muro

DENSIDAD MINIMA DE MUROS

Z = 0.25 factor de zona 2 (Huanuco)


U = 1 Factod de uso en la categoria "C"
S = 1.2 suelo intermedio - zona S2
N = 5 Numero de pisos
Ap = 152 Area de terreno
L = Indicado cuadro
t = Indicado cuadro

PRIMER NIVEL

PARA LA DIRECCION X-X

ESPESOR T LARGO AREA DE


MURO APAREJO
(m) (m) MURO (m2)
X1 SOGA 0.23 2.85 0.6555
X2 SOGA 0.23 3.4 0.782
X3 SOGA 0.23 1.2 0.276
X4 SOGA 0.23 1.2 0.276
X5 SOGA 0.23 3.15 0.7245
X6 SOGA 0.23 1.35 0.3105
X7 SOGA 0.23 3.2 0.736
X8 SOGA 0.23 1.7 0.391
L*T 4.1515

1 L*T 4.1515
2** L*T/Ap 0.0273125
3** ZUSN/56 0.02678571

SI CUMPLE POR QUE 2** 3**

PARA LA DIRECCION Y-Y

ESPESOR T LARGO AREA DE


MURO APAREJO
(m) (m) MURO (m2)
Y1 SOGA 0.13 2.2 0.286
Y2 SOGA 0.13 2.75 0.3575
Y3 SOGA 0.13 3 0.39
Y4 SOGA 0.13 2.8 0.364
Y5 SOGA 0.13 2.8 0.364
Y6 SOGA 0.13 1.2 0.156
Y7 SOGA 0.13 2.15 0.2795
Y8 SOGA 0.13 1.45 0.1885
Y9 SOGA 0.13 2.3 0.299
Y10 SOGA 0.13 1.6 0.208
Y11 SOGA 0.13 2.5 0.325
Y12 SOGA 0.13 4.2 0.546
Y13 SOGA 0.13 3.4 0.442
Y14 SOGA 0.13 4.6 0.598
Y15 SOGA 0.13 4.8 0.624
Y16 SOGA 0.13 2.5 0.325
Y17 CABEZA 0.23 1.5 0.345
Y18 CABEZA 0.23 1.5 0.345
L*T 6.4425

1 L*T 6.4425
2** L*T/Ap 0.04238487
3** ZUSN/56 0.02678571

SI CUMPLE POR QUE 2** 3**

SEGUNDO AL QUINTO NIVEL

PARA LA DIRECCION X-X

ESPESOR T LARGO AREA DE


MURO APAREJO
(m) (m) MURO (m2)
X1 SOGA 0.23 2.85 0.6555
X2 SOGA 0.23 3.4 0.782
X3 SOGA 0.13 1.3 0.169
X4 SOGA 0.13 1.25 0.1625
X5 SOGA 0.13 1.25 0.1625
X6 SOGA 0.23 3.15 0.7245
X7 SOGA 0.13 1.5 0.195
X8 SOGA 0.23 3.15 0.7245
X9 SOGA 0.23 1.35 0.3105
X10 SOGA 0.13 1.2 0.156
X11 SOGA 0.13 1.2 0.156
L*T 4.198

1 L*T 4.198
2** L*T/Ap 0.02761842
3** ZUSN/56 0.02678571

SI CUMPLE POR QUE 2** 3**

PARA LA DIRECCION Y-Y


ESPESOR T LARGO AREA DE
MURO APAREJO
(m) (m) MURO (m2)
Y1 SOGA 0.13 2.2 0.286
Y2 SOGA 0.13 2.75 0.3575
Y3 SOGA 0.13 3 0.39
Y4 SOGA 0.13 2.85 0.3705
Y5 SOGA 0.13 2.85 0.3705
Y6 SOGA 0.13 2.85 0.3705
Y7 SOGA 0.13 2.15 0.2795
Y8 SOGA 0.13 1.45 0.1885
Y9 SOGA 0.13 2.3 0.299
Y10 SOGA 0.13 1.6 0.208
Y11 SOGA 0.13 2.4 0.312
Y12 SOGA 0.13 4.2 0.546
Y13 SOGA 0.13 2.4 0.312
Y14 SOGA 0.13 3.4 0.442
Y15 SOGA 0.13 2.15 0.2795
Y16 SOGA 0.13 1.45 0.1885
Y17 SOGA 0.13 2.3 0.299
Y18 SOGA 0.13 1.6 0.208
Y19 SOGA 0.13 2.8 0.364
Y20 SOGA 0.13 1.8 0.234
Y21 SOGA 0.13 3 0.39
Y22 SOGA 0.13 1.8 0.234
Y23 SOGA 0.13 1.8 0.234
L*T 7.163

