CONTRACT ID / PMS ID :
:
PROJECT NAME :
PROJECT DESCRIPTION :
-
Limits: Sta. 1476+453.839 to Sta. 1476+574.169, L= 120
-
Construction of 90.28 meter bridge at 3 spans (@30 m PS
Abutments A & B = 1.0 m dia. X 50 m on bored piles
Piers 1,2 = 1.0 m dia x 44 meter on bored piles, Column:
-
Construction of craneway = 60 meters
-
Construction of Abutment Protection using steel sheet pile
-
Embankment Works
-
Installation of metal guardrails
-
Provision of coco-net and coco-log
PROJECT/CONTRACTUAL DATA :
Project Component :
Province :
Region :
Location :
Source of Fund :
Mode of Contract :
Implementing Office :
Date of Bidding :
Contractor :
Contract Amount :
Revised Contract Amount :
Contract Duration :
Revised Contract Duration :
Effectivity of Contract :
Contract Expiry Date :
Revised Completion Date :
Time Extension/Suspension
Time Extension No. 1 :
Time Extension No. 2 :
Time Extension No. 3 :
Total :
Time Suspension No. _ :
Total :
Grand Total :
PROJECT UPDATE :
- Project On-going
PREPARED BY :
DENNIS P. BACATCAT
Project Inspector
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND
OFFICE OF THE REGIONAL DIRE
Region XI
R. Magsaysay Avenue corner Chavez Stre
Regional Office XI
13LO-0056 / 1101-14-H-00055
Construction/Improvement of Panabo City Coastal Road From Brgy
Bridge II (Leading to Migratory Bird Sanctuary, Mangrove Sanctua
1476+574.169, L= 120.28 m.
e at 3 spans (@30 m PSCG supported by bored piles)
0 m on bored piles
n bored piles, Column: 1.4 m dia. x 5 m.
CONTRACT STATUS :
ERED :
CHECKED AND SUBMITTED BY :
AURORA M. LACASANDILE
Project Engineer
f the Philippines
LIC WORKS AND HIGHWAYS
REGIONAL DIRECTOR
egion XI
rner Chavez Street, Davao City
STATUS REPORT
tober 31, 2015
al Road From Brgy. J.P. Laurel, Panabo City to La Paz, Carmen, b. Constr
Mangrove Sanctuary, Mariculture Park, City Baywalk)
EQUIPMENT ON
: 100.000 %
: 58.720 %
: -41.280 %
: 272 C.D. ( 100.00 % )
: 0 C.D. ( 0.00 % )
: 73.700 %
: 58.720 %
: -14.980 %
: 503 C.D. ( 93.15 % )
: 37 C.D. ( 6.85 % )
: -
: 1
: 1
: 1
: 1
: 2
: 2
: 5
: 2
DPWH | Project Implementation Forms - Project Managem
Project Status Report: Construction/Improvement of P
From Brgy. J.P. Laurel, Panabo City to La Paz, Carmen, b. Construc
(Leading to Migratory Bird Sanctuary, Mangrove Sanctuary, Maric
", on-going.
NOTED :
. LACASANDILE ELIAS P.
t Engineer Chief, Constru
DPWH | Project Implementation Forms - Project Managem
ty to La Paz, Carmen, b. Construction of Tuganay
ty Baywalk)
EQUIPMENT ON SITE :
Backhoe w/ breaker : 1
Payloader : 1
Motorized Road Grader : -
Vibratory Roller : 1
Water Truck : -
Welding Machine : -
Transit Mixer : -
Concrete Vibrator : -
Concrete Screeder : -
Concrete Saw : -
Bar Cutter : -
Rotary Hammer
Drilling Machine : -
Applicator Machine : -
Kneading Machine : -
Truck Mounted Crane : -
Crawler Crane : 1
Bulldozer : -
Pneumatic Drilling Machin : 1
Generator Set : 1
Bentonite Bin : -
Diesel Hammer : -
Vibro Hammer : 1
Vibro Hammer w/
Hydro Power Pack : -
Drilling Rig : -
Bentonite Mixer : -
Water Pump : 1
Bar Bender : -
Cutting Outfit : 1
Tremie Pipe Set : -
SPT & Desanding Machine : -
Portable Breaker : -
Air Compressor, Portable : -
Lighting System/Tower Li : -
Dumptruck : 5
Cargo Truck/Delivery Truc : -
Pumpcrete Whiteman : -
ected structures.
