a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
- Pekerja 0.200 Oh x Rp. 35,000.00 = Rp.
- Tukang Kayu 0.200 Oh x Rp. 45,000.00 = Rp.
- Kepala Tukang 0.020 Oh x Rp. 47,500.00 = Rp.
- Mandor 0.001 Oh x Rp. 49,000.00 = Rp.
JUMLAH = Rp.
a. Bahan
- seng plat 3 x 6 bjls 28 0.500 Lbr x Rp. 66,800.00 = Rp.
- paku biasa 1/2" - 1" 0.015 Kg x Rp. 12,600.00 = Rp.
- kayu borneo, papan 0.010 m3 x Rp. 1,200,000.00 = Rp.
- flincote / meni besi 0.250 Kg x Rp. 21,400.00 = Rp.
JUMLAH = Rp.
b. Tenaga
- Pekerja 0.150 Oh x Rp. 35,000.00 = Rp.
- Tukang Kayu 0.400 Oh x Rp. 45,000.00 = Rp.
- Kepala Tukang 0.025 Oh x Rp. 47,500.00 = Rp.
- Mandor 0.001 Oh x Rp. 49,000.00 = Rp.
JUMLAH = Rp.
a. Bahan
- seng plat 3 x 6 bjls 28 0.500 Lbr x Rp. 66,800.00 = Rp.
- paku biasa 1/2" - 1" 0.015 Kg x Rp. 12,600.00 = Rp.
- kayu borneo, papan 0.019 m3 x Rp. 1,200,000.00 = Rp.
- flincote / meni besi 0.300 Kg x Rp. 21,400.00 = Rp.
JUMLAH = Rp.
b. Tenaga
- Pekerja 0.040 Oh x Rp. 35,000.00 = Rp.
- Tukang Kayu 0.400 Oh x Rp. 45,000.00 = Rp.
- Kepala Tukang 0.025 Oh x Rp. 47,500.00 = Rp.
- Mandor 0.001 Oh x Rp. 49,000.00 = Rp.
JUMLAH = Rp.
a. Bahan
- seng plat 3 x 6 bjls 28 0.300 Lbr x Rp. 66,800.00 = Rp.
- paku biasa 1/2" - 1" 0.100 Kg x Rp. 12,600.00 = Rp.
- kayu borneo, papan 0.019 m3 x Rp. 1,200,000.00 = Rp.
- flincote / meni besi 0.500 Kg x Rp. 21,400.00 = Rp.
JUMLAH = Rp.
b. Tenaga
- Pekerja 0.150 Oh x Rp. 35,000.00 = Rp.
- Tukang Kayu 0.250 Oh x Rp. 45,000.00 = Rp.
- Kepala Tukang 0.025 Oh x Rp. 47,500.00 = Rp.
- Mandor 0.001 Oh x Rp. 49,000.00 = Rp.
JUMLAH = Rp.
a. Bahan
- seng plat 3 x 6 bjls 24 0.300 Lbr x Rp. 54,700.00 = Rp.
- paku biasa 1/2" - 1" 0.100 Kg x Rp. 12,600.00 = Rp.
- kayu borneo, papan 0.019 m3 x Rp. 1,200,000.00 = Rp.
- flincote / meni besi 0.500 Kg x Rp. 21,400.00 = Rp.
JUMLAH = Rp.
b. Tenaga
5 1 bh pasang Ventilator
a. Bahan
b. Tenaga
36,850.00
1,712.00
38,562.00
270.00
2,100.00
285.00
14.70
2,669.70
41,231.70
265,600.00
265,600.00
29,250.00
22,750.00
3,087.50
1,568.00
56,655.50
322,255.50
265,600.00
265,600.00
47,250.00
36,750.00
4,987.50
257.25
89,244.75
354,844.75
882,200.00
882,200.00
67,500.00
36,750.00
7,125.00
254.80
111,629.80
993,829.80
332,200.00
332,200.00
47,250.00
36,750.00
4,987.50
254.80
89,242.30
421,442.30
10,120.00
10,120.00
54,000.00
42,000.00
570.00
29.40
96,599.40
106,719.40
33,550.00
252.00
220.00
34,022.00
7,000.00
9,000.00
950.00
49.00
16,999.00
51,021.00
33,400.00
189.00
11,520.00
5,350.00
50,459.00
5,250.00
18,000.00
1,187.50
61.25
24,498.75
74,957.75
33,400.00
189.00
22,800.00
6,420.00
62,809.00
1,400.00
18,000.00
1,187.50
61.25
20,648.75
83,457.75
20,040.00
1,260.00
22,800.00
10,700.00
54,800.00
5,250.00
11,250.00
1,187.50
61.25
17,748.75
72,548.75
16,410.00
1,260.00
22,800.00
10,700.00
51,170.00
5,250.00
11,250.00
1,187.50
61.25
17,748.75
68,918.75
3,082,200.00
3,082,200.00
47,250.00
36,750.00
4,987.50
254.80
89,242.30
3,171,442.30
Galian Tanah Biasa Untuk Pondasi Jalur
panjang = 24 3.6
lebar = 0.65 47
tinggi = 0.3 24
volume = 20.553 16
16
Pemadatan Tanah Pilihan 103
luas = 20.4
tinggi = 0.35
vlm = 7.14
panjang = 0
tinggi = 3.3
vlm = 0 78.492
vlm jd -78.492
2.42112
Cat Kayu (1 lapis meni), 1 lapis cat dasar 2 lapis cat penutup 0
= 0.34 x 76.77 = 26.1018
= #REF!
0.5992 daun jendela
#REF!
koseng
2.52 0.68 1.7136
2.86 2 5.72
2.44 2 4.88
1.56 1 1.56
13.8736 27.7472
0.6336 5 3.168
7.2072 2 14.4144
2.26 0.9 4.068 21.6504 19.9704
27 18
20 20
1.2 24
18 1.8
22.5 4.8
4.8 23
9 11.4
102.5 103
29.4
1.2
1.2
4.32
luasan
kosen pintu jendela
2.3058 3 6.9174
3.5868 2 7.1736
6.6736 1 6.6736
2.6112 6 15.6672
2.034 2 4.068
1.7028 1 1.7028
6.552 2 13.104
6.8212 2 13.6424
6.375 1 6.375
0.6336 5 3.168
78.492
17500000
204.24 51.06
9 0.12 8.88
9 0.12 8.88
10 0.12 9.88
10 0.24 9.76
7.2 0.36 6.84
8.2 0.24 7.96
9.2 0.24 8.96
10.2 0.24 9.96
=
= 7.02
= 5.89
= 6.93
= 2.33
= 0
= 0
= 0
= 0
= 0
= 0
= 14.37
= 1.83
= 0
= 0
7.46
7.46
7.46
7.46
2.14
2.14
2.14
2.14
76.77 x 0.12 x 0.08 = 0.737
0.834
0.079
0.913
1.2725
143
20.64
226.1438
= 1.685568
7.72
8.2
5.6
8.74
30.26
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : PEMBANGUN GUDANG KELENGKAPAN
LOKASI : BOBONG
TAHUN : 2015
1 2 3 4
A GUDANG KELENGKAPAN
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Kegiatan Ls 1.00
2 Membersihkan Lapangan dan Perataan M2 53.55
3 Pengukuran dan Pemasangan Bouwplank M1 26.00
JUMLAH I
II PEKERJAAN TANAH
1 Galian Tanah Biasa Untuk Pondasi Jalur M3 20.55
2 Urugan Kembali M3 5.14
3 Pemadatan Tanah Pilihan M3 7.14
4 Urugan Pasir Dibawah Pondasi Jalur M3 0.78
5 Urugan Pasir Dibawah Lantai M3 1.02
6 Timbunan Tanah Pilihan M3 7.14
JUMLAH II
III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kosong M3 3.12
2 Pasang Pondasi Batu Kali 1 Pc : 4 Ps M3 4.50
JUMLAH III
IV PEKERJAAN BETON
1 Pekerjaan Lantai Rabat Beton, 1 Pc : 3 Ps : 5 Kr. Tbl. 5 cm M3 1.02
JUMLAH IV
V PEKERJAAN DINDING
1 Pasang dinding Papan Uk. 3x25 Kelas I M2 65.40
JUMLAH V
VI PEKERJAAN LISTRIK
1 Box MCB Bh 1.00
2 Instalasi Titik Lampu & Stop Kontak Ttk 6.00
3 Stop Kontak Bh 2.00
4 Saklar Tunggal Bh 2.00
