LIST OF DISSERTATION FOR M.SC.

IN CONSTRUCTION CONTRACT MANAGEMENT

YEAR NAME OF AUTHOR TITLE

2004-2005 CHAI VOON CHIET PROFESSIONAL LIABILITY OF CIVIL ENGINEER

2005-2006 LING TEK LEE NATURAL JUSTICE IN ADJUDICATION

MELISSA CHAN YUET LI NEW ENGINEERING CONTRACT (NEC) 1993 AS


RADICAL CHANGES TO THE MALAYSIAN
STANDARD FORMS OF CONTRACT

NOR JALILAH BINTI IDRIS EFFECT OF WORK PROGRAMME IN


EXTENSION OF TIME ENTITLEMENT

ZAINAB MOHMAD ZAINORDIN CONTRACTORS LIABILITY TO THIRD PARTY


FOR DEFECTIVE WORKS

2006-2007 ASRIAH PROFILE OF CONSTRUCTION DISPUTES

MD. ASRUL NASID BIN MASROM NATURE OF DELAY IN NOMINATED


SUBCONTRACTING

FELICIA YONG YAN YAN JOINDER AND CONSOLIDATION PROVISIONS


IN ARBITRATION

HAMIZAH LIYANA BINTI TAJUL LETTER OF INTENT AND STANDARD FORM OF


ARIFFIN BUILDING CONTRACT

KHAIRI BIN JAFFAR PRACTICAL COMPLETION FOR WATER


SUPPLY PROJECTS

KUZAIDA BINTI KAZILAN IMPLEMENTATION OF COLLATERAL


WARRANTIES IN MALAYSIAN CONSTRUCTION
INDUSTRY

LEE SHIAU MEI JUDICIAL INTERPRETATIONS ON THE PHRASE


REGULARLY AND DILIGENTLY IN
CONSTRUCTION INDUSTRY

LEE SHIH YIN A REPUDIATORY BREACH IN THE


CONSTRUCTION INDUSTRY NON-PAYMENT

LEE CEN YING PRINCIPLES OF IMPLIED TERMS IN


CONSTRUCTION CONTRACTS

NGAI XIAO-WEI RECOVERY OF PURE ECONOMIC LOSS IN


CONSTRUCTION INDUSTRY

NORHAFIZAH BT.YUSOP ARBITRATION:CHALLENGING THE ARBITRAL


AWARDS(CERTIORARI)

NURAIN ISMAIL PERFORMANCE BOND AND AN INJUNCTION

1
LIST OF DISSERTATION FOR M.SC. IN CONSTRUCTION CONTRACT MANAGEMENT

YEAR NAME OF AUTHOR TITLE

2006-2007 NOR MARINA BINTI ROSLI THE USE OF STANDARD FORM OF DOMESTIC
SUBCONTRACT IN MALAYSIAN
CONSTRUCTION INDUSTRY

ONG RUI YING TIME AT LARGE AND REASONABLE TIME FOR


COMPLETION

TAN SEAN GIT CHALLENGES TO THE ADJUDICATORS


DECISION

TAN EE LEN THE CONCLUSIVENESS OF FINAL


CERTIFICATES

TAN PEI LING EMPLOYERS RIGHTS AND CONTRACTORS


LIABILITIES IN RELATION TO CONSTRUCTION
DEFECTS AFTER FINAL CERTIFICATE

ZULKFLI SAPECIAY SUMMARY JUDGMENT IN


CONSTRUCTION CONTRACT

2007-2008 NOR AZIZAH BTE ZALIN THE EFFICACY OF LIABILITY UNDER THE RULE
IN RYLANDS v FLETCHER IN CONSTRUCTION
INDUSTRY IN MALAYSIA