ELIAS P. BERMEJO
Chief, Construction Division
mentation Forms - Project Management Form C-02
PROJECT PROGRESS & STATUS R
II - Project Activities:
- Pouring of PCCP at the following stations;
a. Sta 0+897.50 to 1+001.00 R/S (Segment 1);
b. Sta 1536+001.00 to 1536+221.5 R/S (Segment 2);
c. Sta 1536+230.50 to 1536+433.00 L/S (Segment 2);
d. Sta 1557+000.00 to 1557+103.50 R/S (Segment 3);
e. Sta 1557+203.5 to 1557+597.00 L/S (Segment 3);
- Construction of Limao, Sapdan and Kiayo Bridges
ACTIONS TAKEN:
- Instructed the contractor to conduct overtime works if weather condition is fair.
Prepared by:
Scheduled/Planned : 96.44 %
: 96.57 %
: 0.13 %
CONTRACT TIME
A.) ORIGINAL
Time Elapsed : 278 c.d. 87.42%
Time Remaining : 40 c.d. 12.58%
Time Elapsed :
Time Remaining :
MANPOWER
Project Manager : 1 Mason : 8
Project Engineer : 1 Steelman : 4
Materials Engineer : 1 Laborer : 20
Safety Officer : 1
: 1
Const. Foreman : 10
Operator/ Driver : 22
: 10
EQUIPMENT
Motorized Road Grader : 2 Concrete Blade : 1
: 1 Backhoe : 2
Vibratory Roller : 2 One Bagger Mixer : 1
Back Hoe w/pavement breaker : 1 Concrete Vibrator : 1
: 2 Bulldozer : 2
: 2 Batching Plant : 1
: 4 Concrete Screeder : 1
: 1 Bar Cutter : 1
Plate Compactor 1
Submitted by:
ELIAS P. BERMEJO
Chief, Construction Division
DATE STARTED : January 27, 2015
COMPLETION DATE : December 10, 2015
CONTRACT DURATION : 318 Calendar Days
CONTRACTOR : Maverick Builders, Inc. / AB Aponesto Const. Parts and Supply (JV)
CONTRACT AMOUNT : P 274,533,318.30
Value of Work Accomplishment
Item No. Description Rel. Wt %
Unit Quantity Amount This Month % Previous % Quantity
:Prepared by
HILARIO T.
.ALVIAR, JR
Project
Engineer III
Upgrading of Farm to Market Road with Bridge Components at Barangay Aguinaldo-Kidawa,
Laak-Barangay Casoon-Banlag, Monkayo, Compostela Valley
As of September 31, 2015
hment 2015
% Total Jan. 27-31 Feb.1-28 March1-31 April1-30 May1-31 Jun. 1-30 Jul. 1-31 Aug. 1-31 Sep. 1-30
5 28 31 30 31 30 31 31 30
05/318 33/318 64/318 94/318 125/318 155/318 186/318 217/318 247/318
0.207
0.005
Revised S-Curve
0.022 due to Approved
0.006 PERT-CPM
0.116
0.063
0.161
1.354
0.016
0.002
0.001
0.010
0.006
0.006
25.448
0.151
0.023
0.100
5.566
1.257
18.873
31.985
0.081
0.704
0.573
0.255
0.146
0.117
0.037
0.095
0.240
0.356
0.379
0.002
0.255
0.146
0.117
0.037
0.095 Original S-Curve
0.120
0.147
0.379
0.002
0.340
0.197
0.117
0.046
-
0.275
0.328
0.386
0.002
0.051
1.710
1.371
0.402
0.180
0.046
0.019
0.899
0.488
-
0.051
96.57
PLANNED 0.12 6.13 6.79 6.57 11.95 14.31 14.79 13.25 7.75
REVISED 0.47 2.97 6.44 7.43 11.86 13.69 16.82 13.08 13.45
ACTUAL 0.13 3.35 6.43 12.33 7.93 14.91 15.42 13.09 13.97
PLANNED 0.12 6.25 13.04 19.61 31.56 45.87 60.66 73.91 81.66
REVISED 0.47 3.44 9.88 17.31 29.17 42.86 59.68 72.76 86.21
ACTUAL 0.13 3.48 9.91 21.95 29.72 44.63 60.05 73.14 87.11
0.01 0.04 0.03 4.64 0.55 1.77 0.37 0.38 0.90
1.57 10.38 20.13 29.56 39.31 48.74 58.49 68.24 77.67
:Submitted by
ELIAS P.