5 Lampu Philips 14 Watt Bh 4.00
6 kabel instalasi M 30.00
JUMLAH VI
VII PEKERJAAN KAYU
1 Kolom Kayu 8x12 Kayu kelas I M3 0.36
2 Ring Balok 5x10 Kayu Kelas I M3 0.34
3 Pasang daun Pintu kayu klas I M2 7.50
4 Pasang gording kayu klas II M3 0.21
5 Pasang Lisplang ukuran (3 x 30) cm, kayu klas I M2 5.10
JUMLAH VII
VIII PEKERJAAN KUNCI KACA
1 Pasang kunci tanam Bh 1.00
2 Pasang engsel pintu 4" Bh 6.00
3 Pasang grendel Pintu Bh 2.00
JUMLAH VIII
IX PEKERJAAN ATAP
1 Pasang Atap Seng gel. BJLS 0.25 M2 64.55
JUMLAH IX
B TEMPAT MESIN LAMPU
I PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan M2 12.00
2 Pengukuran dan Pemasangan Bouwplank M1 10.00
JUMLAH I
II PEKERJAAN TANAH
1 Galian Tanah Biasa Untuk Pondasi Jalur M3 0.80
2 Urugan Kembali M3 0.20
3 Timbunan Tanah Pilihan M3 2.20
JUMLAH II
III PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 4 Ps M3 0.80
JUMLAH III
IV PEKERJAAN BETON
1 Pekerjaan Lantai Rabat Beton, 1 Pc : 3 Ps : 5 Kr. M3 0.90
JUMLAH IV
V PEKERJAAN DINDING
1 Pasang dinding Papan Uk. 3x25 Kelas I M2 19.25
JUMLAH V
VI PEKERJAAN LISTRIK
1 Instalasi Titik Lampu & Stop Kontak Ttk 2.00
2 Saklar Tunggal Bh 1.00
3 Lampu Philips 14 Watt Bh 2.00
4 kabel instalasi M 10.00
JUMLAH VI
VII PEKERJAAN KAYU
1 Kolom Kayu 8x12 Kayu kelas I M3 0.13
2 Ring Balok 5x10 Kayu Kelas I M3 0.07
3 Pasang daun Pintu kayu klas I M2 2.00
4 Pasang gording kayu klas II M3 0.10
JUMLAH VII
VIII PEKERJAAN KUNCI KACA
1 Pasang Slot Besar Bh 1.00
2 Pasang engsel pintu 4" Bh 3.00
3 Pasang grendel Pintu Bh 2.00
JUMLAH VIII
IX PEKERJAAN ATAP
1 Pasang Atap Seng gel. BJLS 0.25 M2 12.00
JUMLAH IX
C TEMPAT PARKIR
I PEKERJAAN TANAH
1 Galian Tanah Biasa Untuk Pondasi Tiang M3 0.96
JUMLAH I
II PEKERJAAN PONDASI
1 Pasang Pondasi Cor Tiang Kayu 1 Pc : 3 Ps : 5 Kr M3 0.96
JUMLAH II
III PEKERJAAN BETON
1 Pekerjaan Lantai Rabat Beton, 1 Pc : 3 Ps : 5 Kr. M3 4.28
JUMLAH III
IV PEKERJAAN LISTRIK
1 Instalasi Titik Lampu & Stop Kontak Ttk 3.00
2 Saklar Tunggal Bh 1.00
3 Lampu Philips 14 Watt Bh 3.00
4 kabel instalasi M 20.00
JUMLAH IV
V PEKERJAAN KAYU
1 Kolom Kayu 8x12 Kayu kelas I M3 0.46
2 Ring Balok 5x10 Kayu Kelas I M3 0.33
3 Pasang gording kayu klas II M3 0.30
JUMLAH V
VI PEKERJAAN ATAP
1 Pasang Atap Seng gel. BJLS 0.25 M2 40.50
JUMLAH VI
KUANTITAS DAN HARGA
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
5 6
315,000.00 315,000.00
14,650.00 784,507.50
67,728.00 1,760,928.00
JUMLAH I 2,860,435.50
38,600.00 793,345.80
18,503.00 95,073.04
48,250.00 344,505.00
487,250.00 380,055.00
487,250.00 496,995.00
378,125.00 2,699,812.50
JUMLAH II 4,809,786.34
611,040.00 1,906,444.80
1,242,083.08 5,589,373.86
JUMLAH III 7,495,818.66
1,362,683.08 1,389,936.74
JUMLAH IV 1,389,936.74
192,080.00 12,562,032.00
JUMLAH V 12,562,032.00
26,880.00 26,880.00
184,050.00 1,104,300.00
53,000.00 106,000.00
14,280.00 28,560.00
44,415.00 177,660.00
7,260.00 217,800.00
JUMLAH VI 1,661,200.00
7,404,000.00 2,693,871.36
7,404,000.00 2,487,744.00
192,080.00 1,440,600.00
6,363,780.00 1,352,303.25
192,080.00 979,608.00
JUMLAH VII 8,954,126.61
157,100.00 157,100.00
63,678.75 382,072.50
47,905.00 95,810.00
JUMLAH VIII 634,982.50
78,732.00 5,082,347.43
JUMLAH IX 5,082,347.43
14,650.00 175,800.00
67,728.00 677,280.00
JUMLAH I 853,080.00
38,600.00 30,880.00
18,503.00 3,700.60
378,125.00 831,875.00
JUMLAH II 866,455.60
1,242,083.08 993,666.46
JUMLAH III 993,666.46
1,362,683.08 1,226,414.77
JUMLAH IV 1,226,414.77
192,080.00 3,697,540.00
JUMLAH V 3,697,540.00
184,050.00 368,100.00
14,280.00 14,280.00
44,415.00 88,830.00
7,260.00 72,600.00
JUMLAH VI 543,810.00
7,404,000.00 959,558.40
7,404,000.00 518,280.00
192,080.00 384,160.00
6,363,780.00 636,378.00
JUMLAH VII 2,498,376.40
70,000.00 70,000.00
63,678.75 191,036.25
47,905.00 95,810.00
JUMLAH VIII 356,846.25
78,732.00 944,784.00
JUMLAH IX 944,784.00
38,600.00 37,056.00
JUMLAH I 37,056.00
611,040.00 586,598.40
JUMLAH II 586,598.40
1,362,683.08 5,825,470.17
JUMLAH III 5,825,470.17
184,050.00 552,150.00
14,280.00 14,280.00
44,415.00 133,245.00
7,260.00 145,200.00
JUMLAH IV 844,875.00
7,404,000.00 3,370,300.80
7,404,000.00 2,443,320.00
6,363,780.00 1,909,134.00
JUMLAH V 7,722,754.80
78,732.00 3,188,646.00
JUMLAH VI 3,188,646.00
REKAPITULASI BIAYA
A GUDANG KELENGKAPAN
C TEMPAT PARKIR
a JUMLAH 75,637,039.63
b PPN 10 % x a 7,563,703.96
d JUMLAH (a + b) 83,200,743.60
e DIBULATKAN 83,200,000.00
TERBILANG : DELAPAN PULUH TIGA JUTA DUA RATUS RIBU RUPIAH RIBU RUPIAH
Bobong, 2015
KABUPATEN PULAU TALIABU
NIP : .
PITULASI BIAYA
Bobong, 2015
KABUPATEN PULAU TALIABU
NIP : .
JADUAL PELAKSANAAN PE
PEKERJAAN : PENGADAAN COLD STORAGE
LOKASI : JAILOLO - KABUPATEN HALMAHERA BARAT
TAHUN ANGGARAN : 2014
#REF! #REF!
#REF! #REF! 50
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
Dibuat oleh :
CV. CIPTA PRASARANA
AGUS SUSANTO
Direktur
PEKERJAAN PERSIAPAN
8,400.00
6,250.00
14,650.00
14,650.00
29388
622.00
17,143.00
47,153.00
10,500.00
8,400.00
1,050.00
625.00
20,575.00
67,728.00
PEKERJAAN TANAH
2 1 m3 Urugan Kembali
b. Tenaga
Pekerja 0.192 Oh x Rp. 84,000.00 = Rp.
Mandor 0.019 Oh x Rp. 125,000.00 = Rp.
JUMLAH = Rp.
