

Q177 Supplying and fixing of 12mm heavy quality brass push taps.

PER No.

M212 12mm heavy quality brass push tap No. 1.000 0.00
L008 Plumber Hour 0.334 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

A178 Supplying and fixing of 12mm light pattern brass push taps.

PER No.

M214 12mm light brass push tap No. 1.000 0.00


L008 Plumber Hour 0.334 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q179 Making a platform, with bamboo and planks for lifting or lowering of storage tank to
a height 4575mm to 9145mm and removing same.

PER No.

M445 Props(bamboo) 3 - 4 m No. 3.500 0.00


M047 Timber planks 25mm class B Sq.m. 0.070 0.00
L011 Unskilled labour day 2.000 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q180 Making a platform, with bamboo and planks for lifting or lowering of storage tank to
a height 9145mm to 15240mm and removing same.

PER No.

M445 Props(bamboo) 3 - 4 m No. 7.000 0.00


M047 Timber planks 25mm class B Sq.m. 0.070 0.00
L011 Unskilled labour day 2.500 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q181 Supplying and fixing of 600mm x 125mm glass shelves with chromium plated brackets
to wall with rawl plugs.

PER No.

M524 600mm x 125mm glass shelf with chromium No. 1.000 0.00
plated brackets.
M525 Rawl Plugs No. 4.000 0.00
L008 Plumber Hour 1.250 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q182 Fixing any size of shower rose in position (Shower rose supplied by client).

PER N.

L008 Plumber Hour 0.250 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q183 Supplying and fixing of 150mm copper shower rose.

PER No.

M118 Shower Rose Copper 150mm x 12mm No. 1.000 0.00


L008 Plumber Hour 0.250 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q184 Supplying and fixing of 150mm p.v.c. shower rose.

PER No.
M117 Shower Rose 150mm x 12mm No. 1.000 0.00
L008 Plumber Hour 0.250 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q185 Shower rose soldered and re - fixed.

PER No.

L008 Plumber Hour 1.000 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q186 Supplying and fixing of 12mm G.I. Nipples.

PER No.

M264 Nipple G.I. 12mm No. 1.000 0.00


L008 Plumber Hour 0.125 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q187 Supplying and fixing of 20mm G.I. Nipples.

PER No.

M265 Nipple G.I. 20mm No. 1.000 0.00


L008 Plumber Hour 0.125 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q188 Supplying and fixing of 25mm G.I. Nipples.

PER No.

M266 Nipple G.I. 25mm No. 1.000 0.00


L008 Plumber Hour 0.125 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q189 Supplying and fixing of 32mm G.I. Nipples.

PER No.

M267 Nipple G.I. 32mm No. 1.000 0.00


L008 Plumber Hour 0.125 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q190 Supplying and fixing of 38mm G.I. Nipples.

PER No.

M268 Nipple G.I. 38mm No. 1.000 0.00


L008 Plumber Hour 0.125 0.00

ALLOW FOR RED LEAD ETC.


SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q191 Supplying and fixing of 50mm G.I. Nipples.

PER No.

M269 Nipple G.I. 50mm No. 1.000 0.00


L008 Plumber Hour 0.125 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q192 Fixing in position of G.I. Nipples upto 50mm (nipple supplied by Client)

PER No.

L008 Plumber Hour 0.125 0.00

ALLOW FOR RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q193 Repairing Piller cock and fixing to basin without damaging the basin.

PER No.

L008 Plumber Hour 1.500 0.00

ALLOW FOR WASHERS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q194 Supplying and fixing 12mm chromium plated pillar cocks to basin.

PER No.

M211 Pillar cock chromium Plated 12mm No. 1.000 0.00


L008 Plumber Hour 0.750 0.00
L001 Unskilled labour Hour 0.750 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q195 Supplying and fixing 20mm chromium plated pillar cocks to basin.

PER No.

