SY 2017-2018
BRIGADA ESKWELA
PHYSICAL FACILITIES AND MAINTENANCE NEEDS ASSESSMENT FORM
Instruction: Conduct an ocular inspection of the school physical listed below. Then provide the needed information to facilitate the
improvement to be done on these identified facilities. (If needed you may use separate forms for each classroom or school facility).
- Needs more potted plants - Planting of ornamental - Pots, plants, planting tools At least 10 planters
(ornamental, herbs, plants
flowering)
- No landscapes/ plant box - Construct concrete plant - 5-6 bags Cement At least 20 workers
box parallel to schools - 1 load Sand and Gravel
front fence - 160 pcs Hollow Blocks
- 10 pcs Reinforced Steel
Bars 9mm
- Soil
- Faded paints in concrete
CONDITION Nature of Manpower
Remarks
(Check One) improvement Needed Material Resources Needed(Indicate
FACILITIES (e.g. repair, Needed (Indicate kind quantity and nature
Satisfactor Unsatisfacto If Unsatisfactory, repainting, and quality) of labor services
y ry describe the problem replacement, etc) needed)
benches and tables
- Repaint benches and - 1 gallon of latex paint At least 5 workers
tables
- Roof / gutters Clogged gutters Removal of leaves on gutters Ladders, stalls and brooms At least 3 workers
- Ceiling Damaged ceiling Repair damaged ceiling Carpentry tools At least 5 workers
Nails, plywood
- Walls Faded interior and exterior wall Repainting of interior and 3 gallons of latex paints At least 10 workers
paints in SHS bldg. exterior walls of SHS bldg. Brushes and rollers
- Blackboards
- Chairs/desks/tables Damaged armchairs, tables Repair/ repainting of chairs and Wood, nails and paints At least 20 workers
and cabinets tables
- Water facilities - Unpainted hand washing - Painting of hand washing - Paints, brushes, rollers At least 10 workers
area area
- Unsafe drinking water - Installation of water filter - Water filter At least 3 workers
- Signage - Broken and faded - Repainting and fixing of - Paints, brushes, welding At least 10 workers
direction street signage direction street signage machine and rods
- Faded wall signage - Repainting wall signage - Paints and brushes At least 3 workers
letterings Letterings
- School Garden - Presence of weeds - Deweeding and removal of - Cleaning and clearing tools At least 20 workers
(Gulayan sa Paaralan) dead plants
- One to vegetables only - Planting vegetable - Vegetable seedling and At least 10 workers
seedling/seeds seeds, planting tools
- No trellis and fence - Construct trellis for vines - Bamboos, nails, strings, tie At least 10 workers
and fence wires, bolo
- Eroded and Flooded - Reconstruct compost pit - Shovel, pail, wheel barrow At least 10 workers
compost pit
- Lightings, switches and - Busted bulbs and lamps - Replacement of bulbs and - Ladder, lamps and bulbs, At least 2 worker,
outlets, ceiling and wall lamps electrical tape
CONDITION Nature of Manpower
Remarks
(Check One) improvement Needed Material Resources Needed(Indicate
FACILITIES (e.g. repair, Needed (Indicate kind quantity and nature
Satisfactor Unsatisfacto If Unsatisfactory, repainting, and quality) of labor services
y ry describe the problem replacement, etc) needed)
fans - Busted switches and wall - Replacement of switches - 19 pcs of switches, 10 pcs of 2 electrician
outlets and outlets outlets, electrical tape, tie
wires
-
- Ceiling and wall fans are - Repair of electric fans - Electric fan accessories and
not functioning parts
- Windows
- Doors - Damaged door - Repair of damaged door Plywood, hammer and saw, nails At least 3 workers
And door knobs and screw drives
- Loosed door knobs
- Comfort rooms Stinky odor Cleaning and sanitation Soap, water bleach and cleaning Ordinary labor
tools
- School canteen - Dirty and dusty area due - Cleaning of school canteen - Cleaning materials Ordinary labor
to construction works
- Unpainted walls and - Painting of walls and - Paints, brushes and rollers At least 10 workers
ceiling ceiling
- School Fence
- Pavement
- Nipa Hut/ Students Damaged floors and roof of 3 Repair of floor and Bamboos, nails, lumber, tie wires, Atleast 10 workers
Shed nipa huts replacement of anahaw roofs anahaw roofings, varnish, 2 carpenters
brushes
- Disaster Risk - Presence of tall mango - Pruning/cutting of - Bolo axe At least 5 workers
Reduction tree branches
Management
- no evacuation plan and - Posting of evacuation plan - Coupon, card board, plastic Atleast 1 worker
guide posted and guide in every area covers, , adhesives
- fire extinguishers are not - Installation of fire - Fire extinguishers, metals Atleast 2 laborer, 1 welder
installed extinguishers plate, screw, drill gun
CONDITION Nature of Manpower
Remarks
(Check One) improvement Needed Material Resources Needed(Indicate
FACILITIES (e.g. repair, Needed (Indicate kind quantity and nature
Satisfactor Unsatisfacto If Unsatisfactory, repainting, and quality) of labor services
y ry describe the problem replacement, etc) needed)
- no emergency kit for - Purchase emergency kit - Teachers Emergency kit
teachers for teachers
SY 2017-2018
BRIGADA ESKWELA
SCHOOL WORK PLAN
Instruction: List down all the specific activities that you will be undertaking in relation to the conduct of Brigada Eskwela in your school
and fill in the required information. Add another sheet if needed. Once completed, submit a copy to the adopt-A-School Program coordinator or
Brigada Eskwela coordinator of your division on or before January 31.