AZIZAN BIN SUPARDI PERFORMANCE BOND: CONDITIONAL OR


UNCONDITIONAL

LIM CHENG SIM WHAT CONSTITUTE A VARIATION IN


CONSTRUCTION FROM LEGAL PERSPECTIVE

MASIDAH BINTI ABDUL MAJID THE LEGAL ASPECT OF PROCUREMENT


SYSTEM - DOCTRINE OF VARIATION ORDER
WITH RESPECT TO DESIGN AND BUILD
PROCUREMENT SYSTEM

MOHAMAD ZAIDI BIN MOHAMED THE EFFECT TO THE TERMINATION OF


SAAD LETTER OF INTENT IN CONSTRUCTION
CONTRACT

SITI SUHANA BINTI JUDI THE CONTRACTORS RIGHT ACTIONS


AGAINST LATE OR NON PAYMENT BY THE
EMPLOYER

NATASHA SAHIL NOVATION AGREEMENT IN DESIGN AND BUILD


CONTRACTS

UMI KALSUM BTE ZULKIFLI @ TERMINATION OF ARCHITECT ENAGAEMENT


ZOLKAFLI

2
LIST OF DISSERTATION FOR M.SC. IN CONSTRUCTION CONTRACT MANAGEMENT

YEAR NAME OF AUTHOR TITLE

2007-2008 HAFIZ BIN SAAD REVISING CONTRACT SUM : THE EMPLOYER


RIGHT TO SET OFF PAYMENT

NANI ERNIE BINTI OTHMAN CASE STUDY : OBSERVATION SKY TOWER IN


MELAKA

SURIANA BINTI YUSSOF CLARITY IN CONSTRUCTION CONTRACT


DOCUMENTS

2008-2009 AFISZA IRFAN BIN AZMI CONTRACTORS APPLICATION OF EXTENSION


OF TIME IN PAM 1998

CHANG SIAW HUI FORMALISATION OF PARTNERING AS A


COLLABORATIVE PROCUREMENT METHOD

EUNICE CHIA MEI LING THE ENFORCEABILITY OF LIQUIDATED AND


ASCERTAINED DAMAGES IN CONSTRUCTION
CONTRACT

HAIRANI BINTI HAIRUDDIN BUILDING CONTRACT COMPARED AND


TABULATED

LAWRENCE YAP SIE KIONG BREACHES OF CONTRACT IN CONSTRUCTION


INDUSTRY

LEE CHIA KUANG SUSPENSION OF WORKS AS REMEDY FOR


NON-PAYMENT

LIEW LI MING TIME AS ESSENCE AND TERMINATION IN


CONSTRUCTION CONTRACT

MAHMOUD SODANGI LEGAL EFFECT OF BREACH OF WARRANTY IN


CONSTRUCTION INSURANCE IN MALAYSIA

NASYIRA BINTI IBRAHIM THE APPLICATION OF PAY WHEN PAID


PROVISIONS IN CONSTRUCTION SUB
CONTRACT

NIK NURHAZIRAH BINTI NIK INVALID CONTRACT ADMINISTRATORS


OMAR INSTRUCTIONS

NURULHUDA BINTI AHAMAD THE IMPORTANCE OF CONDITION OF


CONTRACT IN CONTRACT DOCUMENT

ROSLINDA BINTI ROSLY THE PROFILE OF CONSTRUCTION CONTRACT


TERMINATION CASES

NURUL SAKINA BINTI MOKHTAR THE EXTENT OF THE CONTRACTORS EFFORT


AZIZI TO MITIGATE DELAY

SHAFIKA BINTI SAHIBUDIN CONTRACTORS LIABILITY AS AN OCCUPIER


OF SITE DURING CONSTRUCTION

3
LIST OF DISSERTATION FOR M.SC. IN CONSTRUCTION CONTRACT MANAGEMENT

YEAR NAME OF AUTHOR TITLE

2008-2009 SITI HAIZAN AZMI FEASIBILITY OF ADOPTING MINOR BUILDING


WORKS AGREEMENT IN MALAYSIAN
CONSTRUCTION INDUSTRY

