METROPOLITAN MUNICIPALITY
DEVELOPMENT OF THE
TSHWANE LOCAL AUTHORITY ENERGY STRATEGY
FINAL REPORT
10 MAY 2006
This report is intended solely for the benefit, information and use by the City of
Tshwane Metropolitan Municipality (CTMM). No party other than CTMM is invited
to rely on the contents of the report, either in whole or in part. The Consultants,
including their individual directors, employees and sub-contractors will not accept
any liability or responsibility whatsoever, resulting directly or indirectly from the
disclosure of the report to any third party or reliance of any third party on the
contents of the report, either in whole or in part. The Consultants will not extend
its duty of care in respect of this report or their services to CTMM to any third
party whatsoever.
ACKNOWLEDGEMENTS
THIS ENERGY STRATEGY HAS BEEN COMPILED WITH THE GRATEFULLY
ACKNOWLEDGED COLLABORATION OF THE FOLLOWING:
TABLE OF CONTENTS
CHAPTER 1. INTRODUCTION................................................................................1
1.1 BACKGROUND ..................................................................................................... 1
1.2 TSHWANE METROPOLITAN MUNICIPALITY PROFILE ..................................... 1
1.3 CTMM ENERGY DECLARATION, 2004 AND ALIGNMENT WITH NATIONAL
POLICIES .............................................................................................................. 3
1.3.1 AIR QUALITY ACT, 2004 .......................................................................................................4
TABLE OF CONTENTS
5.3 LINKAGES........................................................................................................... 43
5.3.1 ENABLING LINKAGES.........................................................................................................43
5.3.2 FUNCTIONAL LINKAGES ....................................................................................................43
5.3.3 NORMATIVE LINKAGES......................................................................................................49
5.3.4 DIFFUSE LINKAGES ...........................................................................................................49
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page ii
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
TABLE OF CONTENTS
LIST OF FIGURES
LIST OF TABLES
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page iii
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
TABLE OF CONTENTS
LIST OF ABBREVIATIONS
TABLE OF CONTENTS
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page v
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
CHAPTER 1. INTRODUCTION
1.1 BACKGROUND
This Sustainable Energy and Climate Change Strategy was developed at the request
of City of Tshwane Metropolitan Municipality (CTMM) Department of Social
Development, under a programme to prepare a Tshwane Local Authority Energy
Strategy (TLAES). It was agreed during the course of the assignment that the Strategy
would have a broader footprint than simply energy, and that the focus should be on
developing an integrated Sustainable Energy and Climate Change Strategy with links
to the concurrently developed Air Quality Management Plan.
This Strategy has been prepared on the basis of energy issues identified in the detailed
State of Energy Report, which provides a baseline for energy use and greenhouse gas
emissions evaluation. The State of Energy Report was based on data collected from a
broad range of stakeholders, including a selection of households surveyed under the
auspices of the TLAES. The conclusions of the State of Energy Report and approach
to the development of the Energy Strategy were reviewed at a Technical Working
Group meeting primarily involving internal CTMM stakeholders 1 November 2005,
followed by a Seminar for internal and external stakeholders held 24 November 2005.
This Strategy has also been developed in close collaboration with Airshed Planning
Professionals, the team that has prepared the Air Quality Management Plan (AQMP)
on behalf of CTMM. The resulting institutional recommendations integrate those in the
AQMP.
Throughout the document, the term Energy Strategy should be understood to mean a
Sustainable Energy and Climate Change Strategy, with organisational linkages to the
Air Quality Management Plan.
Far North/
Middle North
East Capital
West Capital
CTMM has positioned itself as a centre of innovation, as home to the Innovation Hub,
which comprises the Innovation Centre and Enterprise Centre. The Innovation Hub,
located close to the CSIR and the University of Pretoria, offers opportunities to small
start-up companies in IT, bioscience, electronics, advanced materials and
manufacturing. It has a business incubation programme which fast tracks the growth of
businesses in there early stages and improves their survival rate.
CTMM also hosts the Gauteng Automotive Cluster. Four major manufacturers, Ford,
Nissan, Fiat and BMW have their production facilities in CTMM, and DaimlerChryslers
South African operations are headquartered in Centurion. Together, these
manufacturers have increased automotive exports from South Africa by 39% over the
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 2
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
last decade, making this the third largest sector in the economy, contributing nearly 6%
of the gross domestic product.
diversify their energy supply and increase renewable and cleaner energy sources
by 10% in 2020;
reduce energy consumption in all council operations by at least 20% in 2005;
implement green procurement policies based on energy efficiency principles; and
Pass legislation requiring solar water heaters in all new middle- to high-income
housing in 2006.
Insulated ceilings in new low-cost housing must also be introduced by 2005 and
retrofitted by 2007.
Bus lanes must be enforced and bicycle lanes must be introduced on at least 20%
of roads by 2010.
Cities have committed themselves to develop an integrated energy strategy by
2006.
CTMM has further committed to the following added goals:
Provide sustainable energy that has health benefits and reduced carbon dioxide
emissions and thus ensures clean air
Ensure energy efficiency in Municipal Buildings, Industry and Commerce, Transport
and Residential sectors
Promote energy that supports economic competitiveness and increases
employment.
Promote general awareness among community members on renewable energy and
energy efficiency.
These comments align closely with key national policies and legislation:
Air quality management falls within the system of pollution minimisation, management
and prevention, with the aim of improving and maintaining good air quality. It is within
this context that the Environmental Health Division initiated the development of an Air
Quality Management (AQM) Plan for the City of Tshwane.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 4
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
The State of Energy Report identified a long list of energy issues for CTMM. The list
was extended to capture issues highlighted during stakeholder consultations and finally
through consultant experience. Out of this long list, the following main areas for
intervention were identified and prioritised highest:
Transport
Industry and commerce
Households
Electricity generation and distribution
Other municipal services
Renewable energy (RE) and energy efficiency (EE)
2.1.1 Transport
The most energy intensive sector in CTMM is the CTMMs Integrated Transport Plan (ITP) does not yet address
transport sector. energy issues.
