TECHNOLOGY
INCOURSE ASSIGNMENT
Cohort
DF10A1ICT
Date of Submission
10th January 2011
Instructor
Ms. Nadeera Ahangama
Word Count
[3001 words]
DF10A1ICT AAPP007-3-2 System Analysis and Design
i
DF10A1ICT AAPP007-3-2 System Analysis and Design
WORKLOAD MATRIX
ii
DF10A1ICT AAPP007-3-2 System Analysis and Design
iii
DF10A1ICT AAPP007-3-2 System Analysis and Design
ACKNOWLEDGEMENTS
Firstly we would like to thank our lecturer Ms.Nadeera Ahangama for all the help
and guidance given to us while doing this assignment. Especially for bearing with us
during lectures and always willing to help us out at difficult times.
Also there are many individuals who have helped us in numerous ways directly and
indirectly so that we were able to complete this assignment.
We would also like to thank Mr.Fazmil Fyzer, Manager Programs at Insight Centre
for Education Development for all the help provided to us in this project.
APIIT Lanka for providing us with resources and the Tech Team at APIIT Lanka for
their assistance at required times.
And last but not least our friends, parents and the well-wishers without whose moral
support and encouragement, we would not have been able to do a good job.
Finally, if there are any shortcomings in this project, then we request to excuse us for
all those and accept this documentation.
Ahamed Nishadh
Deshan Ilangakoon
Tiffaniya Fernando
iv
DF10A1ICT AAPP007-3-2 System Analysis and Design
TABLE OF CONTENTS
ACKNOWLEDGEMENTS ........................................................................................ iv
v
DF10A1ICT AAPP007-3-2 System Analysis and Design
vi
DF10A1ICT AAPP007-3-2 System Analysis and Design
BIBLIOGRAPHY .......................................................................................................41
APPENDIX .................................................................................................................42
vii
DF10A1ICT AAPP007-3-2 System Analysis and Design
viii
DF10A1ICT AAPP007-3-2 System Analysis and Design
TABLE OF FIGURES
ix
DF10A1ICT AAPP007-3-2 System Analysis and Design
x
DF10A1ICT AAPP007-3-2 System Analysis and Design
This system basically will ease the process of allocating counselors to those who
request for and also store that information digitally for future reference and storage
purpose.
1
DF10A1ICT AAPP007-3-2 System Analysis and Design
The organization is primarily funded by donors. Insight now also has its own
education institute called the Insight Institute for Management and Technology
located in Colombo 3 and also has a technical training campus called the Mawanella
Instute of Technical Training located in Mawanella, Sri Lanka.
Insight currently also provides counseling services for members of the public. This is
done free of charge as a community service and counseling is given in various
different areas from education to general affairs. Counselors who have volunteered
to sign up with this project are used for in this process in addition to those counselors
who have been paid and employed by Insight for specialized counseling. (Fazmil,
2010)
2
DF10A1ICT AAPP007-3-2 System Analysis and Design
The system that we have been assigned by the client to design is a Counselor
Allocation System. This is a system where a client is allocated a counselor according
to his needs and requirements who will guide the client in that specific area. After
the meeting, the counselor will provide feedback on that meeting and depending on
the feedback necessary action will be taken by the manager.
One of the files that are maintained is the students file. This file contains all the
application forms that were filled and submitted by the students themselves. Through
this application form all necessary information needed by the administrator is taken.
Then the administrator analyzes the application manually and identifies the
requirements of the student. After which the administrator goes to the other file
which contains details of all counselors signed up with Insight and then matches the
requirements of the clients with their area of expertise of the counselor and then files
another sheet of paper in a third file which contains meeting information. Then the
meeting is set up and informed to both parties by the manager.
After the meeting has taken place, the counselor provides a feedback on the meeting
which is then appended to the meeting information file and then according to the
feedback received, the manager can take necessary action.
3
DF10A1ICT AAPP007-3-2 System Analysis and Design
2. Data Duplication the data entered may get duplicated due to simple human
error to identify existing data. This may lead to the same data being stored
more than once in the same location or in different locations.
