Project Job Ref.

Bahar Warehouse GSS17/L-201


Section Sheet no./rev.
GSS Int.
Tyr main road
1
Ghazieh, Lebanon Calc. by Date Chk'd by Date App'd by Date
+961 7 222593 KH 25/5/2017

WIND LOADING (ASCE7-10)


In accordance with ASCE7-10 incorporating Errata No. 1 and Errata No. 2
Using the envelope design method
36000

10000
48000 36000
Plan Elevation

Building data
Type of roof; Gable
Length of building; b = 48000 mm
Width of building; d = 36000 mm
Height to eaves; H = 8500 mm
Pitch of roof; 0 = 4.8 deg
Mean height; h = 8500 mm
End zone width; a = max(min(0.1min(b, d), 0.4h), 0.04min(b, d), 3ft) = 3400 mm
Plan length of Zone 2/2E when GCpf negative; LZ2 = min(0.5 d, 2.5 H) = 18000 mm
Plan length of Zone 3/3E encroachment on zone 2; LZ3 = max(0 ft,0.5 d - LZ2) = 0 mm

General wind load requirements


Basic wind speed; V = 45.0 m/s
Risk category; II
Velocity pressure exponent coeff (Table 26.6-1); Kd = 0.85
Exposure category (cl.26.7.3); C
Enclosure classification (cl.26.10); Enclosed buildings
Internal pressure coef +ve (Table 26.11-1); GCpi_p = 0.18
Internal pressure coef ve (Table 26.11-1); GCpi_n = -0.18
Topography
Topography factor not significant; Kzt = 1.0

Velocity pressure
Velocity pressure coefficient (T.28.3-1); Kz = 0.96
Velocity pressure; qh = 0.6131N/m2 Kz Kzt Kd V2 / (1m/s)2 = 1.0 kN/m2
Project Job Ref.
Bahar Warehouse GSS17/L-201
Section Sheet no./rev.
GSS Int.
Tyr main road
2
Ghazieh, Lebanon Calc. by Date Chk'd by Date App'd by Date
+961 7 222593 KH 25/5/2017

Design wind pressures


Design wind pressure equation; p = qh [(GCpf) - (GCpi)];

Design wind pressures Loadcase A


p(+GCpi) p(-GCpi)
Zone GCpf Area (m2) +Fwi (kN) -Fwi (kN)
(kN/m2) (kN/m2)
1; 0.40; 0.2; 0.6; 350; 78.3; 206.4;
2; -0.69; -0.9; -0.5; 744; -657.9; -385.7;
3; -0.37; -0.6; -0.2; 744; -415.9; -143.7;
4; -0.29; -0.5; -0.1; 350; -167.3; -39.1;
1E; 0.61; 0.4; 0.8; 58; 25.3; 46.4;
2E; -1.07; -1.3; -0.9; 123; -156.0; -111.1;
3E; -0.53; -0.7; -0.4; 123; -88.6; -43.7;
4E; -0.43; -0.6; -0.3; 58; -35.8; -14.7;

1500
8500
2
3E
4E

1
2E
0
20
41
36
00
0 1E

00
68

Loadcase A

Design wind pressures Loadcase B


p(+GCpi) p(-GCpi)
Zone GCpf Area (m2) +Fwi (kN) -Fwi (kN)
(kN/m2) (kN/m2)
1; -0.45; -0.6; -0.3; 350; -224.2; -96.1;
2; -0.69; -0.9; -0.5; 744; -657.9; -385.7;
3; -0.37; -0.6; -0.2; 744; -415.9; -143.7;
4; -0.45; -0.6; -0.3; 350; -224.2; -96.1;
5; 0.40; 0.2; 0.6; 304; 67.9; 179.0;
6; -0.29; -0.5; -0.1; 304; -145.0; -33.9;
Project Job Ref.
Bahar Warehouse GSS17/L-201
Section Sheet no./rev.
GSS Int.
Tyr main road
3
Ghazieh, Lebanon Calc. by Date Chk'd by Date App'd by Date
+961 7 222593 KH 25/5/2017

