Anda di halaman 1dari 4

EXAMEN A

S/C 500.00 Kg/m2


COL 45.00 cm 45.00 cm
b viga 30.00 cm 0.30 m
h viga 60.00 cm 0.60 m
e losa 12.00 cm 0.12 m
CM 250.00 kg/m2
l 4.25 m
fy 4,200.00 kg/cm2
f'c 280.00 kg/cm2
L1 8.00 m
L2 8.50 m
d 54.00 cm 0.54 m
Metrado de cargas
p.p.viga 432.00 Kg/m
p.p.losa 1,137.60 kg/m
CM 1,062.50 kg/m
CV 2,125.00 kg/m
Wu 6,558.52 kg/m
ln1 prom (APOYO B) 7.80 m
ln2 (B-C) 8.05 m
Wu*(ln1)2 399,020.36 kg-m
Wu*(ln2)2 425,008.49 kg-m

SECCIN Apoyo B Tramo B-C


Coeficiente 1/10 1/16
0.10 0.06
Mu (kg-cm) 3,990,203.57 2,656,303.08
b (cm) 30.00 30.00
Ru 45.61 30.36
(%) 1.37 0.87
As (cm2) 22.26 14.10
As min (cm2) 5.16 5.16
5.44 5.44
Varillas 3#10 5#6
As provista (cm2) 23.82 14.25
b necesario (cm) 27 28
OK OK

EXAMEN B
S/C 500.00 Kg/m2
COL 0.40 cm 40.00
b viga 30.00 cm 0.30
h viga 55.00 cm 0.55
e losa 12.50 cm 0.125
CM 200.00 kg/m2
l 4.00 m
fy 4,200.00 kg/cm2
f'c 280.00 kg/cm2
L1 7.50 m
L2 8.00 m
d 49.00 cm 0.49
Metrado de cargas
p.p.viga 396.00 Kg/m
p.p.losa 1,110.00 kg/m
CM 800.00 kg/m
CV 2,000.00 kg/m
Wu 5,967.20 kg/m
ln1 prom 7.35 m
ln2 7.60 m
Wu*(ln1)2 322,363.06 kg-m
Wu*(ln2)2 344,665.47 kg-m

SECCIN Apoyo B Tramo B-C


Coeficiente 1/10 1/16
0.10 0.06
Mu (kg-cm) 3,223,630.62 2,154,159.20
b 30.00 30.00
Ru 44.75 29.91
1.39 0.89
As 20.47 13.01
As min 4.69 4.69
4.94 4.94
Varillas 2#9 + 2#7 2#7 + 2#6
As provista 20.68 13.45
b necesario (cm) 28 25
OK OK
3.95

36,434.17

0.10 2.87 0.10 3.21


x 2.12 x 2.26
x 0.07 x 0.07
1,110.00

7.35

0.10 2.87 0.10 3.21


x 2.66 x 2.74
x 0.09 x 0.09