3 1 m3 Pemadatan Tanah
b. Tenaga
Pekerja 0.500 Oh x Rp. 84,000.00 = Rp.
Mandor 0.050 Oh x Rp. 125,000.00 = Rp.
JUMLAH = Rp.
4 1 m3 Urugan Pasir
a. Bahan
Pasir Urug 1.200 M3 x Rp. 384,000.00 = Rp.
JUMLAH = Rp.
b. Tenaga
Pekerja 0.300 Oh x Rp. 84,000.00 = Rp.
Mandor 0.010 Oh x Rp. 125,000.00 = Rp.
JUMLAH = Rp.
JUMLAH (a) + (b) = Rp.
33,600.00
5,000.00
38,600.00
16,128.00
2,375.00
18,503.00
42,000.00
6,250.00
48,250.00
460800
460,800.00
25,200.00
1,250.00
26,450.00
487,250.00
354,000.00
354,000.00
21,000.00
3,125.00
24,125.00
378,125.00
2 1 m3 Pasang Pondasi Batu Kosong
a. Bahan
Pasir Urug
- Batu Belah 15 / 20 cm 1.200 M3 x Rp. 317,000.00 = Rp.
- Pasir Urug 0.300 M3 x Rp. 384,000.00 = Rp.
JUMLAH = Rp.
b. Tenaga
- Pekerja 0.780 Oh x Rp. 84,000.00 = Rp.
- Tukang Batu 0.390 Oh x Rp. 105,000.00 = Rp.
- Kepala Tukang 0.039 Oh x Rp. 105,000.00 = Rp.
- Mandor 0.039 Oh x Rp. 125,000.00 = Rp.
JUMLAH = Rp.
JUMLAH (a) + (b) = Rp.
65,520.00
40,950.00
4,095.00
4,875.00
115,440.00
611,040.00
348,700.00
489,000.00
199,708.08
1,037,408.08
126,000.00
63,000.00
6,300.00
9,375.00
204,675.00
1,242,083.08
PEKERJAAN LISTRIK
100,800.00
68,250.00
15,000.00
184,050.00
PEKERJAAN KAYU
5,445,000.00
5,445,000.00
1,680,000.00
210,000.00
31,500.00
37,500.00
1,959,000.00
7,404,000.00
198,000.00
198,000.00
84,000.00
262,500.00
26,250.00
6,250.00
379,000.00
577,000.00
173,250.00
173,250.00
67,200.00
210,000.00
21,000.00
5,000.00
303,200.00
476,450.00
5,445,000.00
129,000.00
24,880.00
5,598,880.00
336,000.00
1,260,000.00
420,000.00
1,500,000.00
3,516,000.00
9,114,880.00
2,693,900.00
129,000.00
24,880.00
2,847,780.00
336,000.00
1,260,000.00
420,000.00
1,500,000.00
3,516,000.00
6,363,780.00
158,400.00
1,555.00
159,955.00
8,400.00
21,000.00
2,100.00
625.00
32,125.00
192,080.00
PEKERJAAN BETON
654,000.00
199,708.08
331500
1,185,208.08
138,600.00
26,250.00
2,625.00
10,000.00
177,475.00
1,362,683.08
PEKERJAAN SANITASI
7 1 Unit Septitank
a. Bahan
- Batu kali/Gunung 2.800 M3 x Rp. 317,000.00 = Rp.
- Semen Portland 450.000 Kg x Rp. 3,000.00 = Rp.
- Pasir Pasang 2.500 M3 x Rp. 384,054.00 = Rp.
- Pekerjaan Beton Bertulang ( 100 Kg ) 0.225 M3 x Rp. 3,064,140.00 = Rp.
JUMLAH = Rp.
b. Tenaga
- Pekerja 12.000 Oh x Rp. 84,000.00 = Rp.
- Tukang batu 8.000 Oh x Rp. 105,000.00 = Rp.
- Kepala Tukang 6.000 Oh x Rp. 105,000.00 = Rp.
- Mandor 3.000 Oh x Rp. 125,000.00 = Rp.
JUMLAH = Rp.
JUMLAH (a) + (b) = Rp.
2 Memasang 1 buah bak kontrol pasangan batu bata ukuran 45x45 tinggi 50 cm
a. Bahan
- Batu bata 0.250 m3 x Rp. 3,000.00 = Rp.
- Semen Portland 77.000 kg x Rp. 3,000.00 = Rp.
- Pasir Pasang 0.130 m3 x Rp. 384,054.00 = Rp.
- Batu Kerikil 0.020 m3 x Rp. 425,000.00 = Rp.
- Besi Beton 2.600 kg x Rp. 19,700.00 = Rp.
- Pasir Beton 3.600 m2 x Rp. 384,054.00 = Rp.
JUMLAH = Rp.
b. Tenaga
- Pekerja 1.420 Oh x Rp. 84,000.00 = Rp.
- Tukang batu 1.473 Oh x Rp. 105,000.00 = Rp.
- Kepala Tukang 0.047 Oh x Rp. 105,000.00 = Rp.
- Mandor 0.071 Oh x Rp. 125,000.00 = Rp.
JUMLAH = Rp.
JUMLAH (a) + (b) = Rp.
PEKERJAAN SANITASI
303,000.00
18,000.00
3,840.54
324,840.54
84,000.00
157,500.00
157,500.00
20,000.00
419,000.00
743,840.54
1,200.00
360,000.00
115,216.20
112,300.00
140,490.00
729,206.20
84,000.00
152,250.00
15,750.00
12,500.00
264,500.00
993,706.20
18,000.00
600,600.00
3,840.54
622,440.54
84,000.00
152,250.00
15,750.00
12,500.00
264,500.00
886,940.54
42,360.00
14,826.00
57,186.00
3,024.00
6,300.00
630.00
225.00
10,179.00
67,365.00
176,640.00
61,824.00
238,464.00
6,804.00
14,175.00
1,417.50
512.50
22,909.00
261,373.00
201,840.00
70,644.00
272,484.00
6,804.00
14,175.00
1,417.50
512.50
22,909.00
295,393.00
33,700.00
87.50
33,787.50
840.00
10,500.00
1,050.00
625.00
13,015.00
46,802.50
20,500.00
840.00
10,500.00
1,050.00
625.00
13,015.00
33,515.00
887,600.00
1,350,000.00
960,135.00
689,431.50
3,887,166.50
1,008,000.00
840,000.00
630,000.00
375,000.00
2,853,000.00
6,740,166.50
750.00
231,000.00
49,927.02
8,500.00
51,220.00
1,382,594.40
1,723,991.42
119,280.00
154,665.00
4,935.00
8,875.00
287,755.00
2,011,746.42
PEKERJAAN KUNCI DAN KACA
314,300.00
314,300.00
5,040.00
63,000.00
6,300.00
375.00
74,715.00
389,015.00
157,100.00
157,100.00
420.00
52,500.00
525.00
312.50
53,757.50
210,857.50
45,000.00
45,000.00
1,260.00
15,750.00
1,575.00
93.75
18,678.75
63,678.75
25,700.00
25,700.00
840.00
10,500.00
1,050.00
62.50
12,452.50
38,152.50
20,900.00
20,900.00
1,260.00
15,750.00
1,575.00
93.75
18,678.75
39,578.75
318,450.00
318,450.00
1,260.00
15,750.00
1,575.00
93.75
18,678.75
337,128.75
23,000.00
23,000.00
1,680.00
21,000.00
2,100.00
125.00
24,905.00
47,905.00
14,000.00
14,000.00
1,680.00
21,000.00
2,100.00
125.00
24,905.00
38,905.00
1,500,000.00
1,500,000.00
68,250.00
54,600.00
6,825.00
4,000.00
133,675.00
1,633,675.00
30,080.00
30,080.00
735.00
588.00
73.50
37.50
1,434.00
31,514.00
PEKERJAAN LANTAI
112,300.00
25,080.00
8,833.24
20,070.00
166,283.24
21,000.00
12,600.00
1,260.00
1,562.50
36,422.50
202,705.74
112,300.00
26,280.00
8,833.24
20,070.00
167,483.24
22,680.00
13,650.00
1,365.00
1,687.50
39,382.50
206,865.74
112,300.00
27,900.00
6,912.97
33,450.00
180,562.97
50,400.00
47,250.00
4,725.00
3,750.00
106,125.00
286,687.97
113,400.00
34,140.00
16,130.27
33,450.00
197,120.27
21,000.00
12,600.00
1,260.00
1,562.50
36,422.50
233,542.77
PEKERJAAN ATAP
b. Tenaga
60,270.00
702.00
60,972.00
10,080.00
6,300.00
630.00
750.00
17,760.00
78,732.00
23,250.00
1,404.00
24,654.00
12,600.00
7,350.00
840.00
750.00
21,540.00
46,194.00
38,750.00
466.50
46,531.00
6,330.00
92,077.50
3,360.00
42,000.00
2,625.00
156.25
48,141.25
140,218.75
PEKERJAAN BESI ALUMANIUM
4 1 m2 Pek. Relling Besi Hollow Sandaran
a. Bahan
- Besi Siku Uk. 50.50.5 6.000 M' x Rp. 50,000.00 = Rp.
