Anda di halaman 1dari 11

SPESIFIKASI UMUM 2010 (REVISI 3)

BAB VII
SPESIFIKASI UMUM

DAFTAR ISI
Halaman
DIVISI I UMUM

SEKSI 1.1 RINGKASAN PEKERJAAN


Pasal 1.1.1 Lingkup Pekerjaan ................................................................................ 1-1
1.1.2 Klasifikasi Pekerjaan Konstruksi ........................................................... 1-2
1.1.3 Ketentuan Kajian Teknis ......................................................................... 1-5
1.1.4 Urutan Pekerjaan ................................................................................. 1-6
1.1.5 Pembayaran Pekerjaan ............................................................................. 1-7

SEKSI 1.2 MOBILISASI


Pasal 1.2.1 Umum .................................................................................................. 1-8
1.2.2 Program Mobilisasi ............................................................................... 1-10
1.2.3 Pengukuran dan Pembayaran ................................................................ 1-11

SEKSI 1.3 KANTOR LAPANGAN DAN FASILITASNYA


Pasal 1.3.1 Umum .................................................................................................. 1-13
1.3.2 Kantor Penyedia Jasa dan Fasilitasnya ................................................... 1-14
1.3.3 Bengkel dan Gudang Penyedia Jasa........................................................ 1-15
1.3.4 Kantor dan Akomodasi untuk Direksi Pekerjaan .................................... 1-15
1.3.5 Pengukuran dan Pembayaran ................................................................ 1-15

SEKSI 1.4 FASILITAS DAN PELAYANAN PENGUJIAN


Pasal 1.4.1 Umum .................................................................................................. 1-16
1.4.2 Fasilitas Laboratorium dan Pengujian ................................................... 1-17
1.4.3 Prosedur Pelaksanaan .......................................................................... 1-18
1.4.4 Pengukuran dan Pembayaran ................................................................ 1-19

SEKSI 1.5 TRANSPORTASI DAN PENANGANAN


Pasal 1.5.1 Umum .................................................................................................. 1-20
1.5.2 Ketentuan Pra (Persiapan) Pelaksanaan ................................................ 1-20
1.5.3 Pelaksanaan ......................................................................................... 1-21

SEKSI 1.6 PEMBAYARAN SERTIFIKAT BULANAN


Pasal 1.6.1 Umum .................................................................................................. 1-22
1.6.2 Penyiapan dan Penyerahan ................................................................... 1-23
1.6.3 Pengesahan oleh Direksi Pekerjaan ....................................................... 1-24

SEKSI 1.7 PEMBAYARAN SEMENTARA (PROVISIONAL SUMS)


(Tidak ada Pembayaran Sementara di dalam Kontrak ini)

SEKSI 1.8 MANAJEMEN DAN KESELAMATAN LALU LINTAS


Pasal 1.8.1 Umum .................................................................................................. 1-27
1.8.2 Rencana Manajemen dan Keselamatan Lalu Lintas ................................ 1-28
1.8.3 Uraian Perlengkapan Minimal Jalan Sementara .................................... 1-32
1.8.4 Pekerjaan Jalan atau Jembatan Sementara ............................................. 1-35
1.8.5 Pemeliharaan Untuk Keselamatan Lalu Lintas ....................................... 1-36
1.8.6 Pengukuran dan Pembayaran.................................................................. 1-36

i
SPESIFIKASI UMUM 2010 (REVISI 3)

SEKSI 1.9 KAJIAN TEKNIS LAPANGAN


Pasal 1.9.1 Umum .................................................................................................. 1-38
1.9.2 Pekerjaan Survei Lapangan Untuk Peninjauan Kembali Rancangan ...... 1-38
1.9.3 Pekerjaan Survei Pelaksanaan Rutin ...................................................... 1-40
1.9.4 Penetapan Titik Pengukuran ............................................................... 1-41
1.9.5 Tenaga Ahli Rekayasa Lapangan ....................................................... 1-42
1.9.6 Pengendalian Mutu Bahan .................................................................... 1-42
1.9.7 Dasar Pembayaran ............................................................................... 1-42

SEKSI 1.10 STANDAR RUJUKAN


Pasal 1.10.1 Umum .................................................................................................. 1-44
1.10.2 Jaminan Mutu ....................................................................................... 1-44