3. Wastage of Resources resources such as storage may be wasted when all
the paperwork is stored. Also more staff may be required to handle all the
paper work while fewer staff can handle the same job in a computerized
system. Also liquid resources such as money get wasted as investment has to
be made for the security of the data, the storage etc.
4. Human Errors human errors may happen in a manual system during the
process where a client may enter details which may accidentally not get
processed etc. In an automated system this can be eliminated as the client
details are entered once and can be retrieved at will to check.
5. Time Wastage Time wastage can occur. Where a job can be done within a
minute in an automated system, it may take around 10-15 minutes on a
manual system as all details have to be manually be entered or retrieved.
6. Tracking in the current system, the staff find it difficult to keep track of the
proceedings and there is a lot of paperwork that is available and they usually
get lost or forget about certain students when they are working on another
student which they find it very frustrating.
4
DF10A1ICT AAPP007-3-2 System Analysis and Design
We have chosen to use the System Development Life Cycle (SDLC) methodology
for the development of our system. This is one of the widely used methodologies for
system development.
It is a systematic method.
Easy to understand and follow.
All the members in our team knew this methodology very well.
Widely used by many who develop systems.
(Ahangama, 2010)
5
DF10A1ICT AAPP007-3-2 System Analysis and Design
Fact finding is the process of finding facts about the system and how it works by the
system analyst before the system is designed or developed. There are various
methodologies that can be used for fact finding. They are
(Ahangama, 2010)
6
DF10A1ICT AAPP007-3-2 System Analysis and Design
The System that we will be developing for the client, Insight Centre for Education
Development, is system that will help them maintain their student counselors with
efficiency and accuracy.
Currently they use a manual method to keep record of the counselors and their
clients. The way the system manages the clients is by firstly getting the information
from the user and then this information is manually given to the management to
assign a counselor for the client. This system is a very slow and tedious process and
requires a lot of man power to handle and maintain all the information.
The proposed solution that we have come up with, after conducting the study is that
the we would develop a system would allow the people at Insight to easily enter
information and to store and used the information without the worry of losing data in
the process of transferring it from one location to another manually.
The system will be developed using Microsoft Office Access. This is to ensure that
while the system remains simple and easy to work on it will give the user the
greatest result.
6.1.2 PRACTICALITY
The practicality of this project was the first area that we looked into as a group when
we went to meet the client. We had to ensure that given the constraints like time we
had to ensure that we would be able to do the project successfully and without any
problems arising towards the latter stages of the project.
The main area that we checked when we were assessing the practicality of the
project was whether it was within the scope of a project that we could handle. We
had to ensure that the project was practical and possible give the constraint of time
that we had.
7
DF10A1ICT AAPP007-3-2 System Analysis and Design
After taking all the information available to us we were able to conclude that the
project was practically possible to accomplish give the constraints.
8
DF10A1ICT AAPP007-3-2 System Analysis and Design
9
DF10A1ICT AAPP007-3-2 System Analysis and Design
The company since it is a charitable organization does not have a high annual profit
levels and their main source of income is derived from donations that the
organization receives. An estimate of the company income and expenditure is given
bellow as we were not granted access to their financial records:
Description Amount
Annual Expenditure Rs. 1,235,000/=
Income Rs. 1,450,000/=
Net Profit Rs. 215,000/=
Figure 3 - Company Financial Details
Given below are the estimated costs that will be incurred for the development and
the installation of the new system:
Cost Cost Description Amount
Specification
Direct Cost Central HP Pavilion p6100z Rs. 40,200/=
Hardware Processing Unit series (Genuine Windows
7 Home basic with
Service Pack 1 (32-bit)
AMD Sempron(TM)
LE1300 (2.3GHz, 512MB
L2, up to 1600MT/s bus)
2GB DDR2-800MHz
SDRAM (1 DIMM)
320GB 7200rpm SATA
3Gb/s Hard Drive
Monitor HP 2009m 20 Diagonal Rs. 20,700/=
HD Ready Widescreen
LCD Monitor
Keyboard Logitech Internet 350 Rs. 2.100/=
Vista Qualified USB
Keyboard (Black)
Mouse Logitech 3-button USB Rs. 1,100/=
Optical Wheel Mouse-
Black (SBF-96)
Printer HP Officejet 6000 Printer Rs. 6,900/=
Labor Service Charges Rs. 15,000/=
Installation Cost of installing the new system and the cost Rs. 15,000/=
of transport for the hardware equipment.
