Anda di halaman 1dari 40

INERTING / VAPORIZER,SPRAY LINE & RELIEF VALVE

SA06 SA04
open valve
close valve VL022 VS022 VL012
VL024 VS012
VL014 VENT POST N01

VG944 VS904 VS952


VAP VS905
VG909 VS951
IGG
UNIT VI792 VI791
VL111
VL900
VS052

VS050

VS041 VS031 VS011


VS354 VS021 VS154
VL041 VL031 VL021
VS254 VL011

VS260
VL300 SA22 VL 200 SA12 VL100

CARGO TANK No 3 CARGO TANK No.2 CARGO TANK No.1


CARGO TANK No 3 CARGO TANK No.2 CARGO TANK No.1

POST DOCKING TANK DRYING (IGG DRY AIR MODE)

open valve VENT POST N01


close valve

IGG VI 791
VI 792 VG172 VG173
VL900

VL310 VG371 VL210 VG271 VL110 VG171

VG270 VG170
SA 39,38,37,36,35 VG370 SA 29,28,27,26,25 SA19,18,17, 16,15
VL300 VL200 VL100

CARGO TANK No3 CARGO TANK No 2 CARGO TANK No 1


CARGO TANK No3 CARGO TANK No 2 CARGO TANK No 1

POST DOCKING TANK INERTING


C
D
VG937 L open valve
C close valve
VG936 VG993 D
L
VG934 VG932 VG931
VG935
VG900 TO HDC No1 MIST SEP

TO HDC No2
BLR VG903 VENT POST N01

VG901 VG172 VG173


VI 791 open 30%
VI 792 after 1hour
IGG
VL900 full shut VL111

SA13 SA11
SA33 SA31 SA23 SA21

VL310 VG371 VL210 VG271 VL110 VG171

SA32 SA22 VG270 SA12 V VG170


open 20% SA 39,38,37,36,35 VG370 open 20% SA 29,28,27,26,25 open 20% SA19,18,17, 16,15
after 1hour VL300 after 1hour VL200 after 1hour VL100
open 60% open 100% open 100%

CARGO
CARGO TANK No 3 CARGO TANK No.2 TANK No 1
CARGO
CARGO TANK No 3 CARGO TANK No.2 TANK No 1

POST DOCKING INERTING / LIQUID LINE (IG MODE)

open valve SA06 SA04


close valve VL022 VL021

OPEN20% VL024 VL014 VENT POST N01


OPEN20%

IGG VI 791 SA41


UNIT VI 792
VI 793 VL900 (open) VL111
OPEN20%

VL047
OPEN20% OPEN20%
VL043 VL033 VL013
VL023
VL041 VL031 VL011
VL0-21
SA09 SA07 SA03 SA01
NO.3 M/F NO.1 M/F

SA32 VL300 SA22 VL200 SA12 VL100

CARGO TANK No 3 CARGO TANK No.2 CARGO TANK No.1


CARGO TANK No 3 CARGO TANK No.2 CARGO TANK No.1
CARGO
CARGO
PIPING DIAGRAM LOW DUTY VG 937 open valve
DURING NAVIGATION By pass valve VG 933 (surge valve) close valve

Low Duty Heater

VG 935 VG 993
Low Duty
VG 934 VG 932
VG 936 IGV
VG 931
VG 904

H/D Comp.
BLR Mist Sep

VG 900 ( master valve) VG 901

VG 371 VG 271 VG 171

VG 370 VG 270 VG 170

CARGO TANK No.3 CARGO TANK No.2 CARGO TANK No.1


CARGO TANK No.3 CARGO TANK No.2 CARGO TANK No.1

VG 937 SHUT
VG 923 (surge valve) open valve
close valve
Low Duty Heater OPEN Shore
VG 935 VG 992 VG 922 No. 2 VG 921
OPEN VG 934 Duty
L/D Comp OPEN IGV
High