M213 Pillar cock chromium Plated 20mm No. 1.000 0.00


L008 Plumber Hour 0.750 0.00
L001 Unskilled labour Hour 0.750 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q196 Fixing of Sink in any size with all fittings (Sink and fittings supplied by Client.)

PER No.

M485 Plugs No. 4.000 0.00


L002 Skilled labour Hour 2.000 0.00
L008 Plumber Hour 6.000 0.00
L001 Unskilled labour Hour 8.000 0.00

ALLOW CEMENT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q197 Supplying and fixing of 610mm x 380mm x 180mm glazed earthenware sink with all
fitting on existing brackets.

PER No.

M089 Kitchen Sink 600 x 375 x 175mm White No. 1.000 0.00
L008 Plumber Hour 5.500 0.00
L001 Unskilled labour Hour 5.500 0.00

ALLOW CEMENT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q198 Supplying and fixing of 610mm x 380mm x 180mm glazed earthenware sink with all
fittings. Rate to include for provision of brackets.

PER No.

M089 Kitchen Sink 600 x 375 x 175mm White No. 1.000 0.00
M112 Wash Basin(M) Bracket Hour 5.500 0.00
L008 Plumber Hour 5.500 0.00
L001 Unskilled labour Hour 5.500 0.00

ALLOW CEMENT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q199 Removing Sink or basin and refixing in new position.

PER No.

M485 Plugs No. 4.000 0.00


L008 Plumber Hour 8.000 0.00
L004 Mason Hour 3.000 0.00
L001 Unskilled labour Hour 12.000 0.00

ALLOW CEMENT, RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q200 Making 600mm x 600mm x 150mm sink in 112mm brick masonary in cement 1:5 including
12mm thick 1:2 cement rendering. Rate to include making holes in the wall and supplying
and fixing of 50mm outlet pipes.

PER No.

M009 Brick 1000 Nos. 0.032 0.00


M010 Cement 50 Kg. 0.500 0.00
M007 sand Cu.m. 0.115 0.00
M297 Pipe PVC 50mm type 1000 m 0.310 0.00
L004 Mason Hour 6.000 0.00
L001 Unskilled labour Hour 6.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q201 Supplying and fixing of 12mm plain G.I. Sockets.

PER No.

M280 Socket G.I. 12mm No. 1.000 0.00


L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00

ALLOW RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q202 Supplying and fixing of 20mm plain G.I. Sockets.

PER No.

M281 Socket G.I. 20mm No. 1.000 0.00


L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00

ALLOW RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q203 Supplying and fixing of 25mm plain G.I. Sockets.

PER No.

M282 Socket G.I. 25mm No. 1.000 0.00


L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00
ALLOW RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q204 Supplying and fixing of 32mm plain G.I. Sockets.

PER No.

M283 Socket G.I. 32mm No. 1.000 0.00


L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00

ALLOW RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q205 Supplying and fixing of 38mm plain G.I. Sockets.

PER No.

M284 Socket G.I. 38mm No. 1.000 0.00


L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00

ALLOW RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q206 Supplying and fixing of 50mm plain G.I. Sockets.

PER No.

M285 Socket G.I. 50mm No. 1.000 0.00


L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00

ALLOW RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q207 Supplying and fixing of 75mm plain G.I. Sockets.

PER No.

M287 Socket G.I. 75mm No. 1.000 0.00


L008 Plumber Hour 0.167 0.00
L001 Unskilled labour Hour 0.167 0.00

ALLOW RED LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q208 Supplying and fixing of 20mm to smaller size G.I. Reducing sockets.

PER No.

M288 Reducing Socket G.I. 20mm to smaller No. 1.000 0.00


L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00

ALLOW OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q209 Supplying and fixing of 25mm to smaller size G.I. Reducing sockets.

PER No.

M526 G.I. reducing Socket 25mm to smaller No. 1.000 0.00


L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00

ALLOW OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER
Q210 Supplying and fixing of 32mm to smaller size G.I. Reducing sockets.

PER No.