Survey Research and Investigation costs. Rs. 5,000/=
Indirect Cost Other costs that cannot be directly allocated to Rs. 44,000/=
10
DF10A1ICT AAPP007-3-2 System Analysis and Design
Cost Benefits
Year Cumulative Cumulative
Cost Benefit
Cost Benefits
Year 0 Rs. 150,000 Rs. 150,000 Rs. 10,000 Rs. 10,000
Year 1 Rs. 26,000 Rs. 176,000 Rs. 60,000 Rs. 70,000
Year 2 Rs. 28,000 Rs. 204,000 Rs. 80,000 Rs. 150,000
Year 3 Rs. 34,300 Rs. 238,300 Rs. 110,000 Rs. 260,000
Year 4 Rs. 45,000 Rs. 283,300 Rs. 130,000 Rs. 390,000
Figure 5 - Payback Period Calculation
According to the above information the payback period for the project can be
calculated. The payback period is in this situation is 2 years and 5.8 moths. This
method is not completely accurate as this method does take into account the
depreciating value of money over time. To overcome this problem we have used the
Net Present Value (NPV) to appropriate for the depreciation of the value of money
over time. Given bellow is the NPV of the project:
Cost Benefits
NPV Benefits
Year Cost Present
10% Cost Benefit Present
value
Value
Year 0 0 Rs. 150,000 Rs. 150,000.00 Rs. 10,000 Rs. 10,000
Year 1 0.909 Rs. 26,000 Rs. 23,634.00 Rs. 60,000 Rs. 54,540
Year 2 0.826 Rs. 28,000 Rs. 23,128.00 Rs. 80,000 Rs. 66,080
Year 3 0.751 Rs. 34,300 Rs. 25,759.30 Rs. 110,000 Rs. 82,610
Year 4 0.683 Rs. 45,000 Rs. 30,735.00 Rs. 130,000 Rs. 88,790
TOTAL Rs. 253,256.30 Rs. 302,020
Rs. 302,020.00 Rs. 253,256.30 =
NET PRESENT VALUE
Rs. 48,763.70
Figure 6 - Net Present Value Calculation
11
DF10A1ICT AAPP007-3-2 System Analysis and Design
The above table shows the Net Present Values that the new project will generate for
the company. The table above shows the project generating a NVP of Rs. 48,763.70.
This NPV of Rs. 48,763.70 can be said to be a fairly good NPV for a project of its
nature.
Another tool that was used to assess the Economic Feasibility of the new system was
by checking the Return on Investment of the project. Given bellow is the ROI of the
system that we will be developing using the formula given bellow:
( )
Cost Benefits
Year Cumulative Cumulative
Cost Benefit
Cost Benefits
Year 0 Rs. 150,000 Rs. 150,000 Rs. 10,000 Rs. 10,000
Year 1 Rs. 26,000 Rs. 176,000 Rs. 60,000 Rs. 70,000
Year 2 Rs. 28,000 Rs. 204,000 Rs. 80,000 Rs. 150,000
Year 3 Rs. 34,300 Rs. 238,300 Rs. 110,000 Rs. 260,000
Year 4 Rs. 45,000 Rs. 283,300 Rs. 130,000 Rs. 390,000
Figure 7 - ROI Calculation
( )
This ROI of 37.66% can be said to be fairly good however require another ROI to
compare against.
