Pretensioning
The prestressing steel is tensioned against independent anchorage before the concrete is
poured around it. When the concrete reaches its required transfer strength, the tension at the
anchorage is gradually released and the steel cut at the ends of the member. The full
prestressing force is transferred to the concrete over a transmission length which depends
upon the strength of the concrete, surface condition, cross-section and diameter of the steel.
The cable profile is normally straight, but deflecting or debonding of strands at the ends
of a member is required for longer span beams. The maximum length is limited to 27m and
sections are chosen from the standard ranges of M, T, I and box beams whenever possible.
Typical Standard Sections
Pretensioning procedure
The prestressing force is applied against internal end anchorages after the concrete has
reached its transfer strength. Cable profile may be straight or curved and is formed by fixing
a sheath or duct inside the steel cage before casting. The prestressing steel is bundled
into these ducts to form large diameter tendons so that bursting forces are particularly
localised at the end anchorages. No restriction on length and precast units may be made
continuous by prestressing units together and in-situ structures may be extended in stages.
Voids in cable ducts are filled with cement grout under pressure. Bond obtained between
prestressing steel and grout important at ultimate loads and provides effective control against
corrosion of steel.
Post-tensioning of beam
Post-tensioning procedure
(A) Preparation of prestressing bed at site (B) Fixing and placing reinforcement cage
(C) Laying of cable ducts
PRESTRESSING SYSTEMS
Prestressing is usually applied by a system comprising of tendons, jacks, anchors, etc.; each
perform different function.
Degree of prestressing