The N1, N14 and R21 highways were identified National legislation banning the use of leaded fuel, introduction
as the most significant corridors for vehicle of low-sulphur diesel and biofuel research along with rising fuel
generated emissions, including greenhouse gas costs will drive cleaner fuel use.
(GHG) emissions.
Few alternatives to fossil-fuel burning vehicles CTMMs Transport Department is studying innovative solutions
are available to CTMMs population, although for implementation before the 2010 Soccer World Cup
improvements in the refining process are Tournament.
resulting in more environmentally-friendly,
reduced-emissions diesel.
There is significant congestion already on The rationalisation of the Pretoria City Transport (PCT) bus
CTMMs roads, expected to increase further over services will potentially attract an increased number of
the next five years. This is exacerbated by the passengers to its services, reducing the number of SOVs on the
prevalence of Single Occupancy Vehicles road network.
(SOVs) and the lack of reliable, safe public
transport.
CTMMs spatial legacy has resulted in low Integrate spatial and transportation planning.
densities, making public transport inefficient.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 5
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Industry also contributes Large industry is sensitive to energy-related greenhouse gas emissions and aware of
to undesirable emissions increasing supply options. Many industries have signed the National Business
in CTMM. Initiative (NBI) - Department of Minerals and Energy (DME) Energy Efficiency Accord.
Several CTMM companies have initiated CDM projects which will result in reduced
GHG emissions.
Record-keeping The DME has commissioned studies in Industrial Energy Management and is working
regarding industrial fossil together with Standards South Africa (StanSA) to develop energy efficiency standards
fuel-fired generation and Codes of Practice for:
within CTMM is not
Fossil fuel fired, non-utility steam-raising boilers
supportive of emissions
quantification. AC motors
Insulated pipe systems
DME is also moving towards implementation of a data collection system to support
the EE Accord and the targets of the national EE Strategy.
The Air Quality Management Plan addresses licensing and monitoring of industrial
polluters and enforcement of the Air Quality Act.
2.1.3 Households
Housing design in CTMM does not yet take into DME is collaborating with StanSA to finalise the standard for
account energy efficiency considerations. the energy efficient design of naturally ventilated buildings
(SANS 0283).
Energy services for low-income households have DME is rolling out is energy efficiency (EE) and renewable
historically been inadequate, and many households energy (RE) strategies.
in the North still use alternatives to electricity for
heating, cooking and lighting due to pricing and
perceived affordability issues.
Households suffering unemployment and poverty DME is examining pricing of liquid fuels to incentivise use of
rely on less convenient and often unhealthy fuels, LPG over IP.
which also have a deleterious effect on the
environment.
Coal use in urban areas results in indoor air pollution Restructuring of the Electricity Distribution Industry (EDI)
as well as adding to South Africas net contribution into Regional Electricity Distributors (REDs) is expected to
to CO2 emissions, and therefore to climate change. introduce efficiencies and harmonise tariffs nationally.
Most decisions on the choice of household energy Eskom has carried out extensive domestic load research for
carriers are taken by women. NRS 034, which gives SAs first in-depth view on gender
effects for domestic load growth.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 6
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Access to electricity in CTMM is of the order of CTMM and Eskom together are rolling out new electricity
100% in established areas and ~65% in rural areas connections at a rate of 22 000 per year, a very rapid rate in
not served by Eskom. comparison with other municipalities in Gauteng.
Regional Electricity Distributors (REDs) are being Tshwane Energy & Electricity are managing the process in
established throughout the country. collaboration with EDI Holdings.
The national peaking capacity is expected to be Eskoms DSM programme is aimed at shifting demand away
exhausted in 2007. from peak periods and reducing demand where possible
CTMMs power generation park is old and in need of Incorporate into CTMMs asset management strategy and
significant maintenance and refurbishment funding. identify strategies for improving the power stations financial
Because of the constraints on national supply, viability.
CTMMs power stations must now operate at a
higher capacity factor. Furthermore, they are not
currently financially viable.
There is an apparent geographic imbalance in Develop an integrated network master plan linked into
CTMMs electricity network maintenance (more CTMMs asset management strategy.
recently electrified areas receive the bulk of
maintenance funding, rather than the older areas),
posing a medium-term threat to reliability and
financial sustainability.
There are still few renewable energy The Innovation Hub could be leveraged to fast track
equipment suppliers in CTMM. development of SME renewable equipment manufacturers.
Renewable energy is not as affordable to the Funding could be sourced from the DME Renewable Energy
consumer as conventional energy Finance and Subsidy Office (REFSO)
Solar hot water heating in particular is CDM might provide a source of funding to reduce the front-end
significantly underutilised. costs of solar domestic hot water (DHW).
CTMMs landfill sites presently emit substantial CTMMs landfill sites and solid waste management represent
methane which is not flared and hence Clean Development Mechanism (CDM) project as well as
presents a significant odour and health risk. additional energy generation opportunities.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 7
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
There is scope and interest for CTMMs municipal CTMM has already carried out a study of the energy
services to become more energy efficient. consumption of its facilities.
CTMMs vehicle fleet is not energy efficient. Coordination of CTMMs sustainable energy activities has
to date been through the Sustainable Energy Tshwane
(SET) Committee.
CTMMs water treatment and distribution system is not CTMM is already implementing measures which will
energy efficient. improve energy service delivery and improve the
Municipalitys contribution to management of South
Africas environment.
CTMMs solid waste treatment is not energy efficient. Renewable energy, energy efficiency and demand side
management programmes are at the planning stage within
CTMM.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 8
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
As shown in Figure 2, liquid fuels are the most significant source of supply at 44%,
followed by electricity (28%) and coal (26%, representing that portion of coal use not
related to electricity generation in Tshwane).