OPEN
VG 936 SHUT ESD VALVE
OPEN VG 904 VG 913 (surge valve) VG 072
20%

BLR OPEN
VG 900 ( Master valve) VG 911
No.1
Duty
OPEN VG 912 High
OPEN IGV

VG 905 OPEN
PIPING DIAGRAM HIGH DUTY DURING LOADING OPEN VG 903
VG 901 VG 079
SHUT
OPEN

VG 371 OPEN VG 271 OPEN VG 171


OPEN

VG 370 OPEN VG 270 OPEN VG 170


OPEN
VAPOR VAPOR VAPOR

CARGO TANK No.3 CARGO TANK No.2 CARGO TANK No.1


CARGO TANK No.3 CARGO TANK No.2 CARGO TANK No.1

GLYCOL WTR
STORAGE TANK

GLYCOL WTR
EXP TANK GW 904
HEATER

GW 931 V GLYCOOL WTR PUMP GW 903

GW 901 1 GW 902

HEATER

GW 924 GW 923
GW 911 2 GW 912

TO EACH COVERDAM

GW 304 GW 308

GW 305 GW 313
GW 309
GW 312
GW 302 GW 303 GW 306
GW 311
GW 307
GW 310

CARGO TANK CARGO TANK


CARGO TANK CARGO TANK

Swing check
VENT. OUT TO ATM TO BOILER/Engine room VN 710 TO COMPRESSOR ROOM
FOR N2 SEAL
vent out SET POINT 20 Kpa
BUFF NG4V primari cont v/v
TANK swing check VN 712
NG 1V NG 2V
OPEN NG3V VN 711
OPEN OPEN
MS1-A VN 713 (OPEN) VN 714
N2 UNIT SHUT EXH V/V (IBS)
TO ATM 1.15 OPEN
0.95 CLOSE
IV 302 OPEN
O2 OUT
filter 1 filter 3
HEATER
filter 2 EXH V/V (IS) IV 305 SHUT
R
0.8 OPEN
COMPRESSOR 1 OIL SEP 0.6 CLOSE SV 302 OPEN

aft cooler
N2 SUPPLY FOR IS ( OPEN 0.2 Kpa)
OILL COOLER water sep CONTROL VALVE (CLOSE 0.4 Kpa) SV 305 SHUT

O2 OUT VCV1A OPEN IS


F1-1B V17 VN 301 OPEN (VN 303)
IBS
N2 UNIT MS1B

air filter 3
HEATER CARGO TANK
air fiter 1 air filter 2 OPEN open
XV3B VN 305 VN 3O6
COMPRESSOR 2 oil sep
aft cooler

OIL COOLER water sep VN 308


SHUT N2 SUPP.V/V FOR IBS (OPEN 0.6 Kpa AND SHUT 0.8 Kpa)
WARMING UP STEP 1 ( BOTTOM FEED)
( THE WARMING UP DONE WHILE THE SHIP IS NAVIGATING IN INLAND SEA)
C
D
VG937 VG933 L open valve
C close valve
VG936 VG934 D VG 931
L
VG935 VG993 VG932
LDC HEATER 1
VG900 C
VG992 VG923 VG921
D
H
VG907 VG922

VG917 MIST SEP


VG916 VG991 VG913 VG911
C
D
H
VG915 VG914 VG912

MAIN HDC HEATER VG903 VL031


BLR

VG909 VG902
VG906 VG901
VG910

VL033
VL043 VL031 VG171
VG371 VL041 VG271
VL300 VG370 VL200 VG270 VL100 VG170

NO.3 TANK NO.2 TANK NO.1 TANK

WARMING UP STEP 2 ( TOP FEED)


( THE WARMING UP DONE WHILE THE SHIP IS NAVIGATING IN INLAND SEA)
C
D
VG937 VG933 L open valve
C close valve
VG936 VG934 D VG 931
L
VG935 VG993 VG932
LD HEATER 1
VG900 C
VG992 VG923 VG921
D
H
VG907 VG922

VG917 MIST SEP


VG916 VG991 VG913 VG911
C
D
H
VG915 VG914 VG912

MAIN HD HEATER VG903


BLR

VG909 VG902
VG906 VG901
VG910

VG171
VG371 VG271
VL300 VG370 VL200 VG270 VL100 VG170

NO.3 TANK NO.2 TANK NO.1 TANK

INERTING / LIQUID LINE

open valve SA06 SA04


close valve VL022 VL021

VL024 VL014 VENT POST N01

IGG VI792 VI791 SA41


UNIT
VL900 (open) VL111

VL047

VL043 VL033 VL013


VL023
VL041 VL031 VL011
VL0-21
SA09 SA07 SA03 SA01
NO.3 M/F NO.1 M/F

SA32 VL300 SA22 VL200 SA12 VL100


CARGO TANK No 3 CARGO TANK No.2 CARGO TANK No.1

INERTING / TANK ( 17 HOURS)