Signature over Printed name Date Prepared ASP Division Coordinator/ BE coordinator
BE Form 03
SY 2017-2018
BRIGADA ESKWELA
RESOURCE MOBILIZATION FORM
Instruction: Using the completed BE Form 01: Physical Facilities Needs Assessment as basis, summarize the resources (materials and
manpower) needed and list down the potential source or partners to be tapped. Add additional sheet if needed. The Status and Remarks
columns should be updated regularly to determine progress in acquiring resources needed.
Key
Strategies/Plan
Persons/Organization
Materials Needed Quantity of Person Responsible Status Remarks
to
Action
be Tapped
Key
Labor Strategies/Plan
Persons/Organization
Skills/Volunteers Quantity of Person Responsible Status Remarks
to
Needed Action
be Tapped
Carpenters
Mason
Painter
Electrician 2
Prepared by: Noted:
___________________________________________ _______________________________________________
BE Form 04
Republic of the Philippines
DEPARTMENT OF EDUCATION
REGION I
SCHOOLS DIVISION OFFICE I OF PANGASINAN
Lingayen
SY 2017-2018
BRIGADA ESKWELA
DAILY ATTENDANCE OF VOLUNTEERS
Date: ____________________
Instruction: Volunteers themselves should personally fill in the details required by this form under the supervision of any of the
committee members. For the last column, indicate if masonry, carpentry, plumbing, painting, electrical, gardening/landscaping, ordinary
labours or others.
TOTAL NATURE
NAME POSITION/ ADDRESS/ CONTACT TIME SIGNATUR NUMBERS OF
DESIGNATION ORGANIZATION/ NUMBER E OF VOLUNTEER
AFFILIATION IN OU HOURS SERVICES
T SERVED RENDERED
Noted:
___________________________________________ _________________________________
BE Form 05
SY 2017-2018
BRIGADA ESKWELA
RECORD OF DONATIONS RECEIVED
________________________________________________ ______________________________________________
BE Form 06
Republic of the Philippines
DEPARTMENT OF EDUCATION
REGION I
SCHOOLS DIVISION OFFICE I OF PANGASINAN
Lingayen
SY 2017-2018
BRIGADA ESKWELA
DAILY ACCOMPLISHMENT REPORT
Instruction: List down all the activities that needs to be undertaken for each day of the Brigada Eskwela week. At the end of each day,
please mark the appropriate column that corresponds to the status of each activity. Cite reasons for non-completion.
STATUS
Started but not REMARKS/RECOMMENDATIONS
Activities Completed yet Not done
completed
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
________________________________________________ ______________________________________________
BE Form 7
SY 2017-2018
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
BE Form 07
SY 2017-2018
A. SCOPE OR REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
What was done?
Others
Repaired Repainted Replaced
(Brief Description)
- School Grounds
- Roof / gutters
- Ceiling
- Walls
- Blackboards
- Chairs/desks/tables
- Water facilities
- Signage
- School Garden (Gulayan sa Paaralan)
- Lightings, switches and outlets, ceiling and wall fans
- Windows
- Doors
- Comfort rooms
- School canteen
- School Fence
- Pavement
School gate and arc
- Nipa Hut/ Students Shed
- Disaster Risk Reduction Management
-
-
BE Form 07
Republic of the Philippines
Department of Education
Region I
SCHOOLS DIVISION OF ILOCOS SUR
(Name of School)
(School Address)
School Year _________
TOTAL
BE Form 07
Republic of the Philippines
Department of Education
Region I
SCHOOLS DIVISION OF ILOCOS SUR
(Name of School)
(School Address)
School Year _________
C. VOLUNTEERS SERVICE
Number of Volunteers
Name of individuals/
Type of Volunteer
organization
Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 TOTAL
TOTAL
BE Form 07
F. LESSONS LEARNED
_____________________________
_________________________________________
School Head