M289 Reducing Socket G.I. 32mm to smaller No. 1.000 0.00


L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00

ALLOW OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q211 Supplying and fixing of 38mm to smaller size G.I. Reducing sockets.

PER No.

M290 Reducing Socket G.I. 38mm to smaller No. 1.000 0.00


L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00

ALLOW OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q212 Supplying and fixing of 50mm to smaller size G.I. Reducing sockets.

PER No.

M291 Reducing Socket G.I. 50mm to smaller No. 1.000 0.00


L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00

ALLOW OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q213 Supplying and fixing of 75mm to 50mm size G.I. Reducing sockets.
PER No.

M292 Reducing Socket G.I. 75mm No. 1.000 0.00


L008 Plumber Hour 0.167 0.00
L001 Unskilled labour Hour 0.167 0.00

ALLOW OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q214 Fixing in position of G.I. Socket in any size (Socket supplied by Client.)

PER No.

L008 Plumber Hour 0.125 0.00


L001 Unskilled labour Hour 0.125 0.00

ALLOW OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q215 Supplying of white porcelain soap tray and fixing to wall by rawl plugs.

PER No.

M095 Soap Holder - White No. 1.000 0.00


M525 Rawl plugs No. 2.000 0.00
L008 Plumber Hour 1.000 0.00

ALLOW FOR SCREWS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q216 Steel work in RSJ's as supports for tanks. Fixed in position upto 6000mm in height
and painted 2 coats red and 2 coats anti corrosive paint.

PER No.
M494 2" x 4" H iron Kg. 1.000 0.00
M082 Red lead paint Lit. 0.008 0.00
M078 Anti - Corrosive Paint Lit. 0.008 0.00
L008 Plumber Hour 0.023 0.00
L001 Unskilled labour Hour 0.046 0.00
L015 Painter day 0.006 0.00

ALLOW FOR CEMENT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q217 Supplying and fixing of 12mm brass stop cocks.

PER No.

M204 Stop Cock Brass , 12mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q218 Supplying and fixing of 20mm brass stop cocks.

PER No.

M205 Stop Cock Brass , 20mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00
ALLOW FOR LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q219 Supplying and fixing of 25mm brass stop cocks.

PER No.

M206 Stop Cock Brass , 25mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q220 Supplying and fixing of 32mm brass stop cocks.

PER No.

M207 Stop Cock Brass , 32mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q221 Supplying and fixing of 38mm brass stop cocks.

PER No.

M208 Stop Cock Brass , 38mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q222 Supplying and fixing of 50mm brass stop cocks.

PER No.

M209 Stop Cock Brass , 50mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR LEAD ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q223 Supplying and fixing of 12mm chromium plated stop cocks.

PER No.

M215 12mm chromium plated stop cock. No. 1.000 0.00


L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q224 Hoist & place in position of 1125 - 1800 litre GI tank upto a height of 6000mm
& remove old tank include disconnect & connect all pipes & paint the new tank with
red lead paint & 2 coats of anti corrosive paint.(Tank supplied by client & scaffolding
paid.
PER No.

L008 Plumber Hour 4.500 0.00


L001 Unskilled labour Hour 17.000 0.00
L006 Painter Hour 14.000 0.00
M082 Red Lead Paint * Lit. 0.700 #N/A #N/A
M078 Anti - Corrosive paint * Lit. 1.400 #N/A #N/A

ALLOW FOR BRUSHES ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A

Q225 Hoisting and placing in position of 110 to 910 litre G.I. Tank upto a height of 6000mm
& removing the old tank including connecting & disconnecting all pipes & painting the new
tank with red lead paint & 2 coats of anti corrosive paint.(Tank supplied by client &
scaffolding paid.

PER No.

L008 Plumber Hour 4.500 0.00


L001 Unskilled labour Hour 12.000 0.00
L006 Painter Hour 5.000 0.00
M082 Red Lead Paint * Lit. 0.225 #N/A #N/A
M078 Anti - Corrosive paint * Lit. 0.450 #N/A #N/A

ALLOW FOR BRUSHES ETC.