SEKSI 1.11 BAHAN DAN PENYIMPANAN


Pasal 1.11.1 Umum .................................................................................................. 1-50
1.11.2 Pengadaan Bahan ................................................................................. 1-51
1.11.3 Penyimpanan Bahan ............................................................................. 1-51
1.11.4 Pembayaran ......................................................................................... 1-52

SEKSI 1.12 JADWAL PELAKSANAAN


Pasal 1.12.1 Umum .................................................................................................. 1-53
1.12.2 Detil Jadwal Pelaksanaan ..................................................................... 1-53
1.12.3 Revisi Jadwal Pelaksanaan ................................................................... 1-54
1.12.4 Rapat Pembuktian Keterlambatan (Show Cause Meeting) ...................... 1-55

SEKSI 1.13 PROSEDUR PERINTAH PERUBAHAN


Pasal 1.13.1 Umum .................................................................................................. 1-56
1.13.2 Prosedur Awal Perintah Perubahan ...................................................... 1-57
1.13.3 Pelaksanaan Perintah Perubahan ........................................................... 1-57
1.13.4 Pelaksanaan Adendum ........................................................................... 1-58

SEKSI 1.14 PENUTUPAN KONTRAK


Pasal 1.14.1 Umum .................................................................................................. 1-59
1.14.2 Berita Acara Penyelesaian Akhir ........................................................... 1-59
1.14.3 Pengajuan Berita Acara Pembayaran Akhir ........................................... 1-60
1.14.4 Amandemen Penutup ............................................................................ 1-60

SEKSI 1.15 DOKUMEN REKAMAN KEGIATAN


Pasal 1.15.1 Umum .................................................................................................. 1-61
1.15.2 Dokumen Rekaman Kegiatan ............................................................... 1-61
1.15.3 Bahan Rekaman Kegiatan .................................................................... 1-62
1.15.4 Pemeliharaan Dokumen Pelaksanaan Kegiatan ...................................... 1-62
1.15.5 Dokumen Rekaman Akhir ..................................................................... 1-63

SEKSI 1.16 PEKERJAAN PEMBERSIHAN


Pasal 1.16.1 Umum .................................................................................................. 1-65
1.16.2 Pembersihan Selama Pelaksanaan ......................................................... 1-65
1.16.3 Pembersihan Akhir ................................................................................ 1-66
1.16.4 Dasar Pembayaran ............................................................................... 1-66

SEKSI 1.17 PENGAMANAN LINGKUNGAN HIDUP


Pasal 1.17.1 Umum ................................................................................................. 1-67
1.17.2 Upaya Pengelolaan Lingkungan (UKL) ................................................. 1-69
1.17.3 Implementasi Studi Lingkungan Hidup Yang Diperlukan........................ 1-74

ii
SPESIFIKASI UMUM 2010 (REVISI 3)

1.17.4 Laporan Bulanan................................................................................... 1-75


1.17.5 Dasar Pembayaran................................................................................. 1-76

SEKSI 1.18 RELOKASI UTILITAS DAN PELAYANAN YANG ADA


(Kecuali disebutkan lain dalam Spesifikasi Khusus maka Relokasi
Utilitas dan Pelayanan yang ada tidak termasuk dalam kontrak ini)

SEKSI 1.19 KESELAMATAN DAN KESEHATAN KERJA


Pasal 1.19.1 Umum .................................................................................................. 1-79
1.19.2 Sistem Manajemen K3 Konstruksi......................................................... 1-79
1.19.3 K3 Kantor Lapangan dan Fasilitasnya.................................................... 1-80
1.19.4 Ketentuan Bekerja Pada Tempat Tinggi.................................................. 1-82
1.19.5 Elektrikal............................................................................................... 1-84
1.19.6 Material dan Kimia Berbahaya............................................................... 1-85
1.19.7 Penggunaan Alat-Alat Bermesin............................................................. 1-87
1.19.8 Pengukuran dan Pembayaran.................................................................. 1-90

SEKSI 1.20 PENGUJIAN PENGEBORAN


Pasal 1.20.1 Umum .................................................................................................. 1-91
1.20.2 Pengujian Bor (Lubang)......................................................................... 1-91
1.20.3 Pengukuran dan Pembayaran ............................................................... 1-92