BERMEJ0
Chief, Construction
Division
ad with Bridge Components at Barangay Aguinaldo-Kidawa,
asoon-Banlag, Monkayo, Compostela Valley
As of September 31, 2015
2015
Oct. 1-31 Nov. 1-30 Dec. 1-10
31 30 10
278/318 308/318 318/318
100
###
###
###
Revised S-Curve
due to Approved
PERT-CPM 90
80
###
70
###
###
###
###
###
###
###
60
50
40
30
20
###
###
10
###
###
0###
:Prepared by
HILARIO T.
.ALVIAR, JR
Project
Engineer III
Upgrading of Farm to Market Road with Bridge Components at Barangay Aguinaldo-Kidawa,
Laak-Barangay Casoon-Banlag, Monkayo, Compostela Valley
As of November 30, 2015
hment 2015
% Total Jan. 27-31 Feb.1-28 March1-31 April1-30 May1-31 Jun. 1-30 Jul. 1-31 Aug. 1-31 Sep. 1-30
5 28 31 30 31 30 31 31 30
05/318 33/318 64/318 94/318 125/318 155/318 186/318 217/318 247/318
0.207
0.495
0.005
Revised S-Curve
0.038 due to Approved
0.006 PERT-CPM
0.116
0.063
0.161
1.354
0.016
0.002
0.001
0.010
0.006
0.006
25.448
0.151
0.053
0.226
5.566
1.257
18.873
32.879
0.081
0.704
0.573
0.255
0.146
0.117
0.037
0.095
0.240
0.356
0.379
0.002
0.255
0.146
0.117
0.037
0.095 Original S-Curve
0.240
0.356
0.379
0.002
0.340
0.197
0.117
0.046
0.179
0.275
0.328
0.386
0.002
0.051
1.710
1.371
0.402
0.180
0.046
0.019
0.958
0.601
0.802
0.229
99.79
PLANNED 0.12 6.13 6.79 6.57 11.95 14.31 14.79 13.25 7.75
REVISED 0.47 2.97 6.44 7.43 11.86 13.69 16.82 13.08 13.45
ACTUAL 0.13 3.35 6.43 12.33 7.93 14.91 15.42 13.09 13.97
PLANNED 0.12 6.25 13.04 19.61 31.56 45.87 60.66 73.91 81.66
REVISED 0.47 3.44 9.88 17.31 29.17 42.86 59.68 72.76 86.21
ACTUAL 0.13 3.48 9.91 21.95 29.72 44.63 60.05 73.14 87.11
0.01 0.04 0.03 4.64 0.55 1.77 0.37 0.38 0.90
1.57 10.38 20.13 29.56 39.31 48.74 58.49 68.24 77.67
:Submitted by
ELIAS P.
BERMEJ0
Chief, Construction
Division
ad with Bridge Components at Barangay Aguinaldo-Kidawa,
asoon-Banlag, Monkayo, Compostela Valley
As of November 30, 2015
2015
Oct. 1-31 Nov. 1-30 Dec. 1-10
31 30 10
278/318 308/318 318/318
100
###
###
###
Revised S-Curve
due to Approved
PERT-CPM 90
80
###
70
###
###
###
###
###
###
###
60
50
40
30
20
###
###
10
###
###
0###
A.1.1(3) Construction of Field Office for the Engineer l.s. 1.00 256,052.63 256,052.63 0.183 0.027
A.1.2(5) Vehicle for the Engineer Based on DO3 , s 2010, Fully Operated
b. 4x4 pick-up 2500 CC MT diesel w/ aircon, stereo, megawheels, step board, bed liners,
mo. 9.00 108,386.77 975,480.93 0.696
GPS, Rustproof
0.155
A.1.1(16) Assistance to the Engineer
mo. 9.00 8,782.73 79,044.57 0.056 0.004
A. Operations & Maintenance of Field Office for the Engineer
Part B: General Requirement
B-5 Project Billboard each 2.00 5,339.25 10,678.50 0.008 -
B-7 Occupational Safety and Health Program mo. 9.00 30,756.71 276,810.39 0.197 0.01
B-8 Traffic Management mo. 9.00 27,309.27 245,783.43 0.175 0.012
B-9 Mobilization & Demobilization l.s. 1.00 524,258.40 524,258.40 0.374 Err:522
B.4 (1) Construction Survey and Staking km. 3.75 12,545.26 47,044.73 0.034 Err:522
Part C: Earthworks
100(1) Clearing & Grubbing ha. 1.59 195,474.00 310,803.66 0.222 Err:522
101(2) Removal of Actual Structure/Obstruction (Headwall) each 20.00 2,634.03 52,680.60 0.038 Err:522
101(4)c Removal of Existing 910mm RCPC ln.m. 41.00 1,111.25 45,561.25 0.033 -