SUB TOTAL #N/A


OVER HEAD & PROFITS 22.00% #N/A
TOTAL #N/A
Q PLUMBER

Q226 Placeing in position of 110 - 910 litre GI tank upto a height of 6000mm & fix erction of steel
support, include fixing of all pipes & paint the tank & support with red lead paint & 2 coats
anti corrosive paint.(Tank , pipes, fittings, RSJ's , supplied by the client.)

PER No.

M082 Red Lead Paint Lit. 0.225 0.00


M078 Anti - Corrosive paint Lit. 0.450 0.00
L008 Plumber Hour 3.500 0.00
L001 Unskilled labour Hour 8.000 0.00
L006 Painter Hour 5.000 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q227 Placeing in position of 1125 - 1800 litre GI tank at a height of 6000mm & remove & fix of steel
supports, remove old tank include disconnect all pipes and paint new tank & supports with red
lead paint & 2 coats of anticorrosive paint(Tank , pipes , fittings RSJs.)

PER No.

M082 Red Lead Paint Lit. 0.700 0.00


M078 Anti - Corrosive paint Lit. 1.400 0.00
L008 Plumber Hour 3.500 0.00
L001 Unskilled labour Hour 11.000 0.00
L006 Painter Hour 14.000 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q228 Cleaning of tanks upto the storage capacity of 1800 litres.

PER No.

L001 Unskilled labour Hour 4.000 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q229 Cleaning of tanks of storage capacity over 1800 litres.

PER No.

L001 Unskilled labour Hour 8.000 0.00

ALLOW FOR BRUSHES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q230 Removing of G.I. Storage tank and making good to walls and floor (scaffolding
paid separately where necessary.)

PER No.

L008 Plumber Hour 3.000 0.00


L001 Unskilled labour Hour 8.000 0.00

ALLOW FOR CEMENT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER
Q231 Supplying and installing of 400 litre. 16 BWG G.I. Tank including painting the tank
with one coat of primer and 2 coats of anti - corrosive paint.

PER No.

M412 400 L, 16 BWG G.I. Tank No. 1.000 0.00


M082 Red Lead Paint Lit. 0.280 0.00
M078 Anti - Corrosive paint Lit. 0.550 0.00
L008 Plumber Hour 3.500 0.00
L001 Unskilled labour Hour 8.000 0.00
L006 Painter Hour 3.000 0.00

ALLOW FOR BRUSHES , WASHERS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q232 Supplying and installing of 1125 litre. 16 BWG G.I. Tank including painting the tank
with primer and 2 coats of anti - corrosive paint.

PER No.

M413 1125 L, 16 BWG G.I. Tank No. 1.000 0.00


M082 Red Lead Paint Lit. 0.620 0.00
M078 Anti - Corrosive paint Lit. 1.240 0.00
L008 Plumber Hour 3.500 0.00
L001 Unskilled labour Hour 4.000 0.00
L006 Painter Hour 6.000 0.00

ALLOW FOR BRUSHES , WASHERS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q233 Supplying and installing of 1800 litre. 16 BWG G.I. Tank including painting the tank
with one coat primer and 2 coats of anti - corrosive paint.
PER No.

M414 1800 L, 16 BWG G.I. Tank No. 1.000 0.00


M082 Red Lead Paint Lit. 0.900 0.00
M078 Anti - Corrosive paint Lit. 1.800 0.00
L008 Plumber Hour 3.500 0.00
L001 Unskilled labour Hour 11.000 0.00
L006 Painter Hour 12.000 0.00

ALLOW FOR BRUSHES , WASHERS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q234 Supplying and fixing of wall type Urinals.

PER No.

M093 Urinal - White No. 1.000 0.00


M470 Wood plugs m 0.200 0.00
L002 Skilled labour Hour 0.500 0.00
L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 1.000 0.00

ALLOW FOR CEMENT , SCREWS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q235 Supplying and fixing of wall type Urinals.(Urinals available)

PER No.

