D2 = 8 Pulg
S2= 0.0365
n= 0.0130
Norte
2
D1 = 12 Pulg
S1 = 0.036 Este
n1 = 0.015
1
3
Sur
D3 = 8 Pulg
S3 = 0.0074
n= 0.015
SOLUCIN
a) Q1 = ?
Q1 = Q2 + Q3
Q=VA
Q = R^(2/3) S^0,5 / n x A tubo lleno
Como R = D/4
Q2 = (D/4)^(2/3) S^0,5 x PI D^2 / (4 n)
D= 8 Pulg
D = 8 x 0,0254
D= 0.2032 m
Q2 = 0.0654 m3/seg
Q1 = Q2 + Q3
Q1r = 0.0909 m3/seg Real
Y=0,0753+2,1519*A52-6,7788*A52^2+13,8282*A52^3-13,469*A52^4+5,016*A52^5
Y= 0.528 Altura proporcional
Y del flujo = Y D
Y del flujo = 0.161 m
VP =0,0037+3,9903*A55-8,5135*A55^2+16,3799*A55^3-19,2536*A55^4+8,91*A55^5
VP = 1.017 Velocidad proporcional
Vtubo lleno = QT /AT
Vtubo lleno = 2.274 m/seg
Vreal = VP x VT
Vreal = 2.31 m/seg
PROBLEMA
Lotes de 100 x 50 m
Calles 16 m
1 5
2 6
3 7
4
Poblacin 8 9
2500
Dotacion agua potable
150 Lt/Hab dia
K2 = 1.80
1) Desague 80% Del caudal maximo horario
2) Infiltracin
8% Del caudal mximo horario (dependera del la permeabilidad y nivel fretico)
3) Lluvia
5% Del caudal mximo horario (dependera de la zona -Lluviosa- moderada o seca)
Dimetro mnimo
Dmin = 8 Pulg
Profundidad mnima
Pmin = 1.00 m sobre la clave de la tubera
SOLUCIN
METODO PORCENTAJES
Q sanitario
Mtodo 80% Qmh
Q infiltracin
8% Qmh
0.63
Qlluvia 5% Qmh
0.39
Q a seccin llena (m3/seg)
Descarga Proporcional DP
Lmit mn prof del colector
verificacion pendiente
Long. del Tramo (m)
Altura Proporcional
n= 0.013
Pendiente minima
Velocidad real
Buzn Ag Aba
Cota colector
Dimetro (m)
Pendiente
Desnivel
Colector
Buzn
Calle
VP
En el
Ag Arri Ag Aba Contrib Ag Arri tramo Ag. Aba Ag Arri Ag Aba Ag Arri Ag Aba Ag Arri Ag Aba Cota col Prof m3/s Lt/seg m/s Q/Qo d/D V/Vo Y real m/seg
1 2 116 - - 1.211 1.211 2000.00 2000.00 1.20 1.80 1998.80 1998.20 0.60 0.005 0.00503 BIEN 8 0.203 1998.20 1.80 0.02258 22.58 0.696 0.054 0.17 0.51 0.035 0.354
1 2 3 116 - 1.211 1.211 2.422 2000.00 2000.00 1.80 2.40 1998.20 1997.60 0.60 0.005 0.00363 BIEN 8 0.203 1997.60 2.40 0.023 22.58 0.696 0.107 0.24 0.65 0.049 0.450
3 4 116 - 2.422 1.211 3.633 2000.00 2000.00 2.40 2.80 1997.60 1997.20 0.40 0.003 0.00300 BIEN 8 0.203 1997.20 2.80 0.018 18.43 0.568 0.197 0.32 0.78 0.066 0.442
5 6 116 - - 1.211 1.211 2000.00 2000.00 1.20 1.80 1998.80 1998.20 0.60 0.005 0.00503 BIEN 8 0.203 1998.20 1.80 0.023 22.58 0.696 0.054 0.17 0.51 0.035 0.354
2 6 7 116 - 1.211 1.211 2.422 2000.00 2000.00 1.80 2.40 1998.20 1997.60 0.60 0.005 0.00363 BIEN 8 0.203 1997.60 2.40 0.023 22.58 0.696 0.107 0.24 0.65 0.049 0.450
7 8 116 - 2.422 1.211 3.633 2000.00 2000.00 2.40 2.80 1997.60 1997.20 0.40 0.003 0.00300 BIEN 8 0.203 1997.20 2.80 0.018 18.43 0.568 0.197 0.32 0.78 0.066 0.442
4 8 66 3.633 - ### 3.633 2000.00 2000.00 2.80 3.00 1997.20 1997.00 0.20 0.003 0.00300 BIEN 8 0.203 1997.00 3.00 0.017 17.28 0.533 0.210 0.33 0.79 0.068 0.422