- Besi polos. dia. 16 11.500 M' x Rp. 243,600.00 = Rp.
JUMLAH = Rp.
b. Tenaga
- Tukang Las 1.2 Oh x Rp. 90,000.00 = Rp.
- Pekerja 1.2 Oh x Rp. = Rp.
- Kepala Tukang 0.012 Oh x Rp. = Rp.
- Mandor 0.0006 Oh x Rp. = Rp.
JUMLAH = Rp.
JUMLAH (a) + (b) = Rp.
300,000.00
21,182.61
321,182.61
108,000.00
-
-
-
108,000.00
429,182.61
K. PEKERJAAN BESI ALUMANIUM
Rp. 126,000.00
Rp. 100,800.00
Rp. 1,260.00
Rp. 75.00
Rp. 228,135.00
Rp. 814,935.00
1.58
SPESIFIKASI
NO JENIS BAHAN MERK / MOFDEL SATUAN PEMBULATAN
UKURAN (Rp)
1 2 3 4 11
1 Semen (PC) 50 kg Zak 126,500.00
Kg 3,000.00
2 Semen warna Kg 22,300.00
-
3 Kawat Beton Kg 33,300.00
4 Kawat Bronjong Kg 82,800.00
5 Kawat Duri Kg 23,500.00
6 Besi Beton Kg 19,700.00
7 Besi Beton Dia. 6 mm Kg 34,800.00
8 Besi Beton Dia. 8 mm Kg 25,700.00
9 Besi Beton Dia. 10 mm Kg 21,500.00
10 Besi Beton Dia. 12 mm Kg 19,500.00
11 Besi Beton Dia. 14 mm Kg 18,900.00
12 Besi Beton Dia. 16 mm Kg 18,800.00
13 Besi Beton Dia. 19 mm Kg 17,500.00
14 Besi Beton Dia. 22 mm Kg 17,400.00
15 Besi Beton Dia. 25 mm Kg 17,400.00
16 Besi Beton Dia. 32 mm Kg 17,700.00
-
17 Paku Campuran Kg 31,100.00
18 Paku Tripleks Kg 37,200.00
19 Paku Seng Kg 35,100.00
20 Paku Beton Kg 26,700.00
-
21 Playwood 4x3x4 Lbr 90,400.00
22 Teakwood 3 mm Uk. 122 x 244 cm Lbr 159,100.00
23 Tripleks 3 mm Uk. 122 x 244 cm Lbr 77,300.00
24 Tripleks 5 mm Uk. 122 x 244 cm Lbr 127,400.00
25 Tripleks 9 mm Uk. 122 x 244 cm Lbr 178,100.00
26 Tripleks 10 mm Uk. 122 x 244 cm Lbr 273,500.00
27 Tripleks 20 mm Uk. 122 x 244 cm Lbr 391,700.00
-
28 Pipa Galvanis Medium B Uk. 1/2 " Staf 85,000.00
29 Pipa Galvanis Medium B Uk. 3/4 " Staf 106,100.00
SPESIFIKASI
NO JENIS BAHAN MERK / MOFDEL SATUAN PEMBULATAN
UKURAN (Rp)
1 2 3 4 11
KET.
KET.
KET.
KET.
KET.
KET.
HARGA SATUAN BAHAN FABRIKASI
MINYAK / PELUMAS
150 Solar Pangkalan Liter 9,000 450.00 945.00 1,039.50 51.98
151 Bensin Premium Pangkalan Liter 11,000 550.00 1,155.00 1,270.50 63.53
152 Minyak Tanah Pangkalan Liter 6,000 300.00 630.00 693.00 34.65
153 Pelumas/Olie Kendaraan Roda 2 Top One Liter 40,000 2,000.00 4,200.00 4,620.00 231.00
Mesran Liter 40,000 2,000.00 4,200.00 4,620.00 231.00
Castrol Liter 40,000 2,000.00 4,200.00 4,620.00 231.00
154 Pelumas/Olie Kendaraan Roda 4 Top One Liter 45,000 2,250.00 4,725.00 5,197.50 259.88
Mesran Liter 42,000 2,100.00 4,410.00 4,851.00 242.55
155 Gemuk (Grase) 1/2 Kg 40,000 2,000.00 4,200.00 4,620.00 231.00
156 bak mandi fiber bh 520,000 26,000.00 54,600.00 60,060.00 3,003.00
17
HARGA SATUAN HARGA
DILOKASI PROYEK PEMBULATAN PASARAN
(Rp) (Rp) (Rp)
10 11 5
126,500.00 126,500.00 110,000.00 - 110000
2,970.00 3,000.00 2,200.00 - 2200
22,275.00 22,300.00 20,000.00 23,000.00 23,000.00 20,000.00
- - - -
33,275.00 33,300.00 30,000.00 34,500.00 35,000.00 30,000.00
82,775.00 82,800.00 75,000.00 86,250.00 86,000.00 75,000.00
23,540.00 23,500.00 21,150.00 24,322.50 24,000.00 21,150.00
19,734.00 19,700.00 17,690.00 20,343.50 20,000.00 17,690.00
34,815.00 34,800.00 30,900.00 35,535.00 36,000.00 30,900.00
25,685.00 25,700.00 22,600.00 25,990.00 26,000.00 22,600.00
21,505.00 21,500.00 18,800.00 21,620.00 22,000.00 18,800.00
19,525.00 19,500.00 17,000.00 19,550.00 20,000.00 17,000.00
18,920.00 18,900.00 16,200.00 18,630.00 19,000.00 16,200.00
18,810.00 18,800.00 16,100.00 18,515.00 19,000.00 16,100.00
17,490.00 17,500.00 14,900.00 17,135.00 17,000.00 14,900.00
17,380.00 17,400.00 14,500.00 16,675.00 17,000.00 14,500.00
17,380.00 17,400.00 14,500.00 16,675.00 17,000.00 14,500.00
17,710.00 17,700.00 14,500.00 16,675.00 17,000.00 14,500.00
- - - -
31,075.00 31,100.00 28,000.00 32,200.00 32,000.00 28,000.00
37,235.00 37,200.00 33,600.00 38,640.00 39,000.00 33,600.00
35,145.00 35,100.00 31,700.00 36,455.00 36,000.00 31,700.00
26,675.00 26,700.00 1,200.00 24,000.00 27,600.00 28,000.00 24,000.00
- - - -
90,420.00 90,400.00 81,700.00 93,955.00 94,000.00 81,700.00
159,060.00 159,100.00 144,100.00 ### ### 144,100.00
77,330.00 77,300.00 69,800.00 80,270.00 80,000.00 69,800.00
127,380.00 127,400.00 115,300.00 ### ### 115,300.00
178,090.00 178,100.00 161,400.00 ### ### 161,400.00
273,460.00 273,500.00 248,100.00 ### ### 248,100.00
391,710.00 391,700.00 355,600.00 ### ### 355,600.00
- - - -
85,002.50 85,000.00 76,900.00 88,435.00 88,000.00 76,900.00
106,122.50 106,100.00 96,100.00 ### ### 96,100.00
- - -
- -
- -
HARGA SATUAN HARGA #VALUE! #VALUE! HARGA
DILOKASI PROYEK PEMBULATAN PASARAN #VALUE! #VALUE! PASARAN
(Rp) (Rp) (Rp) #VALUE! #VALUE! (Rp)
10 11 5 5.75 - 5.00
- - -
127,242.50 127,200.00 115,300.00 ### ### 115,300.00
148,362.50 148,400.00 134,500.00 ### ### 134,500.00
- - - -
206,580.00 206,600.00 187,400.00 ### ### 187,400.00
264,770.00 264,800.00 240,300.00 ### ### 240,300.00
- - - -
35,282.50 35,300.00 31,700.00 36,455.00 36,000.00 31,700.00
42,322.50 42,300.00 38,100.00 43,815.00 44,000.00 38,100.00
49,252.50 49,300.00 44,400.00 51,060.00 51,000.00 44,400.00
63,222.50 63,200.00 57,100.00 65,665.00 66,000.00 57,100.00
77,192.50 77,200.00 69,800.00 80,270.00 80,000.00 69,800.00
98,202.50 98,200.00 88,900.00 ### ### 88,900.00
