INCOMING MATERIAL REGISTER

01/12/2016 - 06/02/2017 ###


MRN MRN Dates PO Number Item Code Item Desc Unit Delivery Quantity
Number Prep. Appr. Difference Note Recd Short. Excess
2016127198-00 13-Dec-16 20-Dec-16 7 TSAP 2016102542-01 BBCFB7778-00 TOILET PAPER TOWEL DISPENSNOS 2 2 0 0
2016127208-00 14-Dec-16 20-Dec-16 6 NAT JUPES 2016020465-01 BBCFC2349-00 ADJUSTABLE TOGGLE LATCHESNOS L 2 2 0 0
2017010008-00 4-Jan-17 24-Jan-17 20 SLT 2016112784-01 BBCFC3076-00 PLATE ABOVE HEADER - W391C1 NOS 6 6 0 0
2017010100-00 12-Jan-17 24-Jan-17 12 SLT 2016112784-01 BBCFC3152-00 REAR SKIN SKIRTING PANEL TANOS 1 1 0 0
2016127283-00 27-Dec-16 25-Jan-17 29 NEIHUEEC 2016061759-02 BBAFB0215-00 T-SLOT EXTRUSION PLATE ASSY NOS 9 9 0 0
2017010099-00 12-Jan-17 25-Jan-17 13 SLT 2016112784-01 BBCFC3155-00 REAR SKIN EXTERNAL PANEL TA NOS 1 1 0 0
2017010101-00 12-Jan-17 25-Jan-17 13 SOFIA 2016112609-03 BBCFC3181-00 M8 FEMALE INSERT, - W401C009 NOS 32 32 0 0
2017010107-00 15-Jan-17 25-Jan-17 10 SLT 2016112784-01 BBCFC3168-00 PLATE INSIDE BIOREACTOR ACNOS 6 6 0 0
2016127268-00 22-Dec-16 26-Jan-17 35 ALLPROJ 2016030956-02 BBCFC2617-00 BRACKET 880X89X2 EN 10088-2NOS 1 1 0 0
2017010102-00 12-Jan-17 26-Jan-17 14 ALLPROJ 2016041270-03 BBCFB9823-01 KLAPPAGRIFF (RETRACTABLE HA NOS 3 3 0 0
2017010168-00 21-Jan-17 30-Jan-17 9 ALLPROJ 2015072569-04 BBCFB8908-01 KICK PLATE ON MIRROR HATCHNOS 22 22 0 0
2017010168-00 21-Jan-17 30-Jan-17 9 ALLPROJ 2016020634-02 BBCFB3680-00 KICK PLATE 6 W184C135 SS304 NOS 2 2 0 0
2017010168-00 21-Jan-17 30-Jan-17 9 TSAP 2016061760-02 BBCFB3680-00 KICK PLATE 6 W184C135 SS304 NOS 2 2 0 0
2017010168-00 21-Jan-17 30-Jan-17 9 TSAP 2016102542-01 BBCFB3680-00 KICK PLATE 6 W184C135 SS304 NOS 2 2 0 0
2017010215-00 23-Jan-17 31-Jan-17 8 NAT JUPES 2015051668-06 BBCFC1792-00 INSERT(NAT JUPES) - C 2040 - NOS 5 5 0 0
2017010253-00 31-Jan-17 2-Feb-17 2 ALLPROJ 2016020634-02 BBCFB4186-00 BRAKET 1 SYM, IF-331-0153-1_ NOS 3 3 0 0
2017010232-00 31-Jan-17 5-Feb-17 5 NAT 2015113668-01 BBCFB4186-00 BRAKET 1 SYM, IF-331-0153-1_ NOS 2 2 0 0
2017010232-00 31-Jan-17 5-Feb-17 5 SLT 2016112784-01 BBCFC3031-00 LITTER BIN COVER - W391C111 NOS 2 2 0 0
2017010250-00 31-Jan-17 5-Feb-17 5 SLT 2016112784-01 BBCFC3158-00 PLATE INSIDE EXTERNAL PANELNOS 2 2 0 0