M470 Wood plugs m 0.200 0.00


L002 Skilled labour Hour 0.500 0.00
L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 1.000 0.00

ALLOW FOR CEMENT , SCREWS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q236 Fixing of P.V.C. bends elbows. Tees and other specials upto 75mm (Fittings
supplied by Client.)

PER No.

L008 Plumber Hour 0.100 0.00


L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q237 Supplying and fixing of 20mm p.v.c. bends.

PER No.

M328 Bend PVC 20mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.


SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q238 Supplying and fixing of 25mm p.v.c. bends.

PER No.

M329 Bend PVC 25mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q239 Supplying and fixing of 32mm p.v.c. bends.

PER No.

M330 Bend PVC 32mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q240 Supplying and fixing of 32mm p.v.c. bends.

PER No.

M331 Bend PVC 40mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q241 Supplying and fixing of 50mm p.v.c. bends.

PER No.

M332 Bend PVC 50mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q242 Supplying and fixing of 75mm p.v.c. bends.

PER No.

M334 Bend PVC 75mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q243 Supplying and fixing of 90mm p.v.c. bends.

PER No.

M335 Bend PVC 90mm No. 1.000 0.00


L008 Plumber Hour 0.180 0.00
L001 Unskilled labour Hour 0.180 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q244 Supplying and fixing of 20mm p.v.c. elbows.

PER No.

M368 Elbow PVC 20mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q245 Supplying and fixing of 25mm p.v.c. elbows.

PER No.

M367 Elbow PVC 25mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q246 Supplying and fixing of 32mm p.v.c. elbows.

PER No.

M368 Elbow PVC 32mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q247 Supplying and fixing of 40mm p.v.c. elbows.

PER No.
M369 Elbow PVC 40mm No. 1.000 0.00
L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q248 Supplying and fixing of 50mm p.v.c. elbows.

PER No.

M370 Elbow PVC 50mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Q PLUMBER

Q249 Supplying and fixing of 75mm p.v.c. elbows.

PER No.

M344 Elbow PVC 75mm No. 1.000 0.00


L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q250 Supplying and fixing of 90mm p.v.c. elbows.

PER No.

M345 Elbow PVC 90mm No. 1.000 0.00


L008 Plumber Hour 0.180 0.00
L001 Unskilled labour Hour 0.180 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q PLUMBER

Q251 Supplying and fixing of p.v.c. reducing sockets 20mm to smaller sizes.

PER No.

M356 Reducing Socket PVC 25mm to No. 1.000 0.00


smaller size
L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00

ALLOW FOR SOLVENT , CEMENT , ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

Q252 Supplying of 200mm x 400mm half rounded , tooth brush holders and fixing with
rawl plugs.

PER No.

M096 Toothe Brush Holder 200 x 100mm No. 1.000 0.00


white
M525 Rawl plugs No. 2.000 0.00
L008 Plumber Hour 0.750 0.00
L001 Unskilled labour Hour 0.750 0.00

ALLOW FOR OTHER EXPENSES

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

R DRAINLAYER

R001 Supplying and fixing of 150mm x 150mm C.I. Grating.

PER No.

M226 150mm x 150mm C.I. Grating No. 1.000 0.00


L001 Unskilled labour Hour 0.125 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

R002 600mm x 600mm manhole upto 600mm deep, constructed with 225mm brick
in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm)
concrete foundation. Rate to include forming of channels.

PER No.

M009 Brick 1000 Nos 0.260 0.00


M007 Sand Cu.m. 0.285 0.00
M005 Metal 25mm Cu.m. 0.170 0.00
M010 Cement 50 Kg. 2.040 0.00
L001 Unskilled labour Hour 20.000 0.00
L004 Mason Hour 8.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

R DRAINLAYER

R003 1000mm x 700mm manhole 600mm to 1200mm deep, constructed with 225mm brick
in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm)
concrete foundation. Rate to include forming of channels.