147,152.50 147,200.00 133,300.00 ### ### 133,300.00
168,162.50 168,200.00 152,400.00 ### ### 152,400.00
- - - -
4,400.00 4,400.00 3,800.00 4,370.00 4,000.00 3,800.00
4,400.00 4,400.00 3,800.00 4,370.00 4,000.00 3,800.00
5,500.00 5,500.00 4,800.00 5,520.00 6,000.00 4,800.00
8,580.00 8,600.00 7,600.00 8,740.00 9,000.00 7,600.00
11,770.00 11,800.00 10,500.00 12,075.00 12,000.00 10,500.00
14,960.00 15,000.00 13,400.00 15,410.00 15,000.00 13,400.00
26,620.00 26,600.00 24,000.00 27,600.00 28,000.00 24,000.00
36,080.00 36,100.00 32,600.00 37,490.00 37,000.00 32,600.00
- - - -
2,970.00 3,000.00 2,500.00 2,875.00 3,000.00 2,500.00
2,310.00 2,300.00 1,900.00 2,185.00 2,000.00 1,900.00
2,050.40 2,100.00 1,664.00 1,913.60 2,000.00 1,664.00
3,740.00 3,700.00 3,200.00 3,680.00 4,000.00 3,200.00
3,850.00 3,800.00 3,300.00 3,795.00 4,000.00 3,300.00
- - -
69,300.00 69,300.00 62,600.00 71,990.00 72,000.00 62,600.00
93,170.00 93,100.00 84,300.00 96,945.00 97,000.00 84,300.00
143,220.00 143,200.00 129,800.00 ### ### 129,800.00
242,550.00 242,500.00 220,100.00 ### ### 220,100.00
906,235.00 906,200.00 823,450.00 ### ### 823,450.00
- - -
- - -
- -
- -
HARGA SATUAN HARGA #VALUE! #VALUE! HARGA
DILOKASI PROYEK PEMBULATAN PASARAN #VALUE! #VALUE! PASARAN
(Rp) (Rp) (Rp) #VALUE! #VALUE! (Rp)
10 11 5 5.75 - 5.00
- - -
29,535.00 29,500.00 25,850.00 29,727.50 30,000.00 25,850.00
32,670.00 32,600.00 28,700.00 33,005.00 33,000.00 28,700.00
34,540.00 34,500.00 30,400.00 34,960.00 35,000.00 30,400.00
37,070.00 37,000.00 32,700.00 37,605.00 38,000.00 32,700.00
- - -
146,630.00 146,600.00 132,300.00 ### ### 132,300.00
172,590.00 172,500.00 155,900.00 ### ### 155,900.00
120,890.00 120,800.00 108,900.00 ### ### 108,900.00
- - -
78,430.00 78,400.00 69,800.00 80,270.00 80,000.00 69,800.00
86,130.00 86,100.00 76,800.00 88,320.00 88,000.00 76,800.00
94,600.00 94,600.00 84,500.00 97,175.00 97,000.00 84,500.00
- - -
65,312.50 65,300.00 58,900.00 67,735.00 68,000.00 58,900.00
77,522.50 77,500.00 70,000.00 80,500.00 81,000.00 70,000.00
96,772.50 96,700.00 87,500.00 ### ### 87,500.00
- - -
42,762.50 42,700.00 38,400.00 44,160.00 44,000.00 38,400.00
25,322.00 25,300.00 22,770.00 26,185.50 26,000.00 22,770.00
119,212.50 119,200.00 107,900.00 ### ### 107,900.00
112,365.00 112,300.00 101,600.00 ### ### 101,600.00
68,255.00 68,200.00 61,500.00 70,725.00 71,000.00 61,500.00
80,355.00 80,300.00 72,500.00 83,375.00 83,000.00 72,500.00
112,365.00 112,300.00 101,600.00 ### ### 101,600.00
112,365.00 112,300.00 101,600.00 ### ### 101,600.00
76,615.00 76,600.00 69,100.00 79,465.00 79,000.00 69,100.00
88,715.00 88,700.00 80,100.00 92,115.00 92,000.00 80,100.00
113,465.00 113,400.00 102,600.00 ### ### 102,600.00
89,265.00 89,200.00 80,600.00 92,690.00 93,000.00 80,600.00
101,365.00 101,300.00 91,600.00 ### ### 91,600.00
- - -
50,545.00 50,500.00 45,700.00 52,555.00 53,000.00 45,700.00
50,545.00 50,500.00 45,700.00 52,555.00 53,000.00 45,700.00
21,175.00 21,100.00 19,000.00 21,850.00 22,000.00 19,000.00
21,175.00 21,100.00 19,000.00 21,850.00 22,000.00 19,000.00
660,275.00 660,200.00 600,000.00 ### ### 600,000.00
550,275.00 550,200.00 500,000.00 ### ### 500,000.00
- - -
- -
- -
HARGA SATUAN HARGA #VALUE! #VALUE! HARGA
DILOKASI PROYEK PEMBULATAN PASARAN #VALUE! #VALUE! PASARAN
(Rp) (Rp) (Rp) #VALUE! #VALUE! (Rp)
10 11 5 5.75 - 5.00
- - -
21,175.00 21,100.00 19,000.00 21,850.00 22,000.00 19,000.00
21,175.00 21,100.00 19,000.00 21,850.00 22,000.00 19,000.00
28,215.00 28,200.00 25,400.00 29,210.00 29,000.00 25,400.00
49,775.00 49,700.00 45,000.00 51,750.00 52,000.00 45,000.00
31,955.00 31,900.00 28,800.00 33,120.00 33,000.00 28,800.00
23,023.00 23,000.00 5 3,936 / kg 19,680.00 22,632.00 23,000.00 19,680.00
21,879.00 21,800.00 19,690.00 22,643.50 23,000.00 19,690.00
- - -
236,665.00 236,600.00 211,400.00 ### ### 211,400.00
427,075.00 427,000.00 384,500.00 ### ### 384,500.00
210,265.00 210,200.00 187,400.00 ### ### 187,400.00
289,575.00 289,500.00 259,500.00 ### ### 259,500.00
345,950.00 345,900.00 314,300.00 ### ### 314,300.00
33,770.00 33,700.00 30,500.00 35,075.00 35,000.00 30,500.00
29,480.00 29,400.00 26,600.00 30,590.00 31,000.00 26,600.00
20,570.00 20,500.00 18,500.00 21,275.00 21,000.00 18,500.00
303,072.00 303,000.00 262,400.00 ### ### 262,400.00
303,072.00 303,000.00 262,400.00 ### ### 262,400.00
2,329,030.00 2,329,000.00 2,116,300.00 ### ### ###
2,329,030.00 2,329,000.00 2,116,300.00 ### ### ###
1,924,725.00 1,924,700.00 1,749,000.00 ### ### ###
494,725.00 494,700.00 449,000.00 ### ### 449,000.00
699,215.00 699,200.00 634,900.00 ### ### 634,900.00
- - -
209,605.00 209,600.00 190,500.00 ### ### 190,500.00
157,135.00 157,100.00 142,800.00 ### ### 142,800.00
314,325.00 314,300.00 285,700.00 ### ### 285,700.00
14,025.00 14,000.00 12,700.00 14,605.00 15,000.00 12,700.00
20,955.00 20,900.00 19,000.00 21,850.00 22,000.00 19,000.00
25,795.00 25,700.00 23,400.00 26,910.00 27,000.00 23,400.00
45,045.00 45,000.00 40,900.00 47,035.00 47,000.00 40,900.00
20,955.00 20,900.00 19,000.00 21,850.00 22,000.00 19,000.00
31,955.00 31,900.00 28,500.00 32,775.00 33,000.00 28,500.00
