Contract particulars for the Building Contract SF-88 contract for a home owner/ occupier:
Building consents: The customer [or the consultant] has applied, or will apply, for:
Working hours:
The customer will allow the contractor to work between 7:00am and 6:00pm from Monday to Friday.
And from 8:00am to 2:00PM Saturday
Occupation of premises:
SCOPE OF WORKS
General
With Regard to the Commencement Notice, it is a requirement that:
The lodgement of the Commencement Notice shall be carried out by the selected Contractor and the required fee should be
included in the tender sum. The commencement notice must be lodged within a period of not less than 14 days or more than
28 days before the commencement of the work.
A copy of the notice will be forwarded to OBrien McBrierty Architects Ltd. for filing.
The notice of receipt of the commencement notice which the building control authority is required to issue under Article 10(2)
of the Building Control Regulations 1997 - SI No. 496 of 1997, should similarly be forwarded for filing
Existing House
Work to be carried out listed according to rooms as called up on drg. SU_001 Survey to Existing
1. Entrance Hallway
a. Demolition
i. Removal of existing windows / glazed screens as shown
b. Renovation
i. Drylining as per drawings and specification
c. New Build
i. Construction of new external storage area dry lined and insulated as per drawings and specification
ii. New screen to be installed with doors and windows as per drawing and specification
iii. Existing stair handrail modified as per drawings and specification
iv. Existing floorboards to be taken up, insulation to be installed and floorboards reinstated all as per
drawings and specification OR existing suspended timber floor to be removed and new concrete slab
installed to the same level with insulation below and hardcore build up to engineers specification
[whichever is most economic].
v. Installation of underfloor heating as per drawings and specifications
d. Finishes
i. Internal doors as per drawings and specification
ii. Shadowgap skirting detail as per drawings
iii. Painted finish to selected colour as per specification to all wall and ceiling surfaces
iv. Lighting and electrical layout as per drawings and specification
2. WC
a. Demolition
i. Removal of existing windows / glazed screens as shown
ii. Removal of existing sanitaryware
b. Renovation
i. Drylining as per drawings and specification
c. New Build
i. Existing floorboards to be taken up, insulation to be installed and floorboards reinstated all as per
drawings and specification OR existing suspended timber floor to be removed and new concrete slab
installed to the same level with insulation below and hardcore build up to engineers specification
[whichever is most economic].
ii. New window to be installed in existing ope as per drawings and specifications
d. Finishes
i. Internal doors as per drawings and specification
ii. Shadowgap skirting detail as per drawings
iii. Painted finish to selected colour as per specification to all wall and ceiling surfaces
iv. Lighting and electrical layout as per drawings and specification
3. Living Room
a. Demolition
i. Removal of existing windows
ii. Removal of existing walls as shown
b. Renovation
i. Drylining as per drawings and specification
c. New Build
i. New screen to be installed with windows laid out as per drawings and specification
ii. New walls to be constructed as per drawings and specification.
iii. Existing floorboards to be taken up, insulation to be installed and floorboards reinstated all as per
drawings and specification OR existing suspended timber floor to be removed and new concrete slab
installed to the same level with insulation below and hardcore build up to engineers specification
[whichever is most economic].
iv. Installation of underfloor heating as per drawings and specifications
d. Finishes
i. Internal doors as per drawings and specification
ii. Shadowgap skirting detail as per drawings
iii. Painted finish to selected colour as per specification to all wall and ceiling surfaces
iv. Lighting and electrical layout as per drawings and specification
4. Dining Room
a. Demolition
i. Removal of existing windows
ii. Removal of existing walls as shown
b. Renovation
i. Drylining as per drawings and specification
c. New Build General
i. Carrying out of structural work as per engineers drawings and specification
ii. Dining room extended to line of kitchen external wall
iii. New screen to be installed with windows laid out as per drawings and specification
iv. New partitions to be constructed as per drawings and specification.
v. Installation of kitchen units and ancillary services as per drawings and specification
vi. Installation of underfloor heating as per drawings and specifications
vii. Existing suspended timber floor to be removed and new concrete slab installed to the same level with
insulation below and hardcore build up to engineers specification.
d. Finishes
i. Internal doors as per drawings and specification
ii. Polished concrete floor. To be completed prior to installation of kitchen units
iii. Shadowgap skirting detail as per drawings
iv. Painted finish to selected colour as per specification to all wall and ceiling surfaces
v. Lighting and electrical layout as per drawings and specification
5. Kitchen
a. Demolition
i. Removal of existing windows
ii. Removal of existing walls as shown
b. Renovation
i. Drylining as per drawings and specification
c. New Build General
i. Carrying out of structural work as per engineers drawings and specification
ii. New partitions to be constructed as per drawings and specification.