THOY YEE HUA APPLICATION OF ADJUDICATION IN MALAYSIA

OLALEKAN OLAOLU TITUS NOTICE OF LOSS AND/OR EXPENSE CLAIM IN


PAM 2006

WAN AZLINA BT IBRAHIM CLAIMS DUE TO DISCREPANCIES IN


CONTRACT DOCUMENTS

ENEGBUMA WALLACE IMOUDU DUTY TO DISCLOSE : EXTENT OF


CONTRACTORS OBLIGATION TO PROVIDE
INFORMATION AND PERMITTING ACCESS TO
HIS OWN RECORDS

WONG BI XIA MEASURE OF DAMAGES FOR DEFECTIVE

YAP CHIAW GUAN CONTRACTORS RIGHT TO CLAIM FOR EXTRA


WORKS

YOW LI PIG LETTER OF ACCEPTACE/ AWARD AS A


UQUALIFIED ACCEPTACE

ZUHAILI BIN MOHAMAD RAMLY RESCISSION, VARIATION AND WAIVER OF


CONTRACT

2009-2010 DESTILLA BT. MOHAMAD AZAMI THE POWER AND AUTHORITY TO ISSUE VS.
TO APPROVE THE LEGAL PERSPECTIVE

ARFAH HANUM BT. MEOR ADAM ARCHITECTS CONTINUING DUTY TO REVIEW


DESIGN

AZMI BIN MOHAMED @ MOHD. VARIATION WORKS IN PRIVATIZATION


ADNAN HIGHWAYS IN MALAYSIA

FARIHA BT MOHD RAFIE PAYMENY DILEMA FOR SUB CONTRACTORS

KUMALASARI BINTI KIPLI DISCREPANCIES AND AMBIGUITIES IN


CONTRACT DOCUMENTS

LEE LIN JYE THE SUPERINTENDENT OFFICERS ROLES


AND AUTHORITIES IN CONTRIBUTING
TOWARDS BETTER ENVIRONMENT

LIEW LEE PING CONTRACT ADMINISTRATORS AS


INDEPENDENT AND IMPARTIAL CERTIFIERS

MOHAMAD FAIRUZ BIN KIPRAWI DEFENCE OF ABATEMENT FOR DEFECTIVE


WORKS

4
LIST OF DISSERTATION FOR M.SC. IN CONSTRUCTION CONTRACT MANAGEMENT

YEAR NAME OF AUTHOR TITLE

2009-2010 NAZIRAH BINTI ABD RAHIM PUBLIC WORKS PROCUREMENT


THE EUROPEAN EXPERIENCE

NORWATI BINTI HAJI MOHAMAD JUDICIAL INTERPRETATIONS OF THE TERM


ALI LUMP SUM IN CONSTRUCTION CONTRACT

OLIVIA ANAK RAYEG CONTRACTORS RIGHTS IN THE EVENT OF


EMPLOYERS INSOLVENCY

ROBERT HENG WEI KIONG VARIATION ORDERS IN DESIGN AND BUILD


CONTRACTS

SIM KHIAN HUI EXTENSION OF TIME CONDITION


PRECEDENT NOTICE

SITI FAIRUS BINTI OTHMAN THE LEGAL STATUS OF CONSTRUCTION


WORK PROGRAMME IN THE CONSTRUCTION
INDUSTRY

WEE CHIEW ANG THE LEGAL ISSUES RELATING TO RETENTION


MONEY

YOW LI PIG LETTER OF ACCEPTACE/ AWARD AS A


UQUALIFIED ACCEPTACE

ZAHARAH BINTI YUSOFF EMPLOYERS RECOVERY OF PAYMENT


CAUSED BY VARIATIONS DUE TO DESIGNERS
NEGLIGENCE

ASMAH ALIA BT MOHAMAD QUANTITY SURVEYORS LIABILITY DURING


BOHARI PRE TENDER STAGE

FARIHAN BT MOHD RAFIE PAYMENT DILEMA FOR SUB CONTRACTORS

FRAULINE ANAK ENGKAMAT THE SUPERINTENDING OFFICERS DUTIES


UNDER JKR SARAWAK FORM OF CONTRACT
PWD 75 (VER. 2006)