2017010252-00 31-Jan-17 5-Feb-17 5 NAT 2016122981-02 BBCFC2624-00 BRACKET 1260X31X1 EN 10088-2 NOS 7 7 0 0
2017010245-00 31-Jan-17 6-Feb-17 6 NEIHUEEC 2016082281-01 BBCFC2975-00 L-BRACKET 151MM LONG_LOWER NOS 1 1 0 0
y Rate Curr Del Note No Del Note Remarks PO Creation Data PO Approved Date
Appr. Reject Code Date
0 2 21.34 BHD DN016-3303-A 10-Dec-16 REG NO,9696 25-Oct-16 26-Oct-16
0 2 9.92 BHD DN016-3309 13-Dec-16 REG NO,9716 9-Feb-16 9-Feb-16
0 6 1.202 BHD DN016-3335 A 28-Dec-16 REG NO, 26-Nov-16 1-Dec-16
0 1 1.52 BHD DN017-0005 9-Jan-17 REG NO,9840 26-Nov-16 1-Dec-16
7 2 12.43 BHD DN016-3323 22-Dec-16 REG NO,9767 19-Jul-16 19-Jul-16
0 1 18.896 BHD DN017-0014 9-Jan-17 REG NO,9838 26-Nov-16 1-Dec-16
0 32 0.699 BHD DN017-0018 9-Jan-17 REG NO,9839 30-Nov-16 1-Dec-16
0 6 0.95 BHD DN017-0030 14-Jan-17 REG NO,9858 26-Nov-16 1-Dec-16
0 1 6.66 BHD DN016-3315 18-Dec-16 REG NO,9737 4-Jun-16 5-Jun-16
0 3 166.7 BHD DN017-0025 10-Jan-17 REG NNO,9846 2-Jun-16 5-Jun-16
21 1 1.018 BHD DN017-0036 19-Jan-17 REG NO,9901 18-Sep-16 3-Oct-16
0 2 6.484 BHD DN017-0036 19-Jan-17 REG NO,9901 4-Jun-16 5-Jun-16
0 2 6.484 BHD DN017-0036 19-Jan-17 REG NO,9901 24-Jul-16 24-Jul-16
0 2 6.484 BHD DN017-0036 19-Jan-17 REG NO,9901 25-Oct-16 26-Oct-16
0 5 0.835 BHD DN017-0034 16-Jan-17 REG NO,9817 18-Sep-16 15-Oct-16
0 3 4 BHD DN017-0072 31-Jan-17 REG NO,9985 4-Jun-16 5-Jun-16
0 2 4 BHD DN017-00367 29-Jan-17 REG NO,9967 5-Nov-15 5-Nov-15
0 2 9.611 BHD DN017-00367 29-Jan-17 REG NO,9967 26-Nov-16 1-Dec-16
1 1 1.697 BHD DN017-0070 30-Jan-17 REG NO,9977 26-Nov-16 1-Dec-16
0 7 1.87 BHD DN017-0058 26-Jan-17 REG NO, 4-Jan-17 4-Jan-17
0 1 1.48 BHD DN017-0053 24-Jan-17 REG NO,9952 30-Aug-16 30-Aug-16
Terms of Payment Vendor Code Country CodeAPV No APV Date
AS PER REQUIREMENT OF MRP 276, AND ANOOP EMAIL OF 20/10/2016.
DELIVERY PLAN TO FOLLOW BASED ON EMAIL OF ANOOP DATE 20/10/2016. APLB0105 BHR
PO MADE IN ABSCENCE OF SHARIQ FOR T APLB0105 BHR
APLB0105 BHR
NOTE - AS THE PROJECT IS RUNNING FROM 2016 - 2021 .WE ARE PLACING THE FULL PROJECT QTY PO & THE DELIVERY SCHEDULE FOR THE FIRST 5 TS QTY IS PROVIDED . REMAINING PROJECT QTY DELIVERY SCHEDLE WILL SEND BY ANOOP TO BFG METAL AS PER THE PROJECT PLAN.

