Anda di halaman 1dari 4

LABORATORIUMMETALURGI

MATERIALDAN METALURGI TEKNIK


tr
\ \
JURUSAN TEKNIK MATERIAL DAN METALURGI FTI - ITS \ \
Kampus ITS Sukolilo, Surabaya 601L1 -\-
Telp/Fax:031-5943645,5997026 MATERTAL&METALURGT
e-mail : material@its.ac.id

2l Aprilz}l7
LAPORAN HASIL PENGUJIAN

Laporan No. : 12 I/FTI-MT lLBllV 12017

Dibuat Untuk : PT. SHTVA SAKTI STEEL


Ciujung Serang - Banten

Untuk Proyek : Proyek Tol Batang - Semarang Seksi 4 dan 5


BSTR 4 - 5 (Kendal, Semarang)

Nama Barang : Baja Tulangan Sirip : D. 10 mm, D. 13 mm, D. 16 mm,


D. 19 mm, D. 22 mmr l). 25 mm,I). 32 mm (Shiva)

Jenis Pengujian : Uji Tarik Material dan Bending

Alat Yang Dipergunakan : - Mesin Uji Universal "GOTECH", Kapasitas 50 Ton


- Mesin Uji Universal "WOLPERT", Kapasitas 30 Ton

Standard Pengujian : SNI 07 * 2052 - 2A02


Standard Spesimen : S}.I{ 07 -2052*2442
Standard Mutu : SNI07 -2052-2002 (Terlampir)
Hasil Penryiian :

A. Uii TarikMaterial
No. ,w L wlL De CSA (mm') Yield Tensile Elonga-
Spes. (gram) (mm) (kglm) (mm) Strength Strenprth tion
Ao A1
(ksf/mm2) (ksf/mm') ( o/o\

1. Baja Tulangan Sirip D. 10 mm (Shiva)

I 140,40 234 0,600 9,87 76,51 78.54 62,58 71,67 16,26

2 136,40 233 0,585 9,75 74,66 78,54 53,23 68,56 16,89

a 78,54 63,88 72,97 18,51


J 138,80 232 0,598 9,85 76,20

Keterangan : W: Berat, L : Panjang, De : Diameter efektil CSA: Luas Penampang

ffaf I dari3 fiaf


${s,t tI: g eny"W frerrda* qr*an. eo$Itfi.'{tlrug. E itle'{illan.
LABORATORIUM M ETALURGI
JURUSAT{ TEl(T{tK MATERIAL DAil METATURGI ITS

No. w L w/L De CSA (mm') Yield Tensild Elonga-


Spes. (Sram) (mm) (kglm) (mm) Strength Strength tion
Ar
A.o
(ksf/mm') (ksf/mm2) (%\
Z.Baja Tulangan Sirip D. 13 mm (Shiva)

1 268,20 267 1,004 12,77 128,08 132,70 47,34 61,02 21,56

2 266,44 26s 1,005 12,77 128,08 132,74 47,65 60,86 21,04

J 268,40 266 1,009 L2,80 128,68 132,74 46,88 60,56 20,71

3. Baja Tulangan Sirip D. 16 mm (Shiva)

1 438,60 290 1,512 15,67 192,85 201,14 48,17 62,88 20,84

2 435,20 288 1,51I 15,66 192,61 201,10 46,91 62,37 21,21

J 44l,AA 289 1,526 15,74 194,58 201,10 47,16 60,09 20,48

4.Baja Tulangan Sirip D. 19 mm (Shiva)

I 679,00 319 2,128 18,59 771,42 283,50 54,32 67,98 17,97')

2 668,20 316 2,114 18,52 269,38 283,50 47,84 62,59 18,20

J 705,00 317 ) ))a 18,99 283,23 283,50 47.12 63,13 19,99

5. Baja Tulangan Sirip D. 22 mm (Shiva)

1 1399,60 477 2,934 21,82 373,94 380,10 40,07 54,10 23,87

2 1408,60 479 2,941 21,85 374,97 380,10 47,78 64,59 17,31

J 1400,40 474 2,954 21,90 376,68 380,10 48,34 64,79 16,45

6. Baja Tulangan Sirip D. 25 mm (Shiva)

I 1829,00 497 3,680 24,44 469,13 490,94 49,67 59,03 77,42

2 1850,80 s02 3,687 24,46 469,90 490,90 49,23 59,11 20,39

J 1842,20 495 7 1)) 24,58 474,52 490,94 45,83 58,90 20,30

7 . Baja Tulangan Sirip D. 32 mm (Shiva)


!

