Anda di halaman 1dari 1
PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS Annex. 1 (Schedul ) site for Project 1. Site SCHEDULES The site of project highway is a section of National Highway -17 (New NH-66), which starts from Km 241.300 of NH-17(New NH 66) and ends at km 281.300 of NH 17. The existing road has two lane undivided carriogeway. The land, carriageway and structures comprising the Site are described below 2 land The Site Uf Ue Projeut Lu si. Chainage (in Km) Total Remarks No. Trom Te. ROW (m) as per PWD fl 2414300 2814300 30.00" Note: Except at realignment locations Carriagewav ‘The present carriageway of the project highway Is a 2 Lane undivided carriageway in its entire carriageway. 4. Major Bridges ‘The Site includes the following Major Bridges: ae i if | Total beck «rn | Etsting | reanenment | gy TPES. |totation | wth wd Chainage | °°" superstructure 1_| 2424300 8x105 _ Arch Open 12.00 258+850_| 5216.70 slab Oper 6a 3 | aa14sn0_| 418 50 Slab nen’ 6. eae RCC T-Beam and 4 |aveae | axars oe Open er 5. Railway Over/Under Bridges The Site includes the following Rail Over Bridges Existing Chainage eae | No oh aca aa S.No. Tian | Type racture | SO.0E Tool Deck With (m) wu our lane with paved shoulder n the state ot wanaras Under NOP AV om yt Anlty He hablitation and up-gradation of NH-6 (Estwhile 17) from km 241/300 to Km 281/300 (Arawall~ Kante section] to na

Anda mungkin juga menyukai