102(2) Surplus Common Excavation cu.m. 41,127.00 408.26 16,790,509.02 11.977 Err:522
103(1)a Structure Excavation cu.m. 1,858.00 138.17 256,719.86 0.183 Err:522
103(3) Foundation Fill cu.m. 175.00 765.12 133,896.00 0.096 Err:522
103(6)a Pipe Culvert and Drain Excavation (Common) cu.m. 533.00 397.24 211,728.92 0.151 Err:522
104(1)a1 Embankment (from Excavation) cu.m. 48,036.00 300.86 14,452,110.96 10.309 ##
105(1)a Subgrade Preparation sq.m. 31,210.58 25.45 794,309.26 0.567 Err:522
Part D: Sub-base & Base Course
200(1) Aggregate Subbase Course cu.m. 12,835.00 1,856.06 23,822,530.10 16.994 3.999
Part E: Surface Courses
300(1) Gravel Surface Course cu.m. 2,965.00 1,906.88 5,653,899.20 4.033 -
311(1)e1 PCC Pavement (unreinforced), 280 mm. thk. sq.m. 27,312.19 1,729.17 47,227,419.58 33.690 4.132
PART F-1: Drainage Construction (Box Culvert)
404(1)a Reinforcing Steel Bar, Grade 40 (Minor Structures) kg. 30,306.00 75.78 2,296,588.68 1.638 -
405(1)a3 Structural Concrete, Class "A" (Minor Structures) cu.m. 809.00 5,316.00 4,300,644.00 3.068 -
PART G. Drainage & Slope Protection Structure
500(1)b3 Pipe Culverts, 910 mm ., Class IV ln.m. 194.00 5,782.30 1,121,766.20 0.800 -
500(1)b6 Pipe Culverts, 1520 mm , Class IV ln.m. 6.00 9,870.69 59,224.14 0.042 -
504(3)c Cleaning of Pipe Culvert in Place, 910mm Dia. ln.m. 61.00 1,090.21 66,502.81 0.047 -
504(3)f Cleaning of Pipe Culvert in Place, 1220mm Dia. ln.m. 13.00 2,204.15 28,653.95 0.020 -
505(5) Grouted Riprap, Class "A" cu.m. 611.00 3,176.26 1,940,694.86 1.384 -
506(1) Stone Masonry cu.m. 103.00 2,106.03 216,921.09 0.155 -
508(1) Handlaid Rock Embankment cu.m. 16.00 3,051.53 48,824.48 0.035 -
PART H. Miscellaneous Structure
603(3)a1 Metal Guardrail (Metal Beam) Including Post ln.m. 3,291.83 777.95 2,560,879.15 1.827 -
603(3)b2 Metal Beam End Piece (Bull Nose) each 36.00 2,046.71 73,681.56 0.053 -
612(1) Reflectorized Thermopalstic Pavement Marking (White) sq.m. 1,362.13 1,730.84 2,357,629.08 1.682 -
612(2) Reflectorized Thermopalstic Pavement Marking (Yellow) sq.m. 12.00 7,177.88 86,134.56 0.061 -
620(1)a Chevron Sign (450 x 600mm) each 186.00 12,458.25 2,317,234.50 1.653 -
622(1)a Coco net, 400 sq.m. 10,589.00 215.61 2,283,094.29 1.629 -
622(1)b Coco net, 700 sq.m. 5,764.00 427.59 2,464,628.76 1.758 -
622(2)c Coco log/Fascine ln.m. 6,592.00 670.74 4,421,518.08 3.154 -
622(3)b Vegetation sq.m. 16,352.00 83.91 1,372,096.32 0.979 -
140,184,038.50 100.00 0.160
Legend: Previous This Month Schedule
MONTHLY PROGRESS
CUMULATIVE PROGRESS
Planned
Actual SLIPPA
TIME ELAPS
Accomplishment
Previous % Quantity % Total Apr. 24-30 May 1-31 June 1-30 July 1-31 Aug. 1-31 Sep. 1-30 Oct. 1-31 Nov. 1-30
7 31 30 31 31 30 31 30
7/269 38/269 68/269 99/269 130/269 160/269 191/269 221/269
- 2.00 0.155
3,020.00 3.999
-
3,350.00 4.132
-
-
-
-
-
-
-
-
- Start Date:
April 24, 2017
Start Date:
April 24, 2017
-
-
- Actual
-
-
-
-
-
-
0.35 25,724.300 11.54
PLANNED 0.34 5.11 11.10 17.24 17.45 15.91 16.54 11.18
OGRESS
ACTUAL 11.54
PLANNED 0.34 5.45 16.55 33.79 51.25 67.15 83.69 94.87
PROGRESS
ACTUAL 11.54
SLIPPAGE 11.20
TIME ELAPSED ( % ) 2.60
:Noted
ELIAS P.