LEE KAH CHUONG AN APPROACH TO A FAIR AND REASONABLE


EXTENSION OF TIME ASSESSMENT

ABU BAKAR BIN HASSAN CRITERIA IN ASCERTAINING PROFESSIONAL


NEGLIGENCE

AIZAT FAHMI BIN AHMAD ARCHITECTS DESIGN LIABILITY

ANWAR BIN MOHD APANDI ARCHITECT LIABILITY DURING INSPECTION OF


WORK

FAUZIAH BINTI ISHAK COMMON FAULTS MADE BY ARBITRATORS IN


THE EXECUTION OF THEIR DUTIES

HADZIRA BINTI M.NOR CONSOLIDATION OF ARBITRAL PROCEEDINGS

5
LIST OF DISSERTATION FOR M.SC. IN CONSTRUCTION CONTRACT MANAGEMENT

YEAR NAME OF AUTHOR TITLE

2009-2010 IMRAN BIN MOHD YUSOP ADJUDICATOR DETERMINES OWN


JURISDICTION : A PREDICTION FOR THE
PROPOSED CONSTRUCTION INDUSTRY
PAYMENT AND ADJUDICATION ACT

INTAN BAYANI BINTI ZAKARIA ARBITRATORS JURISDICTION TO RESOLVE


DISPUTES RELATING TO ALLEGATION OF
FRAUD

LIM WAN WEI CONSTRUCTION INSURANCE

MALINJA TEH SHEAN EE EVIDENCE IN ARBITRATION

MAZURA BT MAHDZIR THE IMPOSITION OF DUTIES OF CARE BY


THIRD PARTIES IN TORT

OOI POH POH PROFILE OF CONSTRUCTION PAYMENT


DISPUTE

PATAHORRAHMAN BIN RAFFI LEGAL POSITION OF PAY WHEN PAID


PROVISION IN MALAYSIA

THEN LEE LIAN EQUITABLE REMEDY: SPECIFIC


PERFORMANCE

WONG KOK HOA JUDICIAL INTERPRETATIONS ON


ARBITRATORS MISCONDUCT

YAP POY YEE JUDICIAL INTERPRETAIONS ON ERROR OF


LAW ON THE FACE OF ARBITRATION AWARD

2010-1011 BAWA MUSTAPHA COMPARISON BETWEEN THE STANDARD


FORMS OF BUILDING CONTRACT USED IN
NIGERIA AND MALAYSIA

ROZILAH BINTI TALIB DISPUTE REVIEW BOARD IN THE CONTEXT OF


MALAYSIAN CONSTRUCTION INDUSTRY

NOOR AZLIFAH AMIR SUTAN VALID AND ACCEPTABLE FORM AND FORMAT
OF ARCHITECTS INSTRUCTIONS

NURUL AISHATUL ADHA BT ARBITRATORS MISCONDUCT IN RECEIVING


MOHD SUBHA EVIDENCE IN ARBITRATION PROCEEDINGS

LIM TZE SHWAN CONTRACTORS LIABILITIES TOWARDS


EMPLOYERS DEFECTIVE BUILDING WORK
CLAIMS DURING DEFECT LIABILITY PERIOD

HUI CHAN WHY EMPLOYER RIGHT IN THE EVENT OF


CONTRACTORS LIQUIDATION

NORHAIBATI HASHIM DIMINUTION IN VALUE OF WORKS DUE TO


DEFECTS

6
LIST OF DISSERTATION FOR M.SC. IN CONSTRUCTION CONTRACT MANAGEMENT

YEAR NAME OF AUTHOR TITLE

2010-2011 SITI AISHAH AQILAH BINTI JASRI DISPUTES IN DESIGN AND BUILD
CONSTRUCTION CONTRACT

IZZAT BIN IDRIS DISQUALIFICATION OF ARBITRATOR

ROSE CHIENG LING SHIAN THE EXPERT WITNESS IMMUNITY IN


NEGLIGENCE

HAN SIEW HEE GLOBAL CLAIMS FOR DAMAGES IN


CONSTRUCTION CONTRACTS

NORAZREEN BINTI ABU BAKAR THE LEVEL OF UNDERSTANDING THE


CONTRACT REQUIREMENT OF STANDARD
FORM OF CONTRACT AMONG THE
CONSTRUCTION PROFESSIONAL

MOHD SOFIAN BIN MAKHTAR SOFT SKILLS OF MEDIATOR

AWANG MUHAMAD BIN HJ. MUTUAL TERMINATION OF CONTRACT IN


JAMBOL CONSTRUCTION PROJECTS

NUR SYAIMASYAZA BT. NOTICE AS CONDITION PRECEDENT TO CLAIM


MANSOR - LIQUIDATED DAMAGES