12
DF10A1ICT AAPP007-3-2 System Analysis and Design
13
DF10A1ICT AAPP007-3-2 System Analysis and Design
14
DF10A1ICT AAPP007-3-2 System Analysis and Design
15
DF10A1ICT AAPP007-3-2 System Analysis and Design
7.1.2 LEVEL 0
16
DF10A1ICT AAPP007-3-2 System Analysis and Design
17
DF10A1ICT AAPP007-3-2 System Analysis and Design
18
DF10A1ICT AAPP007-3-2 System Analysis and Design
7.2 ASSUMPTIONS
Only the administrator has access to the system. Client fills the form on paper
and submits it to the manager (sample of form can be seen in the appendix of
this document). The manager enters the details into the system. Then creates
the meeting and then prints the meeting sheet (sample of meeting sheet can
be seen in the appendix of this document) and sends it to the Counselor and
the Client. After the meeting, the counselor will fill out area given in the
meeting sheet and submit it to the manager again who will retrieve the
meeting and enter the feedback given by the counselor and then take any
necessary action.
If a client is to be set up with another meeting with a different counselor after
the recommendations of the first counselor, then a new meeting record is
created.
All paper based documents are discarded after they have been entered into
the system.
Meeting
Meeting
Details, client
Counselor gets the meeting details,
Counselor requirements,
details form the manager. Manager
meeting
Feedback
feedback
Figure 9 - External Entities Data Dictionary
19
DF10A1ICT AAPP007-3-2 System Analysis and Design
7.3.3 DATAFLOW
Name Description Origin Sink/Destinat Data Structure
ion
Meeting After receiving the Date, time, Client Meeting Details 1=
Details application from the Venue and External counselor name+
1 client, date and time counselor Entity Date+ time+ place
for the meeting sent for the of the meeting
to the client. meeting.
Meeting Meeting details such Meeting Meeting Meeting Details 2=
Details as meeting date, details are Details Data Date, Time, Place,
2 time, place and the allocated Store Counselors name.
counselors name and sent to
will be allocated. meeting
details.
Meeting Meeting details such Meeting Counselor Meeting Details 3=
Details as meeting date, details are External Date+ Time+ Place+
3 time, place and allocated Entity client name+
counselors name and sent to Educational
will be allocated and the qualification.
sent to counselor. counselor.
Client After the client What type Manager Client Requirements
Require submits the of External 1= Educational
20
DF10A1ICT AAPP007-3-2 System Analysis and Design
21
DF10A1ICT AAPP007-3-2 System Analysis and Design
availability of available
counselor and sent to dates for
the process of the meeting
allocating of
meeting.
Availab The counselor Process of Data Store Available Dates=
le Dates available dates are sending the Counselor Date
sent to check the available File
dates for the dates of
meeting. counselor
form
counselor
file.
Figure 11 - Dataflow Data Dictionary
22
DF10A1ICT AAPP007-3-2 System Analysis and Design
23
DF10A1ICT AAPP007-3-2 System Analysis and Design
OL10_marks Text
AL1_sub Text
AL1_marks Text
AL2_sub Text
AL2_marks Text
AL3_sub Text
AL3_marks Text
AL4_subs Text
AL4_marks Text
AL5_sub Text
AL5_marks Text
Figure 13 - Client_Results Table
24
DF10A1ICT AAPP007-3-2 System Analysis and Design
Venue Text
Time Date/Time
Counsellor Comments Memo
Figure 17 - Meeting Table
25
DF10A1ICT AAPP007-3-2 System Analysis and Design
26
DF10A1ICT AAPP007-3-2 System Analysis and Design
27
DF10A1ICT AAPP007-3-2 System Analysis and Design
28
DF10A1ICT AAPP007-3-2 System Analysis and Design
29
DF10A1ICT AAPP007-3-2 System Analysis and Design
When the user clicks on the New Application tab, the system takes the user to the
Add New Application Form as shown above.
30
DF10A1ICT AAPP007-3-2 System Analysis and Design
After the user fills the application form, the user has to save the application by
clicking the option called Save Application.
When the user clicks on the Add Counselor button on the figure 25, the system takes
the user to the form shown above. And in this form the user can select the options
which is stored in the system, it help to get the counselor for the meeting.
31
DF10A1ICT AAPP007-3-2 System Analysis and Design
When the user selects the options on search counselor form and click on search tab,
the user will be taken to Available Counselors Form shown above. Also by clicking
the tabs given in the system as previous and next, the user can view all the
counselors available in the selected combination. Once the user finalize the
counselor user can click on the Select Counselor tab.