254,677.50 254,600.00 220,500.00 ### ### 220,500.00
8,662.50 8,600.00 7,500.00 8,625.00 9,000.00 7,500.00
- - -
367,675.00 367,600.00 330,500.00 ### ### 330,500.00
- - -
- -
- -
HARGA SATUAN HARGA #VALUE! #VALUE! HARGA
DILOKASI PROYEK PEMBULATAN PASARAN #VALUE! #VALUE! PASARAN
(Rp) (Rp) (Rp) #VALUE! #VALUE! (Rp)
10 11 5 5.75 - 5.00
- - -
306,625.00 306,600.00 275,000.00 ### ### 275,000.00
75,900.00 75,900.00 17,500.00 67,500.00 77,625.00 78,000.00 67,500.00
38,720.00 38,700.00 35,000.00 40,250.00 40,000.00 35,000.00
141,020.00 141,000.00 126,700.00 ### ### 126,700.00
11,000.00 11,000.00 9,250.00 10,637.50 11,000.00 9,250.00
61,050.00 61,000.00 55,000.00 63,250.00 63,000.00 55,000.00
53,900.00 53,900.00 48,500.00 55,775.00 56,000.00 48,500.00
49,500.00 49,500.00 44,500.00 51,175.00 51,000.00 44,500.00
96,800.00 96,800.00 87,500.00 ### ### 87,500.00
30,800.00 30,800.00 27,500.00 31,625.00 32,000.00 27,500.00
36,300.00 36,300.00 32,500.00 37,375.00 37,000.00 32,500.00
4,895.00 4,800.00 4,400.00 5,060.00 5,000.00 4,400.00
- - -
25,135.00 25,100.00 22,800.00 26,220.00 26,000.00 22,800.00
- - -
192,445.00 192,400.00 174,900.00 ### ### 174,900.00
254,485.00 254,400.00 231,300.00 ### ### 231,300.00
339,075.00 339,000.00 308,200.00 ### ### 308,200.00
151,305.00 151,300.00 137,500.00 ### ### 137,500.00
34,045.00 34,000.00 30,900.00 35,535.00 36,000.00 30,900.00
- - -
25,685.00 25,600.00 23,300.00 26,795.00 27,000.00 23,300.00
25,685.00 25,600.00 23,300.00 26,795.00 27,000.00 23,300.00
25,685.00 25,600.00 23,300.00 26,795.00 27,000.00 23,300.00
25,685.00 25,600.00 23,300.00 26,795.00 27,000.00 23,300.00
- - -
13,695.00 13,600.00 12,400.00 14,260.00 14,000.00 12,400.00
17,875.00 17,800.00 16,200.00 18,630.00 19,000.00 16,200.00
63,085.00 63,000.00 57,300.00 65,895.00 66,000.00 57,300.00
10,340.00 10,300.00 9,350.00 10,752.50 11,000.00 9,350.00
68,035.00 68,000.00 61,800.00 71,070.00 71,000.00 61,800.00
220,605.00 220,600.00 200,500.00 ### ### 200,500.00
2,835,580.00 2,835,500.00 2,577,750.00 ### ### ###
- - -
4,620.00 4,600.00 4,000.00 4,600.00 5,000.00 4,000.00
6,699.00 6,600.00 5,800.00 6,670.00 7,000.00 5,800.00
- - -
- -
- -
- -
HARGA SATUAN HARGA #VALUE! #VALUE! HARGA
DILOKASI PROYEK PEMBULATAN PASARAN #VALUE! #VALUE! PASARAN
(Rp) (Rp) (Rp) #VALUE! #VALUE! (Rp)
10 11 5 5.75 - 5.00
- - -
18,422.25 18,400.00 15,950.00 18,342.50 18,000.00 15,950.00
18,422.25 18,400.00 15,950.00 18,342.50 18,000.00 15,950.00
19,635.00 19,600.00 17,000.00 19,550.00 20,000.00 17,000.00
3,349.50 3,300.00 2,900.00 3,335.00 3,000.00 2,900.00
5,601.75 5,600.00 4,850.00 5,577.50 6,000.00 4,850.00
5,948.25 5,900.00 5,150.00 5,922.50 6,000.00 5,150.00
6,756.75 6,700.00 5,850.00 6,727.50 7,000.00 5,850.00
6,756.75 6,700.00 5,850.00 6,727.50 7,000.00 5,850.00
7,738.50 7,700.00 6,700.00 7,705.00 8,000.00 6,700.00
173,250.00 173,200.00 150,000.00 ### ### 150,000.00
43,312.50 43,300.00 37,500.00 43,125.00 43,000.00 37,500.00
49,087.50 49,000.00 42,500.00 48,875.00 49,000.00 42,500.00
KETERANGAN
87 Kunci Pintu Tanam Biasa Bh 131,000.00
88 Kunci Pintu Tanam Antik Bh 193,000.00
89 Grendel Pintu Bh 45,000.00
90 Grendel Jendela Bh 10,000.00
91 Kait Angin Bh 10,700.00
92 Engsel Jendela Kuningan Bh 29,000.00
93 Engsel Pintu Kuningan Bh 40,900.00
94 Lis Profil 5 cm M' 14,800.00
95 Profil Baja ( Pabrikan ) Kg 30,000.00
96 Plat Eiser M2 240,000.00
97 Besi Strip Kg 12,000.00
98 Pintu Rooling Door 1 M2 900,000.00
99 Pintu Alumanium 1 M2 400,000.00
100 Geotekstil 1 M2 37,500.00
101 Oxigen 1 Btl 260,000.00
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
110,000.00 -
2,200.00 -
20,000.00 23,000.00 23,000.00
- -
30,000.00 34,500.00 34,500.00
75,000.00 86,250.00 86,300.00
21,150.00 24,322.50 24,300.00
17,690.00 20,343.50 20,300.00
- -
28,000.00 32,200.00 32,200.00
33,600.00 38,640.00 38,600.00
31,700.00 36,455.00 36,500.00
1,380.00 24,000.00 27,600.00 27,600.00
- -
81,700.00 93,955.00 94,000.00
144,100.00 ### ###
69,800.00 80,270.00 80,300.00
115,300.00 ### ###
161,400.00 ### ###
248,100.00 ### ###
355,600.00 ### ###
- -
76,900.00 88,435.00 88,400.00
96,100.00 ### ###
- -
- -
- -
HARGA #VALUE! #VALUE!
PASARAN #VALUE! #VALUE!
(Rp) #VALUE! #VALUE!
5 5.75 -
- -
115,300.00 ### ###
134,500.00 ### ###
- -
187,400.00 ### ###
240,300.00 ### ###
- -
31,700.00 36,455.00 36,500.00
38,100.00 43,815.00 43,800.00
44,400.00 51,060.00 51,100.00
57,100.00 65,665.00 65,700.00
69,800.00 80,270.00 80,300.00
88,900.00 ### ###
133,300.00 ### ###
152,400.00 ### ###
- -
3,800.00 4,370.00 4,400.00
3,800.00 4,370.00 4,400.00
4,800.00 5,520.00 5,500.00
7,600.00 8,740.00 8,700.00
10,500.00 12,075.00 12,100.00
13,400.00 15,410.00 15,400.00
24,000.00 27,600.00 27,600.00
32,600.00 37,490.00 37,500.00
- -
2,500.00 2,875.00 2,900.00
1,900.00 2,185.00 2,200.00
1,664.00 1,913.60 1,900.00
3,200.00 3,680.00 3,700.00
3,300.00 3,795.00 3,800.00
- -
62,600.00 71,990.00 72,000.00
84,300.00 96,945.00 96,900.00
129,800.00 ### ###
220,100.00 ### ###
823,450.00 ### ###
- -
- -
- -
- -
HARGA #VALUE! #VALUE!
PASARAN #VALUE! #VALUE!
(Rp) #VALUE! #VALUE!
