This document provides a checklist for mivan shuttering works for a construction project. The checklist includes 10 items to inspect, such as levels and alignments of columns, walls, beams and slabs before pouring concrete. Spaces are provided to note the location, drawing number, date, inspection results and remarks. The document also includes sections for signatures of surveyors and foremen to approve the works.
This document provides a checklist for mivan shuttering works for a construction project. The checklist includes 10 items to inspect, such as levels and alignments of columns, walls, beams and slabs before pouring concrete. Spaces are provided to note the location, drawing number, date, inspection results and remarks. The document also includes sections for signatures of surveyors and foremen to approve the works.
This document provides a checklist for mivan shuttering works for a construction project. The checklist includes 10 items to inspect, such as levels and alignments of columns, walls, beams and slabs before pouring concrete. Spaces are provided to note the location, drawing number, date, inspection results and remarks. The document also includes sections for signatures of surveyors and foremen to approve the works.
SR No. Date Time Descriptoin 9 Am To 6 PM 9 Am To 9 PM 6Pm To 9Pm 9 PM To 12 Am 9 Am To 12 Am 6 PM To 12 Am Extra Time Cahallen NO. 9 Am To 12 Am Above