( BOTTOM FEED)
C
D
VG937 VG933 L
C open valve
VG936 VG934 D VG 931 close valve
L
VG935 VG993 VG932
LDC HEATER 1
VG900 C
VG992 VG923 VG921
D
H
VG907 VG922

VG917 MIST SEP


VG916 VG991 VG913 C VG911
D
H
VG915 VG914 VG912
MAIN
HDC HEATER VG903
BLR

VG909 VG902
VG906 VG901
VG910 VG172 VG173
IGG
VL111
VL900

SA11
VG171
VG371 VG271
SA 39,38,37,36,35 SA 29,28,27,26,25 SA19,18,17, 16,15
VL300 VG370 VL200 VG270 VL100 VG170

NO.3 TANK NO.2 TANK NO.1 TANK


N2 PURGE VAPORIZER,SPRAY LINE & RELIEF VALVE

VG917

VG916 VG914
HH
VG915

VG944 VS952
vap
VG906
VG951

VS356 VS156

NO1 M/F

NO3 M/F

VS357 VS257 VS157

C
D
L
C
D
L
C
D
VG937 L N2 PURGE COMPRESSORE ROOM BY GN2
C
C
D
VG936 VG934 D
L
VG935 L VG931
2
C
D
VG904 D
H VG921 MS
VG907 VG917 L
C
D
VG911
HH
H
VG916 VG903 VG905

VG906 VG909 VG902 VG901

VG908 VG910
VG079 N O.1 VENT POS

NO1 M/F
NO3 M/F

VL075

NO.3 CARGO TANK NO.2 CARGO TANK NO1 CARGO TANK


NO.3 CARGO TANK NO.2 CARGO TANK NO1 CARGO TANK

C
GNG FILLING (GASING UP)
D
VG937
L
D
VG936 VG934 L SA06 SA04
LDH VG935 VG932 VG931 VL022 VL021
TO NO.1 HDC
MS VL014 VENT POST N01
VG904 TO NO.2 HDC
VG900 VG903

VG905

VG944 VS904 VENT POST N01


VAP VS952
VG909
VG901
BLR

BLR VL111

VL900
UNIT

VG371 VG271 VG171


open 20% open 20% open 20%
after 1hour VL300 VG370 after 1hour VL200 VG270 after 1hour VL100 VG170
open 60% open 100% open 100%

CARGO TANK No 3 CARGO TANK No.2 CARGO TANK No.1


CARGO TANK No 3 CARGO TANK No.2 CARGO TANK No.1

C
D TANK COOL DOWN
TO LDC
L
2 VG072 VL021
VG922 VG921
D
H
VS012
C
D
L
1
VG912 D VG911
H

VG903

VG905

VG901 VG907

VS356 VS156

VS351 VG371 VS251 VG271 VS151 VG171

VG370 VG270 VG170

CARGO TANK No 3 CARGO TANK No.2 CARGO TANK No.1


CARGO TANK No 3 CARGO TANK No.2 CARGO TANK No.1

STEAM LINE FOR MOTOR AND COMPRESSOR ROOM


NO.1
G.W.H HS55 HS27 HS49
HS18
HS67 LOW DUTY
HS56 HS57 HEATER

LDC LO DRAIN POT


HEATER HS36 HS21
HTR HS20
HS58 HS13 HS22

HIGH DUTY
HS37 HEATER

NO.2 HS39 HS38


G.W.H NO2 HDC
LO HTR HS16 DRAIN POT
HS59 HS32
HS33 HS15
HS60 HS61 HS68 HS17
HS8

VAPORIZER
HS35
HS64 HS62 HS34
Hs66 HS63 DRAIN POT
NO1HDC HS11
to E/R HS65GV LO HTR HS28
HC4 HS10
DRAIN SEPARATOR DRAIN CLR HS12
from HS602 (E/R) HS29
HS45
HS 46V
DRAIN
TANK
DRAIN
HS47 HS44 HS31 TANK
from HS601 HS30 HS7V TO FO TANK FORE SIDE
E/Room
HC5 HC1 HC10 FROM FO TANK FORE SIDE to drain cooler E/R
To inspection tk E/R
open valve
close valve
DRAIN POT

Anda mungkin juga menyukai