Anda di halaman 1dari 272

Satuan Pekerjaan Persiapan

Diposkan : 31 Mei 2014


Oleh : Endang Kusman

HARGA
No. URAIAN SATUAN VOLUME HARGA
SATUAN
(Rp) (Rp)
A-01 1 M' Pagar Sementara Dari Kayu Tinggi 2 m

Dolken Kayu 8-10 / 400


- Btg 12,500 28,000.00 35,000.00
cm

- Semen Portland Kg 25,000 1,406.00 3,515.00

255,400.0
- Pasir beton M3 0.0050 1,277.00
0

211,100.0
- Koral Beton 2/3 M3 0.0090 1,899.90
0

2,640,000 190,080.0
- Kayu balok terentang M3 0.0720
.00 0

- Paku Biasa 2" - 5" Kg 0.0600 23,400.00 1,404.00

- Residu Kg 0.4000 8,100.00 3,240.00


- Pekerja Oh 0.4000 42,000.00 16,800.00

- Tukang Kayu Oh 0.2000 65,000.00 13,000.00

- Kepala Tukang Oh 0.0200 75,000.00 1,500.00

- Mandor Oh 0.0200 80,000.00 1,600.00

269,315.9
Jumlah
0
269,316.0
Dibulatkan
0

A-02 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m

Dolken Kayu 8-10 / 400


- Btg 12,500 28,000.00 35,000.00
cm
- Semen Portland Kg 25,000 1,406.00 3,515.00

- Seng Gelombang BJLS-30 Lbr 12,000 62,900.00 75,480.00

255,400.0
- Pasir beton M3 0.0050 1,277.00
0

211,100.0
- Koral Beton 2/3 M3 0.0090 1,899.90
0

2,640,000 190,080.0
- Kayu balok terentang M3 0.0720
.00 0

- Paku Biasa 2" - 5" Kg 0.0600 23,400.00 1,404.00

- Meni Besi Kg 0.4500 30,400.00 13,680.00

- Pekerja Oh 0.4000 42,000.00 16,800.00

Tukang Kayu Oh 0.2000 65,000.00 13,000.00

- Kepala Tukang Oh 0.0200 75,000.00 1,500.00

- Mandor Oh 0.0200 80,000.00 1,600.00

355,235.9
Jumlah
0
355,236.0
Dibulatkan
0

1 M' Pagar SementaraKawat Duri


A-03
Tinggi 1,80 m

Dolken Kayu 8-10 / 400


- Btg 10,000 28,000.00 28,000.00
cm

- Semen Portland Kg 20,000 1,406.00 2,812.00

158,750.0
- Kawat Duri Kg 25,000 63,500.00
0
255,400.0
- Pasir beton M3 0.0050 1,277.00
0

211,100.0
- Koral Beton 2/3 M3 0.0090 1,899.90
0
- Paku Biasa 2" - 5" Kg 0.0600 23,400.00 1,404.00

- Pekerja Oh 0.3000 42,000.00 12,600.00

- Tukang Kayu Oh 0.2000 65,000.00 13,000.00

- Kepala Tukang Oh 0.0200 75,000.00 1,500.00

- Mandor Oh 0.0200 80,000.00 1,600.00

222,842.9
Jumlah
0
222,843.0
Dibulatkan
0

1 M2 Pengukuran Dan Pasang


A-04
Bouwplank

1,870,500
- Kayu kaso 5/7 M3 0.0120 22,446.00
.00

- Paku Biasa 2" - 5" Kg 0.0200 23,400.00 468.00

2,071,700
- Kayu papan albasia M3 0.0070 14,501.90
.00

- Pekerja Oh 0.1000 42,000.00 4,200.00

- Tukang Kayu Oh 0.1000 65,000.00 6,500.00

- Kepala Tukang Oh 0.0100 75,000.00 750.00

- Mandor Oh 0.0050 80,000.00 400.00

Jumlah 49,265.90

Dibulatkan 49,266.00

1 M2 Pembuatan Kantor Sementara


A-05
dgn Lantai Diplester

Dolken Kayu 8-10 / 400


- Btg 12,500 28,000.00 35,000.00
cm
2,640,000 475,200.0
- Kayu Balok terentang M3 0.1800
.00 0

- Paku Biasa Kg 0.8500 23,400.00 19,890.00


- Besi Strip Kg 11,000 26,800.00 29,480.00

- Semen Portland Kg 350,000 1,406.00 49,210.00

233,400.0
- Pasir Pasang M3 0.1500 35,010.00
0
255,400.0
- Pasir beton M3 0.1000 25,540.00
0
211,100.0
- Koral Beton2/3 M3 0.1500 31,665.00
0

- Bata Merah Bh 300,000 775.00 23,250.00

- Seng Plat m' 0.2500 15,815.00 3,953.75

- Kawat harmonika M2 20,000 35,900.00 71,800.00

- Kaca Polos 3mm M2 0.0800 87,400.00 6,992.00

- Kunci Tanam Bh 0.1500 94,500.00 14,175.00

Plywood 120 x 240 x 0,4 140,000.0


- Lbr 0.0600 8,400.00
cm 0

- Pekerja Oh 20,000 42,000.00 84,000.00

130,000.0
- Tukang Kayu Oh 20,000 65,000.00
0

- Tukang Batu Oh 10,000 65,000.00 65,000.00

- Kepala Tukang Oh 0.3000 75,000.00 22,500.00

- Mandor Oh 0.0500 80,000.00 4,000.00

1,135,065
Jumlah
.75
1,135,066
Dibulatkan
.00

1 M2 Pembuatan Gudang Semen dan


A-06
Alat-alat

Dolken Kayu 8-10 / 400


- Btg 17,000 28,000.00 47,600.00
cm
2,640,000 554,400.0
- Kayu balok terentang M3 0.2100
.00 0

- Paku Biasa Kg 0.3000 23,400.00 7,020.00

- Semen Portland Kg 105,000 1,406.00 14,763.00


255,400.0
- Pasir Beton M3 0.0300 7,662.00
0
211,100.0
- Koral Beton 2/3 M3 0.0500 10,555.00
0

- Seng Gelombang BJLS 30 Lbr 15,000 62,900.00 94,350.00

- Pekerja Oh 10,000 42,000.00 42,000.00

130,000.0
- Tukang Kayu Oh 20,000 65,000.00
0

- Kepala Tukang Oh 0.2000 75,000.00 15,000.00

- Mandor Oh 0.0500 80,000.00 4,000.00

927,350.0
Jumlah
0
927,350.0
Dibulatkan
0

A-07 1 M2 Pembuatan Bedeng Buruh

Dolken Kayu 8-10 / 400


- Btg 12,500 28,000.00 35,000.00
cm
2,640,000 491,040.0
- Kayu balok terentang M3 0.1860
.00 0

- Paku Biasa Kg 0.3000 23,400.00 7,020.00

- Semen Portland Kg 180,000 1,406.00 25,308.00

255,400.0
- Pasir Beton M3 0.0300 7,662.00
0
211,100.0
- Koral Beton 2/3 M3 0.0500 10,555.00
0

- Seng Gelombang BJLS 30 Lbr 15,000 62,900.00 94,350.00

- Pekerja Oh 10,000 42,000.00 42,000.00

130,000.0
- Tukang Kayu Oh 20,000 65,000.00
0

- Kepala Tukang Oh 0.2000 75,000.00 15,000.00

- Mandor Oh 0.0500 80,000.00 4,000.00

861,935.0
Jumlah
0
861,935.0
Dibulatkan
0
A-08 1 M2 Membersihkan Lapangan dan Perataan

- Pekerja Oh 0.1000 42,000.00 4,200.00

- Mandor Oh 0.0500 80,000.00 4,000.00


Jumlah 8,200.00
Dibulatkan 8,200.00
A-09 1M2 Pembuatan Jalan Sementara

205,500.0
- Batu Belah 15/20 M3 0.1500 30,825.00
0
196,000.0
- Batu Pecah 5/7 M3 0.0900 17,640.00
0
233,400.0
- Pasir Pasang M3 0.0100 2,334.00
0

- Pekerja Oh 10,000 42,000.00 42,000.00

- Mandor Oh 0.0500 80,000.00 4,000.00

Jumlah 96,799.00

Dibulatkan 96,799.00

A-10 1 M3 Bongkaran Beton Bertulang

280,014.0
- Pekerja Oh 66,670 42,000.00
0

- Mandor Oh 0.3330 80,000.00 26,640.00

306,654.0
Jumlah
0
306,654.0
Dibulatkan
0

A-11 1 M3 Bongkaran Dinding Tembok Bata Merah

280,014.0
- Pekerja Oh 66,670 42,000.00
0

- Mandor Oh 0.0330 80,000.00 2,640.00

282,654.0
Jumlah
0
282,654.0
Dibulatkan
0

A-12 1 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm


199,200.0 196,411.2
- Panel Beton Pracetak Lbr 0.9860
0 0
264,000.0 138,600.0
- Kolom Beton Pracetak Btg 0.5250
0 0
255,400.0
- Pasir Beton M3 0.0740 18,899.60
0
211,100.0
- Koral 2/3 M3 0.1460 30,820.60
0

- Semen abu - abu Kg 450,000 1,406.00 63,270.00

- Pekerja Oh 0.3750 42,000.00 15,750.00

- Tukang Batu Oh 0.1250 65,000.00 8,125.00

- Kepala Tukang Oh 0.0120 75,000.00 900.00

- Mandor Oh 0.0190 80,000.00 1,520.00

474,296.4
Jumlah
0
474,296.0
Dibulatkan
0

A-13 1 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'

- Kawat ram ayam Lbr 0.4340 14,900.00 6,466.60

124,183.8
- Besi siku L 50.50.5 Kg 67,860 18,300.00
0

- Besi pelat (1,2 x 3) mm Kg 0.0424 18,300.00 775.92


- Baut bh 40,000 600.00 2,400.00
- Semen Portland Kg 25,000 1,406.00 3,515.00
255,400.0
- Pasir beton M3 0.0050 1,277.00
0
211,100.0
- Koral Beton 2/3 M3 0.0090 1,899.90
0

- Pekerja Oh 0.3750 42,000.00 15,750.00

- Tukang Batu Oh 0.1250 65,000.00 8,125.00

- Kepala Tukang Oh 0.0120 75,000.00 900.00

- Mandor Oh 0.0190 80,000.00 1,520.00

166,813.2
Jumlah
2
166,813.0
Dibulatkan
0

A-14 1 M2 Pagar BRC lengkap dengan tiang

BRC lengkap dengan 171,300.0


- Lbr 0.4340 74,344.20
tiang 0
- Semen Portland Kg 20,000 1,406.00 2,812.00
158,750.0
- Kawat Duri Kg 25,000 63,500.00
0
255,400.0
- Pasir beton M3 0.0050 1,277.00
0
211,100.0
- Koral Beton 2/3 M3 0.0090 1,899.90
0

- Pekerja Oh 0.3750 42,000.00 15,750.00

- Tukang Batu Oh 0.1250 65,000.00 8,125.00

- Kepala Tukang Oh 0.0120 75,000.00 900.00

- Mandor Oh 0.0190 80,000.00 1,520.00

265,378.1
Jumlah
0
265,378.0
Dibulatkan
0

A-15 1 M2 Steiger Werk / perancah dari Bambu

- Bambu 6 - 10 (600) cm btng 10,000 25,000.00 25,000.00

- Tali ijuk kg 0.2500 23,400.00 5,850.00

- Pekerja org 0.2500 42,000.00 10,500.00

- Tukang kayu org 0.0170 65,000.00 1,105.00

- Kepala tukang org 0.0020 75,000.00 150.00

- Mandor org 0.0130 80,000.00 1,040.00

Jumlah 43,645.00

Dibulatkan 43,645.00
A-16 1 M' Cerucuk Bambu
- Bambu 7 -10 (400) cm btng 12,500 25,000.00 31,250.00
- Pekerja org 0.5000 42,000.00 21,000.00

- Mandor org 0.0250 80,000.00 2,000.00

Jumlah 54,250.00

Dibulatkan 54,250.00

Kembali ke Analisa AHS SNI


a Satuan Pekerjaan Tanah
Berkut ini adalah contoh Analisa Harga Satuan (AHS) SNI tahun 2011 untuk pekerjaan tanah yang seri

B. ANALISA HARGA SATUAN PEKERJAAN TANAH

HARGA
No. URAIAN SATUAN VOLUME HARGA
SATUAN
(Rp) (Rp)
1 M3
Galian
Tanah
B-01
Biasa
sedalam 1
m

- Pekerja Oh 0.4000 42,000.00 16,800.00

- Mandor Oh 0.0400 80,000.00 3,200.00

Jumlah 20,000.00

Dibulatkan 20,000.00

1 M3
Galian
Tanah
B-02
Biasa
Sedalam
2m

- Pekerja Oh 0.5260 42,000.00 22,092.00

- Mandor Oh 0.0520 80,000.00 4,160.00

Jumlah 26,252.00

Dibulatkan 26,252.00

1 M3
Galian
Tanah
B-03
Biasa
Sedalam
3m

- Pekerja Oh 0.7350 42,000.00 30,870.00


- Mandor Oh 0.0730 80,000.00 5,840.00

Jumlah 36,710.00

Dibulatkan 36,710.00

1 M3
Galian
Tanah
B-04
Keras
Sedalam
1m

- Pekerja Oh 0.6250 42,000.00 26,250.00

- Mandor Oh 0.0620 80,000.00 4,960.00

Jumlah 31,210.00

Dibulatkan 31,210.00

1 M3
Galian
Tanah
B-05
Lumpur
Sedalam
1m

- Pekerja Oh 0.8230 42,000.00 34,566.00

- Mandor Oh 0.0830 80,000.00 6,640.00

Jumlah 41,206.00

Dibulatkan 41,206.00

Materi Terkait :
ekerjaan tanah yang sering digunakan untuk pekerjaan bangunan rumah.
Pekerjaan Pondasi (AHS SNI 2011)
Untuk menghitung biaya pekerjaan pondasi bagunan rumah Anda diperlukan Analisa Harga Satuan Pe

C. ANALISA HARGA SATUAN PEKERJAAN PONDASI

HARGA
No. URAIAN SATUAN VOLUME HARGA
SATUAN
(Rp) (Rp)
1 M3
Pasanag
Pondasi
C-01
batu Kali
adk 1pc :
3 ps
Batu 205,500.0 226,050.0
- M3 11,000
Belah 0 0
Semen 284,012.0
- Kg 2,020,000 1,406.00
Portland 0
Pasir 233,400.0 113,199.0
- M3 0.4850
Pasang 0 0

- Pekerja Oh 15,000 42,000.00 63,000.00

Tukang
- Oh 0.6000 65,000.00 39,000.00
Batu
Kepala
- Oh 0.0600 75,000.00 4,500.00
Tukang

- Mandor Oh 0.0750 80,000.00 6,000.00

735,761.0
Jumlah
0
735,761.0
Dibulatkan
0
1 M3
Pasang
Pondasi
C-02
Batu kali
adk 1pc :
4ps
Batu 205,500.0 226,050.0
- M3 11,000
Belah 0 0
Semen 229,178.0
- Kg 1,630,000 1,406.00
Portland 0
Pasir 233,400.0 121,368.0
- M3 0.5200
Pasang 0 0
- Pekerja Oh 15,000 42,000.00 63,000.00

Tukang
- Oh 0.6000 65,000.00 39,000.00
Batu
Kepala
- Oh 0.0600 75,000.00 4,500.00
Tukang

- Mandor Oh 0.0750 80,000.00 6,000.00

689,096.0
Jumlah
0
689,096.0
Dibulatkan
0
1 M3
Pasang
Pondasi
C-03
Batu kali
adk 1pc :
5ps
Batu 205,500.0 226,050.0
- M3 11,000
Belah 0 0
Semen 191,216.0
- Kg 1,360,000 1,406.00
Portland 0
Pasir 233,400.0 126,969.6
- M3 0.5440
Pasang 0 0

- Pekerja Oh 15,000 42,000.00 63,000.00

Tukang
- Oh 0.6000 65,000.00 39,000.00
Batu
Kepala
- Oh 0.0600 75,000.00 4,500.00
Tukang

- Mandor Oh 0.0750 80,000.00 6,000.00

656,735.6
Jumlah
0
656,736.0
Dibulatkan
0
1 M3
Pasang
Pondasi
C-04 Batu
Kosong
(aanstam
ping)
Batu 205,500.0 246,600.0
- M3 12,000
Belah 0 0
175,300.0
- Pasir Urug M3 0.3000 52,590.00
0
- Pekerja Oh 0.7800 42,000.00 32,760.00

Tukang
- Oh 0.3900 65,000.00 25,350.00
Batu
Kepala
- Oh 0.0390 75,000.00 2,925.00
Tukang

- Mandor Oh 0.0390 80,000.00 3,120.00

363,345.0
Jumlah
0
363,345.0
Dibulatkan
0

Materi Terkait :
Analisa Harga Satuan Pekerjaaan Pondasi. Berikut adalah contoh analisa pekerjaan pondasi (AHS SNI tahun 201
ndasi (AHS SNI tahun 2011). Pada dasarnya yang selalu berubah setiap tahun pada analisa harga satuan, adalah
lisa harga satuan, adalah harga bahan dan upah, sedangkan koefisien (volume pek.) tetap.
a Satuan Pekerjaan Beton
NO URAIAN SAT VOLUME HRG.SAT JUMLAH

1 M3 Sloof
Beton
Tulang
15/20
D-17r2 (180 kg
besi +
bekisting)
4dia. 12
ring 8-15

Kayu
papan M3 0.2700 2,850,000 769.5
terentang
Paku
Biasa 2" - Kg 20,000 23.4 46.8
5"
Besi
Kg 1,800,000 16.5 2,970,000
Beton
Kawat
Kg 30,000 27.7 83.1
Beton
Semen
Kg 3,230,000 1.2 387.6
Portland
Pasir
M3 0.5200 225 117
Beton

Koral
M3 0.7800 200 156
Beton 2/3

Pekerja Oh 48,500 55 266.75


Tukang
Oh 0.3500 70 24.5
Batu
Tukang
Oh 15,600 70 109.2
Kayu
Tukang
Oh 14,000 70 98
Besi
Kepala
Oh 0.3310 80 26.48
Tukang
Mandor Oh 0.1700 85 14.45
Jumlah 5,069,380
Dibulatka
5,069,380
n
1 M3
Kolom
Beton
Tulang
15/20
(180 kg
besi +
bekisting)
4dia.12 8-
15

Kayu
papan M3 0.4000 2,850,000 1,140,000
terentang
Paku
Biasa 2" - Kg 40,000 23.4 93.6
5"
Minyak
Ltr 40.5 -
Bekisting
Besi
Kg 1,800,000 16.5 2,970,000
Beton
Kawat
Kg 18,000 27.7 49.86
Beton
Semen
Kg 3,230,000 1.2 387.6
Portland
Pasir
M3 0.5200 225 117
Beton

Koral
M3 0.7800 200 156
Beton 2/3

Kayu
Balok M3 0.1500 2,640,000 396
Terentang

Dolken -
Btg 200,000 15 300
8-10/4m
Pekerja Oh 73,000 55 401.5
Tukang
Oh 0.3500 70 24.5
Batu
Tukang
Oh 33,000 70 231
Kayu
Tukang
Oh 21,000 70 147
Besi
Kepala
Oh 0.5700 80 45.6
Tukang
Mandor Oh 0.2500 85 21.25
Jumlah 6,480,910
Dibulatka
6,481,000
n

1 M3
Balok
Beton
Tulang
15/20
sofi-sofi,
ring balk
+ balok
poratl
(180 kg
besi +
bekisting)
4dia. 12,
8-15

Kayu
papan M3 0.3200 2,850,000 912
terentang
Paku
Biasa 2" - Kg 32,000 23.4 74.88
5"
Besi
Kg 1,800,000 16.5 2,970,000
Beton
Kawat
Kg 22,500 27.7 62.325
Beton
Semen
Kg 3,230,000 1.2 387.6
Portland
Pasir
M3 0.5200 225 117
Beton

Koral
M3 0.7800 200 156
Beton 2/3

Kayu
Balok M3 0.1400 2,640,000 369.6
Terentang

Dolken -
Btg 160,000 15 240
8-10/4m
Pekerja Oh 59,600 55 327.8
Tukang
Oh 0.3500 70 24.5
Batu
Tukang
Oh 28,000 70 196
Kayu
Tukang
Oh 14,000 70 98
Besi
Kepala
Oh 0.4550 80 36.4
Tukang
Mandor Oh 0.2080 85 17.68
Jumlah 6,412,865
Dibulatka
6,413,000
n

1 M3
Tangga
Beton
D-29
Tulang (90
kg besi +
bekisting)

Kayu
papan M3 0.2500 2,850,000 712.5
terentang
Paku
Biasa 2" - Kg 30,000 23.4 70.2
5"
Minyak
Ltr 12,000 40.5 48.6
Bekisting
Besi
Kg 900,000 16.5 1,485,000
Beton
Kawat
Kg 30,000 27.7 83.1
Beton
Semen
Kg 3,230,000 1.2 387.6
Portland
Pasir
M3 0.5200 225 117
Beton

Koral
M3 0.7800 200 156
Beton 2/3

Kayu
Balok M3 0.1050 2,640,000 277.2
Terentang

Dolken -
Btg 140,000 15 210
8-10/4m
Pekerja Oh 56,000 55 308
Tukang
Oh 0.3500 70 24.5
Batu
Tukang
Oh 23,000 70 161
Kayu
Tukang
Oh 14,000 70 98
Besi
Kepala
Oh 0.4050 80 32.4
Tukang
Mandor Oh 0.2020 85 17.17
Jumlah 4,188,720
Dibulatka
4,189,000
n