1 L*T 7.163
2** L*T/Ap 0.047125
3** ZUSN/56 0.02678571

SI CUMPLE POR QUE 2** 3**


DETERMINANDO ESFUERZO AXIAL MAXIMO(m)

PROPIEDADES DE MATERIALES

CONCRETO ARMADO = 2.40 t/m3 VIGA SOLERA EN X-X 0.15x0.30


LOSA ALIGERADA 0.30 t/m2 VIGA SOLERA EN Y-Y 0.25x0.30
ACABADOS 0.10 t/m2
SOBRECARGA DE AZOTEA 0.10 t/m3 LOSA ALIGERADA e = 0.20 m
SOBRECARGA DE VIVIENDA 0.25 t/m2
MUROS DE ALBAILERIA 1.90 t/m3 PRIMER NIVEL EJE X-X

ESPESOR AREA DE AREA PESO PESO PESO PESO PISO TIPICO AZOTEA
MURO L(m) H(m) P.ESPEF.
(m) MURO(m2) TRIBUTARIA MUTO(t) LOSA(t) ACAB.(t) SOLERA(t) P.V.(t) P.V.(t)
X1 2.85 0.23 0.66 2.40 3.55 1.90 2.99 1.07 0.36 0.31 0.89 0.36
X2 3.4 0.23 0.78 2.40 4.1 1.90 3.57 1.23 0.41 0.37 1.03 0.41
X3 1.2 0.23 0.28 2.40 1.79 1.90 1.26 0.54 0.18 0.13 0.45 0.18
X4 1.2 0.23 0.28 2.40 1.21 1.90 1.26 0.36 0.12 0.13 0.30 0.12
X5 3.15 0.23 0.72 2.40 8.71 1.90 3.30 2.61 0.87 0.34 2.18 0.87
X6 1.35 0.23 0.31 2.40 10.1 1.90 1.42 3.03 1.01 0.15 2.53 1.01
X7 3.2 0.23 0.74 2.40 5.74 1.90 3.36 1.72 0.57 0.35 1.44 0.57
X8 1.7 0.23 0.39 2.40 8.47 1.90 1.78 2.54 0.85 0.18 2.12 0.85

PISO TIPICO SERVICIO AZOTEA SERVICIO TOTAL MURO


N PISOS AZOTEA
P.D.(t) P.L(t) PD+PL (t) P.D.(t) P.L(t) PD+PL (t) P.D+P.L (ton)
4.72 0.89 5.60 4.72 0.36 5.07 5 1 33.09
5.57 1.03 6.60 5.57 0.41 5.98 5 1 38.97
2.10 0.45 2.55 2.10 0.18 2.28 5 1 15.04
1.87 0.30 2.17 1.87 0.12 1.99 5 1 12.87
7.13 2.18 9.31 7.13 0.87 8.00 5 1 54.53
5.60 2.53 8.13 5.60 1.01 6.61 5 1 47.25
6.00 1.44 7.43 6.00 0.57 6.57 5 1 43.74
5.35 2.12 7.47 5.35 0.85 6.20 5 1 43.56
LIMITES DE NORMA E070
ESFUERZO DE COMP. 0.2*fm*(1-(h/35e)) 0.15*fm ESFUERSO MAXIMO
(ton/m2) (ton/m2) (ton/m2) mx
50.49 93.83 97.50 CONFORME
49.84 93.83 97.50 CONFORME
54.50 93.83 97.50 CONFORME
46.62 93.83 97.50 CONFORME
75.26 93.83 97.50 CONFORME
152.16 93.83 97.50 NO CONFORME
59.42 93.83 97.50 CONFORME
111.41 93.83 97.50 NO CONFORME