32
DF10A1ICT AAPP007-3-2 System Analysis and Design
After the user select the counselor Add New Meeting Form will open by the system.
And the system automatically gives the Application ID and the Counselor ID. But
the user have to enter the Meeting ID, it should be 3 letters and 4 digit numbers.
33
DF10A1ICT AAPP007-3-2 System Analysis and Design
When the user goes back to the switch board design, and click on the Print Meeting
Sheet tab, system appears as shown above and the user have to enter the meeting ID
as entered before in the Add New Meeting form and select OK. Then the meeting
Report will be opened with the details of the meeting searched for which can then be
printed.
34
DF10A1ICT AAPP007-3-2 System Analysis and Design
To search the meeting, the user has to give the Meeting ID and click on search.
When the user enter the meeting ID as shown in figure 32 the system gives the above
page, so that the user can edit his meeting details and there is an option available in
the system to Save the details, user can click on that tab and save it.
35
DF10A1ICT AAPP007-3-2 System Analysis and Design
This form helps to add a new counselor to the system. When the system handler fills
the information and click on the save tab itll be saved in the system.
36
DF10A1ICT AAPP007-3-2 System Analysis and Design
Testing is one of the most crucial areas of any System Development Life Cycle. In
this area the system will be checked for bugs or any and every error that is inevitably
present in any system. The testing phase will also help the system have a greater
success rate and fewer errors during the operation of the system.
A system test is initially carried by using sample data which is acceptable and also
data that will generate an error message to appear. This way the system is checked as
to how it will operate under conditions with normal data as well as incorrect data.
There are three main way in which to test the system. These methods are Black Box
testing, White Box testing and Daily Build and Smoke technique. Under the Black
Box testing method what happens is that the system is checked from the outside or
external party. This method does not require for a person with special computing
knowledge.
The next method is called White Box method. This method unlike the black box
method the system is checked from inside and in depth. This method will require
someone with a though knowledge of computing and also coding. This method
though harder is far more effective and more comprehensive.
Daily build and Smoke technique is another method that can be used to test the
system. This is where the system is tested daily on the work that has done so far.
This method is more time consuming but will allow for an early detection of an error
and also prevent complication from occurring later on in the development stages of
the system.
(Ahangama, 2010)
37
DF10A1ICT AAPP007-3-2 System Analysis and Design
38
DF10A1ICT AAPP007-3-2 System Analysis and Design
39
DF10A1ICT AAPP007-3-2 System Analysis and Design
11.0 IMPLEMENTATION
There are four ways in which the implementation can be carried out. They are
Parallel Implementation, Pilot Implementation, Phased Implementation and Cutover
Implementation.
The method that we have selected is the Parallel Implementation method. The reason
that we have selected this method is because the current method that the client is
using is a manual system and therefore the transition will need to be slow. This is
because the users will not be used to operating on a computerized system, therefore
they will require training to get adjusted to the new system.
The way that we will carry out the change is by slowly getting the users of the
system to operate both the systems. This way the users will get used to the new
computerized system that we have developed. This method will also double as a
training session for the users of the system. The user will be trained in the
functionalities of the system such as the way to operate the forms and the queries.
Basic training on how to repair small problems will also be given to the user during
this period of parallel implementation.
The reason that we did not opt for a Pilot system is due to the company being so
small and because it would be impractical to implement in this method.
The choice not to take up a Phased Implementation method is because the system
was too small to separate into segments and implement in separate segments.
The cutover method was abandoned because the risks involved were quite
significant. This is because if a single error occurs the entire system will be down.
Therefore this choice was immediately discarded.
(Ahangama, 2010)
40
DF10A1ICT AAPP007-3-2 System Analysis and Design
BIBLIOGRAPHY
Fazmil, F. (2010), About Insight Center for Education Development. [Interview] 6th
November 2010.
Ahangama, N., 2010. Overview of SDLC - Part 1. Presentation. Asia Pacific Institute
of Information Technology.
Ahangama, N., 2010. System Analysis - Part 1. Presentation. Asia Pacific Institute of
Information Technology.
