Anda di halaman 1dari 1

The data needed for preparation of EIA documents of the power plant activities in Kubu Raya

Regency, West Kalimantan Province.


1. Aspects of legality / permit:
a. Tutorial Land from Regent of Kubu Raya
b. Recommendations from Regent of Kubu Raya to permit the location of the power plant
c. Spatial suitability from BAPPEDA of Kubu Raya Regency
d. Indicative Map Delays New License (PIPIB) and Forest Area Consolidation Centres
(BPKH)
e. Company deed
f. Taxpayer Identification Number (TIN)
g. Permit Place of Business (AIS)
h. Trading Business License (License)
i. Company Registration (TDP)
j. Approval of society
k. Organizational structure of the company

2. The technical aspects of the document:


a. Feasibility Study Report / FS (Feasibility Study)
includes:
Map Layout location of the power plant
Power Plant Layout Design
designation of land use (land use type and extent of each building) including green open
space (RTH)
The building design Generating Power Plant (technical specifications + layout) or Detail
Engineering Design of Power Plant.
Design of jetty, layout, and specifications
Layout of drainage
topography and bathimetry
The location of B3 waste at site of Power Plant
Design of the WWTP (Waste Water Treatment Plant) and Design of Water Treatment
b. Estimated usage
The type and amount of heavy equipment and materials used
The number of workers and specifications, necessary at the stage of construction and
operation
Sources and Capacity of Clean Water are used for the activities of the power plant
The type and amount of fuel used
c. System (K3) Occupational Health and Safety / SOP