NORHAZIYAH BINTI MOHAMMAD THE VIABILITY OF ONLINE DISPUTE


NOR RESOLUTION IMPLEMENTATION

NURHANISA HASMAH BINTI PAYMENT FOR OFF-SITE UNFIXED MATERIALS


RUSTAM AND GOODS

ZAIRRA BINTI MAT JUSOH QUANTUM MERUIT IN CONSTRUCTION


CONTRACTS

SITI HUDA BINTI RISK IN CONSTRUCTION CONTRACTUAL


KAMARUZAMAN
TERM AND CONDITION

WAN MOHD IZZUDDIN TERMINATION OF CONTRACT

HASNITA HANA BINTI HASSAN TERMINATION OF CONTRACTOR DUE TO THE


CORRUPTION, UNLAWFUL OR ILLEGAL
ACTIVITIES

MOHD ZAIDI BIN TUAH USE OF DISCRETION BY CONTRACT


PRINCIPAL

CHONG OI SIANG WRONGFUL TERMINATION OF CONTRACT IN


CONSTRUCTION INDUSTRY

7
LIST OF DISSERTATION FOR M.SC. IN CONSTRUCTION CONTRACT MANAGEMENT

YEAR NAME OF AUTHOR TITLE

2011-2012 ALEJO AYODELE .O COMPARATIVE STUDY OF DEFECT LIABILITY


PERIOD PRACTICES BETWEEN MALAYSIA AND
NIGERIA

MOHAMMAD MAHDI HOSSEINI TERMINATION OF CONSTRUCTION


CONTRACTS BY EMPLOYER

ADILA BINTI ZAKARIA TRANSFORMATION OF DELIVERING SYSTEM:


COMPARISON STUDY BETWEEN CERTIFICATE
OF FITNESS FOR OCCUPATION (CFO) TO
CERTIFICATE OF COMPLETION AND
COMPLIANCE (CCC)

AZLINA BINTI ZAINAL ABIDIN LIABILITIES OF THE CONTRACT


ADMINISTRATOR IN CERTIFICATION

CHAI SIAW HIONG CONSTRUING CONTRACT CLAUSE: THE


LITERAL RULE

CHAN NAM ONN JOINT VENTURE AGREMENT IN


CONSTRUCTION INDUSTRY

GRACE POH CHIENG LING THE RESTRAINTS OF PERFORMANCE BOND


CLAIMS IN CONSTRUCTION INDUSTRY

HILMI BIN HAJIJAN TERMINATION WHEN TIME OF THE ESSENCE


IN CONSTRUCTION

JENNY LOO SHIH YEIN THE PROFILE OF CONSTRUCTION DELAYS

JOANNA TAY YUAN JU THE ARBITRABLE DISPUTES IN MALAYSIAN


CONSTRUCTION INDUSTRY

JULIANA BINTI BRAHIM THE PROFILE OF SUPPLEMENTARY


AGREEMENT LAW CASES

LEE SEE KIM SETTING ASIDE AN AWARD: ARBITRATORS


MISCONDUCT

LEONG SIEW CHENG VALIDITY OF LATE DECISION UNDER


CONSTRUCTION INDUSTRY PAYMENT AND
ADJUDICATION ACT (CIPAA) 2012

LOO SHIH NIE @ NANCY LOO PROFILE OF SET-OFF CASES IN MALAYSIAN


CONSTRUCTION INDUSTRY

MOHAMAD SAFUAN BIN MOHD THE IRRELEVANCY OF CLAIM FOR SET-OFF IN


NAZAM THE EXISTENCE OF PROVISIONS IN
STANDARD FORMS OF CONTRACT

MOHD AFIQ BIN ZULKEPLI NEGLIGENCE BY QUANTITY SURVEYORS

8
LIST OF DISSERTATION FOR M.SC. IN CONSTRUCTION CONTRACT MANAGEMENT

YEAR NAME OF AUTHOR TITLE

2011-2012 MOHD NUR IMAN AL HAFIZ BIN TERMINATION OF CONTRACT: ABANDONMENT


MOHD JAMIL OF WORK

NG SENG YAO THE RIGHTS OF THE CONTRACTOR ON


RECOVERY OF PAYMENT AFTER
TERMINATION OF CONTRACT UNDER
SECURITY OF PAYMENT REGIMES

NOOR AKMALEENA BINTI MD PROFILING OF DISPUTE RESOLUTION


DAUD MECHANISMS IN ASEAN COUNTRIES

NOOR HALWANI BT MOKHTAR EXTENSION OF TIME IN COMMENCEMENT OF


ARBITRATION PROCEEDINGS

Nor Aida binti Mohd Amin Doctrine of Privity and Its Application in Relation to
Sub - Contractors Payment

