Anda di halaman 1dari 24

PERTAMINA TANJUNG

SQUEEZE OFF INTERVAL (CEMENTING)


T-101 Zone D
FIELD : TANJUNG
DATE : November 28, 2005

what you get out from your well .


depends on what you put in it, so ... .

FIRST

Presented To :
Setia Bungsu

Prepared By :
Minda Sasmita

PT. BJ SERVICES INDONESIA


Jl. Mulawarman Km 17.5, Batakan Besar. Balikpapan 76114.Kalimantan Timur-Indonesia
Phone: (0542) 747637, Fax: (0542) 747642
ONE STAGE CEMENTING CALCULATION
SQUEEZE OFF INTERVAL (CEMENTING)
T-101 Zone D

DATA
Well# T-101 Zone D Cementer : Saroso/Slamet
Field TANJUNG Corep :
Csg 7.0000 Inches Rig : KB 200
Csg. Fact. 0.0394 b/f
Tbg 3.5000 Inches
Tbg. Fact. 0.0087 b/f
Ann. Fact. 0.0275 b/f Cement Data
spf 4 s/f Yield 1.66
Cuff/Feet 0.4 cuff/s Temp 150
2Xbot. Up 54 bbl

Stage#01(Bottom) Note:
Top Int.#01 956.0 meter
Bott. Int#01 973.0 meter
Tbg. Displ. 27.1 bbl
Sting out to 950.0 feet
Csg. Vol. 2.8 bbl
Bbl slurry 18.7 bbl
Sack cmt. 63.4 sacks
Displace vol. 27.1 bbl 915m - 941 m

Stage#02 (Top) CR 946 m

30 cm ind sting in/out Stg out 950 m


CR 951 m Top Bottom Unit Lgth(f) Cuff.
Top 956 m 956 973 meter 55.76 89.216
meter
meter
Bottom 973 m meter 0 0
TOS 976 Total cuff 89.22
Total bbl
RBP 978 m

Note:

PT BJ Services Indonesia
PT BJ Services Indonesia
: Saroso/Slamet

: KB 200

F3/SX
O
F

bbl
15.89
0
0
0

15.89

PT BJ Services Indonesia
PT BJ Services Indonesia
JOB PROCEDURE AND PUMPING SCHEDULE
SQUEEZE OFF INTERVAL (CEMENTING)
T-101 Zone D

Job Procedure

Time Activity Rate Volume IP


Meeting BJ crew safety concern
Set BJ unit and Rig up BJ line
Test line 3000 psi

Set RBP 978 m and dump sand to 976 m.


RIH CR to 951 m, and circulation test. 3 bpm 40 bbl Using 2 % kcl water.
Mix 2% kcl water. 100 bbl
Sting in slowly, and identify sting out/in possition. 30 cm recommended

Injection rate using 2% kcl water and monitor fluid level in 0.6 - 3 bpm 20 bbl
annulus,with max. pump pressure 1000 psi.
Note: If pressure near to 800 psi with idle rate make sure we pump 30 bbl 2%
water.
Discussion and calculate cement slurry refer to injection
rate. bpm bbl
Mixing chemical, refer to lab test report. bbl
Meeting BJ crew safety concern, job procedure.
Pump 2% kcl water head, refer to max injection rate. bpm 10 bbl
Pump cement slurry with 2 bpm, and monitor pumping bpm 18.732 bbl
pressure or with max rate in jnjection rate data.

Displace cement slurry. bpm 27.138 bbl


Sting out, and reverse out. bpm 54 bbl
R/D BJ Line.

W/O cement 5 hrs or until max compressive strength


achieved.

: Hesitate bpm bbl psi


: Hesitate bpm bbl psi
: Hesitate bpm bbl psi
: Hesitate bpm bbl psi
: Hesitate bpm bbl psi

Final Data

Total Slurry pumped : 18.73 Bbl Initial Pressure : psi


Total cement used : 63 Sacks Final Pressure : psi
Chemical used Cement in place : hrs
1 Silica flour : Sacks Cement in formation : bbl
2 Fluid Lost : Gallons Estimate TOC : feet
3 Bonding Agent : Gallons Time for C strength : hrs
4 Dispersant : Gallons Estimate cost : US$
5 Retarder : Gallons Note:
6 Foam preventer : Gallons

PT BJ Services Indonesia
7 Surfactant : Gallons

PT BJ Services Indonesia
FP

ng 2 % kcl water.

make sure we pump 30 bbl 2% kcl

psi
psi
psi
psi
psi

PT BJ Services Indonesia
PT BJ Services Indonesia
MATERIAL COST
SQUEEZE OFF INTERVAL (CEMENTING)
T-101 Zone D