5 5.75 -
- -
25,850.00 29,727.50 29,700.00
28,700.00 33,005.00 33,000.00
30,400.00 34,960.00 35,000.00
32,700.00 37,605.00 37,600.00
- -
132,300.00 ### ###
155,900.00 ### ###
108,900.00 ### ###
- -
69,800.00 80,270.00 80,300.00
76,800.00 88,320.00 88,300.00
84,500.00 97,175.00 97,200.00
- -
58,900.00 67,735.00 67,700.00
70,000.00 80,500.00 80,500.00
87,500.00 ### ###
- -
38,400.00 44,160.00 44,200.00
22,770.00 26,185.50 26,200.00
107,900.00 ### ###
101,600.00 ### ###
61,500.00 70,725.00 70,700.00
72,500.00 83,375.00 83,400.00
101,600.00 ### ###
101,600.00 ### ###
69,100.00 79,465.00 79,500.00
80,100.00 92,115.00 92,100.00
102,600.00 ### ###
80,600.00 92,690.00 92,700.00
91,600.00 ### ###
- -
45,700.00 52,555.00 52,600.00
45,700.00 52,555.00 52,600.00
19,000.00 21,850.00 21,900.00
19,000.00 21,850.00 21,900.00
600,000.00 ### ###
500,000.00 ### ###
- -
- -
- -
HARGA #VALUE! #VALUE!
PASARAN #VALUE! #VALUE!
(Rp) #VALUE! #VALUE!
5 5.75 -
- -
19,000.00 21,850.00 21,900.00
19,000.00 21,850.00 21,900.00
25,400.00 29,210.00 29,200.00
45,000.00 51,750.00 51,800.00
28,800.00 33,120.00 33,100.00
4,520 / kg 19,680.00 22,632.00 22,600.00
19,690.00 22,643.50 22,600.00
- -
211,400.00 ### ###
384,500.00 ### ###
187,400.00 ### ###
259,500.00 ### ###
314,300.00 ### ###
30,500.00 35,075.00 35,100.00
26,600.00 30,590.00 30,600.00
18,500.00 21,275.00 21,300.00
262,400.00 ### ###
262,400.00 ### ###
2,116,300.00 ### ###
2,116,300.00 ### ###
1,749,000.00 ### ###
449,000.00 ### ###
634,900.00 ### ###
- -
190,500.00 ### ###
142,800.00 ### ###
285,700.00 ### ###
12,700.00 14,605.00 14,600.00
19,000.00 21,850.00 21,900.00
23,400.00 26,910.00 26,900.00
40,900.00 47,035.00 47,000.00
19,000.00 21,850.00 21,900.00
28,500.00 32,775.00 32,800.00
220,500.00 ### ###
7,500.00 8,625.00 8,600.00
- -
330,500.00 ### ###
- -
- -
- -
HARGA #VALUE! #VALUE!
PASARAN #VALUE! #VALUE!
(Rp) #VALUE! #VALUE!
5 5.75 -
- -
275,000.00 ### ###
19,565.00 67,500.00 77,625.00 77,600.00
35,000.00 40,250.00 40,300.00
126,700.00 ### ###
9,250.00 10,637.50 10,600.00
55,000.00 63,250.00 63,300.00
48,500.00 55,775.00 55,800.00
44,500.00 51,175.00 51,200.00
87,500.00 ### ###
27,500.00 31,625.00 31,600.00
32,500.00 37,375.00 37,400.00
4,400.00 5,060.00 5,100.00
- -
22,800.00 26,220.00 26,200.00
- -
174,900.00 ### ###
231,300.00 ### ###
308,200.00 ### ###
137,500.00 ### ###
30,900.00 35,535.00 35,500.00
- -
23,300.00 26,795.00 26,800.00
23,300.00 26,795.00 26,800.00
23,300.00 26,795.00 26,800.00
23,300.00 26,795.00 26,800.00
- -
12,400.00 14,260.00 14,300.00
16,200.00 18,630.00 18,600.00
57,300.00 65,895.00 65,900.00
9,350.00 10,752.50 10,800.00
61,800.00 71,070.00 71,100.00
200,500.00 ### ###
2,577,750.00 ### ###
- -
4,000.00 4,600.00 4,600.00
5,800.00 6,670.00 6,700.00
- -
- -
- -
- -
HARGA #VALUE! #VALUE!
PASARAN #VALUE! #VALUE!
(Rp) #VALUE! #VALUE!
5 5.75 -
- -
15,950.00 18,342.50 18,300.00
15,950.00 18,342.50 18,300.00
17,000.00 19,550.00 19,600.00
29,000.00 33,350.00 33,400.00
48,500.00 55,775.00 55,800.00
51,500.00 59,225.00 59,200.00
58,500.00 67,275.00 67,300.00
58,500.00 67,275.00 67,300.00
67,000.00 77,050.00 77,100.00
150,000.00 ### ###
37,500.00 43,125.00 43,100.00
42,500.00 48,875.00 48,900.00
-
-
-
-
-
-
- -
-
-
-
-
BAHAN MATERIAL ALAMI
11 Sirtu M3 353,100.00
12 Timbunan Pilihan / Pasir Urug M3 350,000.00
13 Timbunan Biasa / Tanah Urug M3 320,000.00
14 Pasir Kasar / Pasir Beton M3 379,500.00
15 Pasir Halus / Pasir Pasangan M3 379,500.00
.., .. 2009
Panitia Pengadaan Barang dan Jasa
Satuan Kerja Universitas Khairun
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
GUDANG 2
ALAT 3
6
BAK FILLING AREA
7 BRINE TANK CELUP TANK PELUNCUR
8
10
11
12
RUANG
OPERATOR PENGGULING
KANTOR
KM/WC
2 Pengukuran Bowplank
= 91.00 M' 1.00 Unit
3 Papan Nama Proyek
1.00 Ls
4 Direksi keet & Gudang Bahan
=3x2 = 6.00 M2 1.00 M2
BACK UP DATA
PROGRAM : DINAS KELAUTAN DAN PERIKANAN
PEKERJAAN : PEMBANGUNAN PABRIK ES PPP LABUHA
KONSULTAN PENGAWAS : CV. RAKA DZIKRA ENG.
LOKASI : LABUHA - KABUPATEN HALMAHERA SELATAN
TAHUN ANGGARAN : 2014
II PEKERJAAN TANAH
1
1 Pekerjaan tanah
Pekerjaan Galian Tanah Pondasi batu kali
=((( 0,75 + 1,00)/2 ) x 0,70)
= 0.61 M2
= 0,61 x 91,00 = 55.74 M3 1.00 Unit
BACK UP DATA
PROGRAM : DINAS KELAUTAN DAN PERIKANAN
PEKERJAAN : PEMBANGUNAN PABRIK ES PPP LABUHA
KONSULTAN PENGAWAS : CV. RAKA DZIKRA ENG.
LOKASI : LABUHA - KABUPATEN HALMAHERA SELATAN
TAHUN ANGGARAN : 2014
BACK UP DATA
= 0.00 M3
= 0.00 M3 = 0.00 M3 1.00 Unit
3 #REF!
= 1,5 x 6,00
= 9.00 M3
= 9,00 x 16,00 = 144.00 M' 1.00 Unit
BACK UP DATA
PROGRAM : DINAS KELAUTAN DAN PERIKANAN
PEKERJAAN : PEMBANGUNAN PABRIK ES PPP LABUHA
KONSULTAN PENGAWAS : CV. RAKA DZIKRA ENG.
LOKASI : LABUHA - KABUPATEN HALMAHERA SELATAN
TAHUN ANGGARAN : 2014
4 #REF!
= ( 5,00 x 71,00 )+ 25,2
= 380.20 M2
= 312.62 M2 = 312.62 M2 1.00 Unit
Volume total pasangan batu bata
= 331.52 M3
BACK UP DATA
3 #REF!
= 0,25 x 0,25 x 7
= 0.438 M3
= 0,438 x 18 = 7.88 M3 1.00 Unit
4 #REF!
= 0,15 x 0,20 x (71 + 9 + 9 + 5,4)
= 2.83 M3
= 2.83 M3 = 2.83 M3 1.00 Unit
#REF!
5
= 1,0 x 1,0 x 0,3
= 0.30 M3
= 0,30 x 18 = 5.40 M3 1.00 Unit
6 #REF!
= 4,5 x 0,1 x 1,70
= 0.77 M2 = 0.77 M3 1.00 Unit
6 #REF!
= (17,00x9,00)
= 153.00 M2
= 153.00 x 0,15 = 22.95 M3 1.00 Unit
BACK UP DATA
PROGRAM : DINAS KELAUTAN DAN PERIKANAN
PEKERJAAN : PEMBANGUNAN PABRIK ES PPP LABUHA
KONSULTAN PENGAWAS : CV. RAKA DZIKRA ENG.