1 M3
Membuat
Plat
Lantai Tb.
10 Cm
3 Beton
Bertulang
( 90 Kg
Besi +
Bekisting
)

Kayu
M3 0.4000 2,850,000 1,140,000
Terentang

Paku
Biasa 2" - Kg 40,000 23.4 93.6
5"
Minyak
Ltr 20,000 40.5 81
Bekisting
Besi
Beton Kg 900,000 16.5 1,485,000
Polos
Kawat
Kg 30,000 27.7 83.1
Beton

Kayu
Balok M3 0.1050 151.1 15.866
Terentang

Plywood
Tebal 9 Lbr 35,000 151.1 528.85
mm
Dolken
kayu
Btg 600,000 15 900
Galam o -
8-10/4 m
Semen
Kg 3,230,000 1.2 387.6
Portland
Pasir
M3 0.5200 225 117
Beton

Koral
M3 0.7800 200 156
Beton 2/3
Pekerja Oh 52,000 55 286
Tukang
Oh 0.3500 70 24.5
Batu
Tukang
Oh 33,000 70 231
Kayu
Kepala
Oh 0.3650 80 29.2
Tukang
Mandor Oh 10,600 85 90.1
Jumlah 5,648,816
Dibulatka
5,649,000
n

Materi Terkait :
Pekerjaan Dinding (AHS-SNI 2011)
Berikut adalah penggalan analisa harga satuan (AHS-SNI 2011) untuk pekerjaan dinding yang biasa di

E. ANALISA HARGA SATUAN PEKERJAAN DINDING


HARGA
No. URAIAN SATUAN VOLUME HARGA
SATUAN
(Rp) (Rp)
M2 Pasang Bata Merah Tebal 1
E-01 1
Bata, 1pc : 3ps
Bata 108,500.0
- Bh 1,400,000 775.00
Merah 0
Semen
- Kg 329,500 1,406.00 46,327.70
Portland
Pasir 233,400.0
- M3 0.0910 21,239.40
Pasang 0

- Pekerja Oh 0.6500 42,000.00 27,300.00

Tukang
- Oh 0.2000 65,000.00 13,000.00
Batu
Kepala
- Oh 0.0200 75,000.00 1,500.00
Tukang

- Mandor Oh 0.0300 80,000.00 2,400.00

220,267.1
Jumlah
0
Dibulatka 220,267.0
n 0
M2
Pasang
Bata
E-02 1 Merah
Tebal 1
Bata,
1pc : 4ps
Bata 108,500.0
- Bh 1,400,000 775.00
Merah 0
Semen
- Kg 265,500 1,406.00 37,329.30
Portland
Pasir 233,400.0
- M3 0.0930 21,706.20
Pasang 0

- Pekerja Oh 0.6500 42,000.00 27,300.00

Tukang
- Oh 0.2000 65,000.00 13,000.00
Batu
Kepala
- Oh 0.0200 75,000.00 1,500.00
Tukang

- Mandor Oh 0.0300 80,000.00 2,400.00

211,735.5
Jumlah
0
Dibulatka 211,736.0
n 0
M2
Pasang
Bata
E-03 1 Merah
Tebal 1
Bata,
1pc : 5ps
Bata 108,500.0
- Bh 1,400,000 775.00
Merah 0
Semen
- Kg 222,000 1,406.00 31,213.20
Portland
Pasir 233,400.0
- M3 0.1020 23,806.80
Pasang 0

- Pekerja Oh 0.6500 42,000.00 27,300.00

Tukang
- Oh 0.2000 65,000.00 13,000.00
Batu
Kepala
- Oh 0.0200 75,000.00 1,500.00
Tukang

- Mandor Oh 0.0300 80,000.00 2,400.00

207,720.
Jumlah
00
Dibulatk 207,720.
an 00
M2 Pasang Bata Merah Tebal
E-04 1
1/2 Bata, 1pc : 3ps
Bata
- Bh 700,000 775.00 54,250.00
Merah
Semen
- Kg 143,700 1,406.00 20,204.22
Portland
Pasir 233,400.0
- M3 0.0400 9,336.00
Pasang 0

- Pekerja Oh 0.3200 42,000.00 13,440.00

Tukang
- Oh 0.1000 65,000.00 6,500.00
Batu
Kepala
- Oh 0.0100 75,000.00 750.00
Tukang
- Mandor Oh 0.0150 80,000.00 1,200.00

105,680.
Jumlah
22
Dibulatk 105,680.
an 00
M2 Pasang Bata Merah Tebal
E-05 1
1/2 Bata, 1pc : 4ps
Bata
- Bh 700,000 775.00 54,250.00
Merah
Semen
- Kg 115,000 1,406.00 16,169.00
Portland
Pasir 233,400.0
- M3 0.0430 10,036.20
Pasang 0

- Pekerja Oh 0.3200 42,000.00 13,440.00

Tukang
- Oh 0.1000 65,000.00 6,500.00
Batu
Kepala
- Oh 0.0100 75,000.00 750.00
Tukang

- Mandor Oh 0.0150 80,000.00 1,200.00

102,345.
Jumlah
20
Dibulatk 102,345.
an 00
M2 Pasang Bata Merah Tebal
E-06 1
1/2 Bata, 1pc : 5ps
Bata
- Bh 700,000 775.00 54,250.00
Merah
Semen
- Kg 96,800 1,406.00 13,610.08
Portland
Pasir 233,400.0
- M3 0.0450 10,503.00
Pasang 0

- Pekerja Oh 0.3200 42,000.00 13,440.00

Tukang
- Oh 0.1000 65,000.00 6,500.00
Batu
Kepala
- Oh 0.0100 75,000.00 750.00
Tukang

- Mandor Oh 0.0150 80,000.00 1,200.00

100,253.
Jumlah
08
Dibulatk 100,253.
an 00
Materi Terkait :
an dinding yang biasa digunakan untuk menghitung biaya pekerjaan dinding pada rumah tinggal. Keseluruhan
ah tinggal. Keseluruhan analisa pekerjaan dinding untuk berbagai ukuran ketebalan dinding dan komposisi adu
nding dan komposisi adukan pada AHS-SNI ada sekitar 40 analisa.
ekerjaan Plesteran (AHS SNI 2011)
Inilah penggalan analisa pekerjaan plesteran yang paling banyak digunakan untuk menghitung biaya

F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN


HARGA
No. URAIAN SATUAN VOLUME HARGA
SATUAN
(Rp) (Rp)
1 M2
Plesteran
F-01 adk. 1pc :
2ps Tebal
15 mm
Semen
- Kg 85,200 1,406.00 11,979.12
Portland
Pasir 233,400.0
- M3 0.0170 3,967.80
Pasang 0

- Pekerja Oh 0.2000 42,000.00 8,400.00

Tukang
- Oh 0.1500 65,000.00 9,750.00
Batu
Kepala
- Oh 0.0150 75,000.00 1,125.00
Tukang

- Mandor Oh 0.0100 80,000.00 800.00

36,021.9
Jumlah
2
36,022.0
Dibulatkan
0
1 M2
Plesteran
F-02 adk. 1pc :
3ps Tebal
15 mm
Semen
- Kg 64,800 1,406.00 9,110.88
Portland
Pasir 233,400.0
- M3 0.0190 4,434.60
Pasang 0

- Pekerja Oh 0.2000 42,000.00 8,400.00

Tukang
- Oh 0.1500 65,000.00 9,750.00
Batu
Kepala
- Oh 0.0150 75,000.00 1,125.00
Tukang
- Mandor Oh 0.0100 80,000.00 800.00

33,620.4
Jumlah
8
33,620.0
Dibulatkan
0
1 M2
Plesteran
F-03 adk. 1pc :
4ps Tebal
15 mm
Semen
- Kg 52,000 1,406.00 7,311.20
Portland
Pasir 233,400.0
- M3 0.0200 4,668.00
Pasang 0

- Pekerja Oh 0.2000 42,000.00 8,400.00

Tukang
- Oh 0.1500 65,000.00 9,750.00
Batu
Kepala
- Oh 0.0150 75,000.00 1,125.00
Tukang

- Mandor Oh 0.0100 80,000.00 800.00

32,054.2
Jumlah
0
32,054.0
Dibulatkan
0
1 M2
Plesteran
F-04 adk. 1pc :
3ps Tebal
20 mm
Semen
- Kg 108,000 1,406.00 15,184.80
Portland
Pasir 233,400.0
- M3 0.0260 6,068.40
Pasang 0

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.2000 65,000.00 13,000.00
Batu
Kepala
- Oh 0.0200 75,000.00 1,500.00
Tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

47,253.2
Jumlah
0
47,253.0
Dibulatkan
0
1 M2
Plesteran
F-05 adk. 1pc :
4ps Tebal
20 mm
Semen
- Kg 86,800 1,406.00 12,204.08
Portland
Pasir 233,400.0
- M3 0.0280 6,535.20
Pasang 0

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.2000 65,000.00 13,000.00
Batu
Kepala
- Oh 0.0200 75,000.00 1,500.00
Tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

44,739.2
Jumlah
8
44,739.0
Dibulatkan
0
1 M2
Plesteran
adk.
F-06
1pc:5ps
tebal 20
mm
Semen
- Kg 72,900 1,406.00 10,249.74
Portland
Pasir 233,400.0
- M3 0.0260 6,068.40
Pasang 0

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.2000 65,000.00 13,000.00
Batu
Kepala
- Oh 0.0200 75,000.00 1,500.00
Tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

42,318.1
Jumlah
4
42,318.0
Dibulatkan
0
1 M2
F-11 Acian
Plesteran
Semen
- Kg 40,000 1,406.00 5,624.00
Portland

- Pekerja Oh 0.1430 42,000.00 6,006.00

Tukang
- Oh 0.1070 65,000.00 6,955.00
batu
Kepala
- Oh 0.0105 75,000.00 787.50
Tukang

- Mandor Oh 0.0105 80,000.00 840.00

20,212.5
Jumlah
0
20,213.0
Dibulatkan
0

Materi Terkait :
untuk menghitung biaya bangunan rumah tinggal.
Satuan Penutup Atap (AHS SNI 2011)
Untuk menghitung pekerjaan penutup atap seperti genting plentong, genting morando, genting keram

G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP


HARGA
No. URAIAN SATUAN VOLUME HARGA
SATUAN
(Rp) (Rp)

M2
Pasang
G-01 1 Atap
Genteng
Palentong

Genteng
- Bh 250,000 1,900.00 47,500.00
palentong

- Pekerja Oh 0.1500 42,000.00 6,300.00

Tukang
- Oh 0.0750 65,000.00 4,875.00
kayu
Kepala
- Oh 0.0080 75,000.00 600.00
tukang

- Mandor Oh 0.0080 80,000.00 640.00

59,915.0
Jumlah
0
Dibulatk 59,915.0
an 0
1 M2 Pasang
G-02 Genteng Bubung
Palentong

Genteng
- bubung Bh 50,000 6,000.00 30,000.00
palentong

Semen
- Kg 80,000 1,406.00 11,248.00
Portland
Pasir 233,400.0
- M3 0.0320 7,468.80
pasang 0

- Pekerja Oh 0.4000 42,000.00 16,800.00

Tukang
- Oh 0.2000 65,000.00 13,000.00
kayu
Kepala
- Oh 0.0200 75,000.00 1,500.00
tukang

- Mandor Oh 0.0020 80,000.00 160.00

80,176.8
Jumlah
0
Dibulatk 80,177.0
an 0
1 M2 Pasang Roof Light
G-03
Fibreglass ( 180 x 90 ) cm
Roof light 100,000.0
- Lbr 0.6000 60,000.00
fibreglass 0
Paku
- biasa " - Kg 0.0500 23,800.00 1,190.00
1"

- Pekerja Oh 0.1400 42,000.00 5,880.00

Tukang
- Oh 0.0670 65,000.00 4,355.00
kayu
Kepala
- Oh 0.0070 75,000.00 525.00
tukang

- Mandor Oh 0.0070 80,000.00 560.00

72,510.0
Jumlah
0
Dibulatk 72,510.0
an 0
1 M2 Pasang Atap
Asbes Gelombang
G-04
( 3,00 x 1,05 m ) x 4
mm
Asbes
- gelomban Lbr 0.3500 80,000.00 28,000.00
g

- Paku seng Kg 0.1200 23,800.00 2,856.00

- Pekerja Oh 0.1400 42,000.00 5,880.00

Tukang
- Oh 0.0700 65,000.00 4,550.00
kayu
Kepala
- Oh 0.0070 75,000.00 525.00
tukang

- Mandor Oh 0.0070 80,000.00 560.00

42,371.0
Jumlah
0
42,371.0
Dibulatkan
0
1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m )
G-05
x 4 mm
Asbes
- gelomban Lbr 0.4200 73,300.00 30,786.00
g

- Paku seng Kg 0.1200 23,800.00 2,856.00

- Pekerja Oh 0.1400 42,000.00 5,880.00

Tukang
- Oh 0.0700 65,000.00 4,550.00
kayu
Kepala
- Oh 0.0070 75,000.00 525.00
tukang

- Mandor Oh 0.0070 80,000.00 560.00

45,157.0
Jumlah
0
Dibulatk 45,157.0
an 0
1 M2 Pasang Atap
Asbes Gelombang
G-06
( 2,40 x 1,05 m ) x 4
mm
Asbes
- gelomban Lbr 0.4400 65,900.00 28,996.00
g

- Paku seng Kg 0.1200 23,800.00 2,856.00

- Pekerja Oh 0.1400 42,000.00 5,880.00

Tukang
- Oh 0.0670 65,000.00 4,355.00
kayu
Kepala
- Oh 0.0070 75,000.00 525.00
tukang

- Mandor Oh 0.0070 80,000.00 560.00

43,172.0
Jumlah
0
Dibulatk 43,172.0
an 0
M2
Pasang
Atap
Asbes
G-07 1
Gelomban
g ( 2,10 x
1,05 m ) x
4 mm
Asbes
- gelomban Lbr 0.5100 58,500.00 29,835.00
g

- Paku seng Kg 0.1200 23,800.00 2,856.00

- Pekerja Oh 0.1400 42,000.00 5,880.00

Tukang
- Oh 0.0670 65,000.00 4,355.00
kayu
Kepala
- Oh 0.0070 75,000.00 525.00
tukang

- Mandor Oh 0.0070 80,000.00 560.00

44,011.0
Jumlah
0
Dibulatk 44,011.0
an 0
1 M2 Pasang Atap
Asbes Gelombang
G-08
( 1,50 x 1,05 m ) x 4
mm
Asbes
- gelomban Lbr 0.8000 42,300.00 33,840.00
g

- Paku seng Kg 0.1200 23,800.00 2,856.00

- Pekerja Oh 0.1400 42,000.00 5,880.00

Tukang
- Oh 0.0670 65,000.00 4,355.00
kayu
Kepala
- Oh 0.0070 75,000.00 525.00
tukang

- Mandor Oh 0.0070 80,000.00 560.00

48,016.0
Jumlah
0
Dibulatk 48,016.0
an 0
1 M Pasang Nok Stel
G-09
Gelombang 1,05 m
Nok stel
- gelomban Lbr 21,000 38,100.00 80,010.00
g
Paku
- sekrup Bh 60,000 800.00 4,800.00
3,5"

- Pekerja Oh 0.0840 42,000.00 3,528.00

Tukang
- Oh 0.1250 65,000.00 8,125.00
kayu
Kepala
- Oh 0.0130 75,000.00 975.00
tukang

- Mandor Oh 0.0040 80,000.00 320.00

97,758.0
Jumlah
0
Dibulatk 97,758.0
an 0
1 M2 Pasang Atap
G-10
Genteng Beton
Genteng
- bh 110,000 8,500.00 93,500.00
beton
Paku
- biasa 2" - Kg 0.0300 23,400.00 702.00
5"

- Pekerja Oh 0.2000 42,000.00 8,400.00

Tukang
- Oh 0.1000 65,000.00 6,500.00
kayu
Kepala
- Oh 0.0100 75,000.00 750.00
tukang

- Mandor Oh 0.0100 80,000.00 800.00

110,652.
Jumlah
00
110,652.
Dibulatkan
00
1 M2 Pasang Atap
G-11 Genteng Murando
Natural
Genteng
- murando bh 180,000 2,700.00 48,600.00
natural

- Pekerja Oh 0.1500 42,000.00 6,300.00


Tukang
- Oh 0.0750 65,000.00 4,875.00
kayu
Kepala
- Oh 0.0080 75,000.00 600.00
tukang

- Mandor Oh 0.0080 80,000.00 640.00

61,015.0
Jumlah
0
Dibulatk 61,015.0
an 0
1 M2 Pasang Atap
G-12 Genteng Murando
Glazur
Genteng
- murando bh 180,000 4,000.00 72,000.00
glazur

- Pekerja Oh 0.1500 42,000.00 6,300.00

Tukang
- Oh 0.0750 65,000.00 4,875.00
kayu
Kepala
- Oh 0.0080 75,000.00 600.00
tukang

- Mandor Oh 0.0080 80,000.00 640.00

84,415.0
Jumlah
0
Dibulatk 84,415.0
an 0

Materi Terkait :
morando, genting keramik, genting beton dll. diperlukan analisa harga satuan penutup atap. Berikut adalah pe
p atap. Berikut adalah penggalan AHS SNI 2011 penutup atap yang biasa digunakan untuk menghitung RAB Rum
tuk menghitung RAB Rumah tinggal.
aan Penutup Langit-langit (AHS SNI 2011)
Berikut ini adalah penggalan Analisa Harga Satuan Pekerjaan untuk menghitung biaya pekerjaan lang

H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGIT


HARGA
No. URAIAN SATUAN VOLUME HARGA
SATUAN
(Rp) (Rp)
(Rp) (Rp)
1 M2 Langit-langit
H-01 Asbes ( 1,00 x 1,00 )
m, tebal 5 mm
Pelat
asbes
- m2 11,000 22,500.00 24,750.00
tebal 4
mm

- Paku seng Kg 0.0100 23,800.00 238.00

- Pekerja Oh 0.0300 42,000.00 1,260.00

Tukang
- Oh 0.0700 65,000.00 4,550.00
kayu
Kepala
- Oh 0.0070 75,000.00 525.00
tukang

- Mandor Oh 0.0015 80,000.00 120.00

Jumlah 31,443.00

Dibulatkan 31,443.00

1 M2 Langit-langit
H-02 Asbes ( 1,00 x 1,00 )
m, tebal 3,5 mm
Pelat
asbes
- Lbr 11,000 19,500.00 21,450.00
tebal 3,5
mm

- Paku seng Kg 0.0100 23,800.00 238.00

- Pekerja Oh 0.0300 42,000.00 1,260.00

Tukang
- Oh 0.0700 65,000.00 4,550.00
kayu
Kepala
- Oh 0.0070 75,000.00 525.00
tukang
- Mandor Oh 0.0015 80,000.00 120.00

Jumlah 28,143.00

Dibulatkan 28,143.00

1 M2 Langit-langit Akustik ( 60
H-03
x 120 ) cm
Akustik
132,800.0 199,200.0
- 600 x Lbr 15,000
0 0
1200

- Paku Kg 0.0500 23,800.00 1,190.00

- Pekerja Oh 0.0600 42,000.00 2,520.00

Tukang
- Oh 0.1000 65,000.00 6,500.00
kayu
Kepala
- Oh 0.0100 75,000.00 750.00
tukang

- Mandor Oh 0.0030 80,000.00 240.00

210,400.0
Jumlah
0
210,400.0
Dibulatkan
0
1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka
H-04
Alluminium
Profil
- Alluminiu M 36,000 12,200.00 43,920.00
m "T"
Kawat f 4
- Kg 0.1500 28,200.00 4,230.00
mm
Ramset /
- Bh 10,500 7,200.00 7,560.00
dina bolt
Akustik
132,800.0 199,200.0
- 600 x Lbr 15,000
0 0
1200

- Pekerja Oh 0.1500 42,000.00 6,300.00

Tukang
- Oh 0.5000 65,000.00 32,500.00
kayu
Kepala
- Oh 0.0500 75,000.00 3,750.00
tukang

- Mandor Oh 0.0075 80,000.00 600.00

298,060.0
Jumlah
0
298,060.0
Dibulatkan
0
1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka
H-05
kayu borneo super
Kayu
Balok 2,640,000
- M3 0.0230 60,720.00
Borneo .00
Super
Paku
- biasa 2" - Kg 0.0600 23,400.00 1,404.00
5"
Teakwood
120 cm x 131,700.0
- Lbr 0.3900 51,363.00
240 cm x 0
0,4 cm

- Pekerja Oh 0.2700 42,000.00 11,340.00

Tukang
- Oh 0.4000 65,000.00 26,000.00
kayu
Kepala
- Oh 0.0400 75,000.00 3,000.00
tukang

- Mandor Oh 0.0135 80,000.00 1,080.00

154,907.0
Jumlah
0
154,907.0
Dibulatkan
0
1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu
H-06
Borneo Super
Kayu
Balok 2,640,000
- M3 0.0230 60,720.00
Borneo .00
Super
Paku
- biasa 2" - Kg 0.0600 23,400.00 1,404.00
5"
Teakwood
(120 x 129,100.0
- Lbr 0.3900 50,349.00
240x 0,3) 0
cm

- Pekerja Oh 0.2700 42,000.00 11,340.00

Tukang
- Oh 0.4000 65,000.00 26,000.00
kayu
Kepala
- Oh 0.0400 75,000.00 3,000.00
tukang
- Mandor Oh 0.0135 80,000.00 1,080.00