NORHAZREN IZATIE BINTI MOHD SUMMARY JUDGEMENT: TRIABLE ISSUE AS A


DEFENCE

NORIAH BINTI HUSSAIN KEBERKESANAN FUNGSI BANDAR PENAWAR


SEBAGAI BANDAR PERKHIDMATAN
PELANCONGAN

NUR FARAH FARHANA BINTI BEST ENDEAVOURS FOR GRANTING AN


RASID EXTENSION OF TIME IN CONSTRUCTION
CONTRACT

NURHIDAYAH BINTI KAMALUDIN ARCHITECTS LIABILITY IN MAKING DECISION


DURING CONSTRUCTION STAGE

NURUL HAYANI BINTI ABU SIROH PAYMENT OF ARCHITECTS FEES ON


TERMINATION OF SERVICES

NURULAIN BINTI TAZOL ARRIEF EMPLOYERS IMPLIED OBLIGATION IN


CONSTRUCTION CONTRACT

SAIFUL AZHAR BIN ABD HAMID THE EXCLUSION CLAUSE IN GOVERNMENT


STANDARD FORM OF CONSTRUCTION
CONTRACTS

THAM YOON FAH JUDICIAL INTERPRETATION OF THE HIGH


COURT IN APPLICATION OF THE SECURITY
FOR COSTS

TIEW SYEN YOUNGS PETITION FOR WINDING UP UNDER SECTION


218 OF COMPANIES ACT 1965

TING HIE CHING CONFLICT OF LAWS IN ARBITRATION

9
LIST OF DISSERTATION FOR M.SC. IN CONSTRUCTION CONTRACT MANAGEMENT

(LIST OF DISSERTATION - M.SC. CCM WITH QUANTITY SURVEYING OPTION)

YEAR NAME OF AUTHOR TITLE

2010-2011 I PUTU SAMSKERTA ESTIMATION OF DEVELOPMENT AND


MAINTENANCE COST OF NIPAH ISLAND
RESTORATION PROJECT
DODI ARDIANTO ANALYSIS OF FACTORS AFFECTING THE
ACCI]RACY OF EARLY COST ESTIMATE IN
CONSTRUCTION PROJECTS
AGUNG NUGROHO DWI A COMPARATIVE STUDY ON INDONESIA AND
PRASETYO MALAYSIA CONTRACTOR SELECTION
PRACTICES
IMAM BUCHORI COST ANALYSIS FRAMEWORK FOR SEDIMENT
MANAGEMENT IN RESERVOIR
INFRASTRUCTURE
DIDIK ARDIANTO COST-BENEFIT ANALYSIS OF SEDIMENT
MANAGEMENT IN SUTAMI DAM, EAST JAVA,
INDONESIA
ADITYA MUHAMMAD YUWONO COST CONTROL IN CONSTRUCTION PHASE IN
JOINT OPERATION CONTRACTORS (A CASE
STUDY OF JOINT OPERATION CONTRACTORS
IN SUMATERA INDONESIA)
ERWANDO RACHMADI COST PLANNING IN WATER RESOURCES
INFRASTRUCTURE MAINTENANCE PROJECT
MUHAMMAD ITSNA FARID CRITICAL SUCCESS FACTORS OF PROJECT
MANAGEMENT OF RIVER NORMALIZATION
PROJECT
WENDARA BAYU SUMAPRAJA MANAGING THE IMPACT OF ECONOMIC CRISIS
TO CONSTRUCTION PROJECTS
DIMAS MAULANA THE STUDY ON IMPACT OF PROJECT DELAYS
TO CONSTRUCTION COST
ADI ARGO SOEWENDO COMPARISON BETWEEN CONSTRUCTION
CONTRACT USED FOR GOVERNMENT
PROJECTS IN INDONESIA AND MALAYSIA
DEWI ROZAMURTINA NEGOTIATION FOR DISPUTES SETTELMENT IN
CONSTRUCTION CLAIM (A CASE STUDY ON
AIR LAKITAN IRRIGATION SUB-PROJECT-
STAGE-1,INDONESIA)
DWI ADI SUNARKO THE STRATEGY ADOPTED BY THE
INDONESIAN GOVERNMENT CONTRACTORS
TO MAINTAIN PROFIT
ENDAR TRI PRAKOSO A LESSON FROM THE SEDYATMO PACKAGE 4
ADDITIONAL ELEVATED LANE TOLL ROAD
PROJECT

10
LIST OF DISSERTATION FOR M.SC. IN CONSTRUCTION CONTRACT MANAGEMENT

(LIST OF DISSERTATION - M.SC. CCM WITH QUANTITY SURVEYING OPTION)