SEKSI 1.21 MANAJEMEN MUTU


Pasal 1.21.1 Umum .................................................................................................. 1-93
1.21.2 Rencana Pengendalian Mutu (QC Plan).................................................. 1-94
1.21.3 Rencana Jaminan Mutu ......................................................................... 1-99
1.21.4 Titik-Titik Tunggu (Holding Points)....................................................... 1-99
1.21.5 Pengujian-Pengujian Untuk Penyelesaian................................................ 1-100
1.21.6 Audit Mutu ........................................................................................... 1-100
1.21.7 Laporan Ketidak-Sesuaian (NCR).......................................................... 1-101
1.21.8 Banding .................................................................................................. 1-102
1.21.9 Pembayaran .......................................................................................... 1-102

DIVISI 2 DRAINASE

SEKSI 2.1 SELOKAN DAN SALURAN AIR


Pasal 2.1.1 Umum .................................................................................................. 2-1
2.1.2 Bahan dan Jaminan Mutu ...................................................................... 2-3
2.1.3 Pelaksanaan ......................................................................................... 2-3
2.1.4 Pengukuran dan Pembayaran ................................................................ 2-4

SEKSI 2.2 PASANGAN BATU DENGAN MORTAR


Pasal 2.2.1 Umum .................................................................................................. 2-6
2.2.2 Bahan dan Jaminan Mutu ...................................................................... 2-8
2.2.3 Pelaksanaan ......................................................................................... 2-8
2.2.4 Pengukuran dan Pembayaran ................................................................ 2-10

SEKSI 2.3 GORONG-GORONG DAN DRAINASE BETON


Pasal 2.3.1 Umum ................................................................................................. 2-11
2.3.2 Bahan .................................................................................................. 2-13
2.3.3 Pelaksanaan ......................................................................................... 2-14
2.3.4 Pengukuran dan Pembayaran ................................................................ 2-17

iii
SPESIFIKASI UMUM 2010 (REVISI 3)

SEKSI 2.4 DRAINASE POROUS


Pasal 2.4.1 Umum .................................................................................................. 2-19
2.4.2 Bahan .................................................................................................. 2-21
2.4.3 Pemasangan Drainase Porous ............................................................... 2-23
2.4.4 Pengukuran dan Pembayaran ................................................................ 2-25

DIVISI 3 PEKERJAAN TANAH

SEKSI 3.1 GALIAN


Pasal 3.1.1 Umum .................................................................................................. 3-1
3.1.2 Prosedur Penggalian ............................................................................. 3-7
3.1.3 Pengukuran dan Pembayaran ................................................................ 3-13

SEKSI 3.2 TIMBUNAN


Pasal 3.2.1 Umum .................................................................................................. 3-17
3.2.2 Bahan .................................................................................................. 3-21
3.2.3 Penghamparan dan Pemadatan Timbunan ............................................. 3-23
3.2.4 Jaminan Mutu ............................................................................... 3-26
3.2.5 Pengukuran dan Pembayaran ................................................................ 3-27

SEKSI 3.3 PENYIAPAN BADAN JALAN


Pasal 3.3.1 Umum .................................................................................................. 3-30
3.3.2 Bahan .................................................................................................. 3-32
3.3.3 Pelaksanaan dari Penyiapan Badan Jalan ............................................... 3-32
3.3.4 Pengukuran dan Pembayaran ................................................................ 3-33

SEKSI 3.4 PEMBERSIHAN, PENGUPASAN DAN PEMOTONGAN POHON


Pasal 3.4.1 Umum .................................................................................................. 3-34
3.4.2 Pelaksanaan ......................................................................................... 3-35
3.4.3 Pengukuran dan Pembayaran ............................................................... 3-36

SEKSI 3.5 GEOTEKSTIL


Pasal 3.5.1 Umum .................................................................................................. 3-38
3.5.2 Bahan .................................................................................................. 3-40
3.5.3 Pelaksanaan ........................................................................................ 3-44
3.5.4 Pengendalian Mutu ........................................................................... 3-47
3.5.5 Pengukuran dan Pembayaran .............................................................. 3-48