PER No.

M009 Brick 1000 Nos 0.500 0.00


M007 Sand Cu.m. 0.485 0.00
M005 Metal 25mm Cu.m. 0.285 0.00
M010 Cement 50 Kg. 3.300 0.00
L001 Unskilled labour Hour 32.000 0.00
L004 Mason Hour 12.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

R004 1000mm x 700mm manhole 1200mm to 1800mm deep, constructed with 225mm brick
in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm)
concrete foundation. Rate to include forming of channels.

PER No.

M009 Brick 1000 Nos 0.875 0.00


M007 Sand Cu.m. 0.736 0.00
M005 Metal 25mm Cu.m. 0.250 0.00
M010 Cement 50 Kg. 4.580 0.00
L001 Unskilled labour Hour 7.000 0.00
L004 Mason Hour 2.500 0.00
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

R DRAINLAYER

R005 Supplying and fixing of 550mm x 500mm rectangular C.I. Manhole cover.

PER No.

M227 Manhole Cover 550mm x 500mm No. 1.000 0.00


M528 Rag bolts No. 4.000 0.00
M010 Cement 50 Kg. 0.200 0.00
L002 Skilled labour Hour 2.000 0.00
L001 Unskilled labour Hour 2.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

R006 Constructing and placing in position of 75mm thick 600mm x 600mm reinforced concrete
manhole cover, reinforced with 6mm dia. M.S. rods at 75mm centres both ways.

PER No.

M004 Metal 40mm Cu.m. 0.028 0.00


M007 Sand Cu.m. 0.015 0.00
M010 Cement 50 Kg. 0.210 0.00
M549 Tor Steel Kg. 2.500 0.00
L005 Black Smith Hour 0.500 0.00
L002 Skilled labour Hour 2.000 0.00
L001 Unskilled labour Hour 2.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
R DRAINLAYER

R007 Supplying and fixing of wire domes 100mm pipes.

PER No.

M224 Wire Dome, 100mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

R008 Supplying and fixing of wire domes for 50mm pipes.

PER No.

M223 Wire Dome, 50mm No. 1.000 0.00


L008 Plumber Hour 0.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

R009 110 dia. Pvc(type 600) laid in 350 x 150mm thick 1:3:6(25mm) concrete upto
600mm depth of trench. Rate to include excavation.

PER m

M308 Pipe PVC 110mm type 600 m 1.000 0.00


M010 Cement 50 Kg. 0.420 0.00
M007 Sand Cu.m. 0.045 0.00
M005 Metal 25mm Cu.m. 0.080 0.00
L004 Mason Hour 0.030 0.00
L011 Unskilled labour day 0.400 0.00
L018 Plumber day 0.030 0.00
ALLOW FOR ERASE PART ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
R DRAINLAYER

R010 110 dia. Pvc(type 600) laid in 150mm thick 1:3:6(25mm) concrete upto
600mm to 1200mm depth of trench. Rate to include excavation.

PER m

M308 Pipe PVC 110mm type 600 m 1.000 0.00


M010 Cement 50 Kg. 0.420 0.00
M007 Sand Cu.m. 0.045 0.00
M005 Metal 25mm Cu.m. 0.080 0.00
L004 Mason Hour 0.030 0.00
L011 Unskilled labour day 0.530 0.00
L018 Plumber day 0.030 0.00

ALLOW FOR TRANSPORT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

R011 110 dia. Pvc(type 600) embedded in 150mm thick 1:3:6(25mm) over 1200mm to
1800mm depth of trench. Rate to include excavation.

PER m

M308 Pipe PVC 110mm type 600 m 1.000 0.00


M010 Cement 50 Kg. 0.420 0.00
M007 Sand Cu.m. 0.045 0.00
M005 Metal 25mm Cu.m. 0.080 0.00
L004 Mason Hour 0.030 0.00
L011 Unskilled labour day 0.700 0.00
L018 Plumber day 0.030 0.00

ALLOW FOR TRANSPORT ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
R DRAINLAYER

R012 Supplying and fixing of 100m x 100mm aluminium grating.