8 9 66 3.633 3.633 - 7.266 2000.00 2000.00 3.00 3.20 1997.00 1996.80 0.20 0.003 0.00217 BIEN 8 0.203 1996.80 3.20 0.017 17.28 0.533 0.420 0.45 0.95 0.092 0.505
7.266
PROBLEMA
Lotes de 100 x 50 m
Calles 16 m
1 5
2 6
3 7
4
Poblacin 8 9
2500
Dotacion agua potable
150 Lt/Hab dia
K2 = 1.80
1) Desague 80% Del caudal maximo horario
2) Infiltracin
8% Del caudal mximo horario (dependera del la permeabilidad y nivel fretico)
3) Lluvia
5% Del caudal mximo horario (dependera de la zona -Lluviosa- moderada o seca)
Dimetro mnimo
Dmin = 8 Pulg
Profundidad mnima
Pmin = 1.00 m sobre la clave de la tubera
SOLUCIN
METODO PORCENTAJES
Q sanitario
Mtodo 80% Qmh
Q infiltracin
8% Qmh
0.63
Qlluvia 5% Qmh
0.39
Q a seccin llena (m3/seg)
Descarga Proporcional DP
Lmit mn prof del colector
verificacion pendiente
Long. del Tramo (m)
Altura Proporcional
n= 0.013
Pendiente minima
Velocidad real
Buzn Ag Aba
Cota colector
Dimetro (m)
Pendiente
Desnivel
Colector
Buzn
Calle
VP
En el
Ag Arri Ag Aba Contrib Ag Arri tramo Ag. Aba Ag Arri Ag Aba Ag Arri Ag Aba Ag Arri Ag Aba Cota col Prof m3/s Lt/seg m/s Q/Qo d/D V/Vo Y real m/seg
1 2 116 - - 1.211 1.211 2000.00 2000.00 1.20 4.10 1998.80 1995.90 2.90 0.025 0.00503 BIEN 8 0.203 1995.90 4.10 0.04963 49.63 1.531 0.024 0.12 0.39 0.025 0.604
1 2 3 116 - 1.211 1.211 2.422 2000.00 2000.00 4.10 5.60 1995.90 1994.40 1.50 0.013 0.00363 BIEN 8 0.203 1994.40 5.60 0.036 35.70 1.101 0.068 0.19 0.55 0.039 0.608
3 4 116 - 2.422 1.211 3.633 2000.00 2000.00 5.60 6.60 1994.40 1993.40 1.00 0.009 0.00300 BIEN 8 0.203 1993.40 6.60 0.029 29.15 0.899 0.125 0.26 0.68 0.053 0.611
5 6 116 - - 1.211 1.211 2000.00 2000.00 1.20 4.10 1998.80 1995.90 2.90 0.025 0.00503 BIEN 8 0.203 1995.90 4.10 0.050 49.63 1.531 0.024 0.12 0.39 0.025 0.604
2 6 7 116 - 1.211 1.211 2.422 2000.00 2000.00 4.10 5.60 1995.90 1994.40 1.50 0.013 0.00363 BIEN 8 0.203 1994.40 5.60 0.036 35.70 1.101 0.068 0.19 0.55 0.039 0.608
7 8 116 - 2.422 1.211 3.633 2000.00 2000.00 5.60 6.60 1994.40 1993.40 1.00 0.009 0.00300 BIEN 8 0.203 1993.40 6.60 0.029 29.15 0.899 0.125 0.26 0.68 0.053 0.611
4 8 66 3.633 - ### 3.633 2000.00 2000.00 6.60 7.20 1993.40 1992.80 0.60 0.009 0.00300 BIEN 8 0.203 1992.80 7.20 0.030 29.93 0.923 0.121 0.26 0.67 0.053 0.622
8 9 66 3.633 3.633 - 7.266 2000.00 2000.00 7.20 7.60 1992.80 1992.40 0.40 0.006 0.00217 BIEN 8 0.203 1992.40 7.60 0.024 24.44 0.754 0.297 0.39 0.87 0.078 0.653
7.266
PROBLEMA
Lotes de 100 x 50 m
Calles 16 m
1 5
2 6
3 7
4
Poblacin 8 9
2500
Dotacion agua potable
150 Lt/Hab dia
K2 = 1.80
1) Desague 80% Del caudal maximo horario
2) Infiltracin
8% Del caudal mximo horario (dependera del la permeabilidad y nivel fretico)
3) Lluvia
5% Del caudal mximo horario (dependera de la zona -Lluviosa- moderada o seca)
Dimetro mnimo
Dmin = 8 Pulg
Profundidad mnima
Pmin = 1.00 m sobre la clave de la tubera
SOLUCIN
METODO PORCENTAJES
Q sanitario
Mtodo 80% Qmh
Q infiltracin
8% Qmh