153,893.0
Jumlah
0
153,893.0
Dibulatkan
0
1 M2 Langit-langit Triplek 4 mm + Rangka Kayu
H-07
Borneo Super
Kayu
Balok 2,640,000
- M3 0.0230 60,720.00
Borneo .00
Super
Paku
- biasa 2" - Kg 0.0600 23,800.00 1,428.00
5"
Triplek
120 cm x
- Lbr 0.3900 64,400.00 25,116.00
240 cm x
0,4 cm

- Pekerja Oh 0.2700 42,000.00 11,340.00

Tukang
- Oh 0.4000 65,000.00 26,000.00
kayu
Kepala
- Oh 0.0400 75,000.00 3,000.00
tukang

- Mandor Oh 0.0135 80,000.00 1,080.00

128,684.0
Jumlah
0
128,684.0
Dibulatkan
0
1 M2 Langit-langit Gypsum Board, tebal 9 mm +
H-08
rangka besi hollow
Hollow
4/4
- Btg 0.4150 29,200.00 12,118.00
Zincromat
e
Hollow
2/4
- Btg 0.1500 22,600.00 3,390.00
Zincromat
e
Gypsum
board
- ( 120 x Lbr 0.3640 79,800.00 29,047.20
240 x 9 )
mm
Paku
- kg 0.1100 17,500.00 1,925.00
gypsum
Ramset /
- Bh 40,000 7,200.00 28,800.00
dina bolt
Cotton
- Bh 0.0720 15,000.00 1,080.00
plaster

- Compoun Zak 0.1250 75,000.00 9,375.00

- Pekerja Oh 0.1000 42,000.00 4,200.00

Tukang
- Oh 0.0500 65,000.00 3,250.00
kayu
Kepala
- Oh 0.0050 75,000.00 375.00
tukang

- Mandor Oh 0.0050 80,000.00 400.00

Jumlah 93,960.20

Dibulatkan 93,960.00

1 M2 Langit-langit GRC t = 4 mm + rangka


H-09
besi hollow
Hollow
4/4
- Btg 0.4150 29,200.00 12,118.00
Zincromat
e
Hollow
2/4
- Btg 0.1500 22,600.00 3,390.00
Zincromat
e
GRC ( 120
- x 240 x Lbr 0.3640 67,500.00 24,570.00
4 ) mm

- Paku GRC kg 0.1100 35,000.00 3,850.00

Ramset /
- Bh 40,000 7,200.00 28,800.00
dina bolt
Cotton
- Bh 0.0720 15,000.00 1,080.00
plaster

- Compoun Zak 0.1250 75,000.00 9,375.00

- Pekerja Oh 0.1000 42,000.00 4,200.00

Tukang
- Oh 0.0500 65,000.00 3,250.00
kayu
Kepala
- Oh 0.0050 75,000.00 375.00
tukang

- Mandor Oh 0.0050 80,000.00 400.00


Jumlah 91,408.00

Dibulatkan 91,408.00

1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu


H-10
Borneo Super
Kayu
Balok 2,640,000
- M3 0.0230 60,720.00
Borneo .00
Super
Paku
- biasa 2" - Kg 0.0600 23,800.00 1,428.00
5"
Gypsum
board
- ( 120 x Lbr 0.3900 79,800.00 31,122.00
240 x 9 )
mm
Paku
- kg 0.1100 17,500.00 1,925.00
sekrup

- Pekerja Oh 0.2700 42,000.00 11,340.00

Tukang
- Oh 0.4000 65,000.00 26,000.00
kayu
Kepala
- Oh 0.0400 75,000.00 3,000.00
tukang

- Mandor Oh 0.0135 80,000.00 1,080.00

136,615.0
Jumlah
0
136,615.0
Dibulatkan
0
1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu
H-11
Borneo Super
Kayu
Balok 2,640,000
- M3 0.0230 60,720.00
Borneo .00
Super
Paku
- biasa 2" - Kg 0.0600 23,800.00 1,428.00
5"
GRC ( 120
- x 240 x Lbr 0.3900 67,500.00 26,325.00
4 ) mm

- Paku GRC kg 0.1100 35,000.00 3,850.00

- Pekerja Oh 0.2700 42,000.00 11,340.00


Tukang
- Oh 0.4000 65,000.00 26,000.00
kayu
Kepala
- Oh 0.0400 75,000.00 3,000.00
tukang

- Mandor Oh 0.0135 80,000.00 1,080.00

133,743.0
Jumlah
0
133,743.0
Dibulatkan
0
1 M List Langit-
H-12 langit Kayu Profil 10
cm
List Kayu
- M 10,500 29,400.00 30,870.00
profil

- Paku Kg 0.0100 23,800.00 238.00

- Pekerja Oh 0.0500 42,000.00 2,100.00

Tukang
- Oh 0.0500 65,000.00 3,250.00
kayu
Kepala
- Oh 0.0050 75,000.00 375.00
tukang

- Mandor Oh 0.0030 80,000.00 240.00

Jumlah 37,073.00

Dibulatkan 37,073.00

1 M List Langit-
H-13
langit Gypsum 10 cm
List
- M 10,500 8,500.00 8,925.00
gypsum
Tepung
- Kg 0.1500 12,500.00 1,875.00
gypsum

- Pekerja Oh 0.0500 42,000.00 2,100.00

Tukang
- Oh 0.0500 65,000.00 3,250.00
kayu
Kepala
- Oh 0.0050 75,000.00 375.00
tukang

- Mandor Oh 0.0030 80,000.00 240.00

Jumlah 16,765.00

Dibulatkan 16,765.00
Materi Terkait :
2011)
ng biaya pekerjaan langit-langit: asbes, akustik, tekwood, gypsum, dan GRC.
Penutup Lantai dan Dinding (AHS SNI 2011)
Berikut adalah analisa harga satuan pekerjaan penutup landat dan dinding untuk menghitung biaaya

HARGA
No. URAIAN SATUAN VOLUME HARGA
SATUAN
(Rp) (Rp)
1 M2 Lantai Ubin
Granito ukuran 40 x
I-01
40 cm Setara
Essenza
Granito
345,000.0 362,250.0
- 40 x 40 m2 10,500
0 0
cm
Semen
- Kg 98,000 1,406.00 13,778.80
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 13,000 15,700.00 20,410.00
warna

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.1200 65,000.00 7,800.00
batu
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

421,656.9
Jumlah
0
421,657.0
Dibulatkan
0
1 M2 Lantai Ubin
Granito ukuran 30 x
I-02
30 cm Setara
Essenza
Granito
322,800.0 338,940.0
- 30 x 30 m2 10,500
0 0
cm
Semen
- Kg 100,000 1,406.00 14,060.00
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 15,000 15,700.00 23,550.00
warna
- Pekerja Oh 0.2600 42,000.00 10,920.00

Tukang
- Oh 0.1250 65,000.00 8,125.00
batu
Kepala
- Oh 0.0125 75,000.00 937.50
tukang

- Mandor Oh 0.0130 80,000.00 1,040.00

402,590.6
Jumlah
0
402,591.0
Dibulatkan
0
1 M Plint Ubin
Granito ukuran 10 x
I-03
40 cm Setara
Essenza

Plint
- granito 10 Bh 26,500 27,600.00 73,140.00
x 40 cm

Semen
- Kg 12,000 1,406.00 1,687.20
portland
Pasir 233,400.0
- M3 0.0030 700.20
pasang 0
Semen
- Kg 0.1000 15,700.00 1,570.00
warna

- Pekerja Oh 0.0600 42,000.00 2,520.00

Tukang
- Oh 0.0300 65,000.00 1,950.00
batu
Kepala
- Oh 0.0030 75,000.00 225.00
tukang

- Mandor Oh 0.0030 80,000.00 240.00

Jumlah 82,032.40

Dibulatkan 82,032.00

1 M Plint Ubin
Granito ukuran 10 x
I-04
30 cm Setara
Essenza

Plint
- granito 10 Bh 33,300 25,900.00 86,247.00
x 30 cm
Semen
- Kg 16,500 1,406.00 2,319.90
portland
Pasir 233,400.0
- M3 0.0032 746.88
pasang 0
Semen
- Kg 0.1000 15,700.00 1,570.00
warna

- Pekerja Oh 0.0900 42,000.00 3,780.00

Tukang
- Oh 0.0900 65,000.00 5,850.00
batu
Kepala
- Oh 0.0090 75,000.00 675.00
tukang

- Mandor Oh 0.0045 80,000.00 360.00

101,548.7
Jumlah
8
101,549.0
Dibulatkan
0
1 M2 Lantai Keramik Corak 10 x 20 cm
I-05
setara Mulia
Keramik
- corak 10 x m2 10,000 56,000.00 56,000.00
20 cm
Semen
- Kg 80,000 1,406.00 11,248.00
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 0.0130 15,700.00 204.10
warna

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.1200 65,000.00 7,800.00
batu
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

Jumlah 92,670.20

Dibulatkan 92,670.00

1 M2 Lantai Keramik
I-06 corak 20 x 20 cm
setara Mulia
Keramik
- corak 20 x m2 10,000 62,500.00 62,500.00
20 cm
Semen
- Kg 80,000 1,406.00 11,248.00
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 0.0130 15,700.00 204.10
warna

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.1200 65,000.00 7,800.00
batu
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

Jumlah 99,170.20

Dibulatkan 99,170.00

1 M2 Lantai Keramik
I-07 polos 30 x 30 cm
setara Mulia
Keramik
- polos 30 x m2 10,000 53,000.00 53,000.00
30 cm
Semen
- Kg 80,000 1,406.00 11,248.00
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 0.0130 15,700.00 204.10
warna

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.1200 65,000.00 7,800.00
batu
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

Jumlah 89,670.20

Dibulatkan 89,670.00

1 M2 Lantai Keramik
I-08 corak 30 x 30 cm
Setara Mulia
Keramik
- corak 30 x m2 10,000 58,000.00 58,000.00
30 cm
Semen
- Kg 80,000 1,406.00 11,248.00
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 0.0130 15,700.00 204.10
warna

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.1200 65,000.00 7,800.00
batu
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

Jumlah 94,670.20

Dibulatkan 94,670.00

1 M2 Lantai Keramik
I-09 polos 40 x 40 cm
Setara Mulia
Keramik
- polos 40 x m2 10,000 56,800.00 56,800.00
40 cm
Semen
- Kg 80,000 1,406.00 11,248.00
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 0.0130 15,700.00 204.10
warna

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.1200 65,000.00 7,800.00
batu
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

Jumlah 93,470.20

Dibulatkan 93,470.00
1 M2 Lantai Keramik
I-10 corak 40 x 40 cm
Setara Mulia
Keramik
- corak 40 x m2 10,000 65,500.00 65,500.00
40 cm
Semen
- Kg 80,000 1,406.00 11,248.00
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 0.0130 15,700.00 204.10
warna

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.1200 65,000.00 7,800.00
batu
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

102,170.2
Jumlah
0
102,170.0
Dibulatkan
0
1 M2 Lantai Keramik Corak 10 x 20 cm
I-11
setara Roman
Keramik
- corak 10 x m2 10,000 72,200.00 72,200.00
20 cm
Semen
- Kg 80,000 1,406.00 11,248.00
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 0.0130 15,700.00 204.10
warna

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.1200 65,000.00 7,800.00
batu
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

108,870.2
Jumlah
0
108,870.0
Dibulatkan
0
1 M2 Lantai Keramik
I-12 corak 20 x 20 cm
setara Roman
Keramik
- corak 20 x m2 10,000 75,200.00 75,200.00
20 cm
Semen
- Kg 80,000 1,406.00 11,248.00
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 0.0130 15,700.00 204.10
warna

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.1200 65,000.00 7,800.00
batu
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

111,870.2
Jumlah
0
111,870.0
Dibulatkan
0
1 M2 Lantai Keramik
I-13 polos 30 x 30 cm
setara Roman
Keramik
- polos 30 x m2 10,000 68,900.00 68,900.00
30 cm
Semen
- Kg 80,000 1,406.00 11,248.00
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 0.0130 15,700.00 204.10
warna

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.1200 65,000.00 7,800.00
batu
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

105,570.2
Jumlah
0
105,570.0
Dibulatkan
0
1 M2 Lantai Keramik
I-14 corak 30 x 30 cm
Setara Roman
Keramik
- corak 30 x M2 10,000 76,600.00 76,600.00
30 cm
Semen
- Kg 80,000 1,406.00 11,248.00
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 0.0130 15,700.00 204.10
warna

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.1200 65,000.00 7,800.00
batu
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

113,270.2
Jumlah
0
113,270.0
Dibulatkan
0
1 M2 Lantai Keramik
I-15 polos 40 x 40 cm
setara Roman
Keramik
- polos 40 x m2 10,000 72,500.00 72,500.00
40 cm
Semen
- Kg 80,000 1,406.00 11,248.00
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 0.0130 15,700.00 204.10
warna

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.1200 65,000.00 7,800.00
batu
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0125 80,000.00 1,000.00


109,170.2
Jumlah
0
109,170.0
Dibulatkan
0
1 M2 Lantai Keramik
I-16 corak 40 x 40 cm
Setara Roman
Keramik
- corak 40 x m2 10,000 77,000.00 77,000.00
40 cm
Semen
- Kg 80,000 1,406.00 11,248.00
portland
Pasir 233,400.0
- M3 0.0215 5,018.10
pasang 0
Semen
- Kg 0.0130 15,700.00 204.10
warna

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.1200 65,000.00 7,800.00
batu
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0125 80,000.00 1,000.00

113,670.2
Jumlah
0
113,670.0
Dibulatkan
0
I-17 1 M2 Lantai Marmer
550,000.0 583,000.0
- Marmer m2 10,600
0 0
Semen
- Kg 81,900 1,406.00 11,515.14
portland
Pasir 233,400.0
- M3 0.0450 10,503.00
pasang 0
Semen
- Kg 0.6500 15,700.00 10,205.00
warna

- Pekerja Oh 0.7000 42,000.00 29,400.00

Tukang
- Oh 0.3500 65,000.00 22,750.00
batu
Kepala
- Oh 0.0350 75,000.00 2,625.00
tukang

- Mandor Oh 0.0350 80,000.00 2,800.00

672,798.1
Jumlah
4
672,798.0
Dibulatkan
0
1 M2 Lantai Parquet
I-18
Jati
Parquet 375,400.0 394,170.0
- M2 10,500
jati 0 0

- Lem vinyl Kg 0.6000 44,000.00 26,400.00

- Pekerja Oh 0.6500 42,000.00 27,300.00

- Tukang Oh 0.3500 65,000.00 22,750.00

Kepala
- Oh 0.0350 75,000.00 2,625.00
tukang

- Mandor Oh 0.0325 80,000.00 2,600.00

475,845.0
Jumlah
0
475,845.0
Dibulatkan
0

Materi Terkait :
NI 2011)
ntuk menghitung biaaya penutup lantai per meter persegi, seperti lantai keramik, lantai marmer dll.
i marmer dll.
n Pekerjaan Kayu - AHS SNI 2011
Berikut adalah penggalan analisa harga satuan pekerjaan kayu, untuk menghitung harga satuan peke

J. ANALISA HARGA SATUAN PEKERJAAN KAYU


HARGA
No. URAIAN SATUAN VOLUME HARGA
SATUAN
1 M3 Kusen Pintu &
J-01 jendela kayu Kamper
Samarinda
Kayu
Balok
8,633,700 10,360,44
- Kamper m3 12,000
.00 0.00
Samarind
a
252,000.0
- Pekerja Oh 60,000 42,000.00
0
Tukang 1,170,000
- Oh 180,000 65,000.00
Kayu .00
Kepala 150,000.0
- Oh 20,000 75,000.00
Tukang 0

- Mandor Oh 0.3000 80,000.00 24,000.00

11,956,44
Jumlah
0.00
11,956,44
Dibulatkan
0.00
M3 Kusen
Pintu &
jendela
J-02 1 kayu
Kamper
Medan/Kr
uing
Kayu
Balok 5,692,600 6,831,120
- M3 12,000
Kamper .00 .00
Medan
252,000.0
- Pekerja Oh 60,000 42,000.00
0
Tukang 1,170,000
- Oh 180,000 65,000.00
Kayu .00
Kepala 150,000.0
- Oh 20,000 75,000.00
Tukang 0
- Mandor Oh 0.3000 80,000.00 24,000.00

8,427,120
Jumlah
.00
8,427,120
Dibulatkan
.00
M3 Kusen
Pintu &
jendela
J-03 1
kayu
Borneo
Super
Kayu
Borneo 5,280,000 6,336,000
- M3 12,000
Balok .00 .00
Super
252,000.0
- Pekerja Oh 60,000 42,000.00
0
Tukang 1,170,000
- Oh 180,000 65,000.00
Kayu .00
Kepala 150,000.0
- Oh 20,000 75,000.00
Tukang 0

- Mandor Oh 0.3000 80,000.00 24,000.00

7,932,000
Jumlah
.00
7,932,000
Dibulatkan
.00
1 M2 Pintu Panel Kayu Kamper
J-04
Samarinda
Kayu
Papan
8,633,700 345,348.0
- Kamper M3 0.0400
.00 0
Samarind
a
Paku
- Biasa 2" - Kg 0.0500 23,400.00 1,170.00
5"

- Pekerja Oh 10,000 42,000.00 42,000.00

Tukang 162,500.0
- Oh 25,000 65,000.00
Kayu 0
Kepala
- Oh 0.2500 75,000.00 18,750.00
Tukang

- Mandor Oh 0.0500 80,000.00 4,000.00


573,768.0
Jumlah
0
573,768.0
Dibulatkan
0
1 M2 Pintu Panel Kayu Kamper
J-05
Medan/Kruing
Kayu
Papan 5,692,600 227,704.0
- M3 0.0400
Kamper .00 0
Medan
Paku
- Biasa 2" - Kg 0.0500 23,400.00 1,170.00
5"

- Pekerja Oh 10,000 42,000.00 42,000.00

Tukang 162,500.0
- Oh 25,000 65,000.00
Kayu 0
Kepala
- Oh 0.2500 75,000.00 18,750.00
Tukang

- Mandor Oh 0.0500 80,000.00 4,000.00

456,124.0
Jumlah
0
456,124.0
Dibulatkan
0
1 M2 Pintu & Jendela Kaca Kayu Kamper
J-06
Medan
Kayu
Papan 5,692,600 199,241.0
- M3 0.0350
Kamper .00 0
Medan

- Pekerja Oh 0.8000 42,000.00 33,600.00

Tukang 130,000.0
- Oh 20,000 65,000.00
Kayu 0
Kepala
- Oh 0.2000 75,000.00 15,000.00
Tukang

- Mandor Oh 0.0400 80,000.00 3,200.00

381,041.0
Jumlah
0
381,041.0
Dibulatkan
0
M2 Pintu
& Jendela
J-07 1
Kaca Kayu
Borneo

Kayu
Papan 5,595,800 195,853.0
- M3 0.0350
Borneo .00 0
Super

- Pekerja Oh 0.8000 42,000.00 33,600.00

Tukang 130,000.0
- Oh 20,000 65,000.00
Kayu 0
Kepala
- Oh 0.2000 75,000.00 15,000.00
Tukang

- Mandor Oh 0.0400 80,000.00 3,200.00

377,653.0
Jumlah
0
377,653.0
Dibulatkan
0
M2 Pintu
& Jendela
Jalusi
J-08 1
Kayu
Kamper
Medan
Kayu
Papan 5,692,600 364,326.4
- M3 0.0640
Kamper .00 0
Medan

- Pekerja Oh 10,000 42,000.00 42,000.00

Tukang 195,000.0
- Oh 30,000 65,000.00
Kayu 0
Kepala
- Oh 0.3000 75,000.00 22,500.00
Tukang

- Mandor Oh 0.5000 80,000.00 40,000.00

663,826.4
Jumlah
0
663,826.0
Dibulatkan
0
M2 Pintu
Triplek
Rangkap,
Rangka
J-09 1
Tertutup
Kayu
Kamper
Medan
Kayu
Papan 5,692,600 111,574.9
- M3 0.0196
Kamper .00 6
Medan
Paku
- Biasa " - Kg 0.0300 23,800.00 714.00
1"

- Lem Kayu Ltr 0.3000 23,900.00 7,170.00

Triplek
- 120 x 240 Lbr 10,000 64,400.00 64,400.00
x 0,4 cm

- Pekerja Oh 0.6000 42,000.00 25,200.00

Tukang 130,000.0
- Oh 20,000 65,000.00
Kayu 0
Kepala
- Oh 0.2000 75,000.00 15,000.00
Tukang

- Mandor Oh 0.0300 80,000.00 2,400.00

356,458.9
Jumlah
6
356,459.0
Dibulatkan
0
1 M2 Jalusi Mati Kusen Kayu kamper
J-10
Medan
Kayu
Papan 5,692,600 341,556.0
- M3 0.0600
Kamper .00 0
Medan
Paku
- Biasa " - Kg 0.1500 23,800.00 3,570.00
1"

- Pekerja Oh 0.5000 42,000.00 21,000.00

Tukang 130,000.0
- Oh 20,000 65,000.00
Kayu 0
Kepala
- Oh 0.2000 75,000.00 15,000.00
Tukang
- Mandor Oh 0.0250 80,000.00 2,000.00

513,126.0
Jumlah
0
513,126.0
Dibulatkan
0
1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo
J-11
Super
Kayu
Papan 5,595,800 109,677.6
- M3 0.0196
Borneo .00 8
Super
Paku
- Biasa " - Kg 0.0300 23,800.00 714.00
1"

- Lem Kayu Ltr 0.3000 23,900.00 7,170.00

Triplek
- 120 x 240 Lbr 10,000 64,400.00 64,400.00
x 0,4 cm

- Pekerja Oh 0.6000 42,000.00 25,200.00

Tukang 130,000.0
- Oh 20,000 65,000.00
Kayu 0
Kepala
- Oh 0.2000 75,000.00 15,000.00
Tukang

