Project: TBEA Energy (India) Pvt. Ltd., Karjan, Vadodara.

Electrical power required for AC system:


Connected
No Area Item Description
Electrical Load
1 Factory Area a Air Cooled Screw Chiller 300 TR 4 nos. each of 411 KW 1644 KW
b Chw Pumps 4 nos each pump of 50 KW 200 KW
c Pressurized expansion tank of 7.5 KW 7.5 KW
ASSEMBLY WORKSHOP
d 2 Stage AHU 40000 CMH @ 80 MM St.Pr with 64 TR 75 KW
cooling coil & Max Motor -15 KW 5 Nos
e Strip Heater for Humidity Control ( 60 KW / each AHU x 5 300 KW
AHUs)
COIL WORKSHOP
f 2 Stage AHU 40000 CMH @ 80 MM St.Pr with 65 TR 60 KW
cooling coil & Max Motor -15 KW 4 Nos
g Strip Heater for Humidity Control ( 68 KW / each AHU x 4 272 KW
AHUs)
INSULATION PARTS PROCESSING ROOM
h 2 Stage AHU 19000 CMH @ 80 MM St.Pr with 25 TR 5.5 KW
cooling coil & Max Motor -5.5 KW 1 Nos
i Strip Heater for Humidity Control ( 30 KW / each AHU x 1 30 KW
AHU )
LOW HUMIDITY ROOM
j De-humidifier appx. 200 TR cooling coil for fresh air 505
with electrical heater of appx. 490 KW for regeneration
process. Fan motor considered is of 15 KW.
2 Office area a VRF system for Office area 17000 sqft approx. 180 KW
TOTAL 3279 KW

Electrical power required for Process and Test system:


Connected
No Item Description
Electrical Load
1 Process water Pumps- 2 nos. (1W + 1S) of 37 KW 37 KW
2 Cooling Tower for Process 1 no. of 5.5 KW 5.5 KW
3 Test water Pumps- 3 nos. (2W + 1S) of 75 KW 150 KW
4 Cooling Tower for Test 2 nos. of 22 KW 44 KW
TOTAL 237 KW
Electrical power required for Ventilation system:
Connected
No Area Item Description
Electrical Load
Kerosene Vapour 20000 CMH rooftop centrifugal exhaust fan of 3 KW 6 KW
1 a
Phase Drying Room 2nos.
15000 CMH rooftop centrifugal exhaust fan of 1.5 3 KW
b
KW 2nos.
2 Kerosene Vapour a 20000 CMH rooftop centrifugal exhaust fan of 3 KW 6 KW

Page 1 of 2
Project: TBEA Energy (India) Pvt. Ltd., Karjan, Vadodara.

Phase Drying Room 2nos.


15000 CMH rooftop centrifugal exhaust fan of 1.5 3 KW
b
KW 2nos.
2000 CMH inline square centrifugal fan of 0.55 KW 1.1 KW
c
2 nos.
Extreme High Voltage 66 KW
3 a 30000 CMH axial fan of 5.5 KW 12 nos.
Test Hall
3000 CMH fluidic air handling units of 0.64 KW 13 KW
b
20 nos.
Change switch and 11000 CMH sidewall axial exhaust fan of 1.1 KW 4.4 KW
4 a
capacitor room 4 nos.
Capacitor area motor 11000 CMH sidewall axial exhaust fan of 1.1 KW 6.6 KW
5 a
generate room 6 nos.
TOTAL 110 KW

Summary:
No System Connected Electrical Load
1 Total load of AC System 3279 KW
2 Total load of Process and Test System 237 KW
3 Total load of Ventilation System 110 KW
GRAND TOTAL 3626 KW

Page 2 of 2