Figure 2 Supply by Energy Carrier in Tshwane
Stationary type
Sasol gas
liquid fuels
2%
5%
Electricity
28%
Transport liquid
fuels
39%
Coal
26%
CTMM presently owns two power stations, Rooiwal and Pretoria West. Both of these
are coal fired steam turbine power stations, with a combined capacity of 480 MW,
broken down as follows:
Rooiwal: 6 x 30 MW = 180 MW (commissioned 1958)
Pretoria West: 5 x 60 MW = 300 MW (commissioned 1952)
1
This is roughly equivalent to 100 000 times the Rooiwal power station generating at its full
300 MW capacity for one hour. 1 kWh = 3.6 MJ, and Rooiwals installed capacity is 300 MW
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 9
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 10
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Rooiwal has a total of 5 coal-fired boilers, while Pretoria West, based on older
technology, runs off 10 boilers.
Aerial view of Pretoria West power station, showing the cooling towers
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 11
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
CTMMs maximum electricity demand peaks at 1651.4 MW during the winter season.
This figure assumes that the power station peaks coincide with the Eskom peak.
The Transport sector and liquid fuels represent the greatest demand for and supply of
energy in CTMM respectively, as illustrated in Figure 4 and Figure 5. These figures
show respectively that the Transport sector accounts for 36% of the demand for
energy, and consumes energy through diesel and petrol (transport liquid fuels), which
represent 39% of the supply of energy to CTMM.
Tshwane
Energy Demand by Sector
Agriculture Transport
Local 1% 36%
Households
Government
19%
1%
Commerce
9% Industry,
Mining and construction
quarrying 34%
0%
Demand for transport liquid fuels is split approximately 80/20 between petrol and
diesel, as shown in Figure 6 overleaf, which further confirms the dominance of
transport as a demand sector.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 13
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
1,200,000
1,000,000
800,000
Jet Fuel
600,000
kl
400,000 LPG
200,000 IP
- Furnace oil
Avgas
an e
ca om ng
ric nt
t
qu ion
er e
s
or
Tr ltur
i n co n o l d
o v e rc
Ag me
Lo C rryi
sp
ct
u
M t ry/ seh
lG m
an t ru
n
a
Diesel
s
us ou
d
H
Petrol
g
in
d
In
Demand Sector
Figure 7 shows that the industry/construction sector primarily gets its energy from coal
(58%), followed by electricity (35%). The household sectors demand is met principally
by electricity (60%), followed by coal at 34%, as shown in Figure 8.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 14
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Sasol gas
Stationary Electricity
0%
type liquid 60%
fuels
6%
Transport
liquid fuels Coal
0% 34%
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 15
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Households
Agriculture
41%
2%
Local
Industry,
Government
Transport0% construction
0% 42%
Commerce
15% Mining and
quarrying
0%
The Department of Minerals and Energy (DME) has estimated typical low-income
household energy use as shown in Table 1.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 16
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Rated
Hours per Days per
Item Qty Power kWh
Day Month
(W)
Energy saver light 1 11 5 30 1.7
Light 3 60 3 30 16.2
Light 1 100 5 30 15.0
TV (b&w) 1 35 6 30 6.3
Iron 1 1 000 4 6 24.0
Kettle 1 1 000 0.5 30 15.0
Hotplate 1 1 000 1 25 25.0
Fridge (small) 1 250 6.5 30 48.8
Total 10 3 456 151.9
Source: DME
The South African government has decided that all poor households would have
access to free basic services, including electricity. Free Basic Electricity of 50 kWh is
available to all households in CTMM, regardless of income level and regardless of
whether the household is supplied through conventional (credit) metering or through a
prepaid system.
Number of
Area Households
Surveyed
Soshanguve 1 372
Mamelodi 1 051
Hammanskraal 540
Atteridgeville 525
Centurion 360
Ga-Rankuwa 324
Total 4 172
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 17
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
As shown in Table 3, most households in the areas surveyed have access to electricity,
and Table 5 further shows that most households have backup. It is presumed at this
stage that backup is kept in case electricity is not available from the network or the
household has insufficient funds to purchase electricity for the whole month, and
makes decisions on which energy carrier to use for which household purpose on an
ongoing basis.
Table 3 Distribution of Energy Carriers in Households Surveyed
Number of
Energy Carrier Households %age
Using
Electricity 3 652 87.5
Illuminating Paraffin 2 376 57.0
Candles 2 149 51.5
Gas (bottled) 1 247 29.9
Gas (piped) 962 23.1
Firewood 758 18.2
Coal 685 16.4
Overall, after electricity, a majority of households use IP, as shown in Figure 10. The
survey has shown results which conflict somewhat with information available on liquid
fuel sales the percentage of houses using gas appears much higher than the CTMM
sales data (see Figure 4) would suggest. Furthermore, since piped gas does not yet
reach households in CTMM, there appears to be a misunderstanding of the question
regarding the use of piped gas. This may mean that more than half of the households
surveyed have used bottled gas occasionally.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 18
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Energy Carriers
Household in Use
Energy in CTMM
Carrier Households
Distribution
88%
57% 52%
30%
23% 18%
16%
R 250
R 200
R 150
R 100
R 32
R 50
R 0.47
R 10
R8
R4
R2
R0
es
)
er
l
ty
fin
oa
rs
oo
ci
th
dl
de
f
C
ra
ri
O
an
ct
in
re
Pa
C
e
yl
Fi
El
(c
as
G
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 19
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Electric Stove
92% 95% 94%
89% Geyser
Fan
Air conditioner
Kettle
Iron
Radio
TV- Colour
TV - Black and white
13% 12% 15% 15% 15%
Heater
2%
The survey also queried household expenditure by energy type, as illustrated in Figure
11 2 , as well as the types of energy-consuming appliances and equipment used in
households, as shown in Figure 12.
