Anda di halaman 1dari 3

SMHB Sdn. Bhd. Job No. : 798 Rev.

0
Job name : KK WATER SUPPLY - TELIBONG Sheet No.:
Structure : GENERATOR BLDG Designed by : WCK Date : ###
Section : REVISED CORBEL Checked by : Date :

Ref

CRANE DATA

Span between corbel ( same frame ) = 13.106 m


Weight of crane + crab = 39 kN
Weight of crab only = 9 kN
Minimum hook approach = 0.77 m
Span of crane rail ( bay c/c ) = 7 m
Weight of crane rail = 81.84 kg/m
Crane capacity = 50 kN
Wheel spacing = 1.875 m

Maximum static wheel load = 35.27 kN / wheel


Minimum static wheel load = 9.23 kN / wheel

For impact max wheel load = 44.08 kN / wheel


For impact min wheel load = 11.54 kN / wheel

Horizontal force transverse to rail = 1.475 kN / wheel


Horizontal force longitudinally along e = 1.76 kN / wheel

Vertical load of rail on each corbel = 5.73 kN

Ultimate max vertical load on a corbe = 115 kN


(1 wheel exactly at corbel )

Ultimate Min vertical load on a corbel = 36 kN


(1 wheel exactly at corbel )

Ultimate transverse force on a corbel = 4 kN


SMHB Sdn. Bhd. Job No. : 798 Rev. 0
Job name : KK WATER SUPPLY - TELIBONG Sheet No.:
Structure : GENERATOR BLDG Designed by : WCK Date : ###
Section : REVISED CORBEL Checked by : Date :

Ref
SMHB Sdn. Bhd. Job No. : Rev. 0
Jurutera Perunding Calc sheet no.
Job name : Drawings nos.
Structure : Designed by : WTF Date : 5/26/2017
Section : Checked by : Date :
Reviewed by : Date :
Ref
Input av
Fv = 32 kN
av = 150 mm av< d,OK Fv

b = 200 mm Ft hy =
0.45h to
h = 200 mm Fc 0.6h
z

h
hy = 120 mm d
Reinf. dia = 12 mm 0.9x

cover = 30 mm
d = 164 mm L
av / d = 0.915 mm 0.9 x cos
fcu = 40
Reynold H/bk fy = 460 N/mm2
link dia = 10 mm
L = 500 mm
k = 0.02963 k = Fv / (0.9 fcu b av )
z = 155.1061 mm = 0.946 d
x = 20 mm = 0.121 d x = ( d - z )/0.45
x/d = 0.121 < 0.615 The Steel will have yielded before concrete crashes

Steel Strain st = cc( d - x / x ) = 0.02554 > y = 0.00219


Steel Stress fst = Es st = 460 N/mm2

Moment Check :
Ft = 30.94655 kN Ft = N cot
Ast req. = 77.36638 mm2
Ast min = 131.2 mm2
Ast max = 426.4 mm2
Bar size = 12 mm
No. of bar = 2 mm
Asprovided = 226 mm2 Reinf. sufficient
= 0.689618 %

Shear Capacity Check :

2d / av = 2.187
vc(C25 conc) = 0.79 ( 100 As / ( bv d ))1/3 ( 400 / d )1/4 /m m = 1.25
= 0.698

vc (C30 conc) = vc(C25 conc) * ( fcu / 25 )1/3


= 0.816

Max. vc = vc*2d / av = 1.784 N/mm2


v = V / bd = 0.976 N/mm2

Shear reinforcement :
v-2dvc/av = -0.809 Not less than 0.4
Asv = 27.460 mm2 < 0.5 Ast = 113.097

- Combined As + Asv should be within the limits of 0.6% minimum and 2.0% maximum of b * d

Main bars Min. Asv No. of link Asv Combined Limiting of combined
Ast = 1/2*Ast provided provided Ast + Asv Ast + Asv

( mm2 ) ( mm2 ) ( mm2 ) (%)


226 113 2 314 OK 540 1.65 Value OK

Result : Reinforcement = 2T12


Shear link provided = 2T10

Anda mungkin juga menyukai