Leighton Asia, India and Offshore

Work Method Statement (WMS)

ACTIVITY INSPECTION & HANDOVER CHECK LIST TEMPFACIL ELECTRICAL


Location: G.PASCUAL/PNR COMPOUND and PCY area
NOTE: This document is to be accomplished to ensure the activity is complete and housekeeping is done prior to handover to the
succeeding activity. The Superintendent in charge of the work shall be responsible for getting each Supervisor check their work areas
and affix their signature herein once satisfactory assessment is achieved.

ITEM ACTIVITY SUPERVISOR/ SIGNATURE DATE


LEADMAN
1 Assembly of Flood Lights w/ Gerry
upstand Genito/Gracilito
GA
2 Installation of Flood lightings Gerry
at Genito/Gracilito
crossheads;Columns;Access GA
areas and etc.
3 Wiring from DPB/Dist.Boxes Gerry
to flood lights Genito/Gracilito
GA
4 Switching on the intended Gerry
Breakers at DPB Genito/Gracilito
GA
5 Maintenance works Activities Gerry
for Lightings and Power Genito/Gracilito
GA
6 Dismantling of Lighting and Gerry
transfer to the next activities Genito/Gracilito
GA
7 Installation of Lightning Gerry
Protection System. Genito/Gracilito
GA
8 Installation of DPB/ Gerry
DB/Cabling and Twist Locks Genito/Gracilito
GA

Checked by: Noted by:

ENGR.PEDRO N.NITURA DEAN ALLISON


Signature over printed name Signature over printed name

SAFETY RESPONSIBILITIES Tempfacil Electrical

Electrical Engineer

[Engr.Pedro Nitura]

Electrical Foreman

[Gerry Genito ]
Leighton Asia, India and Offshore Page 1 of 3
P-HO-DEP-FRM-029 Rev 01
15 March 2015
Leighton Asia, India and Offshore
Work Method Statement (WMS)

Leadman Electrical

[ Gracilito Ga )

The Electrical Foreman or Electrical Lead man is responsible for the supervision of work
activities assigned to him. In executing the task, he is responsible that works will be done
in safety manner adhering to LCALs rules and procedures. This includes:

Leading and conducting daily pre-start meetings discuss tasks ahead;


Conducting TAKE-5 practice on works and areas under his control every day;
Assigning individual or group tasks to workers who are competent and capable to do the
task at hand;
Cleaning and tidying up work areas with all access / emergency routes clear of
obstructions;
Using of equipments or Electrical Tools properly in executing the works and timely notice
to equipment personnel unsafe equipment condition;
Reporting incidents and/or accidents promptly to agree with SM and WS corrective
actions;
Ensuring workers under his group wear required PPEs all the time; and
Stopping work or activity posing impending incident;

Specific to crosshead tempfacil electrical works, the Supervisor shall ensure that the
following MAJOR controls in addition to standard Class One practice shall be incorporated
into the works. This shall be minimum requirements which will be assessed during activity
inspection and handover headed by the crosshead Superintendent before succeeding
activity can commence.

TEMPFACIL- ELECTRICAL CONTROL


ACTIVITY
Assembling of Flood Safety harness and complete PPE shall be
Lights;DPB;Plugs and implemented while on the ground and working at
Sockets at heights.
Crossheads/Columns/Access Ensure to fix the floodlights on the cross arms w/
Roads vicinity areas. upstand prior to fixing on the rails or scoffolds.
Ensure all the extension leads must be tightened
and laid in parallel on the rails.
Ensure all twist locks and leads connecting points
must be secured and safe condition and good
working order.
Installation of Flood Lights at Ensure to install and fix the flood lights along
crossheads/Columns and with the upstand.
access road areas. Make sure that the leads must be fix via cable
glands at the equipments or at the fixtures to
prevent from damaging the cables or loose
contact.
Ensure to have a correct size of cables and
breakers to be use.
Ensure all cables,Twistlocks are maintained in a
safe condition and in good working order.
All cables must be properly label/Tags in a
desired color coding.
Ensure all cables used must in complaint to
Leighton Asia, India and Offshore Page 2 of 3
P-HO-DEP-FRM-029 Rev 01
15 March 2015
Leighton Asia, India and Offshore
Work Method Statement (WMS)
LCAL safety standards.
Installation of DPB/Dist. Ensure a correct size of CB and cables prior to
Boxes; wiring from Gensets, installation.
DPB; DB to Lightings and Ensure to terminate or connect on a desired
Power Points. ELCB size and circuit arrangements.
Ensure that ELCB shall be set on 30ma
sensitivity to prevent potential incidents.
Ensure to provide cable glands; terminal lugs;
ELCB/RCD on the panel boards.
Ensure proper equipment grounding systems are
in place.

Switching on the intended Ensure all flood lights been tested and ready to
CB (ELCB) at DPB. use.
Conduct routine inspection after energizing the
flood lights.
Ensure all ELCB are fully tested and in good
working order.

Maintenance works activities Conduct routine inspection of all lightings and


for lightings and power and power prior to use on other activities.
etc. Carryout routine inspection of all extension leads.
Continuous labeling and inspection of electrical
equipments such as power tools; Welding
Machines and etc.
Continuous to do wirings for workers to use
power and lightings if necessary.
Ensure to implement (LOTO) procedures at all
times.
Conduct regular inspections of all protective
devices at times.
Dismantling of Floodlights Ensure Complete PPE is implemented at all time.
and transfer to the next LCAL
activities. Ensure to shut-off the Main power sources prior
to transferring or dismantling any electrical
equipments/fixtures.

Carryout routine inspections on fixtures and


cables to ensure the integrity or maintain on good
working condition.

Periodic Inspection of Ensure to wear a complete PPE (High Voltage


ELCBs/RCD/MCCB Gloves and etc.)
Ensure that the ELCB tester must have
calibration Cert. updated.
No testing without JHA; LOTO and Work Permit.
Carryout testing by using ELCB/RCD tester and
manual testing.
Ensure to list down the result as per generated
standard form and keep on records.

Leighton Asia, India and Offshore Page 3 of 3


P-HO-DEP-FRM-029 Rev 01
15 March 2015