2.2.4.2 Affordability
The price per GJ of energy delivered varies significantly between the principal
household energy carriers. Figure 13 illustrates quite clearly why households would
choose, for instance, to use IP or coal for space heating rather than LPG or electricity.
Indoor coal use engenders significant respiratory problems and IP represents both a
health hazard (especially for children, who risk drinking it by accident) as well as a
safety hazard due to its flammability and ease of spillage. Furthermore, IP attracts a
subsidy, which maintains its unit energy price below that of LPG and electricity.
2
The expenditure for electricity appears high. It should be noted that these are reported
figures, and are not based on examination of energy bills or recording of prepayment
purchases. They may therefore suggest a perception that electricity is a very costly part of the
monthly household account, rather than an indication of actual expenditures. Furthermore,
the very low monthly expenditures for alternatives such as paraffin and coal suggest these
may be under-reported. Seasonal factors may also influence the perception of average
monthly spend.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 20
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
104 100.14
120
100
78.75
80
R/GJ 60 17.95
40
20
0
IP Coal LPG Electricity
2.2.5.1 Statistics
CTMM has the following transport infrastructure:
5 109 lane-km surfaced roadway (structural and surface index decreasing due to
poor maintenance)
2 173 lane-km gravel roadway
666 000 registered vehicles
The unattractiveness (due to poor services and high fares) and inefficiency of public
transport (it attracts large subsidies) are demonstrated in Figure 14, which indicates the
commuter transport split in Tshwane. This figure is comparable to other cities in South
Africa such as EMM and Cape Town.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 21
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Walk/Cycle Car
35% 33% Car
Rail
Bus
Taxi
Taxi Rail Walk/Cycle
16% Bus 6%
10%
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 22
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Spatial legacy
Communities marginalised to distant dormitory towns
Low densities result in inefficient public transport
Greenhouse Gas (GHG) emissions were calculated using the energy balance. Carbon
dioxide, methane and nitrous oxide were evaluated. Details of the methodologies used
are provided in the State of Energy Report.
A factor for CO2 emissions from Eskom (coal-based) electricity generation was
developed, taking into account plant efficiency as well as adjusting for the proportion of
Eskom generation by coal.
Similarly, the carbon emission factors used for petroleum-based and biomass fuels
were based on a weighted average factor applied to the Tshwane energy balance
categories, and converted to carbon dioxide.
In practice, the majority of methane emissions derive not from energy use but from
agricultural and landfill sources.
N2O emissions for all energy carriers were evaluated, although given that the diesel
and petrol figures could not be disaggregated, it is believed that the calculation may
need to be refined once further information becomes available.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 24
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
The estimates of CO2-equivalent emissions from energy sources are shown in the
following table:
12,542,832
tCO2
tCH4
766
tN2O
504
12,715,215
Total tCO2 equivalent emissions
This compares with approximately 18 000 000 tonnes/year for Ekurhuleni and
17 000 000 tonnes/year for Cape Town.
The breakdown by energy carrier is shown in the following pie chart:
LF Transport Coal
22% 17%
LF Stationary
3%
Sasol gas
1%
Electricity
57%
This chart clearly shows the dominant effect that coal-based grid electricity has on
Tshwanes emissions profile (recalling that the two greatest demand sectors for
electricity were industry/construction at 42% and households at 41%, as shown in
Figure 9). Emissions by sector are shown in the figure below. The
industry/construction sector shows the greatest contribution towards GHG emissions,
followed by households and then transport.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 25
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Agriculture Households
1% 28%
Transport
21%
Local Government
0%
Commerce
12% Industry/construction
38%
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 26
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Energy issues were identified at the stage of preparation of the State of Energy
Report
An Energy Vision and Strategic Pillars were identified
Action plans to support key strategy implementation were identified
Building on the experience of other municipalities in developing Energy
Strategies
Customising for CTMM issues
Seeking and incorporating stakeholder input
The results were consolidated and prioritised
The proposed action plans were finalised
A proposed institutional framework was developed
Indicative costs for the identified action plans will be developed once the proposed
action plans are agreed with CTMM.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 27
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Capacity development
The consulting team has identified a need for institutional arrangements, which
accommodate a Sustainable Energy and Climate Change unit.
A Sustainable Energy and Climate Change unit within a South African municipality
would have very close linkages with the Air Quality Management function mandated
under the Air Quality Act to be carried out at municipal level. This template then forms
the fundamentals of a Business Plan for a Sustainable Energy/Climate Change/Air
Quality Management (SE/CC/AQM) unit to be implemented within CTMM.
This template clearly links the external inputs (international policy and legislation,
baseline information and stakeholder contributions) to the coordination of internal line
functions within CTMM, in alignment with the Citys established Visions and Goals. It
also provides the basis for Triple Bottom Line reporting CTMM will be able to
categorise its SE/CC/AQM activities as primarily Environmental, Social or Economic
and to set up reporting structures accordingly.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 28
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
(KPIs) are identified and linked to the extent practical to the City management
scorecard.
While this strategic framework provides the background to a Business Plan, a Service
Delivery Framework is needed within the context of a Municipality rolling out a complex
strategy.
The Service Delivery Framework integrates into the Integrated Development Planning
(IDP) process while the Energy Strategy links into the City Development Strategy,
providing high-level direction.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 29
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Cross-cutting Critical Outcome Criteria influence the way functions are carried
out in order to bring about the desired outcomes in line with Strategic
Objectives
Planning and
Design
The desired outcomes, or strategic objectives, realised as a result of the delivery of the
product (or service) influence the way in which the various functions on the Service
Delivery Path are carried out. Monitoring and verification provides feedback along the
Service Delivery Path.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 30
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
The Energy Strategy also takes cognisance of the anticipated World Cup Soccer event
in 2010, for which several large scale capital projects have been planned, including the
Gautrain and stadium projects such as the Rainbow Junction project near the Zone of
Choice.