DIVISI 4 PELEBARAN PERKERASAN DAN BAHU JALAN

SEKSI 4.1 PELEBARAN PERKERASAN


Pasal 4.1.1 Umum .................................................................................................. 4-1
4.1.2 Bahan .................................................................................................. 4-2
4.1.3 Persiapan untuk Pelebaran Perkerasan .............................................. 4-2
4.1.4 Penghamparan dan Pemadatan Bahan Pelebaran Perkerasan ................. 4-4
4.1.5 Pengukuran dan Pembayaran ............................................................... 4-4

SEKSI 4.2 BAHU JALAN


Pasal 4.2.1 Umum .................................................................................................. 4-5
4.2.2 Bahan ................................................................................................... 4-7
4.2.3 Pelaksanaan dan Pemadatan ................................................................. 4-7
4.2.4 Pengukuran dan Pembayaran ................................................................ 4-7

iv
SPESIFIKASI UMUM 2010 (REVISI 3)

DIVISI 5 PERKERASAN BERBUTIR DAN PERKERASAN


BETON SEMEN

SEKSI 5.1 LAPIS PONDASI AGREGAT


Pasal 5.1.1 Umum .................................................................................................. 5-1
5.1.2 Bahan ................................................................................................... 5-4
5.1.3 Penghamparan dan Pemadatan Lapis Pondasi Agregat .......................... 5-5
5.1.4 Pengukuran dan Pembayaran ................................................................ 5-7

SEKSI 5.2 PERKERASAN BERBUTIR TANPA PENUTUP ASPAL


Pasal 5.2.1 Umum .................................................................................................. 5-9
5.2.2 Bahan ................................................................................................... 5-11
5.2.3 Penghamparan dan Pemadatan Perkerasan Berbutir Tanpa Penutup
Aspal ........................................................................................ 5-12
5.2.4 Pengujian .............................................................................................. 5-14
5.2.5 Pengukuran dan Pembayaran ................................................................ 5-15

SEKSI 5.3 PERKERASAN BETON SEMEN


Pasal 5.3.1 Umum .................................................................................................. 5-17
5.3.2 Bahan ...................................................................................................... 5-19
5.3.3 Peralatan ................................................................................................ 5-24
5.3.4 Sambungan (Joints)................................................................................... 5-25
5.3.5 Pelaksanaan ......................................................................................... 5-29
5.3.6 Panjang Percobaan ............................................................................... 5-35
5.3.7 Perlindungan Terhadap Perkerasan ........................................................ 5-36
5.3.8 Pembukaan Terhadap Lalu Lintas ......................................................... 5-36
5.3.9 Toleransi Ketebalan Perkerasan ............................................................ 5-37
5.3.10 Pengukuran dan Pembayaran ................................................................ 5-37

SEKSI 5.4 LAPIS PONDASI SEMEN TANAH


Pasal 5.4.1 Umum .................................................................................................. 5-40
5.4.2 Bahan ................................................................................................... 5-42
5.4.3 Campuran ............................................................................................. 5-46
5.4.4 Percobaan Lapangan (Field Trials) ....................................................... 5-48
5.4.5 Penghamparan dan Pencampuran .......................................................... 5-51
5.4.6 Pengendalian Mutu ................................................................................ 5-57
5.4.7 Pengukuran dan Pembayaran ................................................................ 5-61

SEKSI 5.5 LAPIS PONDASI AGREGAT SEMEN (CTB dan CTSB)


Pasal 5.5.1 Umum .................................................................................................. 5-64
5.5.2 Bahan ................................................................................................... 5-66
5.5.3 Campuran dan Takaran .......................................................................... 5-67
5.5.4 Percobaan Lapangan (Field Trials) ....................................................... 5-68
5.5.5 Penghamparan dan Pencampuran ............................................... 5-68
5.5.6 Penghamparan dan Pemadatan ............................................................. 5-68
5.5.7 Pengendalian Mutu .......................................................... 5-69
5.5.7 Pengukuran dan Pembayaran ................................................................ 5-70

DIVISI 6 PERKERASAN ASPAL

SEKSI 6.1 LAPIS RESAP PENGIKAT DAN LAPIS PEREKAT


Pasal 6.1.1 Umum ................................................................................................... 6-1

v
SPESIFIKASI UMUM 2010 (REVISI 3)