PER No.

M527 100mm x 100mm Aluminium grating No. 1.000 0.00


L001 Unskilled labour Hour 0.250 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
S MISCELLANEOUS

S001 Supplying of Bamboos

PER m

M445 Props (bamboo) 3 - 4m No. 0.350 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S002 Supplying of Bamboos and fixing in position.

PER m

M445 Props (bamboo) 3 - 4m No. 0.350 0.00


L001 Unskilled labour Hour 0.132 0.00

ALLOW FOR COIR, STRING ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S003 Removing of Bamboos and re-fixing with coir string.

PER m

L001 Unskilled labour Hour 0.180 0.00

ALLOW FOR COIR, STRING ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S MISCELLANEOUS

S004 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) an exsisting timber post with GI staples.

PER m

M039 Barbed wire Kg. 0.093 0.00


L002 Skilled labour Hour 0.030 0.00
L001 Unskilled labour Hour 0.030 0.00

ALLOW FOR STAPLES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S005 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) an exsisting concrete post .

PER m

M039 Barbed wire Kg. 0.093 0.00


L002 Skilled labour Hour 0.050 0.00
L001 Unskilled labour Hour 0.050 0.00

ALLOW FOR HOOK BOLTS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S MISCELLANEOUS

S006 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) in short lengths and timber posts with G.I. Staples.

PER m
M039 Barbed wire Kg. 0.093 0.00
L002 Skilled labour Hour 0.040 0.00
L001 Unskilled labour Hour 0.040 0.00

ALLOW FOR STAPLES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S007 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) in short lengths an concrete or steel posts with available hook bolts..

PER m

M039 Barbed wire Kg. 0.093 0.00


L002 Skilled labour Hour 0.060 0.00
L001 Unskilled labour Hour 0.060 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S008 Fixing of Barbed wire with G.I. Staples in existing timber posts(Barbed wire supplied
by Client.)

PER m

L002 Skilled labour Hour 0.030 0.00


L001 Unskilled labour Hour 0.030 0.00

ALLOW FOR STAPLES ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
S MISCELLANEOUS

S009 Fixing of barbed wire fence with hook bolts on concrete or steel posts (Barbed wire
supplied by Client.)

PER m

L002 Skilled labour Hour 0.050 0.00


L001 Unskilled labour Hour 0.050 0.00
ALLOW FOR HOOK BOLTS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S010 Straining and refixing of barbed wire on the fence with staples.

PER m

L002 Skilled labour Hour 0.040 0.00


L001 Unskilled labour Hour 0.040 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S011 Straining and refixing only the barbed wire on concrete or steel posts with available hook bolts.

PER m

L002 Skilled labour Hour 0.050 0.00


L001 Unskilled labour Hour 0.050 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S MISCELLANEOUS

S012 Construction and fixing of 100mm x 150mm and 1700mm high in 1:1
1/2:3 (20mm) cement concrete intermediate fence posts reinforced with 4 Nos. 6mm dia.
MS rods.

PER No.

M006 Metal 20mm Cu.m. 0.030 0.00


M007 Sand Cu.m. 0.015 0.00
M010 Cement 50 Kg. 0.255 0.00
M549 Tor Steel Kg. 1.800 0.00
M037 Binding wire Hour 0.228 0.00
L001 Unskilled labour Hour 3.000 0.00
L002 Skilled labour Hour 2.000 0.00

ALLOW FOR MOULDS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S013 Construction and fixing of 100mm x 150mm and 2285mm high in 1:1
1/2:3 (20mm) cement concrete intermediate fence posts reinforced with 4 Nos. 6mm dia.
MS rods.

PER No.