VISION
The leading international African capital of excellence that empowers the
community to prosper in a safe and healthy environment.
MISSION
To enhance the quality of life of all the people in the City of Tshwane through a
development system of local government and the rendering of efficient, effective
and affordable services.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 31
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
These priorities have been linked to the Focus Areas of the City Development Strategy.
Managing existing
Strengthening
urban areas
These Focus Areas are briefly reproduced from the City Strategy:
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 32
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
As for the City Development Strategy, the Energy Strategy focuses on top priority, high
impact initiatives, with a clear focus on actions and measurability of progress and
outcomes where possible.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 33
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Table 8 provides a more succinct, rolled-up view of this detailed picture, reprising the
Strategic Pillars and Key Projects, and providing a rough indication of:
resource requirements (to be identified once top action plans are agreed with
CTMM)
timeframe (to be identified once top action plans are agreed with CTMM)
KPIs for project success.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 34
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Triple Bottom
Responsibility/
Strategic Pillar Key Projects Line Sub-projects Sub-Project Targets
Support
Aspect(s)
Sustainability: Facilitate supply of safe, reliable CTMM Social, Enhance awareness of Free Basic Electricity (FBE) 80% of identified wards to be
Enhance energy sustainability, and affordable energy services to SE/CC/AQ unit/ environmental, Develop awareness programme to assist householders in making affordable and environmentally addressed by 2007; 100% by 2010
accessibility and affordability to households, both formal and Electricity, economic friendly appliance energy carrier choices
residents and municipality informal. Housing, LED,
Support the full rollout of the Bassa Njengo Magogo low smoke household coal-burning project
DME, suppliers
within CTMM
Monitor air pollution/indoor air quality and correlate with incidence of energy-poverty related
diseases.
Develop and implement measures to improve air quality through EE/DSM and clean/RE
technologies.
Disseminate information and CTMM Social, promote application of SANS 203 on energy efficient design for naturally ventilated buildings
develop awareness on SE/CC/AQ unit/ environmental, promote application of SANS 204 on energy efficient design for artificially ventilated buildings
sustainable housing and Electricity, economic
commercial building design and Housing, DME,
construction methods StanSA
Cleaner, more efficient and Transform CTMM into a Green CTMM SE/CC/ Economic, Promote identification of CDM and carbon offset projects in support of the 2010 Soccer World 10 CDM/carbon offset projects
diverse energy use and supply: City AQ unit, OMM, environmental Cup events, with emphasis on the Transport sector identified by 2006 for
Transport, implementation by 2010
Encourage and promote shift to NDoT, DME, Develop and implement a Green Procurement policy, with emphasis on smart energy use
cleaner (emitting less pollutants and DEAT, Energy All incandescent lighting in CTMM
GHGs), more efficient and diverse Develop and implement a Green Buildings policy for municipal buildings, with emphasis on RE, and national government buildings
SETA EE and DSM solutions
energy use and supply to be replaced with energy-efficient
o Implement mandatory energy audits/monitoring and targeting for all Council and national lighting by 2015
government office buildings in CTMM. 15% reduction in energy demand in
Provide leadership in Green Municipal Fleet Management (efficient vehicles and cleaner fuels) government buildings by 2012
o Investigate feasibility of implementing cleaner/renewable fuel sources for vehicle fleet 10% improvement in HVAC
(biodiesel, ethanol, fuel cells, etc.). efficiency by 2010
Incentivise CTMM building owners and managers to seek EE qualifications based on existing 100% of CTMM vehicle fleet
Building Energy Management courses equipped with catalytic converters
by 2007 (align with national
Disseminate information to builders, developers and architects on energy efficient/passive solar manufacturing and import policies)
design, as well as on guidelines in SANS 0283 and SANS 204 (standards for energy efficient
design of Naturally Ventilated and Artificially Ventilated Buildings, respectively) Procurement policy for all local
authority vehicle fleet to include
Incentivise CTMM based manufacturers to switch to Cleaner Production methods energy efficiency as additional
criterion
Disincentivise the use of electrode boilers
50 % of diesel fleet to operate on
biofuel by 2010
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 35
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Triple Bottom
Responsibility/
Strategic Pillar Key Projects Line Sub-projects Sub-Project Targets
Support
Aspect(s)
Facilitate and support less CTMM SE/CC/ Economic, Promote Traffic Demand Management (TDM) and Intelligent Transport Systems (ITS) Vehicle flow improved by 40% by
energy intensive transport in AQ unit/ NDoT, social, 2010
CTMM CTMM environmental Promote integrated spatial and public transport planning
Transport, Implement energy efficient public transport services in CTMM, with a focus on the North
SASITS, LED,
City Planning, Incentivise cleaner, more energy efficient vehicle use, including
PCT, Putco,
o the use of fuel efficient vehicles
Northwest Star,
Taxi Assoc., o the use of Multiple Occupancy Vehicles (MOVs)
Gautrans,
SANRAL Implement vehicle emissions testing
Facilitate and support energy CTMM SE/CC/ Environmental, Electricity 10% of CTMM electricity demand
smart municipal services AQ unit/ Water economic being met by local renewable
& Sanitation, o Implement a feasibility study to evaluate converting Rooiwal and Pretoria West power sources by 2010
Roads & stations to alternative fuels, including gas
Stormwater 50% of eligible landfills producing
Solid waste management: electricity cost-effectively from
o Implement landfill planning, design and operation to optimise landfill gas extraction and methane by 2010
utilisation for power generation reduce the number of links in the
o Examine proposed system to transform solid waste to natural gas, potable water and carbon road network with a volume/
black (all can be used for further service provision and revenue generation) capacity ratio of greater than 90%.