LOKASI : LABUHA - KABUPATEN HALMAHERA SELATAN
TAHUN ANGGARAN : 2014
POTONGAN 2
SK ALA 1 : 30
POTONGAN B
SK ALA 1 : 30
1 #REF!
= 1x1 = 1.00 Bh 1.00 Unit
5 Grendel Jendela
= 1x2
= 2.00 Bh 1.00 Unit
6 Grendel Pintu
= 1x1
= 1.00 Bh 1.00 Unit
7 Kait angin
= 2x2
= 4.00 Bh 1.00 Unit
BACK UP DATA
kosen pintu
=(1.52*1)+(2.16*2)+(1.12*5)+(2.16*2*5)
= 225.00 M3
=163,80 x 0.24 = 54.00 M2 1.00 Unit
b Cat jendela
Bingkai Jendela
= (0.62+0.62+1.22+1.22)*28
= 103.04 M2
= 103.04 x 0.1 x 2 = 20.61 M2 1.00 Unit
Kosen Jendela
= 92.32
= 44.42 M2
1.00 Unit
c Cat Lisplank
= 62.80 M2
= 98.20 x 0.25
= 15.70 M2 = 18.84 M2 1.00 Unit
Volume total pekerjaan cat kayu
= 119.85 M3
= 663.03 M2
= 663.03 M3 = 663.03 M2 1.00 Unit
= 95.16 M2
= 95.16 M2 = 95.16 M2 1.00 Unit
4 Cat Atap
= 241.34 M2 = 241.34 M2
1.00 Unit
BACK UP DATA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
GUDANG 2
ALAT 3
7 BRINE TANK
8
10
11
12
RUANG
OPERATOR
KANTOR
KM/WC
KANTOR
KM/WC
Jendela
= (0,92 x 1 x 2 x 2)+(1,32 x 2 x 2)+(1,20 x 3 x 2 x 3)+(1,54 x 3 x 3)
= 44.42 M2
= 44,42 x 0,06 x 0,12 = 0.32 M3 1.00 Unit
Ventilasi V1
= ( 0,5 + 1,04) x 2 x 2
= 6.16 M2
= 6,16 x 0,05 x 0,12 = 0.04 M3 1.00 Unit
Ventilasi V2
= ( 0,64 x 4 x 16) + (0,94 x 2 x 3 x 16) + ( 0,64 x 2 x 2) + (0,94 x 2 x 2 x 2)
= 141.28 M2
= 141,28 x 0,05 x 0,12 = 0.85 M3 1.00 Unit
BACK UP DATA
Pipa Uk. 5 x 5 cm
Pipa Uk. 3 x 5 cm
Pipa Uk. 5 x 5 cm
Pipa Uk. 3 x 5 cm
P2
= 0,82 x 2,10
= 1.72 M2
= 1,72 x 6 = 10.26 M2 1.00 Unit
BACK UP DATA
Ring balok 15 X 20
Atap Senk BJLS 0.25
Gording 105 kayu kls I
Ring balok 15 X 20
Kolom Beton 25 X 25
DETAIL KUDA-KUDA TYPE K1
SK ALA 1 : 20
= 5,56 x 2
= 11.12 M'
= 11,12 x 0,06 x 0,12 x 2 = 0.16 M3 1.00 Unit
K3
= 6,21 x 2
= 12.42 M'
= 12,42 x 0,08 x 0,12 x 2 = 0.24 M3
BACK UP DATA
BACK UP DATA
PROGRAM : DINAS KELAUTAN DAN PERIKANAN
PEKERJAAN : PEMBANGUNAN PABRIK ES PPP LABUHA
KONSULTAN PENGAWAS : CV. RAKA DZIKRA ENG.
LOKASI : LABUHA - KABUPATEN HALMAHERA SELATAN
TAHUN ANGGARAN : 2014
GUDANG
ALAT
RUANG
OPERATOR PENGGULING
KANTOR
KM/WC
X. PEKERJAAN SANITAIR
1 Kloset jongkok
= Jumlah Kloset Jongkok = 1 bh
= 1.00 Bh 1.00 Unit
2 Kloset Duduk
= Jumlah Kloset Jongkok = 1 bh
= 0.00 Bh 1.00 Unit
BACK UP DATA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
GUDANG 2
ALAT 3
PERESAPAN 4
7 BRINE TANK
8
10
11
12
RUANG
OPERATOR
SEPTIKTANK
KANTOR
KM/WC
3 Floor drain
= Jumlah Flor Drain = 2 bh
= 1.00 Bh 1.00 Unit
- Afor
= Jumlah Afor = 2 bh
= 2.00 Bh
#REF!
= Panjang = 20 M'
= 20.00 M'
#REF!
= Panjang = 20,00 M'
= 4.00 M'
#REF!
= Panjang = 15 M'
= 8.00 M'
BACK UP DATA
PROGRAM : DINAS KELAUTAN DAN PERIKANAN
PEKERJAAN : PEMBANGUNAN PABRIK ES PPP LABUHA
KONSULTAN PENGAWAS : CV. RAKA DZIKRA ENG.
LOKASI : LABUHA - KABUPATEN HALMAHERA SELATAN
TAHUN ANGGARAN : 2014
- Plesteran 1 : 5
= 13,50 x 2
= 27.00 M2 = 27.00 M2
- Rabat Beton 1 : 5
= 3,00 x 1,50 x 0,06
= 0.27 M3 = 0.27 M3
- Plat Beton 1 : 2 : 3
= 3,00 x 1,50 x 0,07
= 0.32 M3 = 0.32 M3
- Slof Beton 12 x 15
= 0,12 x 0,20 x 1,50
= 0.04 M3 = 0.04 M3
BACK UP DATA
PROGRAM : DINAS KELAUTAN DAN PERIKANAN
PEKERJAAN : PEMBANGUNAN PABRIK ES PPP LABUHA
KONSULTAN PENGAWAS : CV. RAKA DZIKRA ENG.
LOKASI : LABUHA - KABUPATEN HALMAHERA SELATAN
TAHUN ANGGARAN : 2014
7 Plesteran saluran 1 : 5
= 61,60 x 1,45
= 89.32 M2 = 89.32 M2
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
NGGULING
KANTOR
221.16 M2
91.00 M'
1.00
6.00
1.00
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
55.74 M3
11.20 M3
66.94 M3
8.70 M3
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
91.80 M3
4.55 M3
7.65 M3
12.20 M3
40.04 M3
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
0.00 M3
40.04 M3
13.65 M3
144.00 M'
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
18.90 M2
312.62 M2
37.80 M2
625.23 M2
663.03 M2
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
91.00 M'
2.73 M3
0.76 M3
7.88 M3
2.83 M3
2.13 M3
5.40 M3
0.77 M3
22.95 M3
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
5.00 Bh
1.00 Bh
0.84 M2
21.00 Bh
4.00 Bh
2.00 Bh
1.00 Bh
4.00 Bh
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
###
###
###
20.61 M2
0.00 M2
18.84 M2
663.03 M2
95.16 M2
241.34 M2
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
KANTOR
KANTOR
= 0.24 M3
= 0.32 M3
= 0.04 M3
x 2 x 2 x 2)
= 0.85 M3
= 1.44 M3
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
2.94 M2
10.26 M2
13.20 M2
1.62 M2
14.82 M2
1.76 M2
0.00 M2
1.76 M2
16.58 M2
12.16 M2
326.08 M2
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
Ring balok 15 X 20
Kayu 55 kls II
Tripleks 4 mm
Beton 25 X 25
3.11 M3
0.24 M3
0.24 M3
3.29 M3
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
0.87 M2
###
###
###
###
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
###
= 19.40 M'
= 12.60 M'
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
FILLING AREA
P TANK PELUNCUR
ULING
KANTOR
###
= 4.00 M2
###
= 1.00 Bh
= 0.00 Bh
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
KANTOR
= 0.00 Bh
= 1.00 Bh
= 1.00 Bh
= 1.00 Bh
###
= 4.00 Bh
= 8.00 Bh
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
10.50 M3
0.65 M3
13.50 M2
27.00 M2
0.27 M3
0.32 M3
0.04 M3
0.80 M3
0.80 M3
0.60 M3
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
`
P LABUHA
HERA SELATAN
VOLUME KETERANGAN
4.62 M3
4.62 M3
3.30 M2
30.80 M3
6.16 M3
3.08 M3
89.32 M2