1 3262,04 s33 6,120 31,52 780,30 804,20 45,59 60,83 28,36

2 3304,60 530 6,235 31,81 794,23 804,20 48,72 63,83 25,&2

3 3307,80 s34 6,194 31,71 789,74 9a4,20 52,69 68,83 35,50

Keterangan: W: Berat, L: Panjang, De: Diameter efektil CSA: Lur ryfK+ar$pF+s-


*): patah di luar giuge length (L6)
,fr,fSBq',drd
Lap. $ro. rul/f( I fl{f{lffi Wffihffi
Ifi tti']ff iJ"
fiaI

F&&f+
t
#flH""t
-a'*,,
JURUSAf{ TEKNIK MATERIAT DAl{ METATURGI ITS

B. Uii Bendi
No. Nama BarangA(ode Sudut Bending Keterangan

I Baja Tulangan Sirip D. 10 mm (Shiva) 180. Baik/Acc


I 800 Baik/Acc
1 800 BaiklAcc
2. Baja Tulangan Sirip D. 13 mm (Shiva) 1800 Baik/Acc
1 800 Baik/Acc
I 800 Bailc/Acc
3. Baja Tulangan Sirip D. 16 mm (Shiva) I 800 Baik/Acc
180" Baik/Acc
I 800 Baik/Acc
4. Baja Tulangan Sirip D. 19 mm (Shiva) 180" Baik/Acc
1800 Baik/Acc
I 800 Baik/Acc
5. Baja Tulangan Sirip D. 22 mm (Shiva) 1800 Baik/Acc
1 800 Baik/Acc
I 80" BaiklAcc
6. Baja Tulangan Sirip D.25 mm (Shiva) 1800 Baik/Acc
180" BaiklAcc
1800 Baik/Acc
7. Baja Tulangan Sirip D.32 mm (Shiva) 1 800 Baik/Acc
1800 Baik/Acc
I 800 Baik/Acc

Lap, *b. 1U/rTl-gy$/L(8fi"t//2a1r, htaf i cfari3 liat


gtail 0 engu,iian gladaiqnfrnn eonlgfr. Uang. Difruifran

I
LABORATORIUM M ETALURGI
JURUSAN TEKT{II( MATERIAT DAf{ METAIURGI ITS

LAMPIRAN : STANDARD MUTU

SNI (Standard Nasional Indonesia) 07 - 2052 - 20A2 : Baja Tulangan Beton


Ukuran Tula n Strip dan Polos
No, Diameter Toleransi Diameter Berat Nominal Toleransi Berat
(mm) (mm) (ko/m) Per Batano (%)
1. D. 10 + 0,4 0,617 +6
2_ D. 13 + 0,4 1,040 +6
3. D. 16 t 0.5 1,580 r5
4 D. 19 + 0,s 2,230 r5
5. D.22 r 0.5 2,980 r5
6. D.25 r 0,5 3,850 t5
7. D.29 t 0,6 5,180 x4
B. D.32 + 0,0 6,310 +4
9. D.36 i 0,8 7,990 t4
1 P.8 + 0,4 0,395 4:7
2 P. 10 t 0,4 0,617 r6
3 P.12 + 0,4 0,888 +6

TABEL 6. SIFAT MEKANIS


Kelas Baja Nomor UjiTarik Uji Lengkung
Tulangan Batang Uji Batas Ulur, Kuat Tarik, Regang Sudut Diameter
Kgf/mm2 Kgf/mq2 Min Lengkung Pelengkung
(N/mm') 1N/mm") (o/o\
No.2 Minimum 24 Minimum 39 20
BjTP 24
No.3 (235) (380) 24
180' 3xd
BjTP 30
No. 2 Minimum 30 Minimum 45 18
1800
d<16=3xd
No.3 (2e5) $44) 20 d>16=4xd
BjTS 30
No. 2 Minimum 30 Minimum 45 16
180"
d<16=3xd
No. 3 (2s5) (440) 18 d>16=4xd
No.2 18 d<16=3xd
Minimum 35 Minimum 50
BjTS 35 No. 3 20 180. 16<d<40=4xd
(34s) (4e0)
d>40=5xd
No. 2 Minimum 40 Minimum 57 16
BjTS 40
No. 3 (3e0) (560) 18
180" 5xd
BjTS 50
No.2 Minimum 50 Minimum 63 12
90"
d<25=5xd
No.3 (4s0) (620) 14 d>25=6xd
Catatan :

1. Hasil lengkung tidak boleh retak pada sisi luar lengkungan.


2. Untuk baja tulangan sirip ) S.32 nilai renggang dikurangi 2%.

fih,tit ?en*u,iian freilaaafian eomfr. Uan* EieUftan

Anda mungkin juga menyukai