Traffic management:
o promote the cost effective use of energy efficient streetlights and traffic lights
Facilitate and support cleaner, CTMM SE/CC/ Economic Publish case studies. Increased business participation in
more efficient and diverse energy AQ unit/ DME, the national Energy Efficiency
use in the commercial/ industrial NBI, Energy Promote availability of national industrial energy management initiatives and availability of Accord
sectors SETA, Wits SAQA-accredited training programs promoted to local industry.
University Companies adopting international
Recognise local companies that have signed the Energy Efficiency Accord and promote further standards for energy efficiency and
engagement of this kind. environmental performance, e.g.
Recognise companies that achieve EE/DSM or clean/RE successfully publicly, by developing ISO14001, WBCSD GHG Protocol,
and issuing suitable awards. etc.
Use special events to promote the environmental profile of the city, for example by incorporating
zero waste, green electricity, efficiency and recycling.
Promote the use of cleaner and more sustainable energy sources as means to keep
development and economic growth in the city sustainable.
Promote energy efficiency and use of clean fuel technologies as corporate social responsibility
initiatives if they result in improved ambient air quality.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 36
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Triple Bottom
Responsibility/
Strategic Pillar Key Projects Line Sub-projects Sub-Project Targets
Support
Aspect(s)
Facilitate and support cleaner, DME promote alternatives to household coal and coal-based electricity use 50% gas reticulaton of middle-
more efficient and diverse energy Renewables income areas by 2010
use in the household sector Subsidy Office, Advocate development of capital subsidy packages for cleaner/ renewable energy measures for
EDI Holdings, implementation by REDs 50% of CTMM homes have
DBSA cleaner/RE energy supported
through subsidies available from
the DME Renewables Subsidy
Office by 2010 (in accordance with
their targets)
Promote and facilitate the publicise key conclusions of State of Energy report and implement awareness programme on
availability of less GHG intensive GHG impact of different energy uses
energy use throughout CTMM
Promote the use of natural gas as a substitute to coal, HFO and other petroleum products used
in industry, and for electricity generation for all demand sectors, where economically feasible.
Negotiate with independent power producers to this end.
Economic growth and Encourage CTMM businesses to CTMM SE/CC/ Economic, Promote the development of SMMEs providing RE, EE and DSM solutions
development: develop Energy Smart products AQ unit/DME, social,
and services IDC, CSIR, environmental o Promote local development and supply of clean-fuel appliances suitable for poor urban and
Support economic growth and Innovation Hub, peri-urban households
development in CTMM, especially in University of
the North, through smarter energy o Facilitate access to information on registration as an Energy Services Company (ESCO) to
Pretoria, assist Eskom in DSM
use technikons
o Promote the development of local RE manufacturing capability
Implement feasibility study for household gas reticulation in the Zone of Choice
Provide an Energy Smart CTMM (all) Economic, Adapt Integrated Resource Plan to balance sustainability and broader economic cost issues
environment for investors, environmental, while maintaining competitive energy prices
developers, businesses and social
workers Implement Energy Smart new transport infrastructure in the North
o Review the tolling strategy cutting the North off from the economically developed South
Innovation: Develop leading Energy Smart CTMM SE/CC/ Encourage development of RE, EE and DSM know-how, products and services At least 1 zero carbon development
innovative capacity AQ unit/ CSIR, by 2010 in e.g. housing
Encourage the development and Innovation Hub, o Develop and share case studies
use of innovative tools, products University of Vehicle flow improved by 40% by
and solutions for energy use Implement eco-city pilot projects and zero carbon developments 2010
Pretoria,
technikons Use Knowledge Management system to encourage and share innovative grass roots ideas
Lobby government (Innovation Hub?) to incentivise local CTMM manufacture of innovative clean
energy technology
Develop and implement Intelligent Transport Systems for implementation within CTMM.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 37
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Triple Bottom
Responsibility/
Strategic Pillar Key Projects Line Sub-projects Sub-Project Targets
Support
Aspect(s)
Integration: Develop and implement web- CTMM SE/CC/ Institutional Establish data/information to be collected and stored System implemented by end 2006
based SE/CC/AQM Knowledge AQ unit, and able to handle internal CTMM as
Integrate energy planning and Management System for CTMM Information Evaluate user profiles and requirements well as external inquiries
information/ knowledge Management
management with national/private Procure and implement system
(IT?)
sector/other municipal initiatives
Coordinate SE/CC/AQM Institutional Set up committee involving DEAT, DME, NDoT and relevant CTMM departments
activities with national
government Coordinate with national government on the implementation of the National EE Strategy/Energy
Efficiency Campaign and National Cleaner Production & Sustainable Consumption Strategy
o Liaise and coordinate with DME on efficiency testing of non-utility, fossil fuel fired steam-
raising boilers (reference to DME programme to increase energy efficiency of such boilers)
o TIEP
o Housing
o etc.