41
DF10A1ICT AAPP007-3-2 System Analysis and Design
APPENDIX
Project Introduction
Company Introduction
Current System
System Development Life Cycle
Fact Finding
Interviewing Mr. Fazmil Fyzer
Data Flow Diagrams
Compiling the documentation
The System
o Tables
o Forms
o Macros for buttons
o VB Codes for buttons.
I took over doing these areas because I had a previous experience in this organization
as well as the existing system that was in use hence I was able to write on these
topics easily with my experience and knowledge as well as from the information that
I gathered in extra.
Once again I took over these sections because I had previous experience in this
system and also the Interviewee was known to me personally and the other group
members insisted that I do the interview while they take down notes.
42
DF10A1ICT AAPP007-3-2 System Analysis and Design
This was rather an interesting section for me. I never had prior experience in making
DFDs and making this was quite a work. With the guidance of the lecturer, I was
able to complete the DFDs in time and also I used Microsoft Visio to make them
which made my life easier.
The system
Making the system was quite a hectic task to do. With the help of others I was able to
do it. I did most of the areas since I had prior experience in making systems in
Access and also I was able to do the coding in Visual Basic.
The hardest of all was this area. Since I had to collect the information from all
members, add it to the system and then also to edit it, style it according to
requirements, add the other necessary requirements such as captions, citations and
making the alignments all were hectic. But with the experience I gained from
compiling the documentations of other projects, I was able to handle this section
without much hassle.
Critical Evaluation
By doing this project, I almost was exhausted. Even my prior experiences in making
systems and documenting didnt help me out in this instance as those instances were
done for case study situations. This being a real life situation, the system had to be
carefully done with very few errors.
It was easy working with my group members in this task as all 3 of us have had prior
experience in making systems using Microsoft Access and also documenting it. All 3
of us had done ICT for our Advanced Levels and it was in there we gained our prior
experiences.
43
DF10A1ICT AAPP007-3-2 System Analysis and Design
While doing this I did not have much of a negative experience except for the stress
of finishing it on time which I was able to successfully overcome due to the
timeliness of my other group members who submitted their work in due time by
keeping to the deadlines.
It should be noted that it was fun working with my group members in this project
and also helping each other in the areas that we were not good at increased each
others knowledge.
Finally I would like to thank all my group members for their support and corporation
given during this project.
44
DF10A1ICT AAPP007-3-2 System Analysis and Design
Feasibility Study
o Technical Feasibility
o Operational Feasibility
o Economic Feasibility
o Schedule Feasibility
Implementation
Process Specification
Data Structure
Data Testing
Gantt chart
Meeting Minutes
Database Queries
Feasibility Study
I was given the task creating the Feasibility Study as I had a fair knowledge in the
commerce field. The topics under the Feasibility study that I covered are:
Technical Feasibility: Under this topic I had to cover the areas of whether
the project was practically feasible and whether we could carry it out
properly.
Economic Feasibility: there were three tools that I used in the evaluation of
the Economic Feasibility of the project. The tools that I employed are the
Payback calculation the Return on Capital and the Net Present Value
calculations. These tools were used to calculate the economic feasibility of
the project.
45
DF10A1ICT AAPP007-3-2 System Analysis and Design
Schedule Feasibility: In this section what was done was to create a table
with the work break down, the persons to whom the work had been assigned
to and the time frame for the completion of the assigned work.
Implementation
This section was regarding as to how the system would be integrated into the
company and the method used. The method we used to implement the system was
the parallel implementation method.
Process Specification
For this area what I did was the writing about the processes that were there in the
system that we were developing. I used the format that had been provided during a
lecture by Ms Nadeera Ahangama.
Data Structure
Here what I have done is to specify what the format of the data is in the system. This
was done in tabular format where the field name and the data type of each field in the
system was written down.
Data Testing
In this segment the data was tested by entering values that were both correct, which
the system would accept, and data that was incorrect, to access if the system would
reject the incorrect data. The details of the results were logged for future reference if
needed.
Gantt Chart
The Gant chart a useful tool in project management to keep the project going so that
it would be able to meet deadlines was another essential part. This was done using
the Microsoft Project 2010 tool.