6.1.2 Bahan ................................................................................................... 6-3


6.1.3 Peralatan ............................................................................................... 6-5
6.1.4 Pelaksanaan Pekerjaan .......................................................................... 6-8
6.1.5 Pemeliharaan dan Pembukaan Bagi Lalu Lintas..................................... 6-11
6.1.6 Pengendalian Mutu dan Pengujian Lapangan ......................................... 6-12
6.1.7 Pengukuran dan Pembayaran ................................................................ 6-12

SEKSI 6.2 LABURAN ASPAL SATU LAPIS (BURTU) DAN LABURAN


ASPAL DUA LAPIS (BURDA)
Pasal 6.2.1 Umum .................................................................................................. 6-15
6.2.2 Bahan ................................................................................................... 6-18
6.2.3 Jenis Pekerjaan Pelaburan ..................................................................... 6-21
6.2.4 Peralatan .............................................................................................. 6-21
6.2.5 Pelaksanaan Pekerjaan .......................................................................... 6-22
6.2.6 Pengendalian Mutu dan Pengujian Lapangan ......................................... 6-25
6.2.7 Pengukuran dan Pembayaran ................................................................ 6-26

SEKSI 6.3 CAMPURAN BERASPAL PANAS


Pasal 6.3.1 Umum .................................................................................................. 6-28
6.3.2 Bahan ................................................................................................... 6-35
6.3.3 Campuran ............................................................................................. 6-41
6.3.4 Ketentuan Instalasi Pencampur Aspal .................................................... 6-47
6.3.5 Pembuatan dan Produksi Campuran Aspal ........................................... 6-53
6.3.6 Penghamparan Campuran ..................................................................... 6-55
6.3.7 Pengendalian Mutu dan Pemeriksaan di Lapangan ................................. 6-59
6.3.8 Pengukuran dan Pembayaran ................................................................ 6-63

SEKSI 6.4 LASBUTAG DAN LATASBUSIR


(Tidak digunakan)

SEKSI 6.5 CAMPURAN ASPAL DINGIN


Pasal 6.5.1 Umum .................................................................................................. 6-68
6.5.2 Bahan .................................................................................................... 6-69
6.5.3 Campuran ............................................................................................ 6-71
6.5.4 Ketentuan Peralatan Pelaksanaan .......................................................... 6-72
6.5.5 Pembuatan Campuran ........................................................................... 6-73
6.5.6 Pemeraman dan Penyimpanan Campuran ............................................... 6-74
6.5.7 Penghamparan Campuran ...................................................................... 6-74
6.5.8 Pengukuran dan Pembayaran ................................................................ 6-75

SEKSI 6.6 LAPIS PENETRASI MACADAM


Pasal 6.6.1 Umum ................................................................................................... 6-77
6.6.2 Bahan ................................................................................................... 6-78
6.6.3 Kuantitas Agregat dan Aspal ................................................................. 6-79
6.6.4 Peralatan .............................................................................................. 6-80
6.6.5 Pelaksanaan .......................................................................................... 6-80
6.6.6 Pengendalian Mutu dan Pengujian di Lapangan ...................................... 6-83
6.6.7 Pengukuran dan Pembayaran ................................................................. 6-84

SEKSI 6.7 PEMELIHARAAN DENGAN LABURAN ASPAL


Pasal 6.7.1 Umum .................................................................................................. 6-86
6.7.2 Bahan ................................................................................................... 6-87
6.7.3 Kuantitas Agregat dan Aspal ................................................................. 6-88
6.7.4 Peralatan ............................................................................................... 6-88

vi
SPESIFIKASI UMUM 2010 (REVISI 3)

6.7.5 Pelaksanaan .......................................................................................... 6-88


6.7.6 Pengendalian dan Pengujian Mutu Lapangan ......................................... 6-89
6.7.7 Pengukuran dan Pembayaran ................................................................ 6-89

DIVISI 7 STRUKTUR

SEKSI 7.1 BETON


Pasal 7.1.1 Umum ................................................................................................. 7-1
7.1.2 Bahan .................................................................................................. 7-7
7.1.3 Pencampuran dan Penakaran ................................................................. 7-10
7.1.4 Pelaksanaan Pengecoran ....................................................................... 7-13
7.1.5 Pengerjaan Akhir ................................................................................... 7-17
7.1.6 Pengendalian Mutu di Lapangan ............................................................ 7-19
7.1.7 Pengukuran dan Pembayaran ................................................................ 7-23

