PUBLIC PRIVATE PARTNERSHIP IN HYBRID ANNUITY PROJECTS
Annex. 1 (Schedul
)
site for Project
1. Site
SCHEDULES
The site of project highway is a section of National Highway -17 (New NH-66), which
starts from Km 241.300 of NH-17(New NH 66) and ends at km 281.300 of NH 17. The
existing road has two lane undivided carriogeway. The land, carriageway and structures
comprising the Site are described below
2 land
The Site Uf Ue Projeut Lu
si. Chainage (in Km) Total Remarks
No. Trom Te. ROW (m) as per PWD
fl 2414300 2814300 30.00"
Note: Except at realignment locations
Carriagewav
‘The present carriageway of the project highway Is a 2 Lane undivided carriageway in its
entire carriageway.
4. Major Bridges
‘The Site includes the following Major Bridges:
ae i if | Total beck
«rn | Etsting | reanenment | gy TPES. |totation | wth wd
Chainage | °°" superstructure
1_| 2424300 8x105 _ Arch Open 12.00
258+850_| 5216.70 slab Oper 6a
3 | aa14sn0_| 418 50 Slab nen’ 6.
eae RCC T-Beam and
4 |aveae | axars oe Open er
5. Railway Over/Under Bridges
The Site includes the following Rail Over Bridges
Existing Chainage eae | No oh aca aa
S.No. Tian | Type racture | SO.0E Tool Deck With (m)
wu
our lane with paved shoulder n the state ot wanaras
Under NOP AV om yt Anlty He
hablitation and up-gradation of NH-6 (Estwhile 17) from km 241/300 to Km 281/300 (Arawall~ Kante section] to
na