- Mandor Oh 0.0300 80,000.00 2,400.00

354,561.6
Jumlah
8
354,562.0
Dibulatkan
0

M2 Pintu
Teakwood
Rangkap,
J-12 1 rangka
Kayu
Kamper
Medan

Kayu
Papan 5,692,600 111,574.9
- M3 0.0196
Kamper .00 6
Medan
Paku
- Biasa " - Kg 0.3000 23,800.00 7,140.00
1"
- Lem Kayu Ltr 0.3000 23,900.00 7,170.00

Teakwood 131,700.0 131,700.0


- Lbr 10,000
4 mm 0 0

- Pekerja Oh 0.6000 42,000.00 25,200.00

Tukang 130,000.0
- Oh 20,000 65,000.00
Kayu 0
Kepala
- Oh 0.2000 75,000.00 15,000.00
Tukang

- Mandor Oh 0.0300 80,000.00 2,400.00

430,184.9
Jumlah
6
430,185.0
Dibulatkan
0
M2 Pintu
Triplek &
Formika,
J-13 1 Rangka
Kayu
Kamper
Medan
Kayu
Papan 5,692,600 111,574.9
- M3 0.0196
Kamper .00 6
Medan
Paku
- Biasa " - Kg 0.3000 23,800.00 7,140.00
1"

- Lem Kayu Ltr 0.8000 23,900.00 19,120.00

Triplek
- 120 x 240 Lbr 10,000 64,400.00 64,400.00
x 0,4 cm
Formica 132,900.0
- Lbr 0.5000 66,450.00
3" x 6" 0

- Pekerja Oh 0.8000 42,000.00 33,600.00

Tukang 162,500.0
- Oh 25,000 65,000.00
Kayu 0
Kepala
- Oh 0.2500 75,000.00 18,750.00
Tukang

- Mandor Oh 0.0400 80,000.00 3,200.00

486,734.9
Jumlah
6
486,735.0
Dibulatkan
0
M2 Pintu
Teakwood
&
Formika,
J-14 1 Rangka
Kayu
Kamper
Medan
(dipolitur)

Kayu
Papan 5,692,600 111,574.9
- M3 0.0196
Kamper .00 6
Medan
Paku
- Biasa " - Kg 0.3000 23,800.00 7,140.00
1"

- Lem Kayu Ltr 0.8000 23,900.00 19,120.00

Teakwood
131,700.0 131,700.0
- 120 x 240 Lbr 10,000
0 0
x 0,4 cm

Formica 238,100.0 119,050.0


- Lbr 0.5000
4" x 8" 0 0

- Pekerja Oh 0.8000 42,000.00 33,600.00

Tukang 162,500.0
- Oh 25,000 65,000.00
Kayu 0
Kepala
- Oh 0.2500 75,000.00 18,750.00
Tukang

- Mandor Oh 0.0400 80,000.00 3,200.00

606,634.9
Jumlah
6
606,635.0
Dibulatkan
0
1 M3 Kuda-kuda Kayu Kamper
J-15
Medan
Kayu
Balok 5,692,600 6,261,860
- M3 11,000
Kamper .00 .00
Medan
402,000.0
- Besi Strip Kg 150,000 26,800.00
0
Paku
- Biasa 2" - Kg 0.8000 23,800.00 19,040.00
5"
168,000.0
- Pekerja Oh 40,000 42,000.00
0
Tukang 780,000.0
- Oh 120,000 65,000.00
Kayu 0
Kepala
- Oh 12,000 75,000.00 90,000.00
Tukang

- Mandor Oh 0.2000 80,000.00 16,000.00

7,736,900
Jumlah
.00
7,736,900
Dibulatkan
.00

M3 Kuda-
kuda Kayu
J-16 1
Borneo
Super

Kayu
balok 5,280,000 5,808,000
- M3 11,000
Borneo .00 .00
super
402,000.0
- Besi Strip Kg 150,000 26,800.00
0
Paku
- Biasa 2" - Kg 0.8000 23,800.00 19,040.00
5"
168,000.0
- Pekerja Oh 40,000 42,000.00
0
Tukang 780,000.0
- Oh 120,000 65,000.00
Kayu 0
Kepala
- Oh 12,000 75,000.00 90,000.00
Tukang

- Mandor Oh 0.2000 80,000.00 16,000.00

7,283,040
Jumlah
.00
7,283,040
Dibulatkan
.00
M2 Kaso
+ Reng
Genteng
J-17 1 Plentong
Kayu
Borneo
Super
Kayu
balok 5,280,000
- m3 0.0120 63,360.00
Borneo .00
super
Paku
- Biasa 2" - Kg 0.1500 23,800.00 3,570.00
5"

- Pekerja Oh 0.1000 42,000.00 4,200.00

Tukang
- Oh 0.1000 65,000.00 6,500.00
Kayu
Kepala
- Oh 0.0100 75,000.00 750.00
Tukang

- Mandor Oh 0.0050 80,000.00 400.00

Jumlah 78,780.00

Dibulatkan 78,780.00

M2 Kaso
+ Reng
Genteng
J-18 1 Beton
Kayu
Borneo
Super
Kayu
balok 5,280,000
- M3 0.0140 73,920.00
Borneo .00
super
Paku
- Biasa 2" - Kg 0.1500 23,800.00 3,570.00
5"

- Pekerja Oh 0.1000 42,000.00 4,200.00

Tukang
- Oh 0.1000 65,000.00 6,500.00
Kayu
Kepala
- Oh 0.0100 75,000.00 750.00
Tukang
- Mandor Oh 0.0050 80,000.00 400.00

Jumlah 89,340.00

Dibulatkan 89,340.00

M'
Lisplang
uk
J-19 1 (3x20)cm,
Kayu
Kamper
Medan
Kayu
Papan 5,823,400
- M3 0.0072 41,928.48
Kamper .00
Medan
Paku
- Biasa 2" - Kg 0.0500 23,800.00 1,190.00
5"

- Pekerja Oh 0.1000 42,000.00 4,200.00

Tukang
- Oh 0.2000 65,000.00 13,000.00
Kayu
Kepala
- Oh 0.0200 75,000.00 1,500.00
Tukang

- Mandor Oh 0.0050 80,000.00 400.00

Jumlah 62,218.48

Dibulatkan 62,218.00

1 M' Lisplang uk (3x30)cm, Kayu Kamper


J-20
Medan
Kayu
Papan 5,692,600
- M3 0.0110 62,618.60
Kamper .00
Medan
Paku
- Biasa 2" - Kg 0.0500 23,800.00 1,190.00
5"

- Pekerja Oh 0.1100 42,000.00 4,620.00

Tukang
- Oh 0.2200 65,000.00 14,300.00
Kayu
Kepala
- Oh 0.0220 75,000.00 1,650.00
Tukang
- Mandor Oh 0.0050 80,000.00 400.00

Jumlah 84,778.60

Dibulatkan 84,779.00

1 M List Plafond + kayu Profil


J-21
10 cm

Kayu Profil
- M' 10,500 29,400.00 30,870.00
10 cm

- Pekerja Oh 0.0210 42,000.00 882.00

Tukang
- Oh 0.0210 65,000.00 1,365.00
Kayu
Kepala
- Oh 0.0020 75,000.00 150.00
Tukang

- Mandor Oh 0.0010 80,000.00 80.00

Jumlah 33,347.00

Dibulatkan 33,347.00

Materi Terkait :
itung harga satuan pekerjaan kayu per m3, seperti pekerjaan kusen dan jendela, pekerjaan plapond, dan peker
jaan plapond, dan pekerjaan atap.
kerjaan Penutup Besi dan Aluminium

Analisa Harga Satuan Pekerjaan Penutup


Diposkan : 01 Juni 2014
Oleh : Endang Kusman

HARGA
No. URAIAN SAT VOLUME HARGA
SAT
(Rp) (Rp)
K-01 1 Kg Besi profil

Besi profil
- Kg 11,000 24,000.00 26,400.00
WF

- Meni besi Kg 0.0800 30,400.00 2,432.00

- Pekerja Oh 0.0600 42,000.00 2,520.00

Tukang
- Oh 0.0060 65,000.00 390.00
besi
Kepala
- Oh 0.0060 75,000.00 450.00
tukang

- Mandor Oh 0.0003 80,000.00 24.00

Jumlah 32,216.00

Dibulatkan 32,216.00

Perakitan
K-02 1 Kg
baja
7,150.000
- Solar m' 0.0100 71.50
0
Minyak 55,000.00
- m' 0.0010 55.00
pelumas 00
100,000.0
- Sewa alat jam 0.0080 800.00
000
42,000.00
- Pekerja Oh 0.0010 42.00
00
Tukang 65,000.00
- Oh 0.00001 0.65
besi 00
Kepala 75,000.00
- Oh 0.00001 0.75
tukang 00
80,000.00
- Mandor Oh 0.00005 4.00
00
Jumlah 973.90
Dibulatkan 974.00
1 Cm Pengelasan
K-03
dengan las listrik

- kawat las kg 0.0400 23,600.00 944.00


- Solar ltr 0.0300 7,150.00 214.50
Minyak
- ltr 0.0040 55,000.00 220.00
pelumas
100,000.0
- Sewa alat jam 0.0170 1,700.00
0

- Pekerja org 0.0040 42,000.00 168.00

- Tukang org 0.0020 65,000.00 130.00

Kepala
- org 0.0002 75,000.00 15.00
Tukang

- Mandor org 0.0002 80,000.00 16.00


Jumlah 2,463.50
Dibulatkan 2,464.00
1 m2 Pintu Rolling
K-04
Door
Rolling 306,600.0 306,600.0
- M2 10,000
door 0 0

- Pekerja Oh 10,500 42,000.00 44,100.00

Tukang
- Oh 15,000 65,000.00 97,500.00
besi
Kepala
- Oh 0.1050 75,000.00 7,875.00
tukang

- Mandor Oh 0.0052 80,000.00 416.00

456,491.0
Jumlah
0
456,491.0
Dibulatkan
0
1 m2 Pintu
K-05
Alluminium Natural
Pintu
211,800.0 211,800.0
- alluminiu m2 10,000
0 0
m natural

- Pekerja Oh 10,500 42,000.00 44,100.00

Tukang
- Oh 10,500 65,000.00 68,250.00
besi
Kepala
- Oh 0.1050 75,000.00 7,875.00
tukang

- Mandor Oh 0.0052 80,000.00 416.00

332,441.0
Jumlah
0
332,441.0
Dibulatkan
0
K-06 1 m2 Terali Besi
Besi strip
- m' 115,000 5,500.00 63,250.00
2x3

- Pekerja Oh 12,000 42,000.00 50,400.00

- Tukang las Oh 12,000 65,000.00 78,000.00

Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0006 80,000.00 48.00

192,598.0
Jumlah
0
192,598.0
Dibulatkan
0
1 m2 Kawat
K-07
Harmonika 4 cm
Kawat
- harmonik M2 11,000 35,900.00 39,490.00
a
Paku
- biasa " - kg 0.0200 23,800.00 476.00
1"
Papan
5,692,600
- kayu M2 0.0018 10,246.68
.00
kamper

- Pekerja Oh 0.1000 42,000.00 4,200.00

Tukang
- Oh 0.1000 65,000.00 6,500.00
kayu
Kepala
- Oh 0.0100 75,000.00 750.00
tukang

- Mandor Oh 0.0050 80,000.00 400.00

Jumlah 62,062.68

Dibulatkan 62,063.00
1 m' Talang Datar,
K-08 Seng BJLS 28 lebar
90 cm
Seng plat
- 3' x 6' m' 10,500 20,801.00 21,841.05
BJLS 30
Paku
- biasa " - Kg 0.0150 23,800.00 357.00
1"
Kayu
papan 5,595,800
- M3 0.0096 53,719.68
borneo .00
super
Flincote /
- Kg 0.2500 30,400.00 7,600.00
meni besi

- Pekerja Oh 0.1500 42,000.00 6,300.00

Tukang
- Oh 0.4000 65,000.00 26,000.00
kayu
Kepala
- Oh 0.0250 75,000.00 1,875.00
tukang

- Mandor Oh 0.0013 80,000.00 104.00

117,796.7
Jumlah
3
117,797.0
Dibulatkan
0
1 m' Talang Miring,
K-09 Seng BJLS 28 lebar
90 cm
Seng plat
- 3' x 6' m' 10,500 20,801.00 21,841.05
BJLS 30
Paku
- biasa " - Kg 0.0150 23,800.00 357.00
1"
Kayu
papan 5,595,800 106,320.2
- M3 0.0190
borneo .00 0
super
Flincote /
- Kg 0.3000 30,400.00 9,120.00
meni besi

- Pekerja Oh 0.2000 42,000.00 8,400.00

Tukang
- Oh 0.4000 65,000.00 26,000.00
kayu
Kepala
- Oh 0.0250 75,000.00 1,875.00
tukang

- Mandor Oh 0.0013 80,000.00 100.00

174,013.2
Jumlah
5
174,013.0
Dibulatkan
0
1 m' Talang 1/2
lingkaran D-15 cm,
K-10
seng pelat BJLS 28
lebar 90 cm
Seng plat
- 3' x 6' m' 10,500 20,801.00 21,841.05
BJLS 30
Paku
- biasa " - Kg 0.1000 23,800.00 2,380.00
1"
Kayu
papan 5,595,800 106,320.2
- kg 0.0190
borneo .00 0
super

- Besi strip Kg 0.5000 26,800.00 13,400.00

- Pekerja Oh 0.1500 42,000.00 6,300.00

Tukang
- Oh 0.3000 65,000.00 19,500.00
kayu
Kepala
- Oh 0.0300 75,000.00 2,250.00
tukang

- Mandor Oh 0.0080 80,000.00 640.00

172,631.2
Jumlah
5
172,631.0
Dibulatkan
0
1 m' Pasang kusen
pintu/jendela
K-11
alluminium natural
4"

Alumuniu
151,100.0 166,210.0
- m profil m' 11,000
0 0
natural 4"

Skrup
- bh 20,000 250.00 500.00
fixer
- Sealant m' 10,000 7,500.00 7,500.00
- Pekerja Oh 0.0430 42,000.00 1,806.00

Tukang
- Oh 0.0430 65,000.00 2,795.00
kayu
Kepala
- Oh 0.0043 75,000.00 322.50
tukang

- Mandor Oh 0.0021 80,000.00 168.00

179,301.5
Jumlah
0
179,302.0
Dibulatkan
0
1 m' Pasang kusen
K-12 pintu/jendela
alluminium warna 4"
Alumuniu
163,000.0 179,300.0
- m profil m' 11,000
0 0
warna 4"
Skrup
- bh 20,000 250.00 500.00
fixer
- Sealant m' 10,000 7,500.00 7,500.00
- Pekerja Oh 0.0430 42,000.00 1,806.00

Tukang
- Oh 0.0430 65,000.00 2,795.00
kayu
Kepala
- Oh 0.0043 75,000.00 322.50
tukang

- Mandor Oh 0.0021 80,000.00 168.00

192,391.5
Jumlah
0
192,392.0
Dibulatkan
0
1 m' Pasang kusen
pintu/jendela
K-13
alluminium natural
3"

Alumuniu
- m profil m' 11,000 81,000.00 89,100.00
natural 3"

Skrup
- bh 20,000 250.00 500.00
fixer
- Sealant m' 10,000 7,500.00 7,500.00
- Pekerja Oh 0.0430 42,000.00 1,806.00
Tukang
- Oh 0.0430 65,000.00 2,795.00
kayu
Kepala
- Oh 0.0043 75,000.00 322.50
tukang

- Mandor Oh 0.0021 80,000.00 168.00

102,191.5
Jumlah
0
102,192.0
Dibulatkan
0
1 m' Pasang kusen
K-14 pintu/jendela
alluminium warna 3"
Alumuniu
102,000.0 112,200.0
- m profil m' 11,000
0 0
warna 3"
Skrup
- bh 20,000 250.00 500.00
fixer
- Sealant m' 10,000 7,500.00 7,500.00
- Pekerja Oh 0.0430 42,000.00 1,806.00

Tukang
- Oh 0.0430 65,000.00 2,795.00
kayu
Kepala
- Oh 0.0043 75,000.00 322.50
tukang

- Mandor Oh 0.0021 80,000.00 168.00

125,291.5
Jumlah
0
125,292.0
Dibulatkan
0
1 m2 Pintu
K-15 alluminium strip
lebar 8 cm

Alumuniu
151,100.0 664,840.0
- m profil 4" m' 44,000
0 0
natural

Alumuniu
171,800.0 180,390.0
- m strip m2 10,500
0 0
6mm

- Pekerja Oh 0.0850 42,000.00 3,570.00

Tukang
- Oh 0.0850 65,000.00 5,525.00
kayu
Kepala
- Oh 0.0085 75,000.00 637.50
tukang
- Mandor Oh 0.0042 80,000.00 336.00

855,298.5
Jumlah
0
855,299.0
Dibulatkan
0
1 m2 Pintu/jendela
kaca rangka
K-16
alluminium natural
4"

Alumuniu
151,100.0 664,840.0
- m profil m' 44,000
0 0
natural 4"

Profil
- alluminiu m' 45,000 12,200.00 54,900.00
mT
- Sealant tube 0.2700 7,500.00 2,025.00
- Pekerja Oh 0.0850 42,000.00 3,570.00

Tukang
- Oh 0.0850 65,000.00 5,525.00
kayu
Kepala
- Oh 0.0085 75,000.00 637.50
tukang

- Mandor Oh 0.0050 80,000.00 400.00

731,897.5
Jumlah
0
731,898.0
Dibulatkan
0
1 m2 Pintu/jendela
K-17 kaca rangka
alluminium warna 4"
Alumuniu
163,000.0 717,200.0
- m profil m' 44,000
0 0
warna 4"
Profil
- alluminiu m' 45,000 12,200.00 54,900.00
mT
- Sealant tube 0.2700 7,500.00 2,025.00
- Pekerja Oh 0.0850 42,000.00 3,570.00

Tukang
- Oh 0.0850 65,000.00 5,525.00
kayu
Kepala
- Oh 0.0085 75,000.00 637.50
tukang
- Mandor Oh 0.0050 80,000.00 400.00

784,257.5
Jumlah
0
784,258.0
Dibulatkan
0
1 m2 Jendela nako &
K-18
teralis (10 klips)
Jendela
nako
300,000.0 330,000.0
- (rangka + m2 11,000
0 0
kaca 5
mm)

Paku
- skrup 1cm bh 100,000 250.00 2,500.00
- 2,5cm

- Besi strip m' 70,000 5,500.00 38,500.00

- Pekerja Oh 0.2000 42,000.00 8,400.00

Tukang
- Oh 0.2000 65,000.00 13,000.00
kayu
Kepala
- Oh 0.0200 75,000.00 1,500.00
tukang

- Mandor Oh 0.0010 80,000.00 80.00

393,980.0
Jumlah
0
393,980.0
Dibulatkan
0
1 m2 Pintu pelat baja tebal 2mm rangkap,
K-19
rangka baja siku
Besi siku L 360,000.0
- Kg 150,000 24,000.00
30.30.3 0
787,200.0
- Baja pelat Kg 328,000 24,000.00
0

- kawat las Kg 0.0500 23,600.00 1,180.00

- Pekerja Oh 0.2000 42,000.00 8,400.00

Tukang
- Oh 0.2000 65,000.00 13,000.00
kayu
Kepala
- Oh 0.0200 75,000.00 1,500.00
tukang

- Mandor Oh 0.0010 80,000.00 80.00


1,171,360
Jumlah
.00
1,171,360
Dibulatkan
.00
1 m2 Rangka jendela
K-20 besi square tube (5 x
5) cm
Besi
- square M 47,600 7,300.00 34,748.00
tube
Besi lis
108,528.0
- kaca (1 x Kg 45,220 24,000.00
0
1) cm
Pengelasa
- Cm 200,000 2,464.00 49,280.00
n

- Pekerja Oh 0.6500 42,000.00 27,300.00

Tukang
- Oh 0.6500 65,000.00 42,250.00
kayu
Kepala
- Oh 0.0650 75,000.00 4,875.00
tukang

- Mandor Oh 0.0320 80,000.00 2,560.00

269,541.0
Jumlah
0
269,541.0
Dibulatkan
0
1 m2 Pintu lipat
K-21 (folding door) bahan
besi
501,700.0 501,700.0
- Pintu lipat M2 10,000
0 0

- Pekerja Oh 10,500 42,000.00 44,100.00

Tukang
- Oh 10,500 65,000.00 68,250.00
kayu
Kepala
- Oh 0.1050 75,000.00 7,875.00
tukang

- Mandor Oh 0.0052 80,000.00 416.00

622,341.0
Jumlah
0
622,341.0
Dibulatkan
0
1 m2 Tirai (venetions
K-22 blinds and vertical
blinds)
537,300.0 537,300.0
- Tirai M2 10,000
0 0

- Pekerja Oh 0.3500 42,000.00 14,700.00

Tukang
- Oh 0.3500 65,000.00 22,750.00
kayu
Kepala
- Oh 0.0350 75,000.00 2,625.00
tukang

- Mandor Oh 0.0018 80,000.00 144.00

577,519.0
Jumlah
0
577,519.0
Dibulatkan
0

Kembali Ke Analisa AHS SNI


n Penutup Besi dan Aluminium
Satuan Pekerjaan Sanitasi
Diposkan : 04 Juni 2014
Oleh : Endang Kusman

HARGA
No. URAIAN SAT VOLUME HARGA
SAT
(Rp) (Rp)
M-01 1 Buah Closet jongkok Porselen Standar
Closet 188,200.0 188,200.0
bh 1.00
jongkok 0 0
P.C (50
Kg 6.00 1,406.00 8,436.00
gk)
Pasir 233,400.0
m3 0.01 2,334.00
pasang 0