BERMEJ0
Chief, Construction
Division
Concrete) of Montevista - DNAS Road (Brgy. Canidkid - Brgy. Camansi Section),
K1422+332 - K1422+879; K1423+603 - K1425+961; K1425+1007+K1426+917
31 17
252/269 269/269
100
90
80
7
0
60
50
40
30
20
20
10
0
4.29 0.84
99.16 100.00
IMPLEMENTING OFFICE :
CONTRACT ID / PMS ID :
PROJECT NAME :
PROJECT DESCRIPTION :
- Concreting of pavement, 280mm thk & 150mm thk = 3,4
- Pipe Culverts, 910mm Diameter, Class IV
- Pipe Culverts, 1220mm Diameter, Class IV
- Provision of Reflectorized Thermoplastic Pavement Markin
- Provision of Metal Guardrail (Metal Beam) Inc. Post
- Provision of Metal Beam End Piece (Bull Nose)
- Trees (Furnishing and Transplanting)
- Chevron Signage
- Vegetation
PROJECT/CONTRACTUAL DATA :
Project Component :
Province :
Region :
Location :
Source of Fund :
Mode of Contract :
Implementing Office :
Date of Bidding :
Contractor :
Contract Amount :
Revised Contract Amount :
Contract Duration :
Revised Contract Duration :
Effectivity of Contract :
Contract Expiry Date :
Revised Completion Date :
Time Extension/Suspension
Time Extension No. 1 :
Time Extension No. 2 :
Time Extension No. 3 :
Total :
Time Suspension No. _ :
Total :
Grand Total :
PROJECT UPDATE :
- Project just started on April 24, 2017
ANJEJON L. BUYOC
Project Inspector
Republic of th
DEPARTMENT OF PUBLIC
REGIONAL
R. Magsaysay Ave. corner
PROJECT STA
As of May
Regional Office XI
17LO-00111/P00119955MN
Road Upgrading (Gravel to Concrete) of Montevista-DNAS
K1422+879, K1423+603-K1425+961, K1425+1007-K1426+
CONTRACT STATU
Roads ACCOMPLISHME
Compostela Valley A.) ORIGINAL
Region XI
Brgy. Canidkid-Brgy. Camansi Section,
Compostela Valley
By Contract
Regional Office XI
B.) REVISED
January 27, 2017
A.B. APONESTO CONSTRUCTION PARTS & SUPPLY
P 140,184,038.50
0 Calendar Days
cavation
se
tion
ure / Obstruction (Headwall)
NCOUNTERED :
HIL
P
Republic of the Philippines
T OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE XI
y Ave. corner Chavez Street, Davao City
NTRACT STATUS :
CCOMPLISHMENT:
.) ORIGINAL
.) REVISED
Sched. Accomp. : -
Actual Accomp. : -
Slippage to Date : -
Time Elapsed to Date : - -
Time Remaining : - -
NPOWER ON SITE
roject Manager : 1
roject Engineer : 1
aterials Engineer : 1
onst. Foreman : 2
aboratory Personnel : 2
aboratory Aide : 2
river/Operator : 18
echanic : 2
killed Worker : 10
nskilled Worker : 10
DPWH | Project Implementation F
Project Status Re
Montevista-DNAS
Compo
K1423
EQUIPMENT ON SITE :
Backhoe : 5
Dumptruck : 6
Bulldozer : 3
Payloader : 3
Batching Plant :
Minimum Materials Testing : 1
Lab Equipment
Water Truck : 1
Transit Mixer :
Road Roller :
Road Grader :
Concrete Screeder :
Concrete Vibrator :
Concrete Saw :
Bar Cutter :
Bagger Mixer :
Implementation Forms - Project Management Form C-02
Project Status Report: Road Upgrading (Gravel to Concrete) of
Montevista-DNAS Road (Brgy. Canidkid-Brgy. Camansi Section),
Compostela Valley 1st LD, K1422+332-K1422+879,
K1423+603-K1425+961, K1425+1007-K1426+917
Page 2 of 2
CTIONS TAKEN :
2017
Description
Apr. May June July Aug. Sep. Oct. Nov. Dec. Jan.