TOOLING COST USD 1,320.754 BHD FOR THE PART BBCFC3046-00 & BBCFC3174-00 & FOR FUTIRE ORDER IF ANY ITEM HAVING DIA 35 MM PIPE,SUPPLIER CAN USE SAME TOOL,BFG WILL NOT PAY .

PRICES FOR THE ITEM BBCFC3060-00 ,BBCFC3061-00 ,BBCFC3067-00 ,BBCFC3068-00 ARE QUOTED WITHOUT ROLLING PROCESS.BEFORE FAI DELIVERY BFG METAL HAS TO SUBMIT TH E ROLLING COST & LATER ADDED INTO THE UNIT PRICE

APLB0105 BHR
NOTE - AS THE PROJECT IS RUNNING FROM 2016 - 2021 .WE ARE PLACING THE FULL PROJECT QTY PO & THE DELIVERY SCHEDULE FOR THE FIRST 5 TS QTY IS PROVIDED . REMAINING PROJECT QTY DELIVERY SCHEDLE WILL SEND BY ANOOP TO BFG METAL AS PER THE PROJECT PLAN.

TOOLING COST USD 1,320.754 BHD FOR THE PART BBCFC3046-00 & BBCFC3174-00 & FOR FUTIRE ORDER IF ANY ITEM HAVING DIA 35 MM PIPE,SUPPLIER CAN USE SAME TOOL,BFG WILL NOT PAY .

PRICES FOR THE ITEM BBCFC3060-00 ,BBCFC3061-00 ,BBCFC3067-00 ,BBCFC3068-00 ARE QUOTED WITHOUT ROLLING PROCESS.BEFORE FAI DELIVERY BFG METAL HAS TO SUBMIT TH E ROLLING COST & LATER ADDED INTO THE UNIT PRICE

AS PER REQUIREMENT OF CHICAGO PROJECT APLB0105 BHR 17010084 24-Jan-17


APLB0105 BHR 17010239 26-Jan-17
NOTE - AS THE PROJECT IS RUNNING FROM 2016 - 2021 .WE ARE PLACING THE FULL PROJECT QTY PO & THE DELIVERY SCHEDULE FOR THE FIRST 5 TS QTY IS PROVIDED . REMAINING PROJECT QTY DELIVERY SCHEDLE WILL SEND BY ANOOP TO BFG METAL AS PER THE PROJECT PLAN.

TOOLING COST USD 1,320.754 BHD FOR THE PART BBCFC3046-00 & BBCFC3174-00 & FOR FUTIRE ORDER IF ANY ITEM HAVING DIA 35 MM PIPE,SUPPLIER CAN USE SAME TOOL,BFG WILL NOT PAY .

PRICES FOR THE ITEM BBCFC3060-00 ,BBCFC3061-00 ,BBCFC3067-00 ,BBCFC3068-00 ARE QUOTED WITHOUT ROLLING PROCESS.BEFORE FAI DELIVERY BFG METAL HAS TO SUBMIT TH E ROLLING COST & LATER ADDED INTO THE UNIT PRICE

APLB0105 BHR 17010130 24-Jan-17


APLB0105 BHR 17010240 26-Jan-17
NOTE - AS THE PROJECT IS RUNNING FROM 2016 - 2021 .WE ARE PLACING THE FULL PROJECT QTY PO & THE DELIVERY SCHEDULE FOR THE FIRST 5 TS QTY IS PROVIDED . REMAINING PROJECT QTY DELIVERY SCHEDLE WILL SEND BY ANOOP TO BFG METAL AS PER THE PROJECT PLAN.

TOOLING COST USD 1,320.754 BHD FOR THE PART BBCFC3046-00 & BBCFC3174-00 & FOR FUTIRE ORDER IF ANY ITEM HAVING DIA 35 MM PIPE,SUPPLIER CAN USE SAME TOOL,BFG WILL NOT PAY .