46
DF10A1ICT AAPP007-3-2 System Analysis and Design
Meeting Minutes
I volunteered to take on the task of maintaining the meeting minutes for the system
that we had created. The minutes were written a day or two after the meeting and
were passed off to be correct at the next meeting.
Critical Evaluation
I have gained a vast amount of experience form carrying out this project. I had prior
to this done a project of similar nature however it was based on a case study and not
on a real life situation as this project was based on. This project gave me a great
amount of exposure to a real life situation and I greatly appreciated the opportunity.
Working with the rest of my group was also a new experience as this was the first
time in a group with all three members together and it was another novel experience.
A draw back that I felt during the assignment was the fact that the company that we
did the assignment for was not forthcoming with their financial reports as they were
a privately run N.G.O. and this made it harder for me when it came to the creating of
the Economic Feasibility, as I had to talk with the contact that we had inside the
company to gather a rough estimate of the companys financial standings.
However other than for the above mentioned problem, I did not during the course of
the project have any problems with neither system nor the documentation. Neither
did i have any problem with the group or the work that I was assigned to work with.
47
DF10A1ICT AAPP007-3-2 System Analysis and Design
Data Dictionary
External Entities
Data Stores
Data Flows
System Form designs
Analyzing system needs
Data Flow Diagrams
System Reports
Data Dictionaries
After making the DFDs the data dictionary was made as well. I created the table to
write the data dictionaries, so that it will be user friendly to read it. After writing the
data dictionaries, it is shown to our lecturer and few errors were corrected.
Forms Designs were done by me, I have explained the whole system and the way it
works with clear screenshots of the system. It was done after the system was
completely finished by our group. This document gives the clear idea and
explanation about the system.
All three types of DFDs were made; all the problems in our DFDs were later
corrected by our lecturers.
48
DF10A1ICT AAPP007-3-2 System Analysis and Design
This was an interesting work for me. I already had experience in making DFDs in
my AS level ICT projects. With the help from our lecturer and together with my
group member Ahamed, We were able to complete the DFDs in time and also we
used Microsoft Visio to draw it easier.
Critical Evaluation
As a member in a my team it also helped me in managing the work of the entire team
and provided valuable experience on delegating work between members by
identifying their strengths. This also helped me find out what exactly users
requirements mean and what it takes to achieve these requirements.
Our project aim mainly was to design a basic system for Insight in order to make the
institute to register their clients to Insight.
Computerizing the functions carried out would make things simpler to be performed
whereas the firm is planning to make use of the MS Access database package.
I have been a part of in making this system work out by creation of database, fact
finding and conducting interviews, collecting source documents and creating the
logical design of the system using data flow diagram along with the data dictionary.
However it was a great experience for me although I have done ICT projects for ma
Advanced Level, because to work as a group. I enjoyed doing the project and as well
I learned so many things in System Analyzing and Designing.
49
DF10A1ICT AAPP007-3-2 System Analysis and Design
Agenda:
Minutes
The first topic on the agenda for the initial meeting for the System Analysis and
Design brought up by Ahamed Nishadh who stated for the minutes that he had been
able to locate a company that would allow us to develop a system for them. The
company is and N.G.O. called Insight Center for Education Development. He also
stated that the system that we would be developing for them would be a Councilor
system since the existing system was inadequate and cumbersome.
The next topic that was discussed was the interviews that would be held on with the
client to acquire the information regarding what would be needed to be done by us in
the development stages of the project. For this Ahamed said that he would go and set
a date for the initial meeting with the client.
50
DF10A1ICT AAPP007-3-2 System Analysis and Design
The next matter that arose was the making of a Feasibility study. It was decided that
Deshan should create the Feasibility Study for this assignment and present it at the
next meeting so that the official go ahead for the project could be given.
After this the next matter that was brought up was the recording and maintaining of
the minutes of the meeting that is being held and those to come. Deshan volunteered
to take on this task and said he would maintain all the records.
A main concern raised by Deshan at this occasion was regarding the complexity and
the level of work that would be needed to be done to develop the project, since if the
project was too complex it would be impractical to take on the project and a new
project would have to be selected.
After this the meeting was adjourned until the interviews with the client were
concluded.