PRIMER NIVEL EJE Y-Y


ESPESOR AREA DE AREA PESO PESO PESO PESO PISO TIPICO AZOTEA
MURO L(m) H(m) P.ESPEF.
(m) MURO(m2) TRIBUTARIA MUTO(t) LOSA(t) ACAB.(t) SOLERA(t) P.V.(t) P.V.(t)
Y1 2.2 0.13 0.29 2.40 3.35 1.90 1.30 1.01 0.34 0.24 0.84 0.34
Y2 2.75 0.13 0.36 2.40 3.9 1.90 1.63 1.17 0.39 0.30 0.98 0.39
Y3 3 0.13 0.39 2.40 5.85 1.90 1.78 1.76 0.59 0.32 1.46 0.59
Y4 2.8 0.13 0.36 2.40 6.15 1.90 1.66 1.85 0.62 0.30 1.54 0.62
Y5 2.8 0.13 0.36 2.40 4.35 1.90 1.66 1.31 0.44 0.30 1.09 0.44
Y6 1.2 0.13 0.16 2.40 2.1 1.90 0.71 0.63 0.21 0.13 0.53 0.21
Y7 2.15 0.13 0.28 2.40 5.74 1.90 1.27 1.72 0.57 0.23 1.44 0.57
Y8 1.45 0.13 0.19 2.40 8.47 1.90 0.86 2.54 0.85 0.16 2.12 0.85
Y9 2.3 0.13 0.30 2.40 3.85 1.90 1.36 1.16 0.385 0.25 0.96 0.39
Y10 1.6 0.13 0.21 2.40 4.15 1.90 0.95 1.25 0.415 0.17 1.04 0.42
Y11 2.5 0.13 0.33 2.40 4.4 1.90 1.48 1.32 0.44 0.27 1.10 0.44
Y12 4.2 0.13 0.55 2.40 4.75 1.90 2.49 1.43 0.475 0.45 1.19 0.48
Y13 3.4 0.13 0.44 2.40 5.65 1.90 2.02 1.70 0.565 0.37 1.41 0.57
Y14 4.6 0.13 0.60 2.40 3.85 1.90 2.73 1.16 0.385 0.50 0.96 0.39
Y15 4.8 0.13 0.62 2.40 4.75 1.90 2.85 1.43 0.475 0.52 1.19 0.48
Y16 2.5 0.13 0.33 2.40 3.9 1.90 1.48 1.17 0.39 0.27 0.98 0.39
Y17 1.5 0.23 0.35 2.40 4.2 1.90 1.57 1.26 0.42 0.16 1.05 0.42
Y18 1.5 0.23 0.35 2.40 3.6 1.90 1.57 1.08 0.36 0.16 0.90 0.36
PISO TIPICO SERVICIO AZOTEA SERVICIO TOTAL MURO
N PISOS AZOTEA
P.D.(t) P.L(t) PD+PL (t) P.D.(t) P.L(t) PD+PL (t) P.D+P.L (ton)
2.88 0.84 3.72 2.88 0.34 3.22 5 1 21.81
3.49 0.98 4.46 3.49 0.39 3.88 5 1 26.19
4.44 1.46 5.90 4.44 0.59 5.03 5 1 34.55
4.42 1.54 5.96 4.42 0.62 5.04 5 1 34.84
3.70 1.09 4.79 3.70 0.44 4.14 5 1 28.09
1.68 0.53 2.21 1.68 0.21 1.89 5 1 12.92
3.80 1.44 5.24 3.80 0.57 4.38 5 1 30.57
4.40 2.12 6.52 4.40 0.85 5.25 5 1 37.86
3.15 0.96 4.11 3.15 0.39 3.54 5 1 24.11
2.78 1.04 3.82 2.78 0.42 3.20 5 1 22.29
3.51 1.10 4.61 3.51 0.44 3.95 5 1 27.01
4.84 1.19 6.03 4.84 0.48 5.32 5 1 35.47
4.64 1.41 6.06 4.64 0.57 5.21 5 1 35.48
4.76 0.96 5.73 4.76 0.39 5.15 5 1 33.78
5.26 1.19 6.45 5.26 0.48 5.74 5 1 38.00
3.31 0.98 4.29 3.31 0.39 3.70 5 1 25.14
3.42 1.05 4.47 3.42 0.42 3.84 5 1 26.16
3.18 0.90 4.08 3.18 0.36 3.54 5 1 23.91

LIMITES DE NORMA E070


ESFUERZO DE COMP. 0.2*fm*(1-(h/35e)) 0.15*fm ESFUERSO MAXIMO
(ton/m2) (ton/m2) (ton/m2) mx
76.27 93.83 97.50 CONFORME
73.25 93.83 97.50 CONFORME
88.59 93.83 97.50 CONFORME
95.70 93.83 97.50 CONFORME
77.16 93.83 97.50 CONFORME
82.83 93.83 97.50 CONFORME
109.36 93.83 97.50 NO CONFORME
200.85 93.83 97.50 NO CONFORME
80.63 93.83 97.50 CONFORME
107.16 93.83 97.50 NO CONFORME
83.11 93.83 97.50 CONFORME
64.97 93.83 97.50 CONFORME
80.28 93.83 97.50 CONFORME
56.49 93.83 97.50 CONFORME
60.89 93.83 97.50 CONFORME
77.34 93.83 97.50 CONFORME
75.83 93.83 97.50 CONFORME
69.31 93.83 97.50 CONFORME