Volume and Cost

Additive For 27 Sacks


Additive Concentration Total Cost US$
Fluid lost agent 1.20 Gps 32.40 Gallons 8.85
Dispersant 0.22 Gps 5.94 Gallons 10.95
Bonding agent 1.50 Gps 40.50 Gallons 10.00
Foam preventer 0.06 Gps 1.62 Gallons 18.87
Retarder 0.07 Gps 1.89 Gallons 13.45
Accelerator 0.00 % 0.00 Sacks 0.26
Sub total, US$

Cement and Silica handling


Cement type Concetration Total Cost US$
G Cement 0 % 0 Sacks 1.00
G Cement + 40% S-8 60 % 63 Sacks 1.00
Silica flour 40 % 21.66 Sacks 1.00
H Cement 0 % 0 Sacks 1.00
Micrometric cement 0 % 0.00 Lbs 4.97
Ticxotropic cement 0 % 0 Sacks 0.00
Magnalinkcement 0 % 63 Sacks 0.00
Sub total

Surfactant
Additive Consentration Total Cost US$
INFLO-40 10 GPT 7.97
Clatrol 20.68
Sub total

Additional chemical
Additive Concentration Total

Sub total

Diverted
Additive Concentration Total Cost Prices US$

Sub total

PT BJ SERVICES INDONESIA
PT BJ SERVICES INDONESIA
MATERIAL COST
ZE OFF INTERVAL (CEMENTING)
T-101 Zone D

Prices US$
286.74
65.04
405.00
30.57
25.42
0.00
812.77

Prices US$
0.00
63.36
21.66
0.00
0.00
0.00
0.00
85.02

Prices US$
0
0.00
0.00

Prices US$
0
-
0

Remark

PT BJ SERVICES INDONESIA
PT BJ SERVICES INDONESIA
OPERATIONAL COST AND LOAD OUT CHEMICAL
SQUEEZE OFF INTERVAL (CEMENTING)
T-101 Zone D

Operational Cost
Services charges
Cost US$ Unit
Job Charges for 4 first hours pumping equipment 1200 1
After 4 hours job charges 200 2
Pumping active charges 60 5
Electronic recorder charges 200 1
Water trailer 230 2
Field engineer 200 1
Operator 100 3
Helper 80 3
Milleage charges 80 5
Squeeze manifold 150 3
Cement And Silica Handling charges 1 ###
Filtration unit 0 0
Nitrogen Unit 0 0

Subtotal US$

Total Cost and Material US$ US $

Load Out Chemical


Load Out
AquaCon 0 Gallons 0.00 Drums
NE-18 0 Gallons 0.00 can
INFLO-150 0 Gallons 0.00 can
INFLO-40 0 Gallons 0.00 Drums
KCL 0 Pounds 0.00 sacks
Filtered Water 0 Gallons 0.00 bbls
Diesel 0 Gallons 0.00 Liters
FAW-21 0 Gallons 0.00 can
Nitrogen 0 SCF 0.00 SCF
FL 45 LS 32.4 Gallons 0.59 Drums
BA 58 L 40.5 Gallons 0.74 Drums
FP 9 LS 1.62 Gallons 0.32 can
INFLO 40 0 Gallons 0.00 can
Retarder 1.89 Gallons 0.38 Drums
CD 31 LS 5.94 Gallons 0.11 can
A-7 0 Sacks 0.00 sacks

PT BJ SERVICES INDONESIA
Prices US$
1200
400
300
200
460
200
300
240
400
450
63.36
0
0

###

5111

PT BJ SERVICES INDONESIA
LAY OUT BJ UNIT IN LOCATION 4B-84
SQUEEZE OFF INTERVAL (CEMENTING)
T-101 Zone D

Mixing Procedure

Water trailer

Formation water

Bulker Pump
truck

PT BJ Services Indonesia
PT BJ Services Indonesia
PT BJ Services Indonesia
PT BJ Services Indonesia
This report is property of BJ SERVIC
and is intended for private informati
of the below named party. This repo
not any part thereof may be publish
PT BJ SERVICES INDONESIA or disclosed to a third party without t
written approval of PT.BJ SERVIC
LABORATORY REPORT INDONESIA

REPORT NO. DC-03/2005 LOCATION DURI LABORATORY DATED 9-Jan-05

SUBJECT : GAS TIGHT SLURRY


CLIENTS : PT CALTEX
CASING :

Well : LIBO # 55
Depth : Feet (MD)
Depth : Feet (TVD)
B.H.S.T : deg. F
B.H.C.T : 275 deg. F

SLURRY SYSTEM :
Class "G" cement
+ 40.00 %S-8 (db-bwoc), Silica Flour
+ 0.22 gps CD-31L, Dispersant
+ 0.10 gps R-21LS, Retarder
+ 1.20 gps FL-45LS, Fluid Loss Additive
+ 1.50 gps BA-58L, Bonding Agent
+ 0.06 gps FP-9LS, Foam Preventer