Pekerja org 10,000 42,000.00 42,000.00

Tukang
org 15,000 65,000.00 97,500.00
batu
Kepala 112,500.0
org 15,000 75,000.00
Tukang 0

Mandor org 0.1600 80,000.00 12,800.00

463,770.0
Jumlah
0
Dibulatka 463,770.0
n 0
1 Buah
M-02
Urinoir
1,773,400 1,773,400
Urinoir bh 1.00
.00 .00
P.C (50
Kg 6.00 1,406.00 8,436.00
gk)
Pasir 233,400.0
m3 0.01 2,334.00
pasang 0

Pekerja org 10,000 42,000.00 42,000.00

Tukang
org 10,000 65,000.00 65,000.00
batu
Kepala
org 0.1000 75,000.00 7,500.00
Tukang

Mandor org 0.0010 80,000.00 80.00


Perlengka
pan 30 % 1,773,400 532,020.0
lot 0.3000
harga .00 0
urinoir
2,430,770
Jumlah
.00
Dibulatka 2,430,770
n .00
1 Buah
M-03
Wastafel
wastafel 1,012,700 1,012,700
unit 1.00
standar .00 .00
P.C (50
Kg 6.00 1,406.00 8,436.00
gk)
Pasir 233,400.0
m3 0.01 2,334.00
pasang 0

Pekerja org 12,000 42,000.00 50,400.00

Tukang
org 14,500 65,000.00 94,250.00
batu
Kepala
org 0.1500 75,000.00 11,250.00
Tukang

Mandor org 0.1000 80,000.00 8,000.00

Perlengka
pan 12 % 1,773,400 212,808.0
lot 0.1200
harga .00 0
wastafel
1,400,178
Jumlah
.00
Dibulatka 1,400,178
n .00
M-04 1 Buah bak Mandi Fibreglass Volume 0,30 m3
Bak
fibreglass 255,300.0 255,300.0
bh 1.00
0.60m x 0 0
0.60m

Pekerja org 18,000 42,000.00 75,600.00

Tukang 175,500.0
org 27,000 65,000.00
batu 0
Kepala
org 0.5400 75,000.00 40,500.00
Tukang

Mandor org 0.1100 80,000.00 8,800.00


Perlengka
255,300.0
pan 18 % lot 0.1800 45,954.00
0
harga bak
601,654.0
Jumlah
0
Dibulatka 601,654.0
n 0
1 M' Saluran Air Limbah Buis beton d = 30 cm - 60
M-05
cm
Buis
beton bh 1.10 61,700.00 67,870.00
30 cm
Bata
bh 25.00 775.00 19,375.00
merah
P.C (50
Kg 10,300 1,406.00 14,481.80
gk)
Pasir 233,400.0
m3 0.061 14,237.40
pasang 0
175,300.0
Pasir urug m3 0.069 12,095.70
0

Pekerja org 0.3800 42,000.00 15,960.00

Tukang
org 0.1900 65,000.00 12,350.00
batu
Kepala
org 0.0190 75,000.00 1,425.00
Tukang

Mandor org 0.0190 80,000.00 1,520.00

159,314.9
Jumlah
0
Dibulatka 159,315.0
n 0
M-06 1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm
Bata 144,150.0
bh 186.00 775.00
merah 0
P.C (50 160,284.0
Kg 114,000 1,406.00
gk) 0
Pasir 233,400.0
m3 0.184 42,945.60
pasang 0

Batu 211,100.0
m3 0.033 6,966.30
pecah 2/3 0

Besi
m3 4,850 16,500.00 80,025.00
beton
Pasir 255,400.0
m3 0.120 30,648.00
beton 0

Pekerja org 21,600 42,000.00 90,720.00


Tukang
org 0.7200 65,000.00 46,800.00
batu
Kepala
org 0.0720 75,000.00 5,400.00
Tukang

Mandor org 0.1080 80,000.00 8,640.00

Tukang
org 0.1000 42,000.00 4,200.00
gali
620,778.9
Jumlah
0
Dibulatka 620,779.0
n 0
M-07 1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
Bata
bh 53.00 775.00 41,075.00
merah
P.C (50
Kg 44,000 1,406.00 61,864.00
gk)
Pasir 233,400.0
m3 0.070 16,338.00
pasang 0

Batu 211,100.0
m3 0.070 14,777.00
pecah 2/3 0

Besi
m3 1,600 16,500.00 26,400.00
beton
Pasir 255,400.0
m3 0.060 15,324.00
beton 0
134,400.0
Pekerja org 32,000 42,000.00
0
Tukang
org 10,150 65,000.00 65,975.00
batu
Kepala
org 0.0015 75,000.00 112.50
Tukang

Mandor org 0.0160 80,000.00 1,280.00

377,545.5
Jumlah
0
Dibulatka 377,546.0
n 0

1 M' Pipa
M-08 PVC
1/2" (AW)

Pipa pvc
m' 12,000 10,025.00 12,030.00
1/2"

Pekerja org 0.0360 42,000.00 1,512.00


Tukang
org 0.0600 65,000.00 3,900.00
batu
Kepala
org 0.0060 75,000.00 450.00
Tukang

Mandor org 0.0018 80,000.00 144.00

Perlengka
pan 35 %
lot 0.3500 12,030.00 4,210.50
harga
pipa

Jumlah 22,246.50

Dibulatka
22,247.00
n
1 M' Pipa
M-09 PVC 1"
(AW)
Pipa pvc
m' 12,000 15,800.00 18,960.00
1"

Pekerja org 0.0360 42,000.00 1,512.00

Tukang
org 0.0600 65,000.00 3,900.00
batu
Kepala
org 0.0060 75,000.00 450.00
Tukang

Mandor org 0.0018 80,000.00 144.00

Perlengka
pan 35 %
lot 0.3500 18,960.00 6,636.00
harga
pipa

Jumlah 31,602.00

Dibulatka
31,602.00
n
1 M' Pipa
PVC
M-10
11/2"
(AW)
Pipa pvc
m' 12,000 26,475.00 31,770.00
11/2"

Pekerja org 0.0360 42,000.00 1,512.00

Tukang
org 0.0600 65,000.00 3,900.00
batu
Kepala
org 0.0060 75,000.00 450.00
Tukang
Mandor org 0.0018 80,000.00 144.00

Perlengka
pan 35 %
lot 0.3500 31,770.00 11,119.50
harga
pipa

Jumlah 48,895.50

Dibulatka
48,896.00
n
1 M' Pipa
M-11 PVC 2"
(AW)
Pipa pvc
m' 12,000 27,675.00 33,210.00
2"

Pekerja org 0.0360 42,000.00 1,512.00

Tukang
org 0.0600 65,000.00 3,900.00
batu
Kepala
org 0.0060 75,000.00 450.00
Tukang

Mandor org 0.0018 80,000.00 144.00

Perlengka
pan 35 %
lot 0.3500 31,770.00 11,119.50
harga
pipa

Jumlah 50,335.50

Dibulatka
50,336.00
n
1 M' Pipa
M-12 PVC 4"
(AW)
Pipa pvc 104,370.0
m' 12,000 86,975.00
4" 0

Pekerja org 0.0810 42,000.00 3,402.00

Tukang
org 0.1350 65,000.00 8,775.00
batu
Kepala
org 0.0135 75,000.00 1,012.50
Tukang

Mandor org 0.0041 80,000.00 328.00


Perlengka
pan 35 % 104,370.0
lot 0.3500 36,529.50
harga 0
pipa
154,417.0
Jumlah
0
Dibulatka 154,417.0
n 0

1 M' Pipa
M-13 PVC
3/4" (AW)

Pipa pvc
m' 12,000 13,050.00 15,660.00
3/4"

Pekerja org 0.0810 42,000.00 3,402.00

Tukang
org 0.1350 65,000.00 8,775.00
batu
Kepala
org 0.0135 75,000.00 1,012.50
Tukang

Mandor org 0.0041 80,000.00 328.00

Perlengka
pan 35 %
lot 0.3500 15,660.00 5,481.00
harga
pipa

Jumlah 34,658.50

Dibulatka
34,659.00
n
M-14 1 Buah Bak Cuci piring Stainless steel
Bak cuci
stainless
397,800.0 397,800.0
steel + bh 10,000
0 0
asesoris
lengkap

Pekerja org 0.0300 42,000.00 1,260.00

Tukang
org 0.3000 65,000.00 19,500.00
batu
Kepala
org 0.0300 75,000.00 2,250.00
Tukang

Mandor org 0.0015 80,000.00 120.00

420,930.0
Jumlah
0
Dibulatka 420,930.0
n 0

1 Buah
M-15 Kran
1/2" - 3/4"

Kran air bh 10,000 40,900.00 40,900.00


Seal tape bh 0.0250 4,200.00 105.00
Pekerja org 0.0100 42,000.00 420.00

Tukang
org 0.1000 65,000.00 6,500.00
batu
Kepala
org 0.0100 75,000.00 750.00
Tukang

Mandor org 0.0050 80,000.00 400.00

Jumlah 49,075.00

Dibulatka
49,075.00
n
1 Buah
M-16 Floor
Drain
Floor
bh 10,000 66,600.00 66,600.00
drain

Pekerja org 0.0100 42,000.00 420.00

Tukang
org 0.1000 65,000.00 6,500.00
batu
Kepala
org 0.0100 75,000.00 750.00
Tukang

Mandor org 0.0050 80,000.00 400.00

Jumlah 74,670.00

Dibulatka
74,670.00
n
1 M' Grafel beton U 20 cm -60
M-17
cm
Pipa
bh 11,000 44,300.00 48,730.00
beton U
Bata
bh 120,000 775.00 9,300.00
merah
P.C (50
zak 0.1030 1,406.00 144.82
gk)
Pasir 233,400.0
m3 0.0305 7,118.70
pasang 0
175,300.0
Pasir urug m3 0.0345 6,047.85
0

Pekerja org 0.0100 42,000.00 420.00

Tukang
org 0.1000 65,000.00 6,500.00
batu
Kepala
org 0.0100 75,000.00 750.00
Tukang

Mandor org 0.0050 80,000.00 400.00

Jumlah 79,411.37

Dibulatka
79,411.00
n
M-18 1 M' Pasang Talang Plastik PVC U 15 cm (AW)
Talang
plastik m' 105,000 60,000.00 63,000.00
PVC
Perlengka
pan 35 %
lot 0.3500 63,000.00 22,050.00
harga
talang

Pekerja org 0.1500 42,000.00 6,300.00

Tukang
org 0.4000 65,000.00 26,000.00
batu
Kepala
org 0.0250 75,000.00 1,875.00
Tukang

Mandor org 0.0013 80,000.00 100.00

119,325.0
Jumlah
0
Dibulatka 119,325.0
n 0
1 M' Saluran Air Limbah Buis
M-19
Beton 60 cm
Buis
130,900.0 143,990.0
beton bh 1.10
0 0
60 cm
Bata
bh 25.00 775.00 19,375.00
merah
P.C (50
zak 0.206 1,406.00 289.64
gk)
Pasir 233,400.0
m3 0.061 14,237.40
pasang 0
175,300.0
Pasir urug m3 0.069 12,095.70
0

Pekerja org 0.3800 42,000.00 15,960.00

Tukang
org 0.1900 65,000.00 12,350.00
batu
Kepala
org 0.0190 75,000.00 1,425.00
Tukang

Mandor org 0.0190 80,000.00 1,520.00

221,242.7
Jumlah
4
Dibulatka 221,243.0
n 0
1 M'
Pasang
M-20 Talang
Seng
Datar
Seng
pelat 3" x lbr 0.50000 20,801.00 10,400.50
6"

Paku kg 0.01500 23,400.00 351.00

Kayu 2,850,000
m3 0.00960 27,360.00
kelas II .00

Meni besi kg 0.2500 30,400.00 7,600.00

Pekerja org 0.1500 42,000.00 6,300.00

Tukang
org 0.4000 65,000.00 26,000.00
batu
Kepala
org 0.0250 75,000.00 1,875.00
Tukang

Mandor org 0.0013 80,000.00 100.00

Jumlah 79,986.50

Dibulatka
79,987.00
n
1 Buah
M-21 Closet
Duduk
Closet 1,724,700 1,724,700
bh 1.00
duduk .00 .00
138,600.0
Pekerja org 33,000 42,000.00
0
Tukang
org 11,000 65,000.00 71,500.00
batu
Kepala
org 0.0010 75,000.00 75.00
Tukang

Mandor org 0.1600 80,000.00 12,800.00

Perlengka
pan 6 % 1,724,700 103,482.0
lot 0.0600
harga .00 0
closet
2,051,157
Jumlah
.00
Dibulatka 2,051,157
n .00
M-22 1 Buah Tangki Air fibreglass Volume 1 m3
Bak
fibreglass 1,316,400 1,316,400
bh 1.00
kapasitas .00 .00
1 m3
138,600.0
Pekerja org 33,000 42,000.00
0
Tukang
org 11,000 65,000.00 71,500.00
batu
Kepala
org 0.0010 75,000.00 75.00
Tukang

Mandor org 0.1600 80,000.00 12,800.00

Perlengka
1,316,400
pan 6 % lot 0.0600 78,984.00
.00
harga bak
1,618,359
Jumlah
.00
Dibulatka 1,618,359
n .00
M-23 1 Unit Septictank 2x1,50x1,50 m + Rembesan
Galian 118,134.0
m3 4,500 26,252.00
tanah 0
175,300.0
Pasir urug m3 0.214 37,514.20
0
lantai 716,798.0 1,612,795
m3 2,250
kerja 0 .50
Pas bata
220,267.1 3,304,006
adk 1pc : m2 15,000
0 .50
3ps
Pelat
6,438,864 1,931,659
beton K- m3 0.300
.00 .20
225
Plesteran
619,527.3
adk 1pc : m2 15,000 41,301.82
0
3ps
Pipa PVC
256,800.0 1,386,720
4" jenis m' 5,400
0 .00
AW
Pipa GIP 1 233,750.0
m' 5,000 46,750.00
1/2" 0

Galian
tanah
m3 3,375 20,000.00 67,500.00
untuk
rembesan

126,360.0
Pas ijuk kg 5,400 23,400.00
0

Urugan 205,000.0 215,250.0


m3 1,050
kerikil 3/5 0 0

Pipa PVC
4" 330,300.0
m' 9,000 36,700.00
berlubang 0
jenis AW

Urugan
dan
m3 1,125 34,584.00 38,907.00
perataan
tanah
10,022,42
Jumlah
3.70
Dibulatka 10,022,42
n 4.00
M-24 1 Unit Septictank 1x1,50x1,50 m + Rembesan
Galian
m3 2,250 20,000.00 45,000.00
tanah
175,300.0
Pasir urug m3 0.107 18,757.10
0
lantai 716,798.0 806,397.7
m3 1,125
kerja 0 5
Pas bata
220,267.1 1,652,003
adk 1pc : m2 7,500
0 .25
3ps
Pelat
6,438,864 965,829.6
beton K- m3 0.150
.00 0
225
Plesteran
309,763.6
adk 1pc : m2 7,500 41,301.82
5
3ps
Pipa PVC
256,800.0 2,311,200
4" jenis m' 9,000
0 .00
AW
Pipa GIP 1 116,875.0
m' 2,500 46,750.00
1/2" 0

Galian
tanah
m3 1,688 20,000.00 33,760.00
untuk
rembesan

Pas ijuk kg 2,700 23,400.00 63,180.00

Urugan 205,000.0 107,625.0


m3 0.525
kerikil 3/5 0 0

Pipa PVC
4" 330,300.0
m' 9,000 36,700.00
berlubang 0
jenis AW

Urugan
dan
m3 0.563 34,584.00 19,470.79
perataan
tanah
6,780,162
Jumlah
.14
Dibulatka 6,780,162
n .00

Kembali ke Analisa SNI


atuan Pekerjaan Pengecatan
Diposkan : 05 Juni 2014
Oleh : Endang Kusman

HARGA
No. URAIAN SAT VOLUME HARGA
SAT

N-01 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama


- Soda api Kg 0.0500 35,600.00 1,780.00

- Pekerja Oh 0.1500 42,000.00 6,300.00

- Mandor Oh 0.0025 80,000.00 200.00


Jumlah 8,280.00
Dibulatkan 8,280.00
N-02 1 M2 Mendempul Dan Menggosok Kayu
- Dempul Kg 0.0800 35,800.00 2,864.00

Minyak
- Kg 0.0200 38,400.00 768.00
cat
Batu
- Kg 0.0100 29,600.00 296.00
apung

- Pekerja Oh 0.0400 42,000.00 1,680.00

Tukang
- Oh 0.0400 65,000.00 2,600.00
cat
Kepala
- Oh 0.0040 75,000.00 300.00
tukang

- Mandor Oh 0.0025 80,000.00 200.00


Jumlah 8,708.00
Dibulatkan 8,708.00
N-03 1 M2 Pengecatan Bidang Kayu Lama Setara Sieve
- Plamir Kg 0.1500 25,000.00 3,750.00

- Cat dasar Kg 0.1700 30,000.00 5,100.00

Cat
penutup
- Kg 0.1700 41,700.00 7,089.00
setara
sieve 2x
- Pekerja Oh 0.0700 42,000.00 2,940.00

Tukang
- Oh 0.0750 65,000.00 4,875.00
cat
Kepala
- Oh 0.0075 75,000.00 562.50
tukang

- Mandor Oh 0.0025 80,000.00 200.00

Jumlah 24,516.50

Dibulatkan 24,517.00
N-04 1 M2 Pengecatan Bidang Kayu Baru Setara Sieve
- Cat meni Kg 0.2000 30,400.00 6,080.00

- Plamir Kg 0.1500 25,000.00 3,750.00

- Cat dasar Kg 0.1700 30,000.00 5,100.00

Cat
penutup
- Kg 0.3500 41,700.00 14,595.00
3x setara
sieve

- Pekerja Oh 0.0700 42,000.00 2,940.00

Tukang
- Oh 0.1050 65,000.00 6,825.00
cat
Kepala
- Oh 0.0040 75,000.00 300.00
tukang

- Mandor Oh 0.0025 80,000.00 200.00

Jumlah 39,790.00

Dibulatkan 39,790.00

1 M2 Pelaburan Bidang Kayu dengan


N-05
Politur

- Politur Ltr 0.1500 48,000.00 7,200.00

Politur 112,700.0
- Ltr 0.3720 41,924.40
jadi 0

- Ampelas Lbr 20,000 5,000.00 10,000.00

Tukang
- Oh 0.0600 65,000.00 3,900.00
cat
Kepala
- Oh 0.0160 75,000.00 1,200.00
tukang
- Mandor Oh 0.0025 80,000.00 200.00

Jumlah 64,424.40

Dibulatkan 64,424.00
N-06 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
Residu
- Ltr 0.3500 8,100.00 2,835.00
atau ter

- Pekerja Oh 0.1000 42,000.00 4,200.00

- Mandor Oh 0.0060 80,000.00 480.00


Jumlah 7,515.00
Dibulatkan 7,515.00
1 M2 Pengecatan Tembok Baru
N-07
Setara ICI
Plamir
- Kg 0.1000 25,000.00 2,500.00
tembok

- Cat dasar Kg 0.1000 30,000.00 3,000.00

Cat
penutup
- Kg 0.2600 75,000.00 19,500.00
2x setara
ICI

- Pekerja Oh 0.0200 42,000.00 840.00

Tukang
- Oh 0.0630 65,000.00 4,095.00
cat
Kepala
- Oh 0.0063 75,000.00 472.50
tukang

- Mandor Oh 0.0025 80,000.00 200.00

Jumlah 30,607.50

Dibulatkan 30,608.00
N-08 1 M2 Pengecatan Tembok Lama Setara ICI
- Cat dasar Kg 0.1200 30,000.00 3,600.00

Cat
- penutup 2 Kg 0.1800 75,000.00 13,500.00
x

- Pekerja Oh 0.0280 42,000.00 1,176.00

Tukang
- Oh 0.0420 65,000.00 2,730.00
cat
Kepala
- Oh 0.0042 75,000.00 315.00
tukang

- Mandor Oh 0.0025 80,000.00 200.00

Jumlah 21,521.00

Dibulatkan 21,521.00
N-09 1 M2 Pengecatan Plafond ( 3x ) Setara ICI
Cat
- tembok Kg 0.2000 75,000.00 15,000.00
setara ICI
Plamir
- Kg 0.1600 25,000.00 4,000.00
tembok

- Rol cat Bh 0.0100 32,500.00 325.00

Steger
- Ls 10,000 1,000.00 1,000.00
werk
- Ampelas Lbr 0.5000 5,000.00 2,500.00
- Pekerja Oh 0.2000 42,000.00 8,400.00

Tukang
- Oh 0.3000 65,000.00 19,500.00
cat
Kepala
- Oh 0.0300 75,000.00 2,250.00
tukang

- Mandor Oh 0.0100 80,000.00 800.00

Jumlah 53,775.00

Dibulatkan 53,775.00
N-10 1 M2 Pengecatan Plafond ( 3x ) Setara Vinilex
Cat
tembok
- Kg 0.2000 25,000.00 5,000.00
setara
Vinilex
Plamir
- Kg 0.1600 25,000.00 4,000.00
tembok

- Rol cat Bh 0.0100 32,500.00 325.00

Steger
- Ls 10,000 1,000.00 1,000.00
werk
- Ampelas Lbr 0.5000 5,000.00 2,500.00
- Pekerja Oh 0.2000 42,000.00 8,400.00

Tukang
- Oh 0.3000 65,000.00 19,500.00
cat
Kepala
- Oh 0.0300 75,000.00 2,250.00
tukang