Provide SE input to the development of a sustainable integrated housing development policy for
all income levels
Integrate energy and air quality planning and monitoring requirements into traffic count
programmes
Evaluate potential for CDM and carbon offset projects within all sectors in CTMM
Evaluate impact of proposed new transport projects (esp for Soccer World Cup) for GHG
emissions, air pollution, energy efficiency
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 38
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Resources required
Additional to current baseline allocation Time-
Pillar Key Projects KPIs for Project Success
Financial line
Human Technical
(budget)
Sustainability: Enhance energy Facilitate supply of safe, reliable and affordable energy services to households, Air Quality Act enforced
sustainability, accessibility and both formal and informal. Households informed on energy choices
affordability to residents and
Call centre and web links established
municipality
Disseminate information and develop awareness on sustainable housing and Standards applied
commercial building design and construction methods
Disseminate information and develop awareness on RE, EE and DSM National RE and EE strategy targets are met
technologies and applications or exceeded
Cleaner, more efficient and Transform CTMM into a Green City Policies and incentives in place
diverse energy use and
supply: Encourage and promote Projects and new city initiatives reviewed for
shift to cleaner (emitting less SE/CC/AQ impact
pollutants and GHGs), more
efficient and diverse energy use Facilitate and support less energy intensive transport in CTMM Systems and incentives in place
and supply
Facilitate and support energy smart municipal services National EE and RE targets met or exceeded
Facilitate and support cleaner, more efficient and diverse energy use in the Improved energy choices
commercial/ industrial sectors
Facilitate and support cleaner, more efficient and diverse energy use in the Improved energy choices
household sector
Promote and facilitate the availability of less GHG intensive energy use Diverse, clean energy carriers available
throughout CTMM
Economic growth and Encourage CTMM businesses to develop Energy Smart products and services CTMM businesses can be branded Energy
development: Support Smart
economic growth and
development in CTMM, CTMM businesses sell RE, EE and DSM
especially in the North, through solutions
smarter energy use
Provide an Energy Smart environment for investors, developers, businesses and Investment and Gross Geographic Product
workers increase
Innovation: Encourage the Develop leading Energy Smart innovative capacity CTMM recognised as Energy Smart
development and use of
innovative tools, products and
solutions for energy use
Integration: Integrate energy Develop and implement web-based SE/CC/AQM Knowledge Management Information on SE/CC/AQ is available and
planning and information/ System for CTMM accessible
knowledge management with Coordinate SE/CC/AQM activities with national government
national/private sector/other Activities are coordinated
municipal initiatives Integrate SE/CC/AQM planning, targeting, monitoring and impact assessment Activities are integrated
into all CTMM strategic planning
Note: Resources will be determined once key projects have been confirmed
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 39
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
The following actions can be promoted/encouraged by the SE/CC/AQM unit and should
be included in the Integrated Transport Plan (ITP) document guiding the rollout and
management of the transport sector in Tshwane:
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 40
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Furthermore, with the level of integration required between Sustainable Energy and
Climate Change management and Air Quality Management, it is recommended that the
two units be implemented as a single unit from the start.
Management of the unit will depend on CTMMs preferred governance model. Under
current governance arrangements within CTMM, three management options for the
proposed unit appear feasible:
It should be noted that the selection of the Agency (external service delivery
mechanism) or Core Group (internal service delivery mechanism) models would be
subject to a Municipal Systems Act (MSA) Section 78 (S78) process (review of internal
and external service delivery mechanisms).
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 41
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 42
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
5.3 LINKAGES
A sustainable organisation has diverse linkages which support its establishment and
continued smooth operation. These linkages are of several different natures:
Enabling
Functional
Normative
Diffuse
The required linkages for CTMMs SE/CC/AQM unit are described below from a
generic perspective. These can be described in more detail once the Governance
Model has been selected.
Funding for specific elements of the organisations functions could also be sourced
from the following:
National government (DME, DEAT, NDoT)
Development Finance Institutions (e.g. DBSA, IDC)
Multilateral and bilateral donors (e.g. World Bank, GEF, UNDP, DANIDA, GTZ)
Private sector financial institutions (e.g. Absa, RMB, private equity investors)
Such funding would have to be sourced and managed in accordance with the
provisions of the MFMA and PFMA, as well as any specific requirements of the funding
agency.
5.3.2.1 Resources
The resources needed for an organisation to be sustainable are grouped into three
main categories:
Material
Financial
Human
It should be noted that these resources need not belong to the proposed unit,
depending on how the functional linkages are set up.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 43
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Examples of material resources, which the proposed unit may need include, for
instance, the following:
Vehicles (may be shared with a common CTMM fleet)
Lab/test equipment (use of such equipment may be outsourced)
Computer hardware and software (may be shared with other functional units in
CTMM)
Library/reference material (may also be shared with other CTMM units)
Financial resource needs for the proposed unit would be addressed through CTMMs
annual budgeting cycle. Capex and opex needs for the upcoming three years would be
clearly identified in these budgeting exercises. The functions of the unit are of a nature
that lends itself to external as well as internal funding, which would be taken into
account in the structuring of the unit.
The profiles of the key staff required under each model are provided in Chapter 5.3.2.3,
directly following the indicative organogram.
Should the internal model of high level strategic coordination be pursued, the
recommendations on organisational structure and responsibilities would be as
proposed in the Air Quality Management Plan, under which additional staff would be
required for Air Quality Management, but no additional staff would be hired to address
sustainable energy or climate change issues. These would be addressed under the
status quo, through a coordinating committee such as the Sustainable Energy
Tshwane (SET) Committee.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 44
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Figure 21 Proposed Organisational Structure of the Tshwane Sustainable Energy and Air Quality Agency
Municipal
TSHWANE
Manager
STRATEGIC TSHWANE
CENTRE SUSTAINABLE ENERGY/
OMM CEO CLIMATE CHANGE/
(Air AIR QUALITY
Quality AGENCY
Officer)
Secretarial/
CFO COO Support Staff
BTO COO CIO SCS CCO
STRATEGIC CENTRE
Air Quality Public Senior Technician Senior Scientist
OMM: Office of the Municipal Manager
Liaison Officer
BTO: Budget and Treasury Office
COO: Chief Operating Officer
CIO: Chief Information Officer
SCS: Strategic Corporate Services Technician Atmospheric AP Practitioner
CCO: Chief Customer Care Officer Scientist
SUSTAINABLE ENERGY/CLIMATE
CHANGE/AIR QUALITY AGENCY
Technician Atmospheric AP Practitioner
Scientist
CEO: Chief Executive Officer
CFO: Chief Financial Officer
COO: Chief Operating Officer
AP: Air Pollution
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 45
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
Figure 22 Proposed Organisational Structure of the Tshwane Sustainable Energy and Air Quality Core Group
Municipal
TSHWANE
Manager
STRATEGIC TSHWANE
CENTRE SUSTAINABLE ENERGY/
OMM CLIMATE CHANGE/
AIR QUALITY
CORE GROUP
SE/CC/AQ Programme
BTO COO CIO SCS CCO Secretarial/
Director and
Support Staff
Air Quality Officer
STRATEGIC CENTRE
Air Quality Public Senior Technician Senior Scientist
OMM: Office of the Municipal Manager
Liaison Officer
BTO: Budget and Treasury Office
COO: Chief Operating Officer
CIO: Chief Information Officer
SCS: Strategic Corporate Services Technician Atmospheric AP Practitioner
CCO: Chief Customer Care Officer Scientist
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 46
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
The proposed SE/CC/AQM function would require the following key staff under the
three proposed models. Profiles are indicative only.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 47
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
o Would also be responsible for certain action plans in the industrial and
commercial sectors
o Must have solid professional standing
Have sufficient authority to influence the fleet management of
CTMM
Participate in associations such as the Automobile
Manufacturers association/body in order to stay abreast of
technology developments
Sustainable Energy Specialist Household/RE/EE/DSM
o Technical degree and 5 years experience involving preferable
o Responsible for implementing selected action plans, LEAP modelling,
updating the energy balance
o Must have an understanding of:
Household, industrial and commercial energy use in the
Tshwane context
electricity, stationary liquid fuels, coal, gas and RE markets
o Must have solid professional standing:
Ability to deal with donors and funding agencies
Participation in professional associations, conferences, etc.