0.63
Qlluvia 5% Qmh
0.39
Q a seccin llena (m3/seg)
Lmit mn prof del colector
Descarga Proporcional DP
Q a seccin llena (Lt/seg)
qm = qd +qi +qll = 7.266 0.01650 l/s -m
Cota del terreno (msnm)
verificacion pendiente
Long. del Tramo (m)
Altura Proporcional
Velo seccin llena
Pendiente minima
n= 0.013
Dimetro (pulg)
Velocidad real
Gasto (Lt/seg)
Buzn Ag Aba
Cota colector
Dimetro (m)
Pendiente
Desnivel
Colector
Buzn
Calle
VP
En el
Ag Arri Ag Aba Contrib Ag Arri tramo Ag. Aba Ag Arri Ag Aba Ag Arri Ag Aba Ag Arri Ag Aba Cota col Prof m3/s Lt/seg m/s Q/Qo d/D V/Vo Y real m/seg
A B 50 - - 0.825 0.825 2000.00 2000.00 1.20 2.80 1998.80 1997.20 1.60 0.032 0.00602 BIEN 8 0.203 1997.20 2.80 0.05616 56.16 1.732 0.015 0.11 0.35 0.021 0.601
1C B 50 - - 0.825 0.825 2000.00 2000.00 1.20 2.80 1998.80 1997.20 1.60 0.032 0.00602 BIEN 8 0.203 1997.20 2.80 0.05616 56.16 1.732 0.015 0.11 0.35 0.021 0.601
B D 50 0.825 0.825 0.825 2.475 2000.00 2000.00 2.80 3.45 1997.20 1996.55 0.65 0.013 0.00359 BIEN 8 0.203 1996.55 3.45 0.03579 35.79 1.104 0.069 0.20 0.56 0.040 0.614
D E 50 - 2.475 0.825 3.300 2000.00 2000.00 3.45 3.90 1996.55 1996.10 0.45 0.009 0.00314 BIEN 8 0.203 1996.10 3.90 0.02978 29.78 0.918 0.111 0.25 0.65 0.050 0.601
2
8 9 66 - -
PROBLEMA
HIDRULICA FLUVIAL
I II
AI = 0.625 Ha AI = 0.956 Ha
CI = 0.65 CI = 0.45
Tc = 10 min Tc = 10 min
A 2330.5 m
III IV
AI = 0.812 Ha AI = 1.235 Ha
CI = 0.65 CI = 0.5
Tc = 8 min Tc = 12 min
L= 100 m
D L= 80 L= 90 m
C B 2327.5 m
2324.1 2325.2 m V VI
AI = 0.786 Ha AI = 1.352 Ha
CI = 0.7 CI = 0.7
Tc = 8 min Tc = 12 min
SOLUCIN
Tramo AB
Area de influencia
I
A= 0.63 Ha
A= 6,250.00 m2
II
A= 0.96 Ha
A= 9,560.00 m2
Caudal en marcha
Q = C i A / 360
Q= 0.0472 m3/seg
Q= 47.16 Lt/seg
Q= 0.0499 m3/seg
Q= 49.94 Lt/seg
Q total tramo 0.0971 m3/seg
Dimetro
D = [(3.21 Q n )/S^0.5]^(3/8)
D= 0.2445830785 m
D= 9.6292550585 Pulg
D= 10 Pulg
CALCULO DE CAUDALES
DESAGUE PLUVIAL
Q a seccin llena (m3/seg)
Lmit mn prof del colector
Descarga Proporcional DP
Q a seccin llena (Lt/seg)
Cota del terreno (msnm)
Altura Proporcional
Velo seccin llena
Dimetro (pulg)
Velocidad real
Buzn Ag Aba
Cota colector
Dimetro (m)
Pendiente
Desnivel
Colector
Buzn
Tramo
Calle
VP
Ag
Ag Arri Ag Aba Descr Contrib Ag Arri En el tramo Ag. Aba Ag Arri Ag Aba Ag Arri Aba Ag Arri Ag Aba Cota col Prof m3/s Lt/seg m/s Q/Qo d/D V/Vo Y real m/seg
AB A B 100 - 97.11 97.11 2330.50 2327.50 1.20 1.20 2329.30 2326.30 3.00 0.030 9.629 12 0.305 2326.30 1.20 0.167 167.34 2.295 0.580 0.55 1.03 0.166 2.369
BC B C 90 97.11 - 168.90 266.01 2327.50 2325.20 1.20 1.20 2326.30 2324.00 2.30 0.026 14.480 16 0.406 2324.00 1.20 0.341 340.79 2.629 0.781 0.65 1.10 0.266 2.887
CD C D 80 266.01 136.494 402.50 2325.20 2324.10 1.20 1.20 2324.00 2322.90 1.10 0.014 18.997 20 0.508 2322.90 1.20 0.460 460.21 2.272 0.875 0.71 1.12 0.360 2.550