- Mandor Oh 0.0100 80,000.00 800.00

Jumlah 43,775.00

Dibulatkan 43,775.00
N-10-r' 1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex
Cat
tembok
- Kg 0.1300 25,000.00 3,250.00
setara
Vinilex
Plamir
- Kg 0.1100 25,000.00 2,750.00
tembok

- Rol cat Bh 0.1000 32,500.00 3,250.00

Steger
- Ls 0.6700 1,000.00 670.00
werk
- Ampelas Lbr 0.3300 5,000.00 1,650.00
- Pekerja Oh 0.1300 42,000.00 5,460.00

Tukang
- Oh 0.2000 65,000.00 13,000.00
cat
Kepala
- Oh 0.0200 75,000.00 1,500.00
tukang

- Mandor Oh 0.0100 80,000.00 800.00

Jumlah 32,330.00

Dibulatkan 32,330.00
N-11 1 M2 Memasang Wallpaper
- Wallpaper m2 12,000 55,700.00 66,840.00

Lem
- Kg 0.2500 35,700.00 8,925.00
Perekat

- Pekerja Oh 0.3500 42,000.00 14,700.00

Tukang
- Oh 0.1750 65,000.00 11,375.00
cat
Kepala
- Oh 0.0170 75,000.00 1,275.00
tukang

- Mandor Oh 0.0017 80,000.00 136.00

103,251.0
Jumlah
0
103,251.0
Dibulatkan
0
N-12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi
- Meni besi Kg 0.1000 30,400.00 3,040.00

- Kuas 3" Bh 0.0100 16,000.00 160.00

- Pekerja Oh 0.0200 42,000.00 840.00

Tukang
- Oh 0.2000 65,000.00 13,000.00
cat
Kepala
- Oh 0.0200 75,000.00 1,500.00
tukang

- Mandor Oh 0.0100 80,000.00 800.00

Jumlah 19,340.00

Dibulatkan 19,340.00

1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan


N-13
Perancah

- Meni besi Kg 0.1000 30,400.00 3,040.00

- Kuas 3" Bh 0.0100 16,000.00 160.00

Kayu 2,069,800
- m3 0.0020 4,139.60
perancah .00

- Pekerja Oh 0.2500 42,000.00 10,500.00

Tukang
- Oh 0.2250 65,000.00 14,625.00
cat
Kepala
- Oh 0.0225 75,000.00 1,687.50
tukang

- Mandor Oh 0.0075 80,000.00 600.00

Jumlah 34,752.10

Dibulatkan 34,752.00

1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara


N-14
manual 1 lps cat 2 um
Cat besi
- Kg 0.3000 67,700.00 20,310.00
setara ICI

- Pekerja Oh 0.0060 42,000.00 252.00

Tukang
- Oh 0.0600 65,000.00 3,900.00
cat
Kepala
- Oh 0.0120 75,000.00 900.00
tukang

- Mandor Oh 0.0060 80,000.00 480.00

Jumlah 25,842.00

Dibulatkan 25,842.00
N-15 1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)
Plamir
- Kg 0.1000 25,000.00 2,500.00
tembok

- Cat dasar Kg 0.1000 30,000.00 3,000.00

Cat
penutup
- Kg 0.2600 25,000.00 6,500.00
2x setara
vinilex

- Pekerja Oh 0.0200 42,000.00 840.00

Tukang
- Oh 0.0630 65,000.00 4,095.00
cat
Kepala
- Oh 0.0063 75,000.00 472.50
tukang

- Mandor Oh 0.0025 80,000.00 200.00

Jumlah 17,607.50

Dibulatkan 17,608.00
N-15r' 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
Plamir
- Kg 0.1000 25,000.00 2,500.00
tembok

- Cat dasar Kg 0.1000 30,000.00 3,000.00

Cat
penutup
- Kg 0.3900 25,000.00 9,750.00
3x setara
vinilex

- Pekerja Oh 0.0300 42,000.00 1,260.00

Tukang
- Oh 0.0945 65,000.00 6,142.50
cat
Kepala
- Oh 0.0095 75,000.00 712.50
tukang

- Mandor Oh 0.0038 80,000.00 304.00


Jumlah 23,669.00

Dibulatkan 23,669.00
N-16 1 M2 Pengecatan Tembok Lama Setara Vinilex
- Cat dasar Kg 0.1200 30,000.00 3,600.00

Cat
- penutup 2 Kg 0.1800 25,000.00 4,500.00
x

- Pekerja Oh 0.0280 42,000.00 1,176.00

Tukang
- Oh 0.0420 65,000.00 2,730.00
cat
Kepala
- Oh 0.0042 75,000.00 315.00
tukang

- Mandor Oh 0.0025 80,000.00 200.00

Jumlah 12,521.00

Dibulatkan 12,521.00

Kembali ke AHS-SNI
an Pekerjaan Penanaman Pohon
Diposkan : o6 Juni2014
Oleh : Endang Kusman

HARGA HARGA
NO. URAIAN KOEF SAT.
SAT. (Rp) (Rp)
O-01 1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m
Pupuk kandang 0.0800 krg 25,000.00 2,000.00

Furadan 0.0010 kg 24,000.00 24.00

Pohon pelindung 10,000 btng 25,000.00 25,000.00

Pekerja 0.0250 org 42,000.00 1,050.00

Mandor 0.0025 org 80,000.00 200.00

Jumlah 28,274.00

Dibulatkan 28,274.00
O-02 1 Lubang (70x70x70) cm, tanam bambu krisik/jepang
Pupuk kandang 0.0800 krg 25,000.00 2,000.00

Furadan 0.0010 kg 24,000.00 24.00

Bambu krisik/jepang 10,000 btng 50,000.00 50,000.00

Pekerja 0.0250 org 42,000.00 1,050.00

Mandor 0.0025 org 80,000.00 200.00

Jumlah 53,274.00

Dibulatkan 53,274.00
O-03 1 Lubang (40x40x40) cm, tanam pohon perdu (polibag)
Pupuk kandang 0.0400 krg 25,000.00 1,000.00

Furadan 0.0010 kg 24,000.00 24.00

Pohon perdu 10,000 btng 10,000.00 10,000.00


Pekerja 0.0200 org 42,000.00 840.00

Mandor 0.0020 org 80,000.00 160.00

Jumlah 12,024.00

Dibulatkan 12,024.00
O-04 1 M2 Tanam rumput gajah (silang papan catur)
Pupuk kandang 0.0400 krg 25,000.00 1,000.00

Rumput gajah mini 0.5000 m2 15,000.00 7,500.00

Pekerja 0.0400 org 42,000.00 1,680.00

Mandor 0.0040 org 80,000.00 320.00

Jumlah 10,500.00

Dibulatkan 10,500.00

Kembali ke AHA-SNI
h Kerja Bangunan - AHS 2011

UPAH
NO URAIAN SATUAN
(Rp.)

Rp
1 Mandor Org/hr
80,000.00

Kepala
Rp
2 Tukang Org/hr
75,000.00
Batu
Kepala
Rp
3 Tukang Org/hr
75,000.00
Kayu
Kepala
Rp
4 Tukang Org/hr
75,000.00
Besi
Kepala
Rp
5 Tukang Org/hr
75,000.00
Cat
Kepala
Rp
6 Tukang Org/hr
75,000.00
Listrik

Kepala Rp
7 Org/hr
Tukang 75,000.00

Tukang Rp
8 Org/hr
Batu 65,000.00

Tukang Rp
9 Org/hr
Kayu 65,000.00

Tukang Rp
10 Org/hr
Besi/Baja 65,000.00

Tukang Rp
11 Org/hr
Cat 65,000.00

Tukang Rp
12 Org/hr
Listrik 65,000.00
Tukang Rp
13 Org/hr
Pipa 65,000.00

Tukang Rp
14 Org/hr
Plitur 65,000.00

Tukang Rp
15 Org/hr
Taman 65,000.00

Rp
16 Tukang Org/hr
65,000.00

Pembantu Rp
17 Org/hr
Tukang 42,000.00

Pekerja Rp
18 Org/hr
Biasa 42,000.00

Penjaga Rp
19 Org/hr
Malam 42,000.00

Rp
20 Sopir Org/hr
65,000.00

Rp
21 Operator Org/hr
75,000.00

Rp
22 Mekanik Org/hr
65,000.00

Pembantu Rp
23 Org/hr
Sopir 42,000.00

Pembantu Rp
24 Org/hr
Operator 50,000.00

Pembantu Rp
25 Org/hr
Mekanik 42,000.00

harga sudah
termasuk PPN dan
keuntungan
Bahan Bangunan - AHS 2011

HARGA
NO MATERIAL SAT
(Rp)

AGREGAT
KASAR,BA
HAN
A.
PEREKAT
& BAHAN
JADINYA

175,300.0
1 Pasir Urug m3
0
Tanah
2 Urug m3 89,200.00
Pilihan
203,500.0
3 Sirtu m3
0
Pasir 174,200.0
4 m3
Teras 0
Pasir
233,400.0
5 Pasang m3
0
Kali
Pasir 255,400.0
6 m3
Beton 0
259,000.0
7 Abu Batu m3
0
Batu
8 Gosok kg 29,600.00
( Apung )

Batu
223,600.0
9 Pecah m3
0
Mesin 1/2

Batu
211,100.0
10 Pecah m3
0
Mesin 2/3

Batu
205,000.0
11 Pecah m3
0
Mesin 3/5
Batu
196,000.0
12 Pecah m3
0
Mesin 5/7

Batu
205,500.0
13 Belah m3
0
Pondasi

Batu
Bronjol 180,800.0
14 m3
( Untuk 0
Bronjong )

Batu Koral 172,600.0


15 m3
Beton Kali 0

Batu
16 Tempel m3 96,600.00
Hitam
Batu
Pinggir
17 bh 14,100.00
Beton 10
x 20 x 35
Batu
Pinggir
18 Beton 15 bh 73,700.00
x 35 x 50
( K-225 )

19 Batu Telor m3 97,800.00

Batako
20 Kecil 8 x bh 2,000.00
10 x 20
Batako
21 Besar 8 x bh 2,400.00
20 x 30
Con Blok
22 8 x 20 x bh 5,400.00
40
Bata
Merah
23 bh 775.00
Bakar
kelas I
Bata
Merah
24 bh 675.00
Bakar
kelas II
Bata
Merah
25 Oven bh 1,800.00
( Klingker
)
Roster
26 Beton 20 bh 14,800.00
x 20
Roster
27 Beton 30 bh 15,500.00
x 30
Grass
28 Blok 20 x bh 9,700.00
20
Grass
29 Blok 30 x bh 22,500.00
30
Paving
Blok
30 m2 81,100.00
Natural 8
cm
Paving
Blok 108,600.0
31 m2
Warna 8 0
cm
Paving
Blok
32 m2 76,000.00
Natural 6
cm
Paving
Blok
33 m2 86,000.00
Warna 6
cm
Canstin
34 Paving m1 34,900.00
Blok
Semen PC
35 zak 70,300.00
/50 kg
1,406.00
Semen
36 zak 92,700.00
Putih
Kanstin
Jalan
Ukuran
Besar
37 bh 58,900.00
( Bina
Marga )
1bh
=60cm

Readymix
Beton
K500, 1,105,000
38 m3
Tanpa .00
Pompa
( Selang )
Readymix
Beton
K400, 903,500.0
39 m3
Tanpa 0
Pompa
( Selang )
Readymix
Beton
K350, 877,500.0
40 m3
Tanpa 0
Pompa
( Selang )
Readymix
Beton
K300, 925,000.0
41 m3
Tanpa 0
Pompa
( Selang )
Readymix
Beton
K225, 850,000.0
42 m3
Tanpa 0
Pompa
( Selang )
Readymix
Beton
K175, 825,000.0
43 m3
Tanpa 0
Pompa
( Selang )
Kapur
Pasang / 353,300.0
44 m3
Kapur 0
Tembok
Kapur
45 kg 18,300.00
Sirih
Semen
46 kg 15,700.00
Warna

47 Tanah liat m3 31,300.00


48 Air ltr 3.00
Formite/s
49 bh 2,500.00
pacer
Hollow/Co
50 n Blok 8 x bh 5,000.00
20 x 40
Hollow/Co
51 n Blok 8 x bh 4,000.00
15 x 40
Hollow/Co
52 n Blok 8 x bh 3,000.00
10 x 40

LABURAN,
PENGISI
B
DAN
ALATNYA
Plamir
1 kg 25,000.00
Tembok
Cat
Tembok
120,000.0
2 ICI lt
0
Eksterior (
Beton )

Cat
Tembok
ICI Interior
3 lt 75,000.00
( Plafon
Dan
Dinding )

Cat
4 Tembok kg 25,000.00
Vinilex
Cat Dasar
ICI untuk
5 Interior lt 75,000.00
( 2 Pelapis
)
Cat
6 Tembok kg 20,000.00
Sanlek

7 Cat Dasar kg 30,000.00

Cat Tahan
8 lt 40,000.00
Asam

Pelapis
Alkali ICI (
9 Cat Dasar kg 90,000.00
Beton
Ekterior )

Cat Marka 185,000.0


10 kg
/ Spotlight 0

Water
11 Profing ml 70,000.00
Emulsion
Water
Profing
12 bh 62,500.00
Membran
ce
Rool Cat
13 bh 32,500.00
Tembok
Kape
14 bh 8,500.00
Tembok
Kape
15 5 lt 10,000.00
Kayu
Soligneu
16 kg 25,000.00
m 1 Blek

17 Plincote m3 29,000.00

Penaweta 382,600.0
18 m3
n Kayu 0
Pegopena 370,000.0
19 bh
n Kayu 0

20 Kwas 3" bh 16,000.00

21 Oker bks 22,000.00


22 Oyan bks 5,200.00
Oten
23 ( Pewarna lt 5,500.00
Plitur )

24 Spirtus kg 15,000.00

Bahan
Pelitur
110,000.0
25 Kripik kg
0
( Sirlak
India )
Dempul
26 kg 34,200.00
Lilin
Dempul
27 kg 37,700.00
Plitur
Dempul
Halus /
28 Imfra lt 37,700.00
( Wood
Filler )
Dempul
29 kg 35,800.00
Jadi

30 Politur lt 48,000.00

Politur 112,700.0
31 lt
Jadi 0

32 Terpentin kg 19,500.00

33 Tiner A kg 23,900.00

34 Tiner B kg 21,400.00

35 Kumpon lbr 30,800.00

36 Melamik kg 52,500.00

Dempul
37 kg 39,200.00
Plastik
Dempul
38 kg 35,800.00
Duco
39 Ampelas lbr 5,000.00
Dempul
40 Kayu Cap kg 24,400.00
Kucing

Meni Kayu
41 kg 30,400.00
/ Besi
42 Sincromat kg 40,900.00

Cat Kayu
43 lt 41,700.00
Sieve

44 Cat Besi lt 44,000.00

Cat Besi
Duco
45 bh 76,300.00
Danaglos
/ ICI

46 Cat Bron kg 67,700.00


47 Karet lis bh 3,300.00
Minyak
48 kg 38,400.00
cat
Glass
49 kg 50,100.00
beet
50 Residu lt 8,100.00

BAHAN
KAYU
C BERIKUT
BAHAN
JADINYA
Bambu 5
1 bt 17,700.00
s.d 7
Bambu 7
2 bt 25,000.00
s.d 10
Bambu
3 bt 37,200.00
Gombong
Kayu
Kamper
Singkil /
7,094,450
4 Kapur m3
.00
( Kayu
Samarind
a kls II )
Kayu
Balok 5,280,000
5 m3
Borneo .00
Super
Kayu
Papan 5,595,800
6 m3
Borneo .00
Super
Kayu
Balok
5,692,600
7 Kamper m3
.00
Medan
(Kruing )
Kayu
Papan
5,823,400
8 Kamper m3
.00
Medan
(Kruing )
Kayu
Balok 6,363,600
9 m3
Kamper .00
Banjar
Kayu
Papan 6,645,300
10 m3
Kamper .00
Banjar
Kayu
Balok
8,633,700
11 Kamper m3
.00
Samarind
a
Kayu
Papan
8,724,300
12 Kamper m3
.00
Samarind
a
Kayu
2,658,000
13 Balok m3
.00
Rasamala

Kayu Jati
20,772,00
14 Jatim Tua m3
0.00
dia. 40 cm

Kayu Jati
22,188,40
15 Jateng Tua m3
0.00
dia. 40 cm

Kayu Jati
13,625,40
16 Jabar Tua m3
0.00
dia. 40 cm
Kayu Jati
Jabar Tua 12,736,10
17 m3
dia. 40 cm 0.00
kebawah

Kayu
Hutan
Kelas I 2,069,800
18 m3
( Segeng, .00
Mahoni,
Laban )
Kayu
1,870,500
19 Balok m3
.00
Albasia
Kayu
2,071,700
20 Papan m3
.00
Albasia
Dolken 5
21 bt 22,600.00
s/d 7
Dolken 7
22 bt 28,000.00
s/d 10
List Profil
23 Kamper 1 m1 8,900.00
cm
List Profil
24 Kamper 2 m1 10,000.00
cm
List Profil
25 Kamper 4 m1 14,300.00
cm
List Profil
26 Kamper 5 m1 17,200.00
cm
List Profil
27 Kamper m1 29,400.00
10 cm
Pegangan
160,100.0
28 Tangga m1
0
Profil Jati
Pegangan
Tangga 122,500.0
29 m1
Profil 0
Kamper
Kayu Kaso 2,772,000
30 m3
4/6 .00
Kayu Kaso
5/7 3,356,800
31 m3
Kamper .00
Medan
Kayu
Reng 2/3
32 m1 2,500.00
Borneo
Super
Kayu
Reng 2/3
33 m1 3,300.00
Kamper
Banjar
Kayu
Reng 3/4
34 m3 4,000.00
Kamper
Medan

Kayu
2,850,000
35 Papan m3
.00
Terentang

Kayu
2,640,000
36 Balok m3
.00
Terentang

Batang 139,500.0
37 bt
Kelapa 0

38 Tali Ijuk kg 23,400.00

lapisan
39 Ijuk tebal m2 22,000.00
10 cm
Venetion 537,300.0
40 m2
Blind 0
Vertikal 351,200.0
41 m2
Blind 0

BAHAN
PENUTUP
D
RANGKA
PLAFOND

Plafond
1 Enternit 4 m2 17,400.00
mm
Plafond
hardpleks
2 lbr 62,400.00
5 mm 120
x 240
Plafond
Asbes
3 m2 22,500.00
Semen 5
mm
Plafond
Asbes
4 m2 19,500.00
Semen
3,5 mm
Gypsum
120 x 240
5 lbr 79,800.00
t= 9 mm
ex DN
Gypsum
120 x 240
6 lbr 83,800.00
t= 9 mm
ex Luar
Tepung
7 kg 12,500.00
gypsum
Acustik
132,800.0
8 Amstrong lbr
0
60 x 120
Cotton
9 bh 15,000.00
Plester
GRC (120
x 240)
10 lbr 67,500.00
cm, t = 4
mm
Cornice
11 Coumpou zak 75,000.00
nd
List
12 m' 8,500.00
gypsum

BAHAN
E KAYU
LAPIS
Triplek 3
1 mm 120 x lbr 61,700.00
240
Triplek 4
2 mm 120 x lbr 64,400.00
240
Triplek 4
mm
3 lbr 56,200.00
ukuran
Pintu
Triplek 6
4 mm 120 x lbr 92,000.00
240
Triplek 9
166,600.0
5 mm 120 x lbr
0
240
Jabar
119,000.0
6 Wood 4 lbr
0
mm
Bilik
Bambu
7 m2 19,800.00
( tanpa
kulit )
Bilik
Bambu
8 m2 22,700.00
( dengan
kulit )
Bilik
Bambu
9 m2 34,200.00
Hitam
Variasi
Wall
10 m2 55,700.00
paper
MultiPlek
151,100.0
11 9 mm 120 lbr
0
x 240
MultiPlek
195,000.0
12 12 mm lbr
0
120 x 240
MultiPlek
255,400.0
13 18 mm lbr
0
120 x 240
Ply Wood
323,900.0
14 18 mm lbr
0
120 x 240
Ply Wood
235,000.0
15 9 mm 120 lbr
0
x 240
Ply Wood
140,000.0
16 4 mm 120 lbr
0
x 240
Teak
Wood 3 129,100.0
17 lbr
mm 120 x 0
240
Teak
Wood 4 131,700.0
18 lbr
mm 120 x 0
240
Teak
Wood 3
mm 120 x 127,200.0
19 lbr
240 0
ukuran
Pintu
Teak
Wood
114,700.0
20 ukuran lbr
0
Pintu 4
mm
Tacon
128,200.0
21 ( Tahan m2
0
Bakar )

22 Supercon m2 57,900.00

Melamin 4
23 mm 120 x lbr 89,200.00
240

Melamin 133,400.0
24 lbr
TOK 4 mm 0

Formika 170,000.0
25 lbr
120 x 240 0
Formika
132,900.0
26 ukuran lbr
0
Pintu
Formika
238,100.0
27 Warna 4" lbr
0
x 8"

BAHAN
LANTAI
F DAN
PELAPIS
DINDING
Tegel PC
1 bh 3,400.00
20 x 20
Plin Tegel
2 PC 10 x bh 2,400.00
20
Tegel PC
3 bh 3,400.00
30 x 30
Plin Tegel
4 PC 15 x bh 2,800.00
30
Tegel
5 Warna 20 bh 3,600.00
x 20
Plin Tegel
6 Warna 10 bh 3,400.00
x 20
Tegel
7 Warna 30 bh 5,700.00
x 30
Plin Tegel
8 Warna 15 bh 6,300.00
x 30
Tegel
9 Wafel PC bh 3,200.00
20 x 20
Tegel
Wafel
10 bh 2,500.00
Warna 20
x 20
Tegel
11 Badak PC bh 4,100.00
30 x 30
Poslin 11
x 11
12 Warna m2 63,300.00
Standar
DN
Poslin 11
x 11
13 Warna m2 67,300.00
khusus
DN
Keramik
10 x 20
dan 20 x
14 20 KW I m2 54,500.00
DN Putih /
Polos
Mulia
Keramik
10 x 20
KW I DN
15 m2 56,000.00
Corak/War
na/Anti
Slip Mulia