SEKSI 7.2 BETON PRATEKAN


Pasal 7.2.1 Umum .................................................................................................. 7-26
7.2.2 Bahan ................................................................................................... 7-29
7.2.3 Pengujian ............................................................................................. 7-31
7.2.4 Pelaksanaan Unit-Unit ........................................................................... 7-32
7.2.5 Metode Penegangan Sebelum Pengecoran (Pre-Tension) ...................... 7-35
7.2.6 Metode Penegangan Setelah Pengecoran (Post-Tension) ........................ 7-39
7.2.7 Penanganan, Pengangkutan dan Penyimpanan Unit-Unit Beton
Pracetak ................................................................................................ 7-43
7.2.8 Pelaksanaan Balok Beton Pratekan Segmental ........................................ 7-44
7.2.9 Pemasangan Unit-Unit Beton Pratekan .................................................. 7-46
7.2.10 Pengukuran dan Pembayaran ................................................................ 7-47

SEKSI 7.3 BAJA TULANGAN


Pasal 7.3.1 Umum .................................................................................................. 7-50
7.3.2 Bahan ................................................................................................... 7-53
7.3.3 Pembuatan dan Penempatan .................................................................. 7-54
7.3.4 Pengukuran dan Pembayaran ................................................................ 7-55

SEKSI 7.4 BAJA STRUKTUR


Pasal 7.4.1 Umum .................................................................................................. 7-57
7.4.2 Bahan ................................................................................................... 7-61
7.4.3 Kecakapan Kerja ................................................................................... 7-63
7.4.4 Pelaksanaan .......................................................................................... 7-65
7.4.5 Pengukuran dan Pembayaran ................................................................ 7-68

SEKSI 7.5 PEMASANGAN JEMBATAN BAJA STANDAR


Pasal 7.5.1 Umum .................................................................................................. 7-71
7.5.2 Bahan ................................................................................................... 7-73
7.5.3 Pelaksanaan .......................................................................................... 7-76
7.5.4 Pengukuran dan Pembayaran ................................................................. 7-78

SEKSI 7.6 PONDASI TIANG


Pasal 7.6.1 Umum .................................................................................................. 7-81
7.6.2 Bahan ................................................................................................... 7-85
7.6.3 Turap .................................................................................................... 7-86
7.6.4 Tiang Pancang Kayu ............................................................................. 7-88
7.6.5 Tiang Pancang Beton Pracetak .............................................................. 7-89

vii
SPESIFIKASI UMUM 2010 (REVISI 3)

7.6.6 Tiang Pancang Baja Struktur ................................................................. 7-92


7.6.7 Pemancangan Tiang .............................................................................. 7-93
7.6.8 Tiang Bor Beton Cor Langsung di Tempat ............................................ 7-97
7.6.9 Pengukuran dan Pembayaran ................................................................ 7-98

SEKSI 7.7 PONDASI SUMURAN


Pasal 7.7.1 Umum .................................................................................................. 7-104
7.7.2 Bahan .................................................................................................. 7-105
7.7.3 Pelaksanaan ......................................................................................... 7-105
7.7.4 Pengukuran dan Pembayaran ................................................................ 7-107

SEKSI 7.8 ADUKAN SEMEN


Pasal 7.8.1 Umum .................................................................................................. 7-109
7.8.2 Bahan dan Campuran ............................................................................ 7-109
7.8.3 Pencampuran dan Pemasangan .............................................................. 7-110
7.8.4 Dasar Pembayaran ............................................................................... 7-111

SEKSI 7.9 PASANGAN BATU


Pasal 7.9.1 Umum .................................................................................................. 7-112
7.9.2 Bahan ................................................................................................... 7-113
7.9.3 Pelaksanaan Pasangan Batu .................................................................. 7-113
7.9.4 Pengukuran dan Pembayaran ................................................................ 7-115

SEKSI 7.10 PASANGAN BATU KOSONG DAN BRONJONG


Pasal 7.10.1 Umum .................................................................................................. 7-117
7.10.2 Bahan ................................................................................................... 7-118
7.10.3 Pelaksanaan .......................................................................................... 7-119
7.10.4 Pengukuran dan Pembayaran ................................................................ 7-120