iii. Installation of kitchen units and ancillary services as per drawings and specification
iv. Installation of sanitary ware and ancillary services as per drawings and specification
v. Installation of washer / drier and ancillary services
vi. Installation of underfloor heating as per drawings and specifications
vii. Existing suspended timber floor to be removed and new concrete slab installed to the same level with
insulation below and hardcore build up to engineers specification.
d. Finishes
i. Internal doors as per drawings and specification
ii. Polished concrete floor. To be completed prior to installation of kitchen units
iii. Shadowgap skirting detail as per drawings
iv. Painted finish to selected colour as per specification to all wall and ceiling surfaces
v. Lighting and electrical layout as per drawings and specification
6. Bedroom 1
a. Demolition
i. Removal of existing windows
ii. Removal of existing walls as shown
b. Renovation
i. Drylining as per drawings and specification
c. New Build General
i. New partitions to be constructed as per drawings and specification.
ii. New window to be installed in existing ope as per drawings and specifications
d. Finishes
i. Internal doors as per drawings and specification
ii. Painted finish to selected colour as per specification to all wall and ceiling surfaces
iii. Lighting and electrical layout as per drawings and specification
7. Bedroom 2
a. Demolition
i. Removal of existing windows
ii. Removal of existing walls as shown
b. Renovation
i. Drylining as per drawings and specification
c. New Build General
i. New external wall to be brought out as per dining room below
ii. New partitions to be constructed as per drawings and specification to form new bathroom and walk-in
wardrobe.
iii. New condensing combi-boiler to be installed as per specification
iv. Installation of sanitary ware and ancillary services as per drawings and specification
8. Bedroom 3
a. Demolition
i. Removal of existing windows
ii. Removal of existing walls as shown
b. Renovation
i. Drylining as per drawings and specification
c. New Build General
i. New partitions to be constructed as per drawings and specification.
ii. New window to be installed in existing ope as per drawings and specifications
d. Finishes
i. Internal doors as per drawings and specification
ii. Painted finish to selected colour as per specification to all wall and ceiling surfaces
iii. Lighting and electrical layout as per drawings and specification
9. Landing
a. Demolition
i. Removal of existing windows
ii. Removal of existing walls as shown
iii. Existing cylinder to be removed
b. Renovation
i. Drylining as per drawings and specification
c. New Build General
i. New partitions to be constructed as per drawings and specification.
ii. New window to be installed in existing ope as per drawings and specifications
iii. Shafts to be formed at two positions at ceiling to allow for rooflight
iv. New stairs formed to second storey level
d. Finishes
i. Internal doors as per drawings and specification
ii. Painted finish to selected colour as per specification to all wall and ceiling surfaces
iii. Lighting and electrical layout as per drawings and specification
10. Bathroom
a. Demolition
i. Removal of existing windows
ii. Removal of existing walls as shown
b. Renovation
i. Drylining as per drawings and specification
c. New Build General
i. New window to be installed in existing ope as per drawings and specifications
d. Finishes
i. Internal doors as per drawings and specification
ii. Painted finish to selected colour as per specification to all wall and ceiling surfaces
iii. Lighting and electrical layout as per drawings and specification
11. Attic
a. Demolition
i. Floor Joists to be cut at positions indicated in engineers drawings to drop the floor to allow for habitable
room height.
ii. New dormer formed as per drawings and specifications
iii. Opes cut in roof to allow for rooflights as indicated
b. Renovation
i. Roof insulation general roof area as per specification
c. New Build General
i. New partitions to be constructed as per drawings and specification.
ii. New window to be installed as per drawings and specifications
iii. Joists trimmed as per engineers drawings and Rooflights to be installed as per drawings and
specifications
iv. Shafts to be formed at two positions at ceiling to allow for rooflight
d. Finishes
i. Internal doors as per drawings and specification
ii. Painted finish to selected colour as per specification to all wall and ceiling surfaces
iii. Lighting and electrical layout as per drawings and specification
iv. Shadowgap skirting detail as per drawings
Roof to dormer: -
Proprietary membrane roofing system [Trocal or silmilar approved] laid according to the manufacturers instructions on
Kingspan Nilvent breathable membrane on
12 mm marine grade ply or iocyanate resin treated moisture resistant oriented strand board [OSB 3] or equivalent approved
sheathing material on firring pieces laid to 1:60 fall toward ridge on
Joists as per engineers specification
90 mm rigid insulation [Kingspan Kooltherm K7 or similar] approved laid between roof joists sized and fixed according to
engineers specifications [50mm min. air gap to be maintained between joists to provide for ventilation to roof space.
