Anda di halaman 1dari 3

Project Spreadsheets to BS 8110 The Concrete Centre

Client Advisory Group Made by Date Page


Location North Staircase RMW 31-May-17 145
REINFORCED CONCRETE STAIRCASES to BS 8110:2005 Checked Revision Job No
Originated from RCC72.xls v4.0 on CD 2006 TCC chg - R68

FLIGHT 5
Waist = 150 mm a = 2.500 m b = 0.600 m c = 0.600 m
L = 3.700 m
Waist 4.20
Steps 1.88
Finishes 0.50
6.57 kN/m n5 = 15.60 kN/m 19.50 19.50

M = 19.50 x ( 1.850 - 0.625 ) = 23.89 kNm/m d = 124 mm K = 0.0444


As = 561 mm PROVIDE 9 H12 @ 130 B = 1018 mm L/d = 29.839 < 30.921 allowed OK
As increased by 67.0 % for deflection
LANDING 4 +7.000 m
h = 150 mm L = 2.800 m

Self wt 3.54 n5 = 16.25 kN/m


Finishes 1.30 n4 = 16.25 kN/m
4.84 kN/m nd = 13.18 kN/m 37.95 37.95

M = 37.95 x 1.400 - 12.91 - 14.14 = 26.08 kNm/m d = 124 mm K = 0.0485


As = 616 mm PROVIDE 7 H12 @ 180 B = 792 mm L/d = 22.581 < 24.984 allowed OK
As increased by 12.4 % for deflection
FLIGHT 6
Waist = 150 mm a = 2.500 m b = 0.600 m c = 0.375 m
L = 3.475 m
Waist 4.20
Steps 1.88
Finishes 0.50
6.57 kN/m n6 = 15.60 kN/m 18.24 20.77

M = 18.24 x ( 1.769 - 0.585 ) = 21.61 kNm/m d = 124 mm K = 0.0401


As = 506 mm PROVIDE 7 H12 @ 180 B = 792 mm L/d = 28.024 < 30.077 allowed OK
As increased by 38.0 % for deflection
LANDING 5 +8.750 m
h = 150 mm L = 2.800 m

Self wt 3.54 n5 = 16.25 kN/m


Finishes 1.30 n6 = 15.20 kN/m
4.84 kN/m ne = 13.18 kN/m 37.65 36.99

M = 37.65 x 1.377 - 12.49 - 13.69 = 25.65 kNm/m d = 124 mm K = 0.0477


As = 605 mm PROVIDE 6 H12 @ 220 B = 679 mm L/d = 22.581 < 22.669 allowed OK
As increased by 11.7 % for deflection
LANDING 6 +10.500 m
h = 150 mm L = 2.800 m

Self wt 3.54 n6 = 27.69 kN/m


Finishes 1.30
4.84 kN/m nf = 13.18 kN/m 26.46 43.66

M = 43.66 x 1.119 - 8.25 - 15.10 = 25.52 kNm/m d = 125 mm K = 0.0467


As = 373 mm PROVIDE 6 H10 @ 130 B = 471 mm L/d = 22.400 < 25.042 allowed OK
As increased by 9.7 % for deflection
Project Spreadsheets to BS 8110
Location North Staircase
REINFORCED CONCRETE STAIRCASES to BS 8110:2005 Made by RMW Job No R68
Originated from RCC72.xls v4.0 on CD 2006 TCC Date 31-May-17

CHOOSE BAR DIAMETERS

Flight 1 Flight 2 Landing 1 Flight 3 Landing 2 Flight 4 Landing 3 Flight 5 Landing 4 Flight 6 Landing 5 Landing 6
M 15.60 23.89 24.48 23.89 26.08 23.89 26.08 23.89 26.08 21.61 25.65 25.52
h 150 150 150 150 150 150 150 150 150 150 150 150
assume d = 124 124 124 124 124 124 124 124 124 124 124 124
K 0.0290 0.0444 0.0455 0.0444 0.0485 0.0444 0.0485 0.0444 0.0485 0.0401 0.0477 0.0474
z 117.80 117.55 117.38 117.55 116.92 117.55 116.92 117.55 116.92 117.80 117.04 117.08
As/m 304.54 467.47 479.61 467.47 512.98 467.47 512.98 467.47 512.98 421.86 504.14 501.33
=% 0.2456 0.3770 0.3868 0.3770 0.4137 0.3770 0.4137 0.3770 0.4137 0.3402 0.4066 0.4043
Clause b? N N N N N N N N N N N N
Smax 310.00 310.00 310.00 310.00 310.00 310.00 310.00 310.00 310.00 310.00 310.00 310.00
Min spaces 4 4 4 4 4 4 4 4 4 4 4 3
S 277.00 277.00 277.00 277.00 277.00 277.00 277.00 277.00 277.00 277.00 277.00 219.33
Dia 10 12 12 12 12 12 12 12 12 12 12 10

0 6
8 8
10 10
12 12
16 16
20 20
25 25
32 32
Disclaimer
All advice or information from MPA-The Concrete Centre is intended for those who will evaluate the significance and limitations of its
contents and take responsibility for its use and application. No liability (including that for negligence) for any loss resulting from such advice
or information is accepted by MPA-The Concrete Centre or its subcontractors, suppliers or advisors. Users should note that all MPA-The
Concrete Centre software and publications are subject to revision from time to time and they should therefore ensure that they are in
possession of the latest version.

This spreadsheet should be used in compliance with the accompanying publication 'User Guide RC Spreadsheets: v4' available from The
Concrete Centre www.concretecentre.com/rcdesign Tel +44 (0)1276 606800

Status of spreadsheet This spreadsheet is shareware but may not be used for commercial purposes until the user
Public release version. has registered with The Concrete Centre using the licence validation form available on The
Concrete Centre website www.concretecentre.com/rcdesign

Revision history RCC72 Stairs & Landings - Multiple

Date Version Action Size (kB)


1-Apr-10 RCC72 v4.0 Re-badged as TCC/Mineral Products Association. 536
16-Oct-08 RCC72 v3.2 Landing widths corrected in cells STAIRCORE C93, C114 etc. 532
28-Jun-06 RCC72 v3.1 v3 release. Page nos, User Guide and registration details amended. 506
12-Nov-05 RCC72 v3.0 Updated to 2005 versions of BS8110 & BS8666 531
22-Jan-03 RCC72 v2.1 DETR logo replaced by DTI. 497
11-Oct-02 RCC72 v2.0 Version 2 enhancements 516
First public release.
3-Aug-99 RCC72 v1.0 429
Includes b version comments