0 penilaian0% menganggap dokumen ini bermanfaat (0 suara)
14 tayangan1 halaman
This document provides a table of contents for a report on assessing the impact of connecting a solar photovoltaic power plant to CENECO's distribution system. The document outlines that the report will include sections on background information, study conditions and methodology, a description of CENECO's distribution system, load flow assessment including thermal capacity and voltage, fault level assessment, and a summary of results and conclusions. Key criteria that will be evaluated include power flow, fault current, thermal capacity under base and solar conditions, voltage levels under base and two test cases, and safety margins of equipment.
This document provides a table of contents for a report on assessing the impact of connecting a solar photovoltaic power plant to CENECO's distribution system. The document outlines that the report will include sections on background information, study conditions and methodology, a description of CENECO's distribution system, load flow assessment including thermal capacity and voltage, fault level assessment, and a summary of results and conclusions. Key criteria that will be evaluated include power flow, fault current, thermal capacity under base and solar conditions, voltage levels under base and two test cases, and safety margins of equipment.
This document provides a table of contents for a report on assessing the impact of connecting a solar photovoltaic power plant to CENECO's distribution system. The document outlines that the report will include sections on background information, study conditions and methodology, a description of CENECO's distribution system, load flow assessment including thermal capacity and voltage, fault level assessment, and a summary of results and conclusions. Key criteria that will be evaluated include power flow, fault current, thermal capacity under base and solar conditions, voltage levels under base and two test cases, and safety margins of equipment.
Distribution Impact Study Robinsons Land Corporation 500 KW On-Grid Three Phase Photovoltaic Power Plant Located in Robinsons Cybergate Bacolod, Araneta St. Brgy. Singcang, Bacolod City