SEKSI 7.11 SAMBUNGAN EKSPANSI (EXPANSION JOINT)


Pasal 7.11.1 Umum .................................................................................................. 7-122
7.11.2 Bahan ................................................................................................... 7-123
7.11.3 Pelaksanaan ......................................................................................... 7-124
7.11.4 Pengukuran dan Pembayaran ................................................................ 7-125

SEKSI 7.12 PERLETAKAN (BEARING)


Pasal 7.12.1 Umum ................................................................................................... 7-127
7.12.2 Bahan .................................................................................................. 7-133
7.12.3 Pemasangan .......................................................................................... 7-135
7.12.4 Pengukuran dan Pembayaran ................................................................ 7-137

SEKSI 7.13 SANDARAN (RAILING)


Pasal 7.13.1 Umum .................................................................................................. 7-139
7.13.2 Bahan .................................................................................................. 7-140
7.13.3 Peralatan .............................................................................................. 7-141
7.13.4 Pelaksanaan .......................................................................................... 7-141
7.13.5 Pengukuran dan Pembayaran ................................................................ 7-142

SEKSI 7.14 PAPAN NAMA JEMBATAN


Pasal 7.14.1 Umum .................................................................................................. 7-143
7.14.2 Bahan ................................................................................................... 7-143
7.14.3 Peralatan .............................................................................................. 7-143
7.14.4 Pengukuran dan Pembayaran ................................................................ 7-143

viii
SPESIFIKASI UMUM 2010 (REVISI 3)

SEKSI 7.15 PEMBONGKARAN STRUKTUR


Pasal 7.15.1 Umum .................................................................................................. 7-144
7.15.2 Prosedur Pembongkaran ....................................................................... 7-145
7.15.3 Pembuangan Bahan Bongkaran ............................................................. 7-145
7.15.4 Pengukuran dan Pembayaran ................................................................ 7-146

SEKSI 7.16 DRAINASE LANTAI JEMBATAN


Pasal 7.16.1 Umum .................................................................................................. 7-147
7.16.2 Bahan ................................................................................................... 7-148
7.16.3 Pelaksanaan .......................................................................................... 7-148
7.16.4 Pengukuran dan Pembayaran ................................................................ 7-149

DIVISI 8 PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

SEKSI 8.1 PENGEMBALIAN KONDISI PERKERASAN LAMA


Pasal 8.1.1 Umum ................................................................................................... 8-1
8.1.2 Bahan ................................................................................................... 8-4
8.1.3 Pelaksanaan .......................................................................................... 8-5
8.1.4 Pengukuran dan Pembayaran ................................................................. 8-10

SEKSI 8.2 PENGEMBALIAN KONDISI BAHU JALAN LAMA PADA


PERKERASAN BERPENUTUP ASPAL
Pasal 8.2.1 Umum .................................................................................................. 8-12
8.2.2 Bahan dan Pelaksanaan ........................................................................ 8-13
8.2.3 Pengukuran dan Pembayaran ................................................................ 8-14

SEKSI 8.3 PENGEMBALIAN KONDISI SELOKAN, SALURAN AIR,


GALIAN, TIMBUNAN DAN PENGHIJAUAN
Pasal 8.3.1 Umum .................................................................................................. 8-15
8.3.2 Bahan .................................................................................................. 8-16
8.3.3 Pelaksanaan ......................................................................................... 8-17
8.3.4 Pengukuran dan Pembayaran ................................................................ 8-22

SEKSI 8.4 PERLENGKAPAN JALAN DAN PENGATUR LALU LINTAS


Pasal 8.4.1 Umum .................................................................................................. 8-24
8.4.2 Bahan .................................................................................................. 8-28
8.4.3 Pelaksanaan ......................................................................................... 8-31
8.4.4 Pengukuran dan Pembayaran ............................................................... 8-45

SEKSI 8.5 PENGEMBALIAN KONDISI JEMBATAN


Pasal 8.5.1 Umum................................................................................................... 8-49
8.5.2 Cakupan Pekerjaan Pengembalian Kondisi ............................................ 8-52
8.5.3 Pengembalian Kondisi Komponen Beton ............................................... 8-53
8.5.4 Pengembalian Kondisi Komponen Kayu ................................................ 8-57
8.5.5 Pengembalian Kondisi Komponen Baja ................................................. 8-63
8.5.6 Pengukuran dan Pembayaran ................................................................ 8-71