Keramik
20 x 20
(KM) KW I
16 DN m2 62,500.00
Corak/War
na /Anti
Slip Mulia

Keramik
20 x 20
(KM) KW I
17 m2 54,500.00
DN Putih
Polos
Mulia

Keramik
20 x 25
Dinding
18 m2 62,500.00
KM KW I
DN Corak
Mulia
Keramik
30 x 30
KWI DN
19 m2 53,000.00
Putih
Polos
Mulia

Keramik
30 x 30
KWI DN
20 Warna/Cor m2 58,000.00
ak (ANTI
SLIP)
Mulia

Keramik
40 x 40
KWI DN
21 m2 56,800.00
Putih
Polos
Mulia
Keramik
40 x 40
KWI DN
22 Warna/Cor m2 65,500.00
ak (ANTI
SLIP)
Mulia

Keramik
10 x 20
dan 20 x
23 20 KW I m2 64,400.00
DN Putih /
Polos
Roman

Keramik
10 x 20
KW I DN
24 Corak/War m2 72,200.00
na/Anti
Slip
Roman

Keramik
20 x 20
(KM) KW I
DN
25 m2 75,200.00
Corak/War
na/Anti
Slip
Roman

Keramik
20 x 20
(KM) KW I
26 m2 72,900.00
DN Putih
Polos
Roman

Keramik
20 x 25
Dinding
27 m2 75,200.00
KM KW I
DN Corak
Roman
Keramik
20 x 25
KW I DN
28 m2 72,900.00
Putih
Polos
Roman
Keramik
30 x 30
29 KW I DN m2 68,900.00
Polos
Roman

Keramik
30 x 30
KW I DN
30 Warna/Cor m2 76,600.00
ak (ANTI
SLIP)
Roman

Keramik
40 x 40
31 KW I DN m2 72,500.00
Polos
Roman

Keramik
40 x 40
KW I DN
32 Warna/Cor m2 77,000.00
ak (ANTI
SLIP)
Roman

Vinyl
33 Lantai m2 56,000.00
Standar
Karpet
1,025,500
34 Kelas Baik m2
.00
LN
Karpet
Kelas 353,500.0
35 m2
Sedang 0
LN
Parquet 375,400.0
36 m2
Jati 0
Stairnosin
37 g Keramik bh 13,700.00
10/20

Stairnosin
38 m 25,000.00
g Fiber
Taraso
39 Kerang 30 m2 31,800.00
x 30
Plin
40 Taraso 10 bh 13,500.00
x 30
Granit
Alam LN 1,848,400
41 m2
Ukuran .00
Besar
Granit
Alam LN 1,612,900
42 m2
Ukuran .00
Kecil
Granit
Alam DN 1,331,100
43 m2
Ukuran .00
Besar
Granit
Alam DN 1,299,400
44 m2
Ukuran .00
Kecil

Granito
Tile
345,000.0
45 Essenza m2
0
Ukuran 40
x 40 Polis

Granito
Tile
322,800.0
46 Essenza m2
0
Ukuran 30
x 30
Granito
Tile
Essenza 204,900.0
47 m2
Ukuran 40 0
x 40
UnPolis
550,000.0
48 Marmer m2
0
Marmer
Alam
550,200.0
49 Lampung m2
0
Ukuran
Besar
Marmer
Alam
345,700.0
50 Lampung m2
0
Ukuran
kecil
Marmer
Alam
340,800.0
51 Citatah m2
0
Ukuran
Besar
Marmer
Alam
237,600.0
52 Citatah m2
0
Ukuran
Kecil
Marmer 157,900.0
53 m2
Sintetis 0
Granito
Tile
358,100.0
54 Essenza m2
0
60 x 60
Polis
Granito
Tile
231,800.0
55 Essenza m2
0
60 x 60
UnPolis
Batu
56 Tempel m2 96,500.00
Hitam

Bata
57 bh 600.00
Karawang

Campuran
untuk
58 ltr 37,600.00
Kedap Air
( AM )
Plint
59 keramik bh 3,000.00
10 x 20
Plint
60 keramik bh 3,250.00
10 x 25
Plint
61 keramik bh 3,500.00
10 x 30
Plint
62 keramik bh 4,000.00
10 x 40
Plint
63 keramik bh 4,500.00
15 x 30
Plint
64 keramik bh 5,250.00
15 x 40
Plint
65 granito 10 bh 25,900.00
x 30
Plint
66 granito 10 bh 27,600.00
x 40
Plint
67 granito 15 bh 31,100.00
x 30
Plint
68 granito 15 bh 41,300.00
x 40

BAHAN
SALURAN
G AIR
KOTOR /
BERSIH
Grafel U
1 m1 44,300.00
20 cm'
Grafel U
2 m1 56,400.00
30 cm'
Grafel U
3 m1 74,200.00
40 cm'
Buis
Beton 20
4 m1 49,200.00
cm ( 1
M' )
Buis
Beton 30
5 m1 61,700.00
cm ( 1
M' )
Buis
Beton 40
6 m1 80,900.00
cm ( 1
M' )
Buis
Beton 50
7 stk 94,300.00
cm ( 1
M' )
Buis
Beton 60 130,900.0
8 stk
cm ( 1 0
M' )
Buis
Beton 100 299,800.0
9 stk
cm ( 0.50 0
M' )
Buis
Beton 80 298,500.0
10 stk
cm ( 0.50 0
M' )
BuisTanah
11 10 cm stk 9,600.00
( 0.50 M' )
BuisTanah
12 15 cm stk 12,700.00
( 0.50 M' )
BuisTanah
13 20 cm stk 16,800.00
( 0.50 M' )
BuisTanah
14 25 cm stk 22,800.00
( 0.50 M' )

15 Injuk kg 17,400.00

BAHAN
LOGAM
H DAN
BAHAN
JADINYA
Besi
Beton U-
1 kg 16,500.00
24 Rata-
rata
Besi
Beton U-
2 kg 20,700.00
39 / U-32
Rata-rata

Pagar BRC
lengkap
171,300.0
3 tiang m2
0
( Tanpa
Pondasi )

185,000.0
4 Bondek m2
0
Besi WF
5 kg 24,000.00
Ex DN SII
Besi WF
6 kg 23,900.00
Ex Jepang

Besi Profil
7 kg 18,300.00
DN SII

Besi Profil
8 kg 21,600.00
Ex LN

Besi C Lip
9 kg 19,200.00
Chanel
Ongkos
10 Galfanis kg 10,600.00
Besi
Kawat
11 kg 27,700.00
Beton
Kawat
12 kg 63,500.00
Duri
Kawat
13 m1 1,000.00
Pengikat
Kawat
14 Bronjong kg 28,200.00
4 mm
Kawat
15 kg 41,400.00
Tembaga
Ram
16 Nyamuk m2 13,400.00
Hijau
Ram
17 Kawat 1 x m2 15,300.00
1 cm
Ram
18 m2 14,900.00
Ayam
Kawat
19 Kasa 1 x 1 m2 32,100.00
( Putih )
Kawat
20 Harmonik m2 35,900.00
a 4 cm
Kawat
21 Harmonik m2 28,600.00
a 2 cm
Kawat Las
22 kg 23,600.00
Listrik
Wiremesh
23 m2 51,900.00
M8
Wiremesh
24 m2 38,700.00
M6

25 Timah kg 46,300.00

Timah
26 kg 43,300.00
Hitam
Ram
nyamuk
27 m2 32,400.00
Alumuniu
m
Plat Srip
2 x 30
28 bt 33,000.00
mm ( 6
m1 )
Plat Srip
3 x 30
29 bt 33,100.00
mm ( 6
m1 )

30 Plat Strip bt 18,200.00

31 Besi Strip kg 26,800.00

Plat
32 Alumuniu m2 89,800.00
m 0.2 mm

Plat
110,500.0
33 Alumuniu m2
0
m 0.3 mm

Plat
141,400.0
34 Alumuniu m2
0
m 0.4 mm
Plat
143,100.0
35 Alumuniu m2
0
m 0.5 mm

Plat
171,800.0
36 Alumuniu m2
0
m 0.6 mm

Plat
37 Alumuniu m2 56,300.00
m 0.1 mm

Kusen
Alumuniu
m Natural 151,100.0
38 m1
1.3 mm 0
t= 1,3
mm ( 4 " )

Kusen
Alumuniu
m Warna 163,000.0
39 m1
1.3 mm 0
t= 1,3
mm ( 4 " )

Kusen
Alumuniu
m Natural
40 m1 81,000.00
1.3 mm
t= 1,3
mm ( 3 " )

Kusen
Alumuniu
m Warna 102,000.0
41 m1
1.3 mm 0
t= 1,3
mm ( 3 " )

Daun
Jendela
Alumuniu
m Natural
42 m2 98,800.00
( tanpa
kaca dan
accessorie
s)
Daun
Jendela
Alumuniu
m Warna ( 148,800.0
43 m2
tanpa 0
kaca dan
accessorie
s)

Daun
Pintu
Alumuniu
m Natural 211,800.0
44 m2
( tanpa 0
kaca dan
accessorie
s)

Daun
Pintu
Alumuniu
m Warna ( 207,500.0
45 m2
tanpa 0
kaca dan
accessorie
s)

Handle
Alumuniu
m
345,200.0
46 ( Tarikan bh
0
Pintu
Alumuniu
m)

Kait Angin
104,500.0
47 Alumuniu ps
0
m

Karet
Asisoris
Kusen /
48 m1 7,500.00
Pintu
Alumuniu
m
Jalusi
49 Alluminiu m' 35,000.00
m
Sunscreen 380,200.0
50 m2
Almunium 0

Seng Plat
BJLS 30 1,581,500
51 roll
60 cm .00
( 100 m1 )
Seng Plat
BJLS 30 2,080,100
52 roll
90 cm .00
( 100 m1 )
Plat Besi
53 Tipis 1 kg 16,800.00
mm
Plat Besi
54 Tipis 0.5 kg 17,700.00
mm
Plat Besi 2
55 mm s/d 5 kg 14,100.00
mm
Plat Besi 6
56 mms/d 10 kg 14,100.00
mm
Plat Besi
57 10 mm kg 14,700.00
keatas
Kabel
58 presstress kg 26,700.00
ed polos
Jaring
59 Kawat kg 28,900.00
Baja
Lem
60 Kuning kg 35,700.00
( Aibond )

61 Lem Fox kg 23,900.00

62 Lem Vinyl kg 44,000.00

Besi Strip
63 kg 11,000.00
Kaca Nako

Profil
64 alumuniu m1 12,200.00
m "T"
Besi
Hallow ( 2
65 x 4 x 4) btg 22,600.00
cm
(400cm)
Besi
Hallow ( 4
66 btg 29,200.00
x 4) cm
(400 cm)
Besi Rail
459,300.0
67 Pengama kg
0
nan
Jendela 390,200.0
68 m2
Besi 0
Jendela
501,700.0
69 Besi m2
0
tahan api
Pintu
501,700.0
70 gulung m2
0
besi
Pintu
306,600.0
71 Roliing m2
0
Door

Jendela
nako kaca
170,000.0
72 ryben + set
0
tralis 6
klips

Jendela
nako kaca
200,000.0
73 ryben + set
0
tralis 7
klips

Jendela
nako kaca
230,000.0
74 ryben + set
0
tralis 8
klips

Jendela
nako kaca
290,000.0
75 ryben + set
0
tralis 10
klips
Jendela
nako kaca
120,000.0
76 bening + set
0
tralis 4
klips

Jendela
nako kaca
140,000.0
77 bening + set
0
tralis 5
klips

Jendela
nako kaca
170,000.0
78 bening + set
0
tralis 6
klips

Jendela
nako kaca
210,000.0
79 bening + set
0
tralis 7
klips

Jendela
nako kaca
230,000.0
80 bening + set
0
tralis 8
klips

Jendela
nako kaca
300,000.0
81 bening + set
0
tralis 10
klips

BAHAN
I
KACA
Kaca
Polos 2
1 m2 69,000.00
mm
( ASAHI )
Kaca
Polos 3
2 m2 87,400.00
mm
( ASAHI )
Kaca
Polos 5 111,000.0
3 m2
mm 0
( ASAHI )
Kaca
Polos 8 183,100.0
4 m2
mm 0
( ASAHI )
Kaca
Rayband 148,700.0
5 m2
5 mm 0
( ASAHI )
Kaca
Rayband 323,400.0
6 m2
8 mm 0
( ASAHI )
Kaca
Rayband 627,000.0
7 m2
12 mm 0
( ASAHI )
Kaca
150,500.0
8 cermin 5 m2
0
mm
Kaca
186,400.0
9 cermin 6 m2
0
mm
Kaca
234,300.0
10 cermin 8 m2
0
mm

Kaca Patri
Lokal 1,621,100
11 m2
Terpasang .00
( ASAHI )

Kaca Patri
Ex Luar 3,425,700
12 m2
Negeri .00
Terpasang

Kaca 6
1,263,900
13 mm m2
.00
Gravver
Glass
Block DN
14 20 x 20 bh 22,000.00
( Kedawun
g)
Glass
Block DN 125,700.0
15 bh
20 x 20 0
Ex LN
211,800.0
16 Sealant kg
0
Jendela 109,200.0
17 bh
Nako 0

BAHAN
PAKU DAN
J
MUR
BAUT

Paku 1/2"
1 kg 23,800.00
s/d 2"
Paku 2"
2 kg 23,400.00
s/d 5"

Paku 8 cm
3 kg 20,000.00
s/d 15 cm

Paku
Beton 2
4 bh 1,600.00
cm s/d 5
cm
Paku Kait
5 bh 900.00
Lengkap
Paku
6 kg 57,100.00
Cacing
Besi
Beugel
7 kg 21,700.00
Kuda -
Kuda
Duk
8 bh 7,500.00
Angker
Angker
Mur Baut
9 dia. 19 / bh 71,800.00
Panjang
60 cm
Mur Baut
HTB dia.
10 bh 15,900.00
19 s/d 16
( 5 cm )
Mur Baut
Biasa dia.
11 bh 9,300.00
19 s/d 16
( 5 cm )
Piser
12 dia.12 s/d bh 5,300.00
20 cm
Paku
13 bh 800.00
skrup 3"
Ramset /
14 bh 7,200.00
Dinabolt
Baut
15 bh 600.00
Besar

16 Baut Kecil bh 300.00

17 Paku GRC kg 35,000.00

Paku
18 kg 17,500.00
gypsum
Sekrup
19 bh 250.00
fixer

BAHAN
K PERPIPAA
N
Besi Pipa
Untuk 166,700.0
1 bt
Hydrant 0
BSP 1"
Besi Pipa
Untuk 210,200.0
2 bt
Hydrant 0
BSP 1.25"
Besi Pipa
Untuk 298,000.0
3 bt
Hydrant 0
BSP 1.5"
Besi Pipa
Untuk 351,800.0
4 bt
Hydrant 0
BSP 2"
Besi Pipa
Untuk 439,300.0
5 bt
Hydrant 0
BSP 2.5"
Besi Pipa
Untuk 595,000.0
6 bt
Hydrant 0
BSP 3"
Besi Pipa
Untuk 869,600.0
7 bt
Hydrant 0
BSP 4"
Besi Pipa
Untuk 1,423,400
8 bt
Hydrant .00
BSP 6"
Besi Pipa
172,300.0
9 Hitam 1" t bt
0
= 2 mm
Besi Pipa
227,900.0
10 Hitam 2" t bt
0
= 2 mm
Besi Pipa
365,800.0
11 Hitam 3" t bt
0
= 2mm
Besi Pipa
573,100.0
12 Hitam 4" t bt
0
= 2 mm
Besi Pipa
772,400.0
13 Hitam 6" t bt
0
= 2 mm
Pipa GIP
Medium A 109,100.0
14 bt
1/2" ( 6 0
m1 )
Pipa GIP
Medium A 159,400.0
15 bt
3/4" ( 6 0
m1 )
Pipa GIP
Medium A 181,500.0
16 bt
1" ( 6 0
m1 )
Pipa GIP
Medium A 259,300.0
17 bt
1 1/4" ( 6 0
m1 )
Pipa GIP
Medium A 280,500.0
18 bt
1 1/2" ( 6 0
m1 )
Pipa GIP
Medium A 326,400.0
19 bt
1 3/4" ( 6 0
m1 )
Pipa GIP
Medium A 467,400.0
20 bt
2" ( 6 0
m1 )
Pipa GIP
Medium A 672,100.0
21 bt
2 1/2" ( 6 0
m1 )
Pipa GIP
Medium A 849,900.0
22 bt
3" ( 6 0
m1 )
Pipa GIP
Medium A 920,300.0
23 bt
4" ( 6 0
m1 )
Macam2
Sambung
24 bh 6,300.00
an GIP
1/2"
Macam2
Sambung
25 bh 8,600.00
an GIP
3/4"
Macam2
26 Sambung bh 16,700.00
an GIP 1"
Macam2
Sambung
27 bh 19,800.00
an GIP 1
1/4"
Macam2
Sambung
28 bh 20,700.00
an GIP 1
1/2"
Macam2
Sambung
29 bh 22,700.00
an GIP 1
3/4"
Macam2
30 Sambung bh 51,200.00
an GIP 2"
Macam2
Sambung
31 bh 60,400.00
an GIP 2
1/2"
Macam2
32 Sambung bh 75,900.00
an GIP 3"
Macam2
118,600.0
33 Sambung bh
0
an GIP 4"
Pipa PVC
RUCIKA
34 bt 40,100.00
type AW
1/2"
Pipa PVC
RUCIKA
35 bt 52,200.00
type AW
3/4"
Pipa PVC
RUCIKA
36 bt 63,200.00
type AW
1"
Pipa PVC
RUCIKA
37 bt 79,900.00
type AW 1
1/4"
Pipa PVC
RUCIKA 105,900.0
38 bt
type AW 1 0
1/2"
Pipa PVC
RUCIKA 110,700.0
39 bt
type AW 0
2"
Pipa PVC
RUCIKA 167,100.0
40 bt
type AW 2 0
1/2"
Pipa PVC
RUCIKA 205,100.0
41 bt
type AW 0
3"
Pipa PVC
RUCIKA 347,900.0
42 bt
type AW 0
4"
Pipa PVC
RUCIKA 640,000.0
43 bt
type AW 0
6"
Pipa PVC
RUCIKA 818,300.0
44 bt
type AW 0
8"
Pipa PVC
MASPION
45 ABU bt 22,500.00
( AW )
1/2"
Pipa PVC
MASPION
46 ABU bt 27,800.00
( AW )
3/4"
Pipa PVC
MASPION
47 bt 40,500.00
ABU
( AW ) 1"
Pipa PVC
MASPION
48 ABU bt 58,500.00
( AW ) 1
1/4"
Pipa PVC
MASPION
49 ABU bt 60,200.00
( AW ) 1
1/2"
Pipa PVC
MASPION
50 bt 75,800.00
ABU
( AW ) 2"
Pipa PVC
MASPION
126,300.0
51 ABU bt
0
( AW ) 2
1/2"
Pipa PVC
MASPION 145,700.0
52 bt
ABU 0
( AW ) 3"
Pipa PVC
MASPION 256,800.0
53 bt
ABU 0
( AW ) 4"

Macam2
Sambung
54 bh 4,400.00
an Paralon
1/2"

Macam2
Sambung
55 bh 4,700.00
an Paralon
3/4"

Macam2
Sambung
56 bh 4,900.00
an Paralon
1"

Macam2
Sambung
57 bh 7,200.00
an Paralon
1 1/4"

Macam2
Sambung
58 bh 9,500.00
an Paralon
1 1/2"

Macam2
Sambung
59 bh 13,500.00
an Paralon
1 3/4"

Macam2
Sambung
60 bh 15,800.00
an Paralon
2"

Macam2
Sambung
61 bh 26,400.00
an Paralon
2 1/2"
Macam2
Sambung
62 bh 29,700.00
an Paralon
3"

Macam2
Sambung
63 bh 34,000.00
an Paralon
4"

Sambung
an Pipa
64 bh 89,900.00
PVC Jenis
AW 4" TY
Lem
65 tb 10,100.00
Paralon
Solatip
66 gl 4,200.00
Ledeng

Pipa PVC
4"
67 m1 36,700.00
Berlobang
Jenis AW

PVC
68 Waterstop m1 53,500.00
lebar 150

PVC
69 Waterstop m1 57,900.00
lebar 200

PVC
70 Waterstop m1 65,700.00
lebar 230

PVC
71 Waterstop m1 74,700.00
lebar 250

PVC
72 Waterstop m1 83,600.00
lebar 300

PVC
73 Waterstop m1 92,500.00
lebar 320
BAHAN
L
SANITAIR
Stop Kran 103,900.0
1 bh
3/4" KIT 0
Stop Kran 124,200.0
2 bh
1" KIT 0

Stop Kran 208,000.0


3 bh
1 1/2" KIT 0

Stop Kran 267,900.0


4 bh
2" KIT 0

Stop Kran 713,200.0


5 bh
2 1/2" KIT 0

Stop Kran 830,300.0


6 bh
3" KIT 0

Check
7 bh 86,400.00
Valve 1/2"

Double
8 Neple bh 32,400.00
1/2"
Water Mur
9 bh 40,200.00
1/2"
Gate
10 walve bh 55,500.00
1/2"
Saringan
Air Lt. KM
11 bh 66,600.00
Stainless
Steel