7 30 31 30 31 31 30 31 31 17
7 37 68 98 129 160 190 221 252 269
Project Manager 1 1 1 1 1 1 1 1 1 1
Project Engineer 1 1 1 1 1 1 1 1 1 1
Materials Engineer 1 1 1 1 1 1 1 1 1 1
Safety & Health Officer 1 1 1 1 1 1 1 1 1 1
Const. Foreman 3 3 3 3 3 3 3 3 3 3
Laboratory Personnel 2 2 2 2 2 2 2 2 2 2
Laboratory Aide 2 2 2 2 2 2 2 2 2 2
Driver/Operator 15 15 15 15 15 15 15 15 15 15
Mechanic 2 2 2 2 2 2 2 2 2 2
Skilled Worker 10 25 25 25 25 25 25 25 25 10
Unskilled Worker 10 25 25 25 25 25 25 25 25 20
Total Manpower 48 78 78 78 78 78 78 78 78 58
Mandays 336 2340 2418 2340 2418 2418 2340 2418 2418 986
2017
Apr. May June July Aug. Sep. Oct. Nov. Dec. Jan.
Description
7 30 31 30 31 31 30 31 31 17
7 37 68 98 129 160 190 221 252 269
Project Manager 1
Project Engineer 1
Materials Engineer 1
Safety & Health Officer 1
Const. Foreman 2
Laboratory Personnel 2
Laboratory Aide 2
Driver/Operator 18
Mechanic 2
Skilled Worker 10
Unskilled Worker 10
Total Manpower 50
Mandays 350 0 0 0 0 0 0 0 0
Name of Project
Location :
Date Effectivity :
Contract Duration :
Expiry Date :
Contract Amount :
Contractor :
6.4
0.00
1
2
3
4
5
6
7
8
9
0.00 10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
0 46
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 -
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000
0 0.000 0.000 0.02
0 0.000 0.020
0 0.000 0.030
0 0.000 0.040
0 0.000 0.050
0 0.000 0.060
0 0.000 0.070
0 0.000 0.080
0 0.000 0.090
0 0.000 0.100
0 0.000 0.110
0 0.000 0.120
0 0.000 0.130
0 0.000 0.140
0 0.000 0.150
0 0.000 0.160
0 0.000 0.170
0 0.000 0.180
0 0.000 0.190
0 0.000 0.200
0 0.000 0.210
0 0.000 0.220
0 0.000 0.230
0 0.000 0.240
0 0.000 0.250
0 0.000 0.260
0 0.000 0.270
0 0.000 0.280
0 0.000 0.290
0 0.000 0.300
0 0.000 0.310
0.320 1
0.330 2
0.340 3
0.350 4
0.360 5
0.370 6
0.380 7
0.390 8
0.400 9
0.410 10
0.420 11
0.430 12
0.440 13
0.450 14
0.460 15
0.470 16
0.480 17
0.490 18
0.500 19
0.510 20
0.520 21
0.530 22
0.540 23
0.550 24
0.560 25
0.570 26
0.580 27
0.590 28
0.600 29
0.610 30
0.620 31
0.630 32
0.640 33
0.650 34
0.660 35
0.670 36
0.680 37
0.690 38
0.700 39
0.710 40
0.720 41
0.730 42
0.740 43
0.750 44
0.760 45
0.770 46
0.780 47
0.790 48
0.800 49
0.810 50
0.820 51
0.830 52
0.840 53
0.850 54
0.860 55
0.870 56
0.880 57
0.890 58
0.900 59
0.910 60