YEAR NAME OF AUTHOR TITLE

2010-2011 NAZIB FAIZAL APPLYING VALUE ENGINEERING IN SLOPE


FAILURE ON ROAD EMBANKMENT REMEDIAL
WORK
MINCE HALIMA THE STUDY ON THE PHYSICAL AND FINANCIAL
PERFORMANCE OF WATER SUPPLY
PROJECTS IN THE PROVINCE OF SOUTHEAST
SULAWESI, INDONESIA
2011-2012 AMRUL DUNAL THE COST SAVING IN VALUE ENGINEERING
EXERCISE IN CONSTRUCTION CONTRACTS
ANGGORO PUTRO THE COST OVERRUNS IN GREEN BUILDING
DEVELOPMENT(CASE STUDY MINISTRY OF
PUBLIC WORKS NEW GREEN BLDG PROJECT
FOR INDONESIA)
DEDENG JEFRI ARTHUR THE PRINCIPLES IN ASSESSING THE
QUANTUM OF ACCELERATION CLAIM FOR
INTERNATIONAL PROJECTS
DONA ALISYAH SIREGAR EFFECT OF ENGINEERING PROCUREMENT
CONSTRUCTION (EPC)
CONTRACT CLAUSES: A CASE STUDY IN
BALONGAN JAKARTA II PIPELINE PROJECT,
INDONESIA
HARDIANSYAH PRANATA PUTRA GREEN BUILDING ENERGY CONSUMPTION
ANALYSIS AT OPERATIONAL STAGE
FANI DHUHA MINOR DEFECTS AND PRACTICAL
COMPLETION
HARDIANSYAH PUTRA VALUE ENGINEERING IN ROAD
CONSTRUCTION AT EXPANSIVE SOIL
PROBLEM
HARY PRASETYA ROUTINE MAINTENANCE COST FOR HEAVY
LOADED ROAD SEGMENTS
HEIDI DUMA THE RELATIONSHIP BETWEEN GENERAL
CONTRACTOR AND SUBCONTRACTOR
HERU RAHMAT PERMANA RISK MGMT IN TOLL ROAD PROJECT UNDER
PUBLIC PRIVATE PARTNERSHIP SCHEME(case
study : Jakarta Outer Ring Road (JORR) W1)

LAMBANG PUSPITO JATI ORAL INSTRUCTION IN CONSTRUCTION


YUNIANTORO CONTRACT FROM LEGAL PERSPECTIVE

MAUL HASWORO RISK ALLOCATION OF FOREIGN FUNDED


INFRASTRUCTURE PROJECT A CASE STUDY
IN SOUTH EAST SULAWESI

11
LIST OF DISSERTATION FOR M.SC. IN CONSTRUCTION CONTRACT MANAGEMENT

(LIST OF DISSERTATION - M.SC. CCM WITH QUANTITY SURVEYING OPTION)

YEAR NAME OF AUTHOR TITLE

2011-2012 MOCHAMAD ANUGRAH WIBOWO A STUDY OF CONTRACTORS PROCUREMENT


SOEHARTO PERFORMANCE
CASE : PT. WASKITA KARYA (PERSERO)

MOHAMAD TAUFIK A STUDY ON IDENTIFYING FACTORS


AFFECTING PROJECT
PERFORMANCE ON ROAD CONSTRUCTION
PROJECTS

MOHD FATHEL BIN LATON APPLICATION FOR STAY OF PROCEEDINGS


AND
UNCONDITIONAL APPEARANCE.

MUHAMMAD REVI FEBIANSYAH APPLYING VALUE ENGINEERING IN ROAD


RECONSTRUCTION
BY USING RECYCLING TECHNIQUE

PURNOMO PRINCIPLE METHODS OF ASSESSING


CONCURRENT DELAYS
IN CONSTRUCTION

RAKHMA DESTRIAN ADI RISK MANAGEMENT OF BRIDGE


MAHARDIKA CONSTRUCTION PROJECT IN INDONESIA
RATIH KUSUMAWATI ISSUES IN IMPLEMENTING ELECTRONIC
TENDERING IN
INDONESIANS CONSTRUCTION INDUSTRY
SENG HANSEN STUDY ON THE MANAGEMENT OF
ENGINEERING PROCUREMENT AND
CONSTRUCTION (EPC) PROJECTS

SONDA PARNINGOTAN A STUDY OF CLAIMS MANAGEMENT FOR


IRRIGATION CONSTRUCTION CONTRACT
(CASE:AMANDIT IRRIGATION SUB
PROJECT,SOUTH KALIMANTAN,INDONESIA)

12