1 Climate Change Specialist
o Technical degree and 5 years experience involving preferable
o responsible for implementing selected action plans
o thorough understanding of climate change and the CDM
o Must have solid professional standing
Ability to deal with donors and funding agencies
Participation in professional associations, conferences, etc.
Air Quality staff as described in the Air Quality Management Plan
It should be noted that the Programme Director would have to carry the title of
Air Quality Officer explicitly in order for CTMM to meet the requirements of the
Air Quality Act. This raises the likelihood of the SE/CC functions becoming
subordinate to Air Quality Management, with a resultant potential impact on visibility of
the activities and access to funding.
In the context of the proposed SE/CC/AQM unit, diffuse linkages with the following
categories of groups/institutions would likely contribute to the units sustainability:
CBOs/NGOs
Print and electronic media
International technical associations
Research organisations
Departments within CTMM
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 50
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
6.1 CONCLUSIONS
CTMM is well placed to be a national and continental leader in the integrated
management of Sustainable Energy, Climate Change and Air Quality.
The industry/construction, household and transport sectors are significant
contributors to GHG emissions.
The proposed Energy Strategy is complex and its implementation will require strong
internal leadership
o In general, the management of Sustainable Energy, Climate Change
and Air Quality is complex and requires multidisciplinary technical
leadership
o The issues to be dealt with are global and cross-cutting, and still not
well-known or understood within municipal management
o Those involved in these three fields may interact with the same
resources within CTMM (e.g. the SET Committee), who are already
working together on these issues
o The field is constantly evolving on technical, financial, economic and
political levels.
Independence of the SE/CC/AQ management, with strong linkages to all line units
within CTMM will be essential as will high level implementation authority
There is strong support from DEAT, but little evidence as yet that DME and NDoT
have engaged with South African municipalities on development and rollout of their
energy strategies and associated climate change and air quality management
activities
Knowledge management will be critical
There are few cities which have developed and implemented energy strategies
worldwide, meaning that CTMM is also well placed to become a continental and
world leader in managing sustainable energy, climate change and air quality.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 51
Africon Engineering International and Menyetla Projects
Development of a Tshwane Local Authority Energy Strategy
6.2 RECOMMENDATIONS
Sustainable Energy, Climate Change and Air Quality should be managed under the
same organisational structure in order to derive benefits from the synergies
between the three fields.
The following three sectors should be targeted for priority projects, given their
current contribution to GHG emissions:
o Industry/construction
o Households
o Transport
CTMM should use the 2010 Soccer World Cup tournament as a macro target/driver
for achieving desired objectives under the Strategy.
Implementation process, timeframe and approximate budget are to be the subject
of further study, once the Governance Model has been selected and the action
plans have been agreed in principle.
A high level coordination committee, consisting of senior representatives of DEAT,
DME and NDoT and CTMM, should be established to oversee rollout of the
Strategy. Should the Agency model be adopted, Board positions could be
assigned to critical national and provincial government departments.
o The transport sector, both within Tshwane and at national level, should
be engaged in the rollout of the Strategy with immediate effect.
CTMM should clearly identify the niche under which SE/CC/AQ will be managed,
and engage all levels of municipal management in the establishment of the unit to
manage these functions. Innovation and Smart Energy should be the
cornerstones of the niche.
The Agency structure is the preferred Governance Model at this stage of analysis.
However, should it be pursued, an assessment in terms of Section 78 of the
Municipal Systems Act must be carried out. This would assess:
o Whether the service to be delivered would be optimally delivered
through an external or an internal service delivery mechanism
o The optimal internal mechanism to deliver the service (department,
business unit or other mechanism)
o The optimal external mechanism to deliver the service
If the Agency option is adopted, the Board of Directors should include members
from DEAT, DME and NDoT.
CTMM should consider outsourcing the process of establishing the SE/CC/AQM
unit.
CTMM should consider significant investment in either developing or procuring a
Knowledge Management system.
The Agency or Core Group should be branded. The three focus areas of
sustainable energy, climate change and air quality management are distinct, yet
linked and in many respects overlapping. The unit should have a name, a logo and
a slogan or motto, preferably building on the phrase Smart Energy and clearly
implying innovation in the nations capital.
The implementation of the Strategy could set an example as a global case study to
be presented at the Commission for Sustainable Development in New York in 2007.
CTMM should engage the private sector in partnerships to roll out the Strategy.
Sustainable Energy and Climate Change Strategy Final Report May 2006 Page 52