M006 Metal 20mm Cu.m. 0.036 0.00


M007 Sand Cu.m. 0.018 0.00
M010 Cement 50 Kg. 0.350 0.00
M549 Tor Steel Kg. 2.270 0.00
M037 Binding wire Kg. 0.340 0.00
L005 Black Smith Hour 1.000 0.00
L001 Unskilled labour Hour 3.000 0.00
L002 Skilled labour Hour 1.000 0.00

ALLOW FOR MOULDS

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S MISCELLANEOUS

Q014 Construction and fixing of end posts and struts as per drawing. Rate to include excavation
and base concrete.

PER No.

M004 Metal 40mm Cu.m. 0.200 0.00


M006 Metal 20mm Cu.m. 0.092 0.00
M007 Sand Cu.m. 0.170 0.00
M010 Cement 50 Kg. 1.790 0.00
M033 Mild Steel M/ton 0.017 0.00
M037 Binding wire Kg. 0.455 0.00
L005 Black Smith Hour 3.250 0.00
L002 Skilled labour Hour 5.500 0.00
L001 Unskilled labour day 1.500 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S015 Construction of barbed wire fence 5 strands with 4 points at 75mm centre. Including
corner posts, struts, intermediate post binding concrete as per drawing.

PER m

M004 Metal 40mm Cu.m. 0.009 0.00


M006 Metal 20mm Cu.m. 0.017 0.00
M007 Sand Cu.m. 0.014 0.00
M010 Cement 50 Kg. 0.175 0.00
M033 Mild Steel M/ton 0.003 0.00
M037 Binding wire Kg. 0.112 0.00
M039 Barbed wire Kg. 1.400 0.00
M529 G.I. Hook bolts No. 0.550 0.00
M530 Straining bolts 16mm dia. No. 0.165 0.00
L005 Black Smith Hour 1.100 0.00

ALLOW FOR MOULDS ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S MISCELLANEOUS

S016 Supplying and fixing of 12mm dia. 450mm long straining bolts.

PER No.

M531 1/2" M/S rods Kg. 0.00


L005 Black Smith Hour 0.00
L001 Unskilled labour day 0.00

ALLOW FOR NUTS, ETC.

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S017 Cleaning of lavatory or sewage block (without clearing rods).


PER P/Block

L020 Sanitary Labourer day 1.000 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S018 Cleaning of lavatory or sewage block (with contractor and clearing rods).

PER P/Block

L020 Sanitary Labourer day 0.00

SUB TOTAL 0.00


OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00

S MISCELLANEOUS
S MISCELLANEOUS
S MISCELLANEOUS
S MISCELLANEOUS
S MISCELLANEOUS
S MISCELLANEOUS
S MISCELLANEOUS
S MISCELLANEOUS
S MISCELLANEOUS
tower bolts for doors
es with brass screws.
ges with brass screws.
ning and smoothing
A - DEMOLISHER

A008 Removal of iron asbestos aluminium corrugated sheets from roofs or


wall from a single storey building and stacked

PER Sq.m.

L001 Unskilled labour 0.300 hour @


L 002 Skilled labour 0.300 hour @
ALLOW FOR SCAFFOLDING

SUB TOTAL
OVER HEAD & PROFITS 25.00%
TOTAL

A009 Removal of corrugated iron asbestos aluminium sheets from roofs


or walls of two storeyed buildings and stacked.

PER Sq.m.

L001 Unskilled labour 0.400 hour @


L002 Skilled labour 0.350 hour @
ALLOW FOR SCAFFOLDING

SUB TOTAL
OVER HEAD & PROFITS 25.00%
TOAL

A010 Removal of corrugated iron luminium asbestos sheets from roof or


walls of 3 storeyed buildings.

PER Sq.m.

L001 Unskilled labour 0.500 hour @


L002 Skilled labour 0.200 hour @
ALLOW FOR SCAFFOLDING

SUB TOTAL
OVER HEAD & PROFITS 25.00%
TOTAL

Anda mungkin juga menyukai