Package-02
132/33kV KEGALLE GRID S/S
Power System Protection Setting Calculation
TECHNICAL DATA
OVER CURRENT & EARTH FAULT PROTECTION SETTING
CALCULATION
FOR
132KV BUS SECTION
FOR APPROVAL
Page 2 of
14
Clean Energy and Network Efficiency
Improvement Project
Power System Protection
Page 3 of
14
Clean Energy and Network Efficiency
Improvement Project
Power System Protection
4. Required Protection Relay Trip Time: (Downstream Trip Time + 0.300) @ Fault
Current
Setting
Sl.no Parameter Value Unit
1 Pickup 1.00 pu
2 TD Multiplier 0.21 Sec
3 RCA - Deg
4 Curve IEC Curve A
5 Block -
Setting
Sl.no Parameter Value Unit
1 Pickup 4.00 pu
2 TD Multiplier 0.02 Sec
3 RCA - Deg
4 Curve Definite Time
5 Block -
Clean Energy and Network Efficiency
Improvement Project
Power System Protection
4. Required Protection Relay Trip Time: (Downstream Trip Time + 0.300) @ Fault
Current
Setting
Sl.no Parameter Value Unit
1 Pickup 1.00 pu
2 TD Multiplier 0.21 Sec
3 RCA - Deg
4 Curve IEC Curve A
5 Block -
Setting
Sl.no Parameter Value Unit
1 Pickup 4.00 pu
2 TD Multiplier 0.02 Sec
3 RCA - Deg
4 Curve Definite Time
5 Block -
Clean Energy and Network Efficiency
Improvement Project
Power System Protection