Anda di halaman 1dari 1

WATER NOC

P.O.BOX : 564, Tel: 04-3244444, Fax: 04-3240801


DUBAI, U.A.E. Web: www.dewa.gov.ae
502500 502600 ion
502700 502800
r at 226-0610
O pe
In 226-0730
M
M
0 -
15
2796600

2796600
n -
a tio
r
O pe
In
M -
- M
0
226-0740 15

-
PRO. BLDG
2796500

2796500
d
a
o
R

226-0732
8068958
h
a

226-5458
d
a
iy
Q
l
-A
8

226-0742
n
a tio
er
Op
In
2796400

2796400
M
M
5
22 ion
MAIN METER LOCATION r at
AS PER DM APPROVAL O pe
WM In
M
M
226-5438 T 32 226-0595
n E
tio E
e ra R
Op
T
In -S 226-0592
6
M
M d 1
Z

5 15 226-0624
22
-

/
10 0 MM
.65 .79
26 20

226-0575
dZ

0M 226-0594
226-5439 M In O 226-0625
In p
O p erat

41
era ion
502500 502600 502700
226-0609
226-0608 226-0607
502800
tio
n
226-0718
dd 27 .
Z
8.8
5
8
1.6

NOTE :
PLOT TO BE DEMARCATED AND P&E (WATER) -
DEWA MUST BE NOTIFIED ( TEL : 04 3220632 , 04 3220631 )
PRIOR TO START EXCAVATION WORKS AND INSTALLATION /
MOBILIZATION OF MACHINARIES / EQUIPMENTS FOR NECESSARY
CHECKING OF SERVICES WITHIN THE PLOT.
THE OWNER WILL BE RESPONSIBLE FOR THE CHECKING
OR RELOCATIONS WATER PIPELINE FOUND WITHIN THE PLOT. NOC NO : 8068958
NOTES:
DM NOC REF. : 226
NO OBJECTION COMMUNITY : 226 - AL TWAR FIRST

SUBJECT TO CONDITIONS IN THE ENCLOSED NOTES.


DEWA (W) NOC IS VALID UP TO (6) SIX MONTHS FROM
REVALIDATED PLOT NO : 226-5458
OWNER : DUBAI MUNCIPALITY
THE DATE OF ISSUE. ISSUED TO : GAMMA CONTRACTING LLC
WATER NETWORK LEGEND PURPOSE : G+4 RESIDENTIAL BLDG.
CONTRACTOR MUST OBTAIN NOC FOR TAPPING CONTROL VALVE WATER LINE
CONSTRUCTION PRIOR TO COMMENCEMENT Common Tap
b Non-Return In Service (AC Line) SCALE 1 : 2000
OF ANY WORKS WITH TRIAL EXCAVATION DETAILS Single Tap SYSTEM VALVE In Service (LDPE Line) PREPARED BY : ALDOUS_VAZ
TAKEN BY CONSULTANT. CONSUMER METER
Ball Proposed
A

Bulk
THIS NOC PERMITS TO WORK WITHIN THE PLOT Combination B Butterfly ! ! Abandon CHECKED BY : WALEED
Double-Air APPROVED BY : DY.MANAGER (NOC) / SMEW
d DGate/dWash-Out
CONDUIT SYSTEM
LIMIT ONLY Filling Culvert
Standard
d Pressure-Relief Duct
WARNING
METER CASING
FlowMeter Single-Air Protective Slab
PressureMeter FITTING Protective Tunnel G/U WATER TANK : 33100 GAL
IT IS LIKELY THAT EXISTING LDPE LINES ARE PASSING
WaterQualityMeter Bend
6
WATER STRUCTURES
THROUGH YOUR PROPOSED WORKING AREA. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO LOCATE IT
PUMPS Cross d PumpHouse O.H WATER TANK : 9500 GAL
BY TRIAL EXCAVATION PRIOR TO THE COMMENCEMENT Pumps + Analyzer
End Cap
Reservoir
TOTAL QUANTITY : 33600 GAL

WATER WELL
OF THE WORK. DEWA WILL NOT BE RESPONSIBLE FOR WaterTank
ANY BREAKAGE TO THESE LINES. THE CHARGES WILL Waterwell LDPE Tee
SAMPLE POINTS Reducer PumpStation
BE MADE AS PER ACT (2)/1994 OF GOVERNMENT OF
DUBAI. Sample Points Z Tee TreatmentPlant
A4 DATE : 19-Mar-2017 SHEET NO : 1 OF 1