.
Lecturer
51
DF10A1ICT AAPP007-3-2 System Analysis and Design
Agenda:
Minutes
The meeting started with the reading of the minutes of the previous meeting by
Deshan. After which Ahamed proposed the minutes to be in order and Tiffanya
seconded this.
The next point that was brought up was the Feasibility study that Deshan had taken
on to do. Deshan read out the Feasibility study that he had completed and it was
concluded by all present that the Councilor system should be accepted.
The next main topic to be discussed was the how and what the system would look
like. This being the data inputs the processors and the outputs of the new system. For
this section Ahamed agreed to take on the Data Flow Diagrams and the Data
Dictionaries would be handled by Tiffanya. Afterwards the way in which the system
would operate was discussed. A rough sketch of the Data flow was drawn to act as a
guide line when the final Data Flow diagrams would be drawn.
52
DF10A1ICT AAPP007-3-2 System Analysis and Design
After this the meeting was adjourned until the 7th of December 2010 where the actual
designing of the project would start.
.
Lecturer
53
DF10A1ICT AAPP007-3-2 System Analysis and Design
Agenda:
Minutes
The meeting started with the reading of the minutes of the previous meeting by
Deshan. After which it was proposed to be in order by Ahamed and seconded by
Tiffaniya.
The first matter that was brought up was a review of the work that had been allocated
to be done at the previous meeting. The area that was mainly looked into was the
section that Tiffaniya was assigned to work on which was the Data Dictionary area.
Tiffaniya said that she had finished the Data Dictionaries. Ahamed after this said that
the Data Flow Diagrams had also been completed and that he had shown them to
Miss Nadeera and that apart from a few corrections she had agreed that they were
fine and was overall proper.
The next topic that was taken up for discussion was the design that would be done
for the system. Topics such as the format and the form layout were discussed.
54
DF10A1ICT AAPP007-3-2 System Analysis and Design
After the design for the system was discussed the documentation and development
part was brought up. It was agreed that this segment will be divided among the three
members equally.
After this the meeting was adjourned until the 27th of December 2010 by which time
the system should be completed and ready for testing.
.
Lecturer
55
DF10A1ICT AAPP007-3-2 System Analysis and Design
Agenda:
Minutes
The meeting was started with the reading of the minutes of the previous meeting
minutes. These minutes were proposed to be in order by Ahamed and this was
seconded by Tiffaniya.
After this the system that had been developed over the past few weeks was evaluated
by all the members and it was said to be in a satisfactory condition and since there
were no changes to make to the system it was decided to move on to the next section.
The next matter that was taken up was the format and the way in which the testing of
the system would be carried out. The test format was designed. The way in which the
system would be checked is by entering both correct information into the system and
by entering incorrect data into the system and checking out how the system will react
to this input of information.
After this the initial testing commenced where the screenshots of the errors that
appear when you enter wrong data into the system.
56
DF10A1ICT AAPP007-3-2 System Analysis and Design
After this the meeting was adjourned until the 8th of January 2011 where the group
would meet up to compile all the documentation that had been done so far.
.
Lecturer
57
DF10A1ICT AAPP007-3-2 System Analysis and Design
Agenda:
Minutes
The minutes of the previous meeting were read and were said to be in order by
Ahamed and was seconded by Tiffaniya.
After this the main reason for the meeting was arrived upon. This is the compile all
the document that has been created so far. All the members gave Ahamed the
documents that were in their possession and then Ahamed compiled it into a single
document.
Finally Ahamed congratulated all the members for a great job and the final meeting
was adjourned.
.
Lecturer
58
DF10A1ICT AAPP007-3-2 System Analysis and Design
Questions Asked:
1. What is Insight?
2. A brief history of Insight.
3. What is the system that needs to be made?
4. What is the current system?
5. What are the problems faced in the current system?
6. What kind of a solution is expected by your organization?
Questions Asked:
59
DF10A1ICT AAPP007-3-2 System Analysis and Design
Questions Asked:
60
DF10A1ICT AAPP007-3-2 System Analysis and Design
61
DF10A1ICT AAPP007-3-2 System Analysis and Design
62