Proprietary insect screened edge ventilators to be provided at side walls to dormer to allow for air ingress equivalent to 25mm
air gap running the entire width of the eaves].
32.5mm Kingspan Kooltherm K18 or similar insulated dry lining board fixed to underside of joists
All penetrations through the vapour control layer should be sealed using bonding or taping methods as per the manufacturer's
instructions.
Critical Dimension: -
It is a condition of the planning permission that [excluding the rooflight lantern] the top of dormer should not to project beyond the level
of the ridge tile to the existing house.
Extension to Rear
Work to be carried out listed according to rooms as called up on drg. T_001 Plans
1. Dining Area
a. New Build General
i. As per drawings and Specification
ii. Installation of underfloor heating as per drawings and specifications
b. Finishes
i. Internal doors as per drawings and specification
ii. Polished concrete floor.
iii. Shadowgap skirting detail as per drawings
iv. Painted finish to selected colour as per specification to all wall and ceiling surfaces
v. Lighting and electrical layout as per drawings and specification
2. Garden Room
a. New Build General
i. As per drawings and Specification
ii. Special attention to the production of fairfaced concrete to soffit and fins of portico element
iii. Installation of underfloor heating as per drawings and specifications
b. Finishes
i. Internal doors as per drawings and specification
ii. Timber floor to later selection
iii. Fairfaced concrete to underside portico and supporting concrete fins
iv. Shadowgap skirting detail as per drawings
v. Painted finish to selected colour as per specification to all wall and ceiling surfaces
vi. Lighting and electrical layout as per drawings and specification
Roof to extension: -
Standing seam zinc roofing system [VMzinc or silmilar approved] laid according to the manufacturers instructions on
Kingspan Nilvent breathable membrane on
108mm Kingspan Kooldeck 18mmply / 90mm phenolic [or similar approved insulation acheiving a thermal conductivity []
of=0.038 w/mk] on
12 mm marine grade ply or iocyanate resin treated moisture resistant oriented strand board [osb 3] or equivalent approved
sheathing material
175mm roof joists fixed according to engineers specifications
12.5 mm Foil backed plasterboard
Generally: -
ACO multidrain md brickslot or similar approved to be used at all thresholds achieve flush finish between internal and external
Finished Floor levels
Wiring to existing house to be brought up to standard where not explicitly mentioned in drawing set
Underfloor Heating to extend to the full area of the ground floor including extension
New condensing boiler to be installed sufficient to supply underflloor heating an existing radiators to comply with part L of the
building regulations
All external drainage gutters and pipes to be selected galvanised metal to BS 2997 or Agrement Certified.
GENERAL SUMMARY
Note: Please complete the following cost breakdown and submit with your tender price. Tenders returned without the breakdown laid out
as follows may not be considered for reasons of fairness.
Total
01 GENERAL REQUIREMENTS
Provisional sums
Pre-commencement notifications
Significant hazards
Timber procurement
General quality standards
Other
02 DEMOLITION AND SITE CLEARANCE
Survey
Site clearance
Materials arising
Temporary works required by customer
Other
03 CONCRETE FOUNDATIONS AND FLOORS
Foundations
In situ concrete rafts and floor slabs
Precast flooring systems
Work to existing
Other
04 MASONRY CONSTRUCTION
Masonry external walling
Masonry internal walling
Work to existing
Other
05 STEELWORK
Posts and beams
Work to existing
Other
06 STRUCTURAL TIMBER AND GENERAL CARPENTRY
Floor, ceiling and flat roof structure
Pitched roof structure
Wall framing and partition structure
Work to existing
Other
07 BOARD CLADDING AND SOFFITS
Board cladding
Fascia, soffits and bargeboards
Work to existing
Other
08 TILE AND SLATE CLADDING AND ROOF COVERINGS
Tile and slate pitched roof coverings
Tile and slate cladding
Work to existing
Other
09 FLAT ROOF COVERINGS
Bitumen and single layer polymeric membranes
Work to existing
Other
10 ROOF DRAINAGE
Roof drainage systems
Work to existing
Other
Work to existing
Other
22 ELECTRICAL SYSTEMS
General
Power accessories and equipment
Lighting accessories and equipment
Other
23 COMMUNICATIONS AND SECURITY SYSTEMS
Television distribution system
Fire detection and alarm system
Access control system
Intruder detection and alarm system
Other