DIVISI 9 PEKERJAAN HARIAN

SEKSI 9.1 PEKERJAAN HARIAN


Pasal 9.1.1 Umum .................................................................................................. 9-1
9.1.2 Bahan dan Peralatan ............................................................................. 9-2
9.1.3 Pelaksanaan Pekerjaan Harian .............................................................. 9-2

ix
SPESIFIKASI UMUM 2010 (REVISI 3)

9.1.4 Pengukuran dan Pembayaran ................................................................ 9-3

DIVISI 10 PEKERJAAN PEMELIHARAAN RUTIN

SEKSI 10.1 PEMELIHARAAN RUTIN PERKERASAN, BAHU JALAN,


DRAINASE, PERLENGKAPAN JALAN DAN JEMBATAN
Pasal 10.1.1 Umum .................................................................................................. 10-1
10.1.2 Pemeliharaan Rutin Perkerasan ............................................................. 10-4
10.1.3 Pemeliharaan Rutin Bahu Jalan ............................................................. 10-6
10.1.4 Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan ........... 10-7
10.1.5 Pemeliharaan Rutin Perlengkapan Jalan Lama yang Ada........................ 10-7
10.1.6 Pemeliharaan Rutin Jembatan ............................................................... 10-8
10.1.7 Pengukuran dan Pembayaran ................................................................ 10-10

SEKSI 10.2 PEMELIHARAAN JALAN SAMPING DAN JEMBATAN


Pasal 10.2.1 Umum .................................................................................................. 10-13
10.2.2 Pemeliharaan Jalan Samping dan Jembatan yang Digunakan oleh 10-13
Penyedia Jasa ........................................................................................
10.2.3 Pemeliharaan untuk Manajemen dan Keselamatan Lalu Lintas............... 10-14
10.2.4 Dasar Pembayaran ............................................................................... 10-14

LAMPIRAN
1.1.A LINGKUP DAN URUTAN KEGIATAN DALAM PEKERJAAN

1.4.A DAFTAR PERALATAN LABORATORIUM UNTUK PEMERIKSAAN


TANAH, ASPAL DAN BETON

1.8.A MANAJEMEN DAN KESELAMATAN LALU LINTAS

1.8.B DAFTAR KETENTUAN MINIMUM PERLENGKAPAN JALAN


SEMENTARA

1.17 RENCANA KERJA PENGELOLAAN DAN PEMANTAUAN


LINGKUNGAN (RKPPL)

3.2.A KLASIFIKASI TANAH KEMBANGSUSUT (EXPANSIVE SOIL) VAN


DER MERVE

5.4.A PROSEDUR LAPANGAN PENGGUNAAN SKALA DCP UNTUK


PENGENDALIAN KONSTRUKSI LAPIS PONDASI SEMEN TANAH

6.1 FAKTOR KONVERSI TEMPERATUR PELAKSANAAN DI LAPANGAN


KE TEMPERATUR STANDAR 15 C UNTUK PENGUKURAN VOLUME
ASPAL CAIR DAN 15,6C UNTUK ASPAL EMULSI

6.2.A METODE PENENTUAN UKURAN, BENTUK DAN GRADASI DARI


SEALING CHIP UKURAN NOMINAL 9 SAMPAI 20 MM (Rujukan Pasal
6.2, Spesifikasi)

x
SPESIFIKASI UMUM 2010 (REVISI 3)

6.2.B PROSEDUR STANDAR PEMERIKSAAN UNTUK MENGUKUR


TEKSTUR DENGAN MENGGUNAKAN METODE LINGKARAN PASIR
(Rujukan Pasal 6.2. dalam Spesifikasi ini)

6.2.C METODE RANCANGAN LABURAN ASPAL SATU LAPIS (BURTU) DAN


LABURAN ASPAL DUA LAPIS (BURDA) (Rujukan Pasal 6.2, Spesifikasi)

6.3 CAMPURAN ASPAL PANAS

6.5.A METODE PENYIAPAN OPTIMUM UNTUK KADAR BITUMEN


RESIDUAL CAMPURAN DINGIN KELAS E

xi

Anda mungkin juga menyukai