Anda di halaman 1dari 1

PT AGINCOURT RESOURCES

Geotechnical & Hydrogeology


Line Mapping Sheet

Project: Date:
Location: Sheet: of:
Mapped by:
IDENTIFICATION PLUNGE TREND LENGTH (m) NORTH DATUM BFA NOTES OR COMMENTS
TRAVERSE .
LINE NORTHING EASTING RL (m)
DATA START
END
DISCONTINUITY SIZE WAVINESS MAJOR STRUCTURE

ROUGHNESS

LITHOLOGY

STRENGTH
THICKNESS
SPACING
LENGTH

WATER
COMMENTS
END

(cm)
DISTANCE TYPE DIP DIP DIR. INFILL ILA l EASTING NORTHING

Sketch

TYPE SPACING, l ROUGHNESS WATER STRENGTH


J Joint A < 0.25m K Slickensided 1 Closed; flow not possible R0 Thumbnail easily scratches core; blow with
JS Joint Set B 0.25-0.5m P Polish 2 Dry and open; no flow in past geological hammer leaves deep impression
CT Contact C 0.5-0.75m R Rough 3 Dry and stained; flow in past R1 Can be peeled by pocketknife; crumbles
S Shear D 0.75-1.0m S Smooth 4 Damp; flow recently under firm blows with geological hammer
SZ Sheared zone E 1.0-1.5m V Very rough 5 Wet; small seepage R2 Can be peeled by pocketknife with
F Fault F 1.5-2.0m 6 Measurable seepage difficulty; shallow indentation made by
VN Vein G 2-5m firm blow of geological hammer
B Bedding H 5-10m ENDS R3 Cannot be scraped or peeled with a
DK Dike I 10-15m 0 Discontinuous; both ends pocketknife; fractured by one blow of
J 15-20m terminate in outcrop geological hammer
INFILLING K 20-30m 1 Semi-continuous; one R4 Requires more than one blow of
0
Ca Calcite L 30-50m 1
2 end terminates in outcrop geological hammer to fracture
Cl Clay M > 50m 2 Continuous; no ends R5 Requires many blows of geological
Cln Clean terminate in outcrop hammer to fracture
Cp Calcopyrite WAVINESS
Is Iron Stain
Py Pyrite ILA
Qtz Quartz
RF Rock Flour
l

Anda mungkin juga menyukai