Slurry Density : 15.80 ppg


Slurry Yield : 1.66 Cuft/sack
Mixing water : 4.00 gal/sack (Fresh water)
Total Fluid : 7.08 gal/sack

TEST RESULTS
Thickening Time at 275 deg. F : 4 hours 17 minutes (100 Bc)
Fluid Loss at 275 deg. F : 24 cc/30 minutes/1000 psi
Free water at 194 deg. F : 0 % by volume
Fann 35 readings (R1,B1,F=1) : 300 200 100 6 3 Pv Yp
@ after Mixing : 205 157 80 18 15 187.5 17.5
@ 194 deg. F : 50 32 22 9 7 42.0 8.0
API Mixing Time : 12 seconds

Compressive Strength @ BHST : 3025 psi after 24 hours

Cement/ Additives/Water : Padang "G" /Lab. Stock/5U Water


Cement Batch No. : OWC. III-34/04

REQUESTED BY PT CPI

ANALYZED BY BJ DPT LAB SIGNED BY

DISTRIBUTED TO PT CPI - BJ
port is property of BJ SERVICES
ntended for private information
below named party. This report
part thereof may be published
osed to a third party without the
approval of PT.BJ SERVICES
SIA

9-Jan-05
This report is property of BJ SERVIC
and is intended for private informati
of the below named party. This repo
not any part thereof may be publish
PT BJ SERVICES INDONESIA or disclosed to a third party without t
written approval of PT.BJ SERVIC
LABORATORY REPORT INDONESIA

REPORT NO. DC-02/2005 LOCATION DURI LABORATORY DATED 9-Jan-05

SUBJECT : GAS TIGHT SLURRY


CLIENTS : PT CALTEX
CASING :

Well : LIBO # 55
Depth : Feet (MD)
Depth : Feet (TVD)
B.H.S.T : 306 deg. F
B.H.C.T : 300 deg. F

SLURRY SYSTEM :
Class "G" cement
+ 40.00 %S-8 (db-bwoc), Silica Flour
+ 0.22 gps CD-31L, Dispersant
+ 0.13 gps R-21LS, Retarder
+ 1.20 gps FL-45LS, Fluid Loss Additive
+ 1.50 gps BA-58L, Bonding Agent
+ 0.06 gps FP-9LS, Foam Preventer

Slurry Density : 15.80 ppg


Slurry Yield : 1.66 Cuft/sack
Mixing water : 3.97 gal/sack (Fresh water)
Total Fluid : 7.08 gal/sack

TEST RESULTS
Thickening Time at 300 deg. F : 4 hours 33 minutes (100 Bc)
Fluid Loss at 300 deg. F : 26 cc/30 minutes/1000 psi
Free water at 194 deg. F : 0 % by volume
Fann 35 readings (R1,B1,F=1) : 300 200 100 6 3 Pv Yp
@ after Mixing : 205 157 80 18 15 187.5 17.5
@ 194 deg. F : 50 32 22 9 7 42.0 8.0
API Mixing Time : 12 seconds

Compressive Strength @ BHST : 3025 psi after 24 hours

Cement/ Additives/Water : Padang "G" /Lab. Stock/5U Water


Cement Batch No. : OWC. III-34/04

REQUESTED BY PT CPI

ANALYZED BY BJ DPT LAB SIGNED BY

DISTRIBUTED TO PT CPI - BJ
port is property of BJ SERVICES
ntended for private information
below named party. This report
part thereof may be published
osed to a third party without the
approval of PT.BJ SERVICES
SIA

9-Jan-05
Chemical Unit Price Function
HCl, 32% GALS $ 1.67 (CONCENTRATED ACID)
CI-25 GALS $ 31.94 (CORROSION INHIBITOR)
NE-18 GALS $ 27.27 (NON-EMULSIFIER)
INFLO-40 GALS $ 5.73 (MUTUAL SOLVENT)
KCl LBS $ 0.18 (BRINE)
FERROTROL 210 LBS $ 9.80 (IRON REDUCING AGENT)
FERROTROL 810 LBS $ 7.08 (IRON CHELATING AGENT)
NITROGEN GALS $ 1.12 (NITROGEN)
HV ACID GALS $ 32.43 (HV ACID)

Equipment Unit
STIMULATION ENGINEER Day/Person
EQUIPMENT OPERATOR Day/Person
HELPER Day/Person
SUPERVISOR/SPECIALIST Day/Person
SERVICE FORMAN Day/Person
MECHANIC Day/Person
LUMP SUM FOR PUMPING EQUIPMENT Job
MIX AND PUMP CASING CLEANING Job
MIX AND PUMP PICKLE Job
MIX AND PUMP TREATMENT Job

Anda mungkin juga menyukai