Apooer 267,800.0
12 bh
Bath Tube 0

Kran
13 Stainless bh 46,100.00
Lokal Kait
Shower
221,000.0
14 Dengan bh
0
Tiang
Shower
134,800.0
15 Tanpa bh
0
Tiang
Kran
Tembok
16 bh 86,900.00
Sun Eui
dia. 1/2"
Kran
Tembok
17 bh 40,900.00
ITAP dia.
1/2"
Kran
Bebek 144,600.0
18 bh
Sun Eui 0
1/2"
Kran
19 Bebek bh 51,500.00
ITAP 1/2"
Kran
Panas
228,400.0
20 Dingin bh
0
San Eui
Standard

Bath Cape
2,098,700
21 Washtere unit
.00
n

Tempat
22 Sabun bh 46,300.00
Poslin
Wastafel
Lengkap 1,012,700
23 unit
TOTO LW .00
230
Wastafel
699,900.0
24 Lengkap unit
0
INA
Closet
Jongkok
205,600.0
25 Poslin unit
0
Warna
TOTO
Closet
Jongkok
Standard 188,200.0
26 unit
Putih 0
Poslin
TOTO
Closet
Jongkok
2,032,900
27 Lengkap unit
.00
Sistem Jet
TOTO
Closet
Duduk
Warna
1,724,700
28 Standard unit
.00
TOTO C
240
Lengkap
Wastafel
Bulat
910,800.0
29 Warna unit
0
Standard
Lengkap
Closet
Duduk
Warna 1,272,100
30 bh
Standard .00
INA
Lengkap
Urinoir
Lengkap
TOTO 1,773,400
31 unit
Warna .00
Standard
Lengkap
Penyekat
Poslin 495,900.0
32 lbr
Urinoar 0
TOTO
Kitchen
Zink
Stainless 397,800.0
33 bh
Standard 0
Lokal ( 1
Lubang )

Kitchen
Zink
Stainless
1,272,300
34 Non bh
.00
Standard
Franke ( 1
Lubang )
Kitchen
Zink
Stainless
1,650,200
35 Non bh
.00
Standard
Franke ( 2
Lubang )
Talang
36 PVC U - btng 60,000.00
15 cm

BAHAN
M PENUTUP
ATAP
Atap
Plastik
1 Gelomban lbr 33,100.00
g 80 x
180

Atap Fiber
Glass
Tipis 80 x
2 lbr 47,100.00
180
( Gelomba
ng )

Atap Fiber
Glass
Tebal 80 x 100,000.0
3 lbr
180 0
( Gelomba
ng )

Atap
Alumuniu
140,600.0
4 m Natural m2
0
USR 26
( JAINDO )

Atap
Alumuniu
164,700.0
5 m Warna m2
0
USR 26
( JAINDO )
Atap
Asbes
6 Gel. Kecil lbr 77,200.00
80 x 180
x 4 mm

Atap
Asbes
111,100.0
7 Gel. Besar lbr
0
80 x 180
x 5 mm

Atap Seng
Gelomban
8 g 80 cm x lbr 62,900.00
180 cm x
3 mm

Atap Seng
Gelomban
9 g 80 cm x lbr 83,100.00
180 cm x
5 mm

Atap Seng
Gelomban
10 g 270 cm lbr 73,300.00
x 105 cm
x 4mm

Atap Seng
Gelomban
11 g 240 cm lbr 65,900.00
x 105 cm
x 4mm

Atap Seng
Gelomban
12 g 210 cm lbr 58,500.00
x 105 cm
x 4mm
Atap Seng
Gelomban
13 g 150 cm lbr 42,300.00
x 105 cm
x 4mm

Atap Seng
Gelomban
14 g 150 cm lbr 78,500.00
x 102 cm
x 5mm

Atap Seng
Gelomban
15 g 180 cm lbr 97,200.00
x 102 cm
x 5mm

Atap
Asbes
Gelomban
16 lbr 80,000.00
g 300 cm
x 105 cm
x 4 mm

Atap
Tegola 487,100.0
17 m2
Kubota, 0
lengkap
Atap
Tegola 283,600.0
18 m2
Kwalitas 0
Sedang
Alumuniu
19 m2 19,600.00
m Foile
Atap
Genteng
Plentong
20 bh 1,900.00
pres
Bakar KW
I
Atap
Genteng
Plentong
21 bh 2,700.00
pres
Molen
Oven KW I

Atap
Genteng
Flam pres
22 bh 2,300.00
Molen
Oven
Jatiwangi
Bubung
Genteng
23 pres Bulat bh 7,500.00
Ex
Jatiwangi
Genteng
Bubungan
24 Ex bh 4,800.00
Jatiwangi
Segi Tiga
Genteng
25 Bubungan bh 10,500.00
Beton
Genteng
Metal 203,100.0
26 m2
( Rainbow 0
Roof )
Genteng
172,700.0
27 Metal m2
0
Hana
Nok Atas
Metal 138,500.0
28 lbr
( Rainbow 0
Roof )
Nok Atas
29 Metal lbr 80,900.00
Hana

Nok Pingir
Metal 105,300.0
30 lbr
( Rainbow 0
Roof )
Nok Pingir
100,800.0
31 Metal lbr
0
Hana

Wall
Flasing
32 lbr 83,900.00
( Rainbow
Roof )
Wall
33 Flasing lbr 88,700.00
Hana
Atap
Genteng
34 Beton m2 96,700.00
Warna
14.5/m2
Genteng
35 Beton bh 8,500.00
Natural
Sirap
36 Kelas I m2 26,400.00
( 80 / m2 )
Genteng
Keramik
112,400.0
37 Natural m2
0
Intan 14.5
/ m2
Genteng
Keramik
142,200.0
38 Glasur m2
0
Standard
14.5 /m2
Genteng
Keramik
139,300.0
39 Glasur m2
0
Special
14.5 /m2
Genteng
Keramik
145,100.0
40 Glasur m2
0
Premium
14.5 /m2
Genteng
Murando
41 Natural bh 2,700.00
1m2 = 18
bh
Genteng
Murando
42 Glasur bh 4,000.00
1m2 = 18
bh
Bubung
43 Murando bh 7,500.00
Natural
Bubung
44 Murando bh 10,700.00
Glasur

Bubungan
45 Genteng bh 10,000.00
Keramik

Atap
46 Genteng bh 3,000.00
Kodok

Bubungan
47 Genteng bh 4,500.00
Kodok

Bubungan
48 Genteng bh 6,000.00
Plentong

Bubungan
Stel
49 bh 7,500.00
Gelomban
g
Nok Stel
50 Gelomban lbr 38,100.00
g
Nok Atap
51 lbr 37,500.00
Seng
Nok
standar
52 m2 75,000.00
40 cm 18,
SWG 22
Pelat
Asbes
53 lbr 21,000.00
tebal 4
mm
Pelat
Asbes
54 lbr 16,400.00
tebal 3.5
mm
Trusses
ZAM-75
55 t=0.8 m1 34,500.00
Rangka
Utama
Trusses
ZAM-75
56 t=0.5 m1 22,000.00
Rangka
Utama
Reng 16-
DB Roof
57 Battens m1 11,000.00
t=0.48
mm
Foot Plate
58 t= 1.22 m1 7,200.00
mm
PLD -
59 Diafragma bh 2,200.00
Plate
WIND
60 m1 1,700.00
Bracing

Tensioner
( Pengaku
61 bh 7,200.00
Tali
angin )

BAHAN
N MEKANIKA
L
Jockey
Pump kap.
80
71,396,40
1 gln/menit unit
0.00
100 m1
( 18.6
kW )
Electrical
Pump kap.
750 216,358,9
2 unit
gln/menit 00.00
120 m1
( 90 kW )
Diesel
Pump kap.
750 591,647,1
3 unit
gln/menit 00.00
120 m1
( 105 kW )
Presure
Tank kap. 36,997,30
4 unit
500 liter 0.00
lengkap
Hydran
Box dlm
6,854,400
5 Gedung unit
.00
( Lengkap
)
Fire House
4,866,100
6 1.5 x 30 unit
.00
m + nose

Exhose
Fan H 360 6,862,900
7 unit
W 60 x 60 .00
cm

Exhose
Fan H 380 5,491,100
8 unit
W CFM 55 .00
x 55 cm

Exhose
Fan H 100 1,092,600
9 unit
W 40 x 40 .00
cm
AC Split 3
30,791,80
10 PK Setara unit
0.00
TOSHIBA
AC Split 2
21,926,50
11 PK Setara unit
0.00
TOSHIBA
AC Split 1
5,174,100
12 PK Setara unit
.00
TOSHIBA
Mesin AC
Split
DAIKIN 4,200,000
13 1 BTU
( Indoor / .00
Outdoor
Unit )
BAHAN
O ELEKTRIK
AL
Kabel NYA
1 x 1.5
102,700.0
1 Prima ( 1 ROLL
0
rol = 50
m' )
Kabel NYA
1 x 2.5
151,700.0
2 Prima ( 1 ROLL
0
rol = 50
m' )
Kabel
NYM 2 x
3 1.5 Prima m' 6,600.00
( 1 rol =
50 m' )
Kabel
NYM 3 x
4 1.5 Prima m' 7,600.00
( 1 rol =
50 m' )
Kabel
NYM 2 x
5 2.5 Prima m' 4,900.00
( 1 rol =
50 m' )
Kabel
NYM 3 x
6 2.5 Prima m' 10,900.00
( 1 rol =
50 m' )
Kabel
NYM 4 x
7 2.5 Prima m' 7,600.00
( 1 rol =
50 m' )
Kabel
NYM 2 x 4
8 Prima ( 1 m' 6,300.00
rol = 50
m' )
Kabel
NYM 3 x 4
9 Prima ( 1 m' 15,400.00
rol = 50
m' )
Kabel
NYM 4 x 4
10 Prima ( 1 m' 20,700.00
rol = 50
m' )

Kabel
NYM 2 x 6
11 Supreme ( m' 11,800.00
1 rol = 50
m' )

Kabel
NYM 3 x 6
12 Supreme ( m' 13,700.00
1 rol = 50
m' )

Kabel
NYM 4 x 6
13 Supreme ( m' 18,600.00
1 rol = 50
m' )

Kabel
NYM 2 x
10
14 m' 17,600.00
Supreme (
1 rol = 50
m' )
Kabel
NYM 3 x
10 119,700.0
15 m'
Supreme ( 0
1 rol = 50
m' )
Kabel
NYM 4 x
10
16 m' 26,500.00
Supreme (
1 rol = 50
m' )
Kabel
NYM 4 x
16
17 m' 29,700.00
Supreme (
1 rol = 50
m' )
Kabel NYY
2x4
18 Supreme ( m' 12,000.00
1 rol = 50
m' )
Kabel NYY
3x4
19 Supreme ( m' 19,300.00
1 rol = 50
m' )
Kabel NYY
4x4
20 Supreme ( m' 23,800.00
1 rol = 50
m' )
Kabel NYY
2x6
21 Supreme ( m' 14,500.00
1 rol = 50
m' )
Kabel NYY
3x6
22 Supreme ( m' 19,200.00
1 rol = 50
m' )
Kabel NYY
4x6
23 Supreme ( m' 18,500.00
1 rol = 50
m' )

Kabel NYY
2 x 10
24 Supreme ( m' 20,400.00
1 rol = 50
m' )
Kabel NYY
3 x 10
25 Supreme ( m' 25,800.00
1 rol = 50
m' )

Kabel NYY
4 x 10
26 Supreme ( m' 35,500.00
1 rol = 50
m' )

Kabel NYY
4 x 16
27 Supreme ( m' 41,900.00
1 rol = 50
m' )

NSFB FUJI 841,900.0


28 bh
EA - 100 A 0

NSFB FUJI 2,182,600


29 bh
EA - 150 A .00

Rumah
Panel 30 x 153,500.0
30 unt
60 cm 0
( Kosong )

Skring Kas
204,800.0
31 2 grop unt
0
Biasa

Skring Kas
222,600.0
32 3 grop unt
0
Biasa

Skring Kas
468,800.0
33 5 grop unt
0
Biasa

MCB 1
34 bh 55,100.00
PAS
MCB 3 106,000.0
35 bh
PAS 0
Tahanan
521,100.0
36 50 A Merk bh
0
Fuji
Saklar
Broko
37 Tunggal bh 23,800.00
Standard (
1 Phase )

Saklar
Broko Seri
38 bh 26,300.00
Standard (
1 Phase )

Stop
Kontak
39 Broko bh 23,800.00
Standard (
1 Phase )

Stop
Kontak
40 Broko 3 bh 87,700.00
Phase
(Out Bow)

Stop
Kontak
144,900.0
41 Broko 3 bh
0
Phase ( In
Bow)
Stop
Kontak
42 bh 87,800.00
Handle 3
Phase
Instalas
Titik
Lampu /
179,600.0
43 Stop ttk
0
Kontak
(Upah dan
Alat)
Lampu
pijar 25
44 bh 61,200.00
Watt s/d
100 Watt
Lampu
Neon
45 bh 29,700.00
Phillips 20
Watt
Lampu
Neon
46 bh 35,200.00
Phillips 40
Watt
Trapo TL
47 20 W bh 41,800.00
(Phillips)
Trapo TL
48 40 W bh 37,900.00
(Phillips)
Trapo TL
49 20 W bh 40,600.00
(Sinar)
Trapo TL
50 40 W bh 41,300.00
(sinar)
Stater
51 Neon bh 8,300.00
Phillips
Stater
52 Neon bh 6,500.00
Biasa

Rumah TL
In Bow /
Out Bow 2 144,000.0
53 bh
x 20 W 0
(kosongan
)

Down
306,900.0
54 Light + SL bh
0
25 W
Lampu SL
306,900.0
55 Philip 25 bh
0
W
Lampu
Sirkel TL
56 bh 67,900.00
20 W
Lengkap
Lampu
147,400.0
57 Mercuri bh
0
80 W
Lampu
Taman +
307,600.0
58 Tiang + bh
0
Lampu 1
Buah
Lampu
Baret 30 221,700.0
59 bh
cm + 0
Neon
Lampu
Neon
738,000.0
60 Arcrilik 2 bh
0
x 40 W
Lengkap
Jarum
101,500.0
61 Penangkal bh
0
Petir 16

Kawat BC
62 ( Tembaga kg 65,100.00
)

Pentanah
an 423,700.0
63 ttk
Penangkal 0
Petir
Pentanah 296,100.0
64 ttk
an Panel 0

BAHAN
ALAT
P PENGANT
UNG DAN
KUNCI

Kunci
Silinder
ALFA
410,900.0
1 untuk bh
0
Pintu
Alumuniu
m
Tarikan
Pintu 408,600.0
2 bh
Alumuniu 0
m
Kunci 2
126,500.0
3 Slaag bh
0
ROYAL

Rel
864,300.0
4 Henderso bh
0
n Lengkap

Rel
193,100.0
5 maraton I unt
0
Pintu
Kunci 2
Slaag
Silinder
335,900.0
6 SEIS Asli bh
0
type 210
s/d type
226

Kunci 2
165,300.0
7 Slaag bh
0
Ancor Asli

Kunci 2 207,300.0
8 bh
Slaag ISO 0
Kunci KM
Bulat
9 bh 54,400.00
Kualitas
Biasa
Kunci kM
102,700.0
10 Bulat bh
0
ALFA
Kunci 2
Slaag
586,600.0
11 Silinder bh
0
Utama
Standard
Kunci
12 Gembok bh 85,200.00
Besar
Kunci 2
Slaag
13 bh 94,500.00
Kuda
Terbang
Kunci
14 bh 46,800.00
Lemari
Espangole
15 ps 51,600.00
t
Grendel
16 bh 49,800.00
15 cm
Grendel 5
17 bh 5,500.00
cm

Hak Angin
Kait
18 ps 7,100.00
Jendela
Biasa

Hak Angin
19 Jendela ps 29,000.00
Antik

Hak Angin
Sendok
20 bh 32,200.00
Stainless /
Kuningan

Sloot
Pintu
21 bh 31,500.00
Berikut
Rantai
Sloot
22 Jendela bh 33,000.00
Tunggal
Engsel
Pintu
23 ps 21,000.00
Unilon
Standard
Engsel
24 Jendela ps 15,000.00
Unilon
Engsel
25 ps 13,700.00
Patrun
Engsel
26 Harmonik m1 9,100.00
a
Door
Closer
Kelas 420,000.0
27 unt
Standard ( 0
Kelas
Sedang )
Door
Closer
Kelas 597,500.0
28 unt
Standard ( 0
Kelas Baik
)
Door
Closer 200,000.0
29 unt
Kelas 0
Rendah
Door 205,400.0
30 unt
Holder 0
Door 255,500.0
31 unt
Stoper 0
Tarikan
32 Almari bh 19,500.00
Rata-rata

Seng BJLS
30 Lebar
33 m1 43,500.00
60 cm ( 1
rol 50 m' )

Seng BJLS
30 Lebar
34 m1 53,500.00
90 cm ( 1
rol 50 m' )

Seng BJLS
35 30 / 3 x lbr 86,900.00
0.3 mm

36 Seng Plat lbr 50,100.00

Waterstop
37 Lebar 200 m1 57,900.00
mm

BAHAN
PENGIKAT
Q UNTUK
KONSTRU
KSI JALAN

Aspal
1 kg 12,459.00
Bitumen
Aspal
2 kg 12,459.00
Emulsi
Aspal
3 kg 10,890.00
Curah
Aspal
Concrete / 1,348,300
4 ton
Laston( A .00
C -WC)
Aspal
Threated 1,200,200
5 ton
Base .00
( ATB )

Lataston /
Hot Rolls 1,666,900
6 ton
Sheet .00
( HRS )

BAHAN
PENGISAP
R AIR
SUMUR
DALAM
Pompa 172,600.0
1 unit
Kodok 0
Pompa
243,800.0
2 Dragon unit
0
Tegal
Pompa
718,500.0
3 Dragon unit
0
Asli
Mesin
Pompa Air 1,100,200
4 unit
100 W - .00
Sanyo
Mesin
Pompa Air 1,890,700
5 unit
150 W - .00
Sanyo
Pompa
Zet Pump 4,961,500
6 unit
250 W - .00
Sanyo
Pompa
Zet Pump 7,878,000
7 unit
450 W - .00
Sanyo
Pompa
Submersi
ble kap. 27,151,20
8 unit
150 liter / 0.00
menit 3
KW
Gear
Pump
15,702,70
9 Kap. 60 unit
0.00
liter /
menit

Deep Well
dengan
kelengkap
172,052,5
10 annya unit
00.00
kap. 150
liter /
menit

Hand Oil 5,195,300


11 unit
Pump .00

BAHAN
S PENAMPU
NG AIR
Tangki Air
Fiber
1,172,500
1 Glass 0.5 bh
.00
m3
( Excel )
Tangki Air
Fiber
1,316,400
2 Glass 1 bh
.00
m3
( Excel )
Tangki Air
Fiber
1,954,200
3 Glass 2 bh
.00
m3
( Excel )
Bak KM
255,300.0
4 Fiber 60 x bh
0
60

Bak
118,500.0
5 Taraso WC bh
0
40 x 40
Bak KM
161,100.0
6 Taraso 60 bh
0
x 60

ALAT
T
TUKANG
Palu 0.5
1 bh 39,300.00
kg

2 Cangkul bh 24,500.00

3 Singkup bh 41,400.00

4 Sekrop bh 50,100.00

5 Pengki bh 12,300.00

6 Linggis bh 41,700.00

Rool
Meter 30
101,000.0
7 meter bh
0
( Bahan
Plastik )
Rool
Meter 5
8 meter bh 37,800.00
( Bahan
Besi )
Selang
Plastik
untuk
9 m 1,600.00
Water Pas
dia. 0.5
cm

Water Pas
10 Alumuniu bh 88,200.00
m 60 cm

BAHAN
BAKAR
U
DAN
PELUMAS
Minyak
1 lt 18,000.00
Tanah
Kayu
Bakar dari 151,100.0
2 m3
Kayu 0
Karet
Bahan
3 Bakar lt 28,435.00
Residu
Minyak
4 lt 7,150.00
Solar
Bensin
5 lt 7,800.00
Premium
6 Plus Oil lt 3,300.00
Oil
7 Mesran 40 lt 55,000.00
SAE
Elpiji / 104,600.0
8 15 kg
botol 0
Asitilin / 15.1 kg
9 88,900.00
Botol btl
Angin
10 ( O2 ) / btl 66,400.00
botol

11 Karbit kg 19,400.00

Minyak
12 ltr 40,500.00
Bekisting

13 Rapidrant Gln 15,700.00

14 Soda Api kg 35,600.00


15 Sabun kg 2,400.00
Arang
16 kg 11,100.00
Kayu

17 Kawat Las bh 1,400.00

BAHAN
V
PAGAR
Panel
199,200.0
1 Beton lbr
0
Pracetak
Kolom
264,000.0
2 Beton btg
0
Pracetak
BIDANG
B. PERTAMA
NAN

1 Aglonema batang 50,000.00

Bambu
2 krisik/jepa batang 50,000.00
ng

3 Furadan kg 24,000.00

Kompos/p
4 upuk karung 25,000.00
kandang
M atoa (2
5 batang 40,000.00
m)
Palm
(botol,
ekor 100,000.0
6 batang
tupai, 0
putri, dll)
tinggi 2 m

7 Philo batang 75,000.00

Pohon
pelindung
(angsana,
8 mahoni, batang 25,000.00
kamboja
dll) tinggi
2m

Pohon
perdu
(kaca
piring,
9 batang 10,000.00
puring,
mawar,
melati,
dll)

Rumput
10 m2 15,000.00
gajah mini

harga sudah
termasuk PPN dan
keuntungan

Anda mungkin juga menyukai