PRICES FOR THE ITEM BBCFC3060-00 ,BBCFC3061-00 ,BBCFC3067-00 ,BBCFC3068-00 ARE QUOTED WITHOUT ROLLING PROCESS.BEFORE FAI DELIVERY BFG METAL HAS TO SUBMIT TH E ROLLING COST & LATER ADDED INTO THE UNIT PRICE

AND AS PER ANOOP'S SUMMARY APLB0105 BHR 17010278 26-Jan-17


AS PER ANOOP PLAN FOR BFG METAL APLB0105 BHR
PO MADE AS PER MRP 217 & AMMENDED AS PER MAIL FROM BABY DATED 18TH SEPTEMBER 2016 APLB0105 BHR 17010309 30-Jan-17
PO MADE AS PER MRP 245 AND ANOOP SHORTAG APLB0105 BHR 17010309 30-Jan-17
AS PER MRP 263 AND ANOOP PLAN APLB0105 BHR 17010309 30-Jan-17
AS PER REQUIREMENT OF MRP 276, AND ANOOP EMAIL OF 20/10/2016.
DELIVERY PLAN TO FOLLOW BASED ON EMAIL OF ANOOP DATE 20/10/2016. APLB0105 BHR 17010309 30-Jan-17
PO BEING AMMENED FOR CHANGE IN UNIT PRICE OF BBCFC1956-00 WITH REFERENCE TO MAIL FROM BABU ON 18/09/2016 APLB0105 BHR 17010336 31-Jan-17
PO MADE AS PER MRP 245 AND ANOOP SHORTAG APLB0105 BHR 17020075 5-Feb-17
PO MADE AS PER ANOOP REQUEST PHYISC APLB0105 BHR 17020075 5-Feb-17
APLB0105 BHR
NOTE - AS THE PROJECT IS RUNNING FROM 2016 - 2021 .WE ARE PLACING THE FULL PROJECT QTY PO & THE DELIVERY SCHEDULE FOR THE FIRST 5 TS QTY IS PROVIDED . REMAINING PROJECT QTY DELIVERY SCHEDLE WILL SEND BY ANOOP TO BFG METAL AS PER THE PROJECT PLAN.

TOOLING COST USD 1,320.754 BHD FOR THE PART BBCFC3046-00 & BBCFC3174-00 & FOR FUTIRE ORDER IF ANY ITEM HAVING DIA 35 MM PIPE,SUPPLIER CAN USE SAME TOOL,BFG WILL NOT PAY .

PRICES FOR THE ITEM BBCFC3060-00 ,BBCFC3061-00 ,BBCFC3067-00 ,BBCFC3068-00 ARE QUOTED WITHOUT ROLLING PROCESS.BEFORE FAI DELIVERY BFG METAL HAS TO SUBMIT TH E ROLLING COST & LATER ADDED INTO THE UNIT PRICE

APLB0105 BHR 17020085 5-Feb-17


NOTE - AS THE PROJECT IS RUNNING FROM 2016 - 2021 .WE ARE PLACING THE FULL PROJECT QTY PO & THE DELIVERY SCHEDULE FOR THE FIRST 5 TS QTY IS PROVIDED . REMAINING PROJECT QTY DELIVERY SCHEDLE WILL SEND BY ANOOP TO BFG METAL AS PER THE PROJECT PLAN.

TOOLING COST USD 1,320.754 BHD FOR THE PART BBCFC3046-00 & BBCFC3174-00 & FOR FUTIRE ORDER IF ANY ITEM HAVING DIA 35 MM PIPE,SUPPLIER CAN USE SAME TOOL,BFG WILL NOT PAY .

PRICES FOR THE ITEM BBCFC3060-00 ,BBCFC3061-00 ,BBCFC3067-00 ,BBCFC3068-00 ARE QUOTED WITHOUT ROLLING PROCESS.BEFORE FAI DELIVERY BFG METAL HAS TO SUBMIT TH E ROLLING COST & LATER ADDED INTO THE UNIT PRICE

PO IS MADE FOLLOWING MRP 285 FOR ALL METAL PARTS BFGM CAN DO.

BFGM TO START DELIVERING MATERIAL JANUARY ONWARD AS PER MATERIALS REQUIREMENT VISIBILITY, WOULD BE PROVIDED SEPERATELY. APLB0105 BHR 17020087 5-Feb-17
APLB0105 BHR 17020029 2-Feb-17