Instruction Assess TJPSC-ASR-WI-005, R00
ment Operation classification
Basic operation
Plant
Before C/ 3 4 3 21 II Regular operation
Operation TURBINE ROTOR
After C/M 3 4 3 21 II Irregular Operation Dept. Name Shop Name
ASSEMBLY
Risk mitigation II II On-site operation
Steam Turbine Rotor Inside Dovetail Blade Assembly (T - Type Blade) 2perso
Quality Non-conformity .
In box balde get damage .
Fixing of blades non sequenceing
Reading error occur
Countermeasure :
1) Safety
Wear hand gloves and to avoid accident
Cleaning after work be done carefully
2) Quality(Confirmity)
Put partion of card board plate in the box and keep all the blades
Check the moment sequence sheet
Check Calibration of instruments.
1) Purpose: Standards :
In turbine rotor for entring the indside dovetail Blades For shot peening refer the drawing 2KS105243
For shot peening refer the KM SI 8008
2) Scope For Notch Blade insertion refer KM SI6032
In turbine rotor assemble the inside dove tail blades as per moment squence sheet
Part Name Operation Book no.
Turbine Rotor Inside Dovetail Blade Assembly (T - Type Blade) TJPSC-ASR-WI-005, R00
Confirmed by
Prod. Engineering
Operation chief
Applicable
Operation
Operator
S.No Operation StepOperation details Operation Points tools/Measurign
QC
duration
instruments
TURBINE ROTOR Inside Dovetail Blade Assembly (T - Type Blade) TJPSC-ASR-WI-005, R00
Confirmed by
Operator
Operation chief
Applicable
Engineering
Operation
S.No Operation StepOperation details Operation Points tools/Measurign
Prod.
duration
QC
instruments
Caution !
Please wear the hand gloves in order
to avoid hand scratch with burr.
6 Checking blade clearance
1 After inserting all the blades hit the blades with copper hammer
to close the clearance gap
2 Check the clearances of blades as per drawing mentioned
QY
QY careful!
careful! !
3 If clearance is overlimit grind the blade Check
Check the cover gap dimensions as indicated
4 To apply color solution and check the eye spot area of the blade in
in the drawing!
QY
QY careful!
careful! !
Check
Check the cover gap dimensions as indicated
in
in the drawing!
Feeler Gauge
Clearance check
Clearance check
TURBINE ROTOR Inside Dovetail Blade Assembly (T - Type Blade) TJPSC-ASR-WI-005, R00
Prod. chief
Confirmed by
Applicable
Operation
Operator
eering
Engin
S.No Operation StepOperation details Operation Points tools/Measurign
Operation
QC
duration
instruments
4.) Grinding of Blade
1 Remove the blade outside from the assembely Color contact paste
2 Apply color contac paste in master piece blade Marker
3 Grind the eye spot area and recheck again
4 After completion of grinding assemble the blade
5 Recheck all the blade clearances Master piece
blade
TURBINE ROTOR Inside Dovetail Blade Assembly (T - Type Blade) TJPSC-ASR-WI-005, R00
Confirmed by
Operation chief
Applicable
Operator
Engineering
Operation
S.No Operation StepOperation details Operation Points tools/Measurign
Prod.
duration
QC
instruments
Note KY! !
During processing always wear protective glasses
Also, be careful that you do not cut the hands and fingers when
handling the cutter wear a leather hand-gloves!
Blade Grinding
TURBINE ROTOR Inside Dovetail Blade Assembly (T- Type Blade) TJPSC-ASR-WI-005, R00
Confirmed by
Operator
Operation chief
Applicable
Engineering
Operation
S.No Operation StepOperation details Operation Points tools/Measurign
Prod.
duration
QC
instruments
TURBINE ROTOR Inside Dovetail Blade Assembly (T- Type Blade) TJPSC-ASR-WI-005, R00
Confirmed by
Operator
Operation chief
Applicable
Engineering
Operation
S.No Operation StepOperation details Operation Points tools/Measurign
Prod.
QC
duration
instruments
1 Check the noth blade tooth section
2 Normal blade and noth blade level are equal
Checking blade insert
level
WI-005, R00 7
f personsWork duration
2persons/20hrs
Protection Wears
Operation
Remark
duration
o. Page No.
005, R00 37
Operation
Remark
duration
dicated
dicated
o. Page No.
005, R00 47
Operation
Remark
duration
nstrument
nstrument
o. Page No.
005, R00 57
Operation
Remark
duration
gers when
ngers
o. Page No.
005, R00 67
Operation
Remark
duration
may swing
o. Page No.
I-005, R00 77
Operation
Remark
duration