1E; -0.48; -0.7; -0.3; 58; -38.8; -17.6;


2E; -1.07; -1.3; -0.9; 123; -156.0; -111.1;
3E; -0.53; -0.7; -0.4; 123; -88.6; -43.7;
4E; -0.48; -0.7; -0.3; 58; -38.8; -17.6;
5E; 0.61; 0.4; 0.8; 29; 12.8; 23.6;
6E; -0.43; -0.6; -0.3; 29; -18.2; -7.5;

3 6

1500
6E

8500
2
3E
4E

1
2E
5 0
20
41
32
6 00
5E 1E

00
00

68
34

Loadcase B

Design wind pressures Loadcase AT


p(+GCpi) p(-GCpi)
Zone GCpf Area (m2) +Fwi (kN) -Fwi (kN)
(kN/m2) (kN/m2)
1; 0.40; 0.2; 0.6; 146; 32.7; 86.2;
2; -0.69; -0.9; -0.5; 311; -274.7; -161.0;
3; -0.37; -0.6; -0.2; 311; -173.6; -60.0;
4; -0.29; -0.5; -0.1; 146; -69.8; -16.3;
1E; 0.61; 0.4; 0.8; 58; 25.3; 46.4;
2E; -1.07; -1.3; -0.9; 123; -156.0; -111.1;
3E; -0.53; -0.7; -0.4; 123; -88.6; -43.7;
4E; -0.43; -0.6; -0.3; 58; -35.8; -14.7;
1T; -; 0.1; 0.1; 204; 11.4; 30.1;
2T; -; -0.2; -0.1; 433; -95.8; -56.2;
3T; -; -0.1; 0.0; 433; -60.6; -20.9;
4T; -; -0.1; 0.0; 204; -24.4; -5.7;
Project Job Ref.
Bahar Warehouse GSS17/L-201
Section Sheet no./rev.
GSS Int.
Tyr main road
4
Ghazieh, Lebanon Calc. by Date Chk'd by Date App'd by Date
+961 7 222593 KH 25/5/2017

4T 3T

1500
2T
3

8500
3E
4E 2 1T

0 00
2E 24
1
36
00
0 1E 2 00
17

00
68

Loadcase AT

Design wind pressures Loadcase BT


p(+GCpi) p(-GCpi)
Zone GCpf Area (m2) +Fwi (kN) -Fwi (kN)
(kN/m2) (kN/m2)
1; -0.45; -0.6; -0.3; 350; -224.2; -96.1;
2; -0.69; -0.9; -0.5; 744; -657.9; -385.7;
3; -0.37; -0.6; -0.2; 744; -415.9; -143.7;
4; -0.45; -0.6; -0.3; 350; -224.2; -96.1;
5; 0.40; 0.2; 0.6; 152; 33.9; 89.3;
6; -0.29; -0.5; -0.1; 152; -72.4; -16.9;
1E; -0.48; -0.7; -0.3; 58; -38.8; -17.6;
2E; -1.07; -1.3; -0.9; 123; -156.0; -111.1;
3E; -0.53; -0.7; -0.4; 123; -88.6; -43.7;
4E; -0.48; -0.7; -0.3; 58; -38.8; -17.6;
5E; 0.61; 0.4; 0.8; 15; 6.5; 12.0;
6E; -0.43; -0.6; -0.3; 29; -18.2; -7.5;
5T; -; 0.1; 0.1; 167; 9.3; 24.5;
6T; -; -0.1; 0.0; 167; -19.9; -4.7;
Project Job Ref.
Bahar Warehouse GSS17/L-201
Section Sheet no./rev.
GSS Int.
Tyr main road
5
Ghazieh, Lebanon Calc. by Date Chk'd by Date App'd by Date
+961 7 222593 KH 25/5/2017

6T
4

1500
6

6E

8500
2
3E
4E
5T 1
2E
18 0
00 20
0
5 41

14 5E 1E
60
0
00
00

68
34

Loadcase BT

Anda mungkin juga menyukai