PROYECTO XXXXXXXX CALCUL: L.L.

CLIENTE XXXXXXXX REVIS: M.I. DISEO DE


ESTRUCTURA XXXXXXXX APROB: L.Z. CONEXIONES
PLANCHA BASE DE COLUMNA -LRFD FECHA: 1/15/2003

C D E E D C

bf A
Vx
P

Mx

1. Materiales

Esfuerzo de cedencia del acero


Plancha : Fy = 2500 kg/cm2
Resistencia deMx
Concreto a 28 d.
Concreto: f'c = 280 kg/cm2

2. Geometra de los componentes

COLUMNA PERNOS DE CONEXIN


ELEMENTO DESIG. d (cm) bf (cm) tf (cm) tw (cm) DIA. (cm) CANTIDAD Ab (cm2)

COLUMNA W10*49 25.30 25.40 1.42 0.86 22.00 6.00 3.88

PLANCHA BASE

GEOMETRIA PLANCHA A (cm) B (cm) C (cm) D (cm) E (cm) F (cm)


VALORES SUGERIDOS 36.00 46.00 5.17 5.18 12.65 5.30

PEDESTAL
bx (cm) by (cm)
55.00 55.00

3. Solicitaciones actuantes

Caso de Carga: 1,2 DL + 1,6 LL


Corte : V = 4780 kg
Carga Vertical: P= 9628 kg
Momento: M = 567000 kg-cm (Moment)

4. Excentricidad

e= 58.89 cm e > B/2, CASO 4

LAST REV:130GD05U 13/08/99, L.Z 357156451.xls 1/2


LAST REV:130GD05U 13/08/99, L.Z 357156451.xls 1/2
PROYECTO XXXXXXXX CALCUL: L.L.
CLIENTE XXXXXXXX REVIS: M.I. DISEO DE
ESTRUCTURA XXXXXXXX APROB: L.Z. CONEXIONES
PLANCHA BASE DE COLUMNA -LRFD FECHA: 1/15/2003

CASE 1 - e=0 THIS SHEET IS NOT VALID. SEE CASE 4

P
P

0,95d m
0,8bf n

fp = P/A fp = P/A

M1 M1 M2 M2

Moment Diagram (x) Moment Diagram (y)

0,8bf= 20.32 cm m= 10.98 cms

Fp= 285.6 kg/cm2 n= 7.84 cms

fp= 5.81 kg/cm2 Fp

M1 = 350.63 kg-cm

M2= 178.68 kg-cm

tpl= 8 mm

LAST REV. 130GD05u 13/08/99 L.Z 357156451.xls 2/2


LAST REV. 130GD05u 13/08/99 L.Z 357156451.xls 2/2
PROYECTO XXXXXXXX CALCUL: L.L.
CLIENTE XXXXXXXX REVIS: M.I. DISEO DE
ESTRUCTURA XXXXXXXX APROB: L.Z. CONEXIONES
PLANCHA BASE DE COLUMNA -LRFD FECHA: 1/15/2003

CASE 2 - e <= B/6 THIS SHEET IS NOT VALID. SEE CASE 4

P
M

Critical section

f2 f3 f1

a= 10.9825 cm (Critical section)

Fp= 142.8 kg/cm2 1,70*f'c

f1= -38.85 kg/cm2 Fp

f2= 50.47 kg/cm2 Fp OK

f3= 29.15 kg/cm2

fu1= 50.47 kg/cm2


fu2= -38.85 kg/cm2
fu3= 29.15 kg/cm2

Mplu= 2615.27 kg-cm (on critical section)

tpl= 22 mm

LAST REV. 130GD05u 13/08/99 L.Z. 357156451.xls 2/2


LAST REV. 130GD05u 13/08/99 L.Z. 357156451.xls 2/2
PROYECTO XXXXXXXX CALCUL: L.L.
CLIENTE XXXXXXXX REVIS: M.I. DISEO DE
ESTRUCTURA XXXXXXXX APROB: L.Z. CONEXIONES
PLANCHA BASE DE COLUMNA -LRFD FECHA: 1/15/2003

CASE 3 - B/6 < e <= B/2 THIS SHEET IS NOT VALID. SEE CASE 4

Critical section

f2 f1

N= -107.67 cm 0

Fp= 142.8 kg/cm2 1.70*f'c

f1= -4.97 kg/cm2 Fp 0

fcrit.= -5.47 kg/cm2

a= 10.98 cm (Critical section)

fu1= -4.97 kg/cm2


fu2= -5.47 kg/cm2

Mplu= -309.78 kg-cm (on critical section)

tpl= 8 mm

LAST REV. 130GD05u 13/08/99 L.Z 357156451.xls 2/2


LAST REV. 130GD05u 13/08/99 L.Z 357156451.xls 2/2
PROYECTO XXXXXXXX CALCUL: L.L.
CLIENTE XXXXXXXX REVIS: M.I. DISEO DE
ESTRUCTURA XXXXXXXX APROB: L.Z. CONEXIONES
PLANCHA BASE DE COLUMNA -LRFD FECHA: 1/15/2003

CASE 4 - e > B/2 "VALID CASE FOR DESIGN"

P
M

Critical section

T
fp
N'

N
B'

N'= 17.83 cm

B'= 40.83 cm

fp= 142.8 kg/cm2

N= 7.50

a= 10.9825 cm (Critical section)

Mplu= 4541.18 kg-cm (on critical section)

tpl= 29 mm

T= 9643 Resultance force in the anchor bolts

LAST REV. 130GD04u 13/08/99 L.Z 357156451.xls 2/2


LAST REV. 130GD04u 13/08/99 L.Z 357156451.xls 2/2
PROYECTO XXXXXXXX CALCUL: L.L.
CLIENTE XXXXXXXX REVIS: M.I. DISEO DE
ESTRUCTURA XXXXXXXX APROB: L.Z. CONEXIONES
PLANCHA BASE DE COLUMNA -LRFD FECHA: 1/15/2003

CASE 5 - Pu < 0 (UPLIFT) THIS SHEET IS NOT VALID. SEE CASE 4

B
C D E E D C

g bf A
P

F
d

g = 10.00 cm

tpl = 8 mm

LAST REV:130GD